State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pipelines & associated contracts Projects


CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Oil & Gas (Pipelines & associated contracts). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Oil & Gas (Pipelines & associated contracts) project at Pilbara Region to Goldfields, WA 6999 for New. Natural gas to be piped approximately 1,400 km underground from the off-shore North-West Shelf gasfields to Kalgoorlie and surrounding centres. Construction of the pipeline will be in three stages. In August 1995 one crew will begin to lay 310 km of pipe at Yaraloola, south of Dampier in the Pilbara, then pass south-east of Paraburdoo through to a point south-west of Newman by January 1996. This section of pipe will be 400 mm diameter. A second crew will commence in September 1995 on a 670 km section to run from near Newman to Mt Keith via Wiluna. Once work on the Yaraloola to Newman section is complete, the crew will start working north from Kalgoorlie in January 1996 and the two teams will meet at Mt Keith, 400 km away, in June 1996. The section from Newman to Kalgoorlie will have a 350 mm diameter. The first gas should be supplied to the Eastern Goldfields by August 1996. The pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. With additional compression, the future load can be expanded up to 160 tjs per day. Main pipelaying will be followed by installation of compressor stations at Yaraloola, Ilgarari and possibly Paraburdoo and Leinster. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Dampier To Bunbury Natural Gas Pipeline is currently at the Early Planning stage, valued at about $ 20000000 it is The study is focusing on the marketing potential in the south west area of Western Australia for a possible extension to the Dampier to Bunbury natural gas pipeline. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

BLACKTIP GAS PROJECT - SUBSEA PIPELINE
Currently at the Construction stage In Offshore is a project estimated to be $ 100000000. This project 108 km offshore pipeline is to be constructed from the gas field to the onshore processing facility. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The West Wimmera Council Area of Pipe - Supply type. Contract 1 for the supply of 22km of pipe of approximately 375 or 450mm diameter. Various materials for the pipeline will be considered, appropriate to achieving a 20 year design life. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Pipelines & associated contracts) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Pipelines & associated contracts). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

TASMANIAN NATURAL GAS PROJECT - SOUTHERN EXTENSION
Rosevale to Bridgewater, Hobart, TAS 7000 Has Tasmanian Natural Gas Project - Southern Extension currently at Construction stage. 200mm diameter pipeline whiCh stretches 168 km from Rosevale (west of Launceston) to Bridgewater). Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

ANGEL GAS PROJECT - RESOURCE
Resource - Gas & Oil project at 130 Km North of Dampier, ., WA 6999 In The Council Area Of Offshore of Private. The project will comprise of the drilling of four wells in 2007, installing a processing platform and exporting the gas and condesate via a new 49 Km pipeline and the existing trunkline to the onshore gas plant near Karratha. Processing platform facilities include accommodation for up to 40 persons; helideck; emergency flare and vent; Produced water treatment and disposal with allowance for potential future volumes; Gas/condensate cooling via air cooled heat exchangers; Gas/condensate seperation and condensate/water seperation; gas dehydration; Gas/condensate metering; Power generation gas turbines (7MW) and 4 installed risers and two additional risers as provision for tie in of future fields. A floating production, storage and offloading vessel. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

COMET RIDGE TO WALLUMBILLA PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at From Roma to Wallumbilla, ., QLD 4999. To construct and operate a 130 km underground high pressure natural (DN350) gas pipeline. Facilities include a custody transfer meter station and an inlet mass flow meter station. Will source coal seam gas from the Fairview coal seam gas fields. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Oil & Gas (Pipelines & associated contracts). Containment walls, processing plant, roads & pipes. Click for more details...

PLUTO LNG PLANT PROJECT - PRE-INSULATED PIPEWORK
A project in the WA Within City Of Karratha. Pre-Insulated Pipework Click for more details...

NARRABRI GAS FIRED POWER STATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Narrabri Council Area for New development. Development comprises the construction and operation of a coal seam methane gas fired power station with an initial capacity of 30 MW, progressing towards 500 MW depending on the availability of methane gas and demand. Other components of the project will be a transmission line, Gunnedah Gas Project and a pipeline. The first stage will be a power station that will comprise 10 x 3 MW reciprocating engines or similar and be connected to the Country Energy electricity grid. Part of the first stage will be a 172 MW power station comprising a GT13 open cycle gas turbine power station. The second stage of the project will be the escalation of the power station to 500 MW. The power station can be increased to 250 MW by adding a waste heat boiler and to 500 MW by adding a second 172 MW gas turbine unit. The construction of a 180 km 330 KV transmission line will undertaken between Narrabri and Tamworth if the power station increases beyond 172 MW. Gas will be sourced from the Gunnedah Gas Project (PEL 450) where 50-100 development wells will be developed. Gas will be collected through a surface gathering system and delivered via a buried steel pipeline to the power station. The pipeline component of the project will involve the construction of 720 km's of buried pipeline. The first part will be a 400 km pipeline from Goondawindi to Narrabri, a 200 Km pipeline from Narrabri through PEL 450 to the Central Ranges Pipeline near Coolah, a 120 Km pipeline from Coolah to a new power station near the existing Bayswater or Liddell power stations in the Hunter Valley. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TOPSOIL REMOVAL
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Topsoil Removal with Private ownership. For the provision of topsoil removal services. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - STORAGE FACILITIES & PIPELINE DELIVERY AREA
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Storage Facilities/Pipeline Delivery Area with Private ownership. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - WASTE MANAGEMENT - FOR TEMPORARY CAMPSITES
Bonaparte Gas Pipeline Project - Waste Management - For Temporary Campsites is currently at the Construction stage, valued at about $ 2000000 it is For the provision of waste management services for the temporary campsites. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Oil & Gas (Pipelines & associated contracts) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - PIPELINE DUPLICATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Brisbane City Council Area for New development. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Duplication of a 6km section of the existing Roma Brisbane pipeline between Murarrie & Carina. Click for more details...

WESTERN COOPER BASIN JOINT VENTURE OIL FLOWLINE PROJECT
Northwest of MOOMBA via, Innamincka, SA 5731 Has Western Cooper Basin Joint Venture Oil Flowline Project currently at Construction stage. A project to link the Growler gas field to Moomba by construction of 2 flowlines. The Growler oil field (PRL 15, PEL 104) to link to the Lycium oil field (PEL 92) by a 70km long, 6 inch diameter liquids flowline with an initial capacity of 8000 barrels of oil a day (bbl/d). A 74km long, 8 inch diameter trunkline with an initial capacity of 15,000 bbl/d then to be constructed via PELs 106B & 107 from Lycium east to Moomba. Click for more details...

CHARO TO TIRRAWARRA GAS PIPELINE UPGRADE
Oil & Gas (Pipelines & associated contracts) New project at Northwest of MOOMBA via, Innamincka, SA 5731. This type is Gas Pipeline - Upgrade with Private ownership. A project by the South Australian Cooper Basin (SACB) parties to upgrade the pipeline from the Charo oil field (PPL 177) to the Tirrawarra oil field from 4 to 6 inches diameter. Click for more details...

COOPER & EROMANGA BASINS CONSTRUCTION & MAINTENANCE CONTRACT
A project in the SA Within Various. A 5 year contract with 3 x 1 year optional extensions. To include project delivery, brownfields construction, flow line construction, shutdown, maintenance & industrial services. Click for more details...

COOPER & EROMANGA BASINS CONSTRUCTION & MAINTENANCE CONTRACT
Construction & Maintenance Contract project at via QUILPIE, ., QLD 4999 In The Council Area Of Various of Private. A 5 year contract with 3 x 1 year optional extensions. To include project delivery, brownfields construction, flow line construction, shutdown, maintenance & industrial services. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Pipelines & associated contracts). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 20 TJ/d. Installation of additional compression at the existing Yarraloola & Paraburdoo compressor stations. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 24 TJ/d. Installation of additional compression at Turee Creek & at the inlet to the Newman lateral. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Oil & Gas (Pipelines & associated contracts) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE (SWQP) EASTERN HAUL PROJECT - MOOMBA COMPRESSION FACILITIES
Oil & Gas (Pipelines & associated contracts) project at MOOMBA via, Innamincka, SA 5731 of Compression Facilities type of New development. Part of a project to develop bi-directional gas supply with eastern haul capability to allow gas to be shipped from the Cooper Basin region to customers in southeast Queensland. Installation of 3 compressors at a new station at Epic Energy's Moomba Station site. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

BUNDABERG GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for New development. Construction of a 24.7km gas pipeline from the existing Wide Bay pipeline west of Bundaberg (Kensington Gate Station & extension through to the Port of Bundaberg.) Associated works. Click for more details...

AMADEUS GAS PIPELINE UPGRADE
Darwin to, Alice Springs, NT 0870 Has Amadeus Gas Pipeline Upgrade currently at Construction stage. For the provision of below ground pipework coating at 25 stations. To include assessment of the coating condition as well asrestoring the stations to their original condition. Click for more details...

NORTHERN GAS PIPELINE VEHICLE HIRE
Vehicle Hire - For Gas Pipeline project at Warrego (NT) - Mount Isa (QLD), ., NT 8999 In The Council Area Of Various of State. Provision of 4WD diesel vehicles for field work, site investigations & stakeholder engagement for the Northern Gas Pipeline. Click for more details...

NORTHERN GAS PIPELINE PIPE LAYDOWN CIVIL WORKS
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Barkly Shire Council Area for New development. Construction of laydown to store the line pipe for the Northern Gas Pipeline in Tennant Creek. To include drainage work & earthworks. Supply, placement & compaction of quarry material. Installation of sand berms to place line pipe. Construction access roads & turnouts. Supply & installation of perimeter fencing. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Oil & Gas (Pipelines & associated contracts) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect