State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pipelines & associated contracts Projects


STANWELL MAGNESIUM PROJECT
A project in the QLD Within Rockhampton Regional. A 22.2 km long pipeline to supply up to 5.4 petajoules of coal seam gas. Click for more details...

CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Oil & Gas (Pipelines & associated contracts). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

HARRIET JV - LINDA
Oil & Gas (Pipelines & associated contracts) project In The City Of Karratha Council Area of Platform type. The development will include a multi-slot platform to allow development of the Linda Gas/condensate field via two or three wells. The platform is positioned to allow development of the Rose and Lee Gas/condensate fields and other future discoveries in the area. The platform is to be connected to the Campbell pipeline. Processing to be at Varanus Island. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

LATROBE VALLEY COAL GASIFICATION & GAS TO LIQUIDS PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. The Victorian Government awarded Australian Power and Energy Ltd an exploration licence to undertake research, development and feasibility studies for one or more new brown coal-based projects. The company proposes to use a number of known technologies to produce low sulphur liquid fuels and to generate 500MW of electricity. Undergrounding (Geosequestration) of carbon dioxide produced in the process is proposed. In stage one, 52000 barrels per day of high quality low sulphur fuels, mainly diesel, as well as the electricity will be produced. Click for more details...

TELFER PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

LNG TRAIN 4 EXPANSION - TRUNKLINE SYSTEM EXPANSION (TSEP)
Rock Dumping project at Burrup Peninsula, Dampier, WA 6713 in the Oil & Gas (Pipelines & associated contracts). Involves the placement of 450,000 cubic metres approx of locally quarried rock on the trunkline to stabilise it on the seabed. The rock will be placed over the trunkline for the first 30 km from shore, as well as around the concrete gravity anchors in the deepwater section. Australian-based crews will be used on board the specialist vessels, SSDV Jan Steen and FFPV Rocky Giant as well as onshore to load rock on board the vessels. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Dampier To Bunbury Natural Gas Pipeline is currently at the Early Planning stage, valued at about $ 20000000 it is The study is focusing on the marketing potential in the south west area of Western Australia for a possible extension to the Dampier to Bunbury natural gas pipeline. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

TELFER PROJECT
Gas Pipeline project at Port Hedland to Telfer gold-copper mine,, Telfer, WA 6762 in the Oil & Gas (Pipelines & associated contracts). A 450 km g 10 inch (250mm) class 600 gas pipeline, utilising a single compressor station with one duty and one stand-by compressor. The pipeline will provide gas to the power station at Telfer. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Oil & Gas (Pipelines & associated contracts) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

VIC P-44 - CASINO - PIPELINE/S
Oil & Gas (Pipelines & associated contracts) project In The Cardinia Council Area of Private ownership. Installation of a pipeline from the field to underneath the coastline near Port Campbell, continuing to TXU's Iona gas processing plant. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - GENERAL PLANT & EQUIPMENT
General Plant & Equipment project at On, Barrow Island, WA 6712 in the Oil & Gas (Pipelines & associated contracts). For the provision of general plant & equipment. Click for more details...

KWINANA ALUMINA REFINERY
Oil & Gas (Pipelines & associated contracts) New project at Lot 100 Anketell Rd, Hope Valley, WA 6165. This type is Gas Pipeline For Carbonation Facility Upgrade with Private ownership. A high pressure gas pipeline for conveying gaseous CO2 from the CSBP to the carbonation facility. 25 per cent above ground and 75 per cent below ground, along existing easements for majority of route. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ANGEL GAS PROJECT - RESOURCE
Resource - Gas & Oil project at 130 Km North of Dampier, ., WA 6999 In The Council Area Of Offshore of Private. The project will comprise of the drilling of four wells in 2007, installing a processing platform and exporting the gas and condesate via a new 49 Km pipeline and the existing trunkline to the onshore gas plant near Karratha. Processing platform facilities include accommodation for up to 40 persons; helideck; emergency flare and vent; Produced water treatment and disposal with allowance for potential future volumes; Gas/condensate cooling via air cooled heat exchangers; Gas/condensate seperation and condensate/water seperation; gas dehydration; Gas/condensate metering; Power generation gas turbines (7MW) and 4 installed risers and two additional risers as provision for tie in of future fields. A floating production, storage and offloading vessel. Click for more details...

NIFTY COPPER MINE GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area for New development. A 40 km x 150 mm diameter gas pipeline to be constructed from the existing Telfer pipeline to the Nifty Copper Mine. Click for more details...

COMET RIDGE TO WALLUMBILLA PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at From Roma to Wallumbilla, ., QLD 4999. To construct and operate a 130 km underground high pressure natural (DN350) gas pipeline. Facilities include a custody transfer meter station and an inlet mass flow meter station. Will source coal seam gas from the Fairview coal seam gas fields. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Oil & Gas (Pipelines & associated contracts) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

PLUTO LNG PLANT PROJECT - PRE-INSULATED PIPEWORK
A project in the WA Within City Of Karratha. Pre-Insulated Pipework Click for more details...

XSTRATA GAS FIRED POWER STATION
Oil & Gas (Pipelines & associated contracts) New project at Cnr X41 Access Rd & Link Rd, Mount Isa, QLD 4825. This type is Gas Fired Power Station with Private ownership. A 30 MW gas fired modular power station with an associated pipeline from the Copper Smelter area. Click for more details...

ICHTHYS LNG PROJECT - CENTRAL PROCESSING FACILITY
Processing Facility project at Off Maret Island Via, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of Private. The offshore CPF facilities include process, power generation, utilities & accommodation facilities. Work involves fabrication, installation, mechanical completion, pre-commissioning & commissioning of equipment, piping, electrical, instrumentation & controls, safety system & accommodation facilities. The CPF topside is modularised on a Semi submersible substructure. Semi-sub includes pontoons, columns & deck box with a plan dimension of approximately 96mx96m to support topsides. Topside to comprise modules up to a maximum of 5000 te & packages if appropriate. The living quarters module can be a part of the semi-sub deck box or separate module. Alternative concepts for integrated topsides will be considered. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TOPSOIL REMOVAL
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Topsoil Removal with Private ownership. For the provision of topsoil removal services. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - EARTHWORKS
Earthworks project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 in the Oil & Gas (Pipelines & associated contracts). For the provision of earthworks for the pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

QUEENSLAND GAS PIPELINE EXPANSION - LOOPING
Looping New project In The Banana Shire Council Area. For the construction of 113km of looking for the Queensland Gas Pipeline (QGP) expansion. The capacity of the QGP will be increased to 49 PJ/a. The looping is from Moura to Bell Creek. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE
Oil & Gas (Pipelines & associated contracts) project at off Maret Islands & Blaydin Point via, Darwin, NT 0800 for New. For the construction of the Gas Export Pipeline. Scope of work to include installation of 889km of subsea pipeline, in water depths of up to 275m connecting the offshore central processing facility to the onshore processing facility in Darwin. Click for more details...

BEVERLEY NORTH EXTENSION URANIUM PROJECT
Oil & Gas (Pipelines & associated contracts) project at Northeast of, Lyndhurst, SA 5731 of Resource - Uranium type of New development. It is proposed to mine the Beverley North deposits by In-Situ Recovery (ISR) methods, utilising the existing infrastructure and workforce for processing the product, and thereby extend the life of the Beverley operations. The proposed mining methods involve pumping the mining solution to the injection wells in the wellfields. Pumping the uranium rich solution from the extraction well pumps to the wellhouse, and through a field filter bank to remove any sand, and then to a storage tank. Pumping the uranium rich solution from the storage tank to ion exchange columns at the Beverley North satellite plant. Pumping loaded resin to surge tanks which are used to supply loaded resin for hte transport to the Beverley Plant. Extracting the uranium from the loaded resin in the Beverley processing plant, and returning barren resin to Beverley North. Click for more details...

PEL 111 SNATCHER GAS FIELD FLOWLINE PROJECT
Gas Pipeline project at Northwest of MOOMBA via, Innamincka, SA 5731 in the Oil & Gas (Pipelines & associated contracts). Construction of a 4km flowline to connect the Snatcher Oil Field (PEL 111) to the upgraded Charo to Tirrawarra pipeline. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - PIPELINE DUPLICATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Brisbane City Council Area for New development. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Duplication of a 6km section of the existing Roma Brisbane pipeline between Murarrie & Carina. Click for more details...

CHARO TO TIRRAWARRA GAS PIPELINE UPGRADE
Oil & Gas (Pipelines & associated contracts) New project at Northwest of MOOMBA via, Innamincka, SA 5731. This type is Gas Pipeline - Upgrade with Private ownership. A project by the South Australian Cooper Basin (SACB) parties to upgrade the pipeline from the Charo oil field (PPL 177) to the Tirrawarra oil field from 4 to 6 inches diameter. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 24 TJ/d. Installation of additional compression at Turee Creek & at the inlet to the Newman lateral. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Pipelines & associated contracts) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

TANUNDA DISTRIBUTION NETWORK GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at ., Tanunda, SA 5352 for New. Construction of a distribution network to deliver natural gas to Tanunda which includes the construction of a 2 km high pressure gas lateral off the Moomba to Adelaide Pipeline. Click for more details...

AMADEUS GAS PIPELINE UPGRADE
Darwin to, Alice Springs, NT 0870 Has Amadeus Gas Pipeline Upgrade currently at Construction stage. For the provision of below ground pipework coating at 25 stations. To include assessment of the coating condition as well asrestoring the stations to their original condition. Click for more details...

NORTHERN GAS PIPELINE VEHICLE HIRE
Vehicle Hire - For Gas Pipeline project at Warrego (NT) - Mount Isa (QLD), ., NT 8999 In The Council Area Of Various of State. Provision of 4WD diesel vehicles for field work, site investigations & stakeholder engagement for the Northern Gas Pipeline. Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Oil & Gas (Pipelines & associated contracts) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect