State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pipelines & associated contracts Projects in SA


PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

BALLERA TO MOOMBA PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Unincorporated Council Area of Private ownership. FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET - CONSTRUCTION CONTRACT
Construction Contract For Plant New project In The Whyalla Council Area. Construction contract will include benefication facilities, a slurry pipeline, conversion of the pellet plant, construction of a desulphuriation plant and the upgrade of storage and handling facilities. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

BEVERLEY NORTH EXTENSION URANIUM PROJECT
Oil & Gas (Pipelines & associated contracts) project at Northeast of, Lyndhurst, SA 5731 of Resource - Uranium type of New development. It is proposed to mine the Beverley North deposits by In-Situ Recovery (ISR) methods, utilising the existing infrastructure and workforce for processing the product, and thereby extend the life of the Beverley operations. The proposed mining methods involve pumping the mining solution to the injection wells in the wellfields. Pumping the uranium rich solution from the extraction well pumps to the wellhouse, and through a field filter bank to remove any sand, and then to a storage tank. Pumping the uranium rich solution from the storage tank to ion exchange columns at the Beverley North satellite plant. Pumping loaded resin to surge tanks which are used to supply loaded resin for hte transport to the Beverley Plant. Extracting the uranium from the loaded resin in the Beverley processing plant, and returning barren resin to Beverley North. Click for more details...

PEL 111 SNATCHER GAS FIELD FLOWLINE PROJECT
Gas Pipeline project at Northwest of MOOMBA via, Innamincka, SA 5731 in the Oil & Gas (Pipelines & associated contracts). Construction of a 4km flowline to connect the Snatcher Oil Field (PEL 111) to the upgraded Charo to Tirrawarra pipeline. Click for more details...

WESTERN COOPER BASIN JOINT VENTURE OIL FLOWLINE PROJECT
Northwest of MOOMBA via, Innamincka, SA 5731 Has Western Cooper Basin Joint Venture Oil Flowline Project currently at Construction stage. A project to link the Growler gas field to Moomba by construction of 2 flowlines. The Growler oil field (PRL 15, PEL 104) to link to the Lycium oil field (PEL 92) by a 70km long, 6 inch diameter liquids flowline with an initial capacity of 8000 barrels of oil a day (bbl/d). A 74km long, 8 inch diameter trunkline with an initial capacity of 15,000 bbl/d then to be constructed via PELs 106B & 107 from Lycium east to Moomba. Click for more details...

CHARO TO TIRRAWARRA GAS PIPELINE UPGRADE
Oil & Gas (Pipelines & associated contracts) New project at Northwest of MOOMBA via, Innamincka, SA 5731. This type is Gas Pipeline - Upgrade with Private ownership. A project by the South Australian Cooper Basin (SACB) parties to upgrade the pipeline from the Charo oil field (PPL 177) to the Tirrawarra oil field from 4 to 6 inches diameter. Click for more details...

COOPER & EROMANGA BASINS CONSTRUCTION & MAINTENANCE CONTRACT
A project in the SA Within Various. A 5 year contract with 3 x 1 year optional extensions. To include project delivery, brownfields construction, flow line construction, shutdown, maintenance & industrial services. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE (SWQP) EASTERN HAUL PROJECT - MOOMBA COMPRESSION FACILITIES
Oil & Gas (Pipelines & associated contracts) project at MOOMBA via, Innamincka, SA 5731 of Compression Facilities type of New development. Part of a project to develop bi-directional gas supply with eastern haul capability to allow gas to be shipped from the Cooper Basin region to customers in southeast Queensland. Installation of 3 compressors at a new station at Epic Energy's Moomba Station site. Click for more details...

TANUNDA DISTRIBUTION NETWORK GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at ., Tanunda, SA 5352 for New. Construction of a distribution network to deliver natural gas to Tanunda which includes the construction of a 2 km high pressure gas lateral off the Moomba to Adelaide Pipeline. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect