COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Townsville City Council Area of Gas Pipeline/Compressor/Gas Processing Facility - Construction type. Pipeline from Moranbah to the Townsville Power Station at Yabulu. The pipeline, which will be 250mm in diameter, will be built, owned and operated by Enertrade. The pipeline will initially be configured for 20PJ per annum but can be expanded through further gas compression to approximately 50PJ per annum. Initially the Townsville Power Station will consume between 11PJ to 14PJ per annum. Click for more details...

LATROBE VALLEY COAL GASIFICATION & GAS TO LIQUIDS PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. The Victorian Government awarded Australian Power and Energy Ltd an exploration licence to undertake research, development and feasibility studies for one or more new brown coal-based projects. The company proposes to use a number of known technologies to produce low sulphur liquid fuels and to generate 500MW of electricity. Undergrounding (Geosequestration) of carbon dioxide produced in the process is proposed. In stage one, 52000 barrels per day of high quality low sulphur fuels, mainly diesel, as well as the electricity will be produced. Click for more details...

TELFER PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Oil & Gas (Pipelines & associated contracts). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Oil & Gas (Pipelines & associated contracts) project at Pilbara Region to Goldfields, WA 6999 for New. Natural gas to be piped approximately 1,400 km underground from the off-shore North-West Shelf gasfields to Kalgoorlie and surrounding centres. Construction of the pipeline will be in three stages. In August 1995 one crew will begin to lay 310 km of pipe at Yaraloola, south of Dampier in the Pilbara, then pass south-east of Paraburdoo through to a point south-west of Newman by January 1996. This section of pipe will be 400 mm diameter. A second crew will commence in September 1995 on a 670 km section to run from near Newman to Mt Keith via Wiluna. Once work on the Yaraloola to Newman section is complete, the crew will start working north from Kalgoorlie in January 1996 and the two teams will meet at Mt Keith, 400 km away, in June 1996. The section from Newman to Kalgoorlie will have a 350 mm diameter. The first gas should be supplied to the Eastern Goldfields by August 1996. The pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. With additional compression, the future load can be expanded up to 160 tjs per day. Main pipelaying will be followed by installation of compressor stations at Yaraloola, Ilgarari and possibly Paraburdoo and Leinster. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

WA-286P - CLIFF HEAD - OFFSHORE PIPELINES
Private ownership Oil & Gas (Pipelines & associated contracts) project In The City Of Greater Geraldton Council Area for New development. A pipeline with a nominal internal diameter of 300 mm to carry produced hydrocarbons and water to shore for processing and a return pipeline with a nominal internal diameter of 300mm to carry produced water back to the platform for reinjection. Two directionally drilled pipeline shore crossings under beach and foredune. An electrical umbilical line and small umbilical lines to supply corrosion and emulsion inhibitors to the production wells and hydraulic fluid (water) by which to remotely operate the platform equipment. Click for more details...

BALLERA TO MOOMBA PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Unincorporated Council Area of Private ownership. FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

DONGARA GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Mondara to, Dongara, WA 6525 for New. A pipeline to transport natural gas from the Dampier to Bunbury Natural Gas Pipeline in the vicinity of the Mondara metering Station to Cockburn Cement's Quicklime Plant (Dongara Lime Sand Operations). The 114.3 mm pipeline will be approx 18 km long and will be constructed within existing easements, freehold lands, mining tenements, dedicated road reserves and a railway reserve. Disturbance of the land during construction will involve digging a trench, laying the pipeline and backfilling. The pipeline will be buried to a minimum cover of 750 mm and the area will be rehabilitated. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Oil & Gas (Pipelines & associated contracts) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

METHANEX AUSTRALIA PROJECT
Oil & Gas (Pipelines & associated contracts) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for Addition development. The Western Australian Department of Resources Development is participating, along with the Office of Energy, the Department of Land Administration and State Treasury, in the Gas Pipeline Sale Steering Committee (GPSSC). The GPSSC is planning and managing the expansion of the Dampier to Bunbury Natural Gas Pipeline (DBNGP) land corridor, and establishing associated strategic gas laterals. As part of the work already completed for the project, specialist consultants have been engaged to conduct feasibility studies and provide advice on the most appropriate route for the proposed widened DBNGP land corridor. Consideration is now being given to associated strategic gas laterals, and the GPSSC now seeks suitable qualified consultants for flora, fauna & vegetation work. The objectives of the studies are to provide advice on the selection of a suitable land corridor for a gas lateral from the DBNGP to Oakajee and complement work already completed for the expansion of the DBNGP land corridor between Karratha and Bullsbrook. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

TASMANIAN NATURAL GAS PROJECT - SOUTHERN EXTENSION
Rosevale to Bridgewater, Hobart, TAS 7000 Has Tasmanian Natural Gas Project - Southern Extension currently at Construction stage. 200mm diameter pipeline whiCh stretches 168 km from Rosevale (west of Launceston) to Bridgewater). Click for more details...

SUNRISE PROJECT - TROUBABOUR/LOXTON SHOALS
J/V - Private & Govt ownership Oil & Gas (Pipelines & associated contracts) project In The Offshore Council Area for New development. A proposal for piping gas 500 km to shore for sale in Darwin and elsewhere in Australia has been found to be not viable. Domestic consumers have been notified. The joint venture partners will now focus on securing ratification of the Timor Sea Treaty and the International Unitisation Agreement for sunrice, finalsing joint venture commercial agreements and securing customers for Sunrise. Success on these fronts will be required before the project can enter the basis of design phase. Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

NIFTY COPPER MINE GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area for New development. A 40 km x 150 mm diameter gas pipeline to be constructed from the existing Telfer pipeline to the Nifty Copper Mine. Click for more details...

WOODSIDE OIL & GAS OPERATIONS - CLASSIFICATION/ASSET SERVICES
Oil & Gas (Pipelines & associated contracts) New project at Various Sites Indian Ocean, ., WA 6999. This type is Classification/Asset Services with Private ownership. Work includes providing classification and asset services to FFPSO assets including production systems, equipment and safety systems. ABS will also provide a consulting service on behalf of Woodside dealing with government authorities. These services involve engineering design review and survey services. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Oil & Gas (Pipelines & associated contracts). Containment walls, processing plant, roads & pipes. Click for more details...

GUNNEDAH BASIN GAS PIPELINE PROJECT
Narrabi to Wilga Park Power Station, ., NSW 2999 Has Gunnedah Basin Gas Pipeline Project currently at Construction stage. A high pressure gas transmission pipeline to be constructed from the Narrabi to Wilga Power Station. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - STORAGE FACILITIES & PIPELINE DELIVERY AREA
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Storage Facilities/Pipeline Delivery Area with Private ownership. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - EARTHWORKS
Earthworks project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 in the Oil & Gas (Pipelines & associated contracts). For the provision of earthworks for the pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - WASTE MANAGEMENT - FOR TEMPORARY CAMPSITES
Bonaparte Gas Pipeline Project - Waste Management - For Temporary Campsites is currently at the Construction stage, valued at about $ 2000000 it is For the provision of waste management services for the temporary campsites. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Oil & Gas (Pipelines & associated contracts) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

QUEENSLAND GAS PIPELINE EXPANSION - LOOPING
Looping New project In The Banana Shire Council Area. For the construction of 113km of looking for the Queensland Gas Pipeline (QGP) expansion. The capacity of the QGP will be increased to 49 PJ/a. The looping is from Moura to Bell Creek. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE
Oil & Gas (Pipelines & associated contracts) project at off Maret Islands & Blaydin Point via, Darwin, NT 0800 for New. For the construction of the Gas Export Pipeline. Scope of work to include installation of 889km of subsea pipeline, in water depths of up to 275m connecting the offshore central processing facility to the onshore processing facility in Darwin. Click for more details...

BEVERLEY NORTH EXTENSION URANIUM PROJECT
Oil & Gas (Pipelines & associated contracts) project at Northeast of, Lyndhurst, SA 5731 of Resource - Uranium type of New development. It is proposed to mine the Beverley North deposits by In-Situ Recovery (ISR) methods, utilising the existing infrastructure and workforce for processing the product, and thereby extend the life of the Beverley operations. The proposed mining methods involve pumping the mining solution to the injection wells in the wellfields. Pumping the uranium rich solution from the extraction well pumps to the wellhouse, and through a field filter bank to remove any sand, and then to a storage tank. Pumping the uranium rich solution from the storage tank to ion exchange columns at the Beverley North satellite plant. Pumping loaded resin to surge tanks which are used to supply loaded resin for hte transport to the Beverley Plant. Extracting the uranium from the loaded resin in the Beverley processing plant, and returning barren resin to Beverley North. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM - CO2 INJECTION PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Ashburton Council Area of Private ownership. Includes the installation of a 300mm NB x 19.05mm thickness high pressure API Gr.X65 CS pipeline & the supply & installation of a power cable & fibre optic cable from the LNG facility to three injection wells located on a 7.23km pipe route from Barrow Island for the purpose of CO2 sequestration. Work includes transport of all materials on Barrow Island, supply & erect pipe supports on concrete foundations poured by others, install pipeline on pipe supports, surface laying & protection of power & fibre optic cables from LNG facility to well locations, commissioning of the pipeline, power supply & fibre optic cable in conjunction with the client & CO2 injection & well contractors. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

WESTERN COOPER BASIN JOINT VENTURE OIL FLOWLINE PROJECT
Northwest of MOOMBA via, Innamincka, SA 5731 Has Western Cooper Basin Joint Venture Oil Flowline Project currently at Construction stage. A project to link the Growler gas field to Moomba by construction of 2 flowlines. The Growler oil field (PRL 15, PEL 104) to link to the Lycium oil field (PEL 92) by a 70km long, 6 inch diameter liquids flowline with an initial capacity of 8000 barrels of oil a day (bbl/d). A 74km long, 8 inch diameter trunkline with an initial capacity of 15,000 bbl/d then to be constructed via PELs 106B & 107 from Lycium east to Moomba. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - SECURITY
Oil & Gas (Pipelines & associated contracts) project at On & Off, Barrow Island, WA 6712 of Security type of New development. For the provision of project support services - security. Click for more details...

WA-26-L & WA-191-P JOINT VENTURE FLETCHER-FINUCANE OIL DEVELOPMENT - SURF WELL CONNECTION CONTRACT
Subsea/Umbilicals/Risers/Flowlines project at North West Shelf 150km north of DAMPIER, ., WA 6999 In The Council Area Of Offshore of Private. A contract including 55km of flexible flowlines & more than 60km of umbilicals. Associated structures to connect wells to the existing Exeter-Mutineer facilities. Pre-commissioning activities & associated services. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - THE NARROWS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area of Pipeline - Under Sea Bed type. Construction of a pipeline under the sea bed of The Narrows to provide a marine crossing for the supply of coal seam gas (CSG) to the Santos GLNG liquefied natural gas (LNG) plant on Curtis Island. The pipeline to traverse a 4.3km tunnel. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE (SWQP) EASTERN HAUL PROJECT - MOOMBA COMPRESSION FACILITIES
Oil & Gas (Pipelines & associated contracts) project at MOOMBA via, Innamincka, SA 5731 of Compression Facilities type of New development. Part of a project to develop bi-directional gas supply with eastern haul capability to allow gas to be shipped from the Cooper Basin region to customers in southeast Queensland. Installation of 3 compressors at a new station at Epic Energy's Moomba Station site. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Pipelines & associated contracts) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL INVESTIGATION
Oil & Gas (Pipelines & associated contracts) project for New development. Provision of consultancy services for geotechnical investigation for the 623km Northern Gas Pipeline. To include recommendation for footing design & excavation characteristics. Assessment of pavement design parameters & soil strength. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL TEST PITS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Geotechnical Test Pits - For Gas Pipeline type. Construction of geotechnical test pits for the Northern Gas Pipeline. To include backfilling test pits with excavated material. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect