List of Pipelines & associated contracts Projects


COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

TL-1/TL-6 - VICTORIA/PEDIRKA/LITTLE SANDY/ROSE/GUDRUN/AVON/HOOVER
Pipleine project at Between Double Island and Victoria oil production platforms north of, Onslow, WA 6710 in the Oil & Gas (Pipelines & associated contracts). Installation and stabilisation of approximately 7 km of 8inch and 4 inch pipelines between the Double Island and Victoris oil production platforms, adding to the subsea network feeding oil to the hub at Varanus Island. The joint venture's lay barge Challenge will be utilised. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

ELANG
Oil & Gas (Pipelines & associated contracts) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Various Council Area for New development. The 1,380 km gas pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. Installation will follow the main pipelaying activity. Gas measuring equipment to also be installed at Yarraloola, Newman, Mt Keith, Leinster and Kalgoorlie. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The West Wimmera Council Area of Pipe - Supply type. Contract 1 for the supply of 22km of pipe of approximately 375 or 450mm diameter. Various materials for the pipeline will be considered, appropriate to achieving a 20 year design life. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

YALLAH TO TALLAWARRA POWER STATION PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From proposed Tallawarra Power Station to Eastern Gas pipeline at, Yallah, NSW 2530 for New. The proposed route of the pipeline is from the tee off point on Duke Energy's Eastern Gas Pipeline at Yallah, 4 km north of Albion Park and 2 km south of Dapto, travelling in an easterly direction acrosss farmland, passing beneath the South Coast Railway line and Duck Creek (immediatley west of Southern Freeway) and continue east passing beneath the Southern Freeway and the Princess Highway where it will continue east across farm land and end at the proposed TXU Tallawarra Power Station. Click for more details...

ATP-632 - BERWYNDALE SOUTH - WINDIBRI PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gasfield, Surat Basin to existing Roma/Brisbane pipeline via, Miles, QLD 4415 for New. A 14 km lateral from field to existing Roma/Brisbane pipeline. The route for the pipeline was cleared in August 2005. Click for more details...

WA-286P - CLIFF HEAD - OFFSHORE PIPELINES
Private ownership Oil & Gas (Pipelines & associated contracts) project In The City Of Greater Geraldton Council Area for New development. A pipeline with a nominal internal diameter of 300 mm to carry produced hydrocarbons and water to shore for processing and a return pipeline with a nominal internal diameter of 300mm to carry produced water back to the platform for reinjection. Two directionally drilled pipeline shore crossings under beach and foredune. An electrical umbilical line and small umbilical lines to supply corrosion and emulsion inhibitors to the production wells and hydraulic fluid (water) by which to remotely operate the platform equipment. Click for more details...

DONGARA GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Mondara to, Dongara, WA 6525 for New. A pipeline to transport natural gas from the Dampier to Bunbury Natural Gas Pipeline in the vicinity of the Mondara metering Station to Cockburn Cement's Quicklime Plant (Dongara Lime Sand Operations). The 114.3 mm pipeline will be approx 18 km long and will be constructed within existing easements, freehold lands, mining tenements, dedicated road reserves and a railway reserve. Disturbance of the land during construction will involve digging a trench, laying the pipeline and backfilling. The pipeline will be buried to a minimum cover of 750 mm and the area will be rehabilitated. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - GENERAL PLANT & EQUIPMENT
General Plant & Equipment project at On, Barrow Island, WA 6712 in the Oil & Gas (Pipelines & associated contracts). For the provision of general plant & equipment. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for Addition development. The Western Australian Department of Resources Development is participating, along with the Office of Energy, the Department of Land Administration and State Treasury, in the Gas Pipeline Sale Steering Committee (GPSSC). The GPSSC is planning and managing the expansion of the Dampier to Bunbury Natural Gas Pipeline (DBNGP) land corridor, and establishing associated strategic gas laterals. As part of the work already completed for the project, specialist consultants have been engaged to conduct feasibility studies and provide advice on the most appropriate route for the proposed widened DBNGP land corridor. Consideration is now being given to associated strategic gas laterals, and the GPSSC now seeks suitable qualified consultants for flora, fauna & vegetation work. The objectives of the studies are to provide advice on the selection of a suitable land corridor for a gas lateral from the DBNGP to Oakajee and complement work already completed for the expansion of the DBNGP land corridor between Karratha and Bullsbrook. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

TASMANIAN NATURAL GAS PROJECT - SOUTHERN EXTENSION
Rosevale to Bridgewater, Hobart, TAS 7000 Has Tasmanian Natural Gas Project - Southern Extension currently at Construction stage. 200mm diameter pipeline whiCh stretches 168 km from Rosevale (west of Launceston) to Bridgewater). Click for more details...

MEREENIE OIL/GAS OPERATIONS
Oil & Gas (Pipelines & associated contracts) project at North Flank to Eastern Satellite Station via, Alice Springs, NT 0872 of Oil Pipeline type of New development. An 8 km oil pipeline. Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

ANGEL GAS PROJECT - RESOURCE
Resource - Gas & Oil project at 130 Km North of Dampier, ., WA 6999 In The Council Area Of Offshore of Private. The project will comprise of the drilling of four wells in 2007, installing a processing platform and exporting the gas and condesate via a new 49 Km pipeline and the existing trunkline to the onshore gas plant near Karratha. Processing platform facilities include accommodation for up to 40 persons; helideck; emergency flare and vent; Produced water treatment and disposal with allowance for potential future volumes; Gas/condensate cooling via air cooled heat exchangers; Gas/condensate seperation and condensate/water seperation; gas dehydration; Gas/condensate metering; Power generation gas turbines (7MW) and 4 installed risers and two additional risers as provision for tie in of future fields. A floating production, storage and offloading vessel. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET - CONSTRUCTION CONTRACT
Construction Contract For Plant New project In The Whyalla Council Area. Construction contract will include benefication facilities, a slurry pipeline, conversion of the pellet plant, construction of a desulphuriation plant and the upgrade of storage and handling facilities. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Oil & Gas (Pipelines & associated contracts). Containment walls, processing plant, roads & pipes. Click for more details...

PLUTO LNG PLANT PROJECT - PRE-INSULATED PIPEWORK
A project in the WA Within City Of Karratha. Pre-Insulated Pipework Click for more details...

GUNNEDAH BASIN GAS PIPELINE PROJECT
Narrabi to Wilga Park Power Station, ., NSW 2999 Has Gunnedah Basin Gas Pipeline Project currently at Construction stage. A high pressure gas transmission pipeline to be constructed from the Narrabi to Wilga Power Station. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY LAYDOWN AREAS
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Temporary Laydown Areas currently at Construction stage. For the provision of temporary laydown areas for the 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - EARTHWORKS
Earthworks project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 in the Oil & Gas (Pipelines & associated contracts). For the provision of earthworks for the pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - BACKFILLING & COMPACTION CONTRACT FOR PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 for New. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Oil & Gas (Pipelines & associated contracts) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

PEL 111 SNATCHER GAS FIELD FLOWLINE PROJECT
Gas Pipeline project at Northwest of MOOMBA via, Innamincka, SA 5731 in the Oil & Gas (Pipelines & associated contracts). Construction of a 4km flowline to connect the Snatcher Oil Field (PEL 111) to the upgraded Charo to Tirrawarra pipeline. Click for more details...

WESTERN COOPER BASIN JOINT VENTURE OIL FLOWLINE PROJECT
Northwest of MOOMBA via, Innamincka, SA 5731 Has Western Cooper Basin Joint Venture Oil Flowline Project currently at Construction stage. A project to link the Growler gas field to Moomba by construction of 2 flowlines. The Growler oil field (PRL 15, PEL 104) to link to the Lycium oil field (PEL 92) by a 70km long, 6 inch diameter liquids flowline with an initial capacity of 8000 barrels of oil a day (bbl/d). A 74km long, 8 inch diameter trunkline with an initial capacity of 15,000 bbl/d then to be constructed via PELs 106B & 107 from Lycium east to Moomba. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Pipelines & associated contracts). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 20 TJ/d. Installation of additional compression at the existing Yarraloola & Paraburdoo compressor stations. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 24 TJ/d. Installation of additional compression at Turee Creek & at the inlet to the Newman lateral. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

BUNDABERG GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for New development. Construction of a 24.7km gas pipeline from the existing Wide Bay pipeline west of Bundaberg (Kensington Gate Station & extension through to the Port of Bundaberg.) Associated works. Click for more details...

NORTHERN GAS PIPELINE EARLY WORKS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Design Consultancy - Pipeline - Gas - Early Works type. Design consultancy for early works for the Northern Gas Pipeline at the Warrego Compressor Station & Mica Creek. To include fencing, bulk earthworks & hardstand area. Provision of underground services. Underground drainage, storm water drainage & run-off control. Site access from adjacent public roads. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL TEST PITS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Geotechnical Test Pits - For Gas Pipeline type. Construction of geotechnical test pits for the Northern Gas Pipeline. To include backfilling test pits with excavated material. Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...