State

Categories

Sub Categories

Click Here to Find Current Projects

List of Piping Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

HISMELT EXPANSION PROJECT
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Piping) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

LAVERTON GOLD OPERATIONS - TREATMENT PLANT REFURBISHMENT/EXPANSION
Treatment Plant - Refurbishment/Expansion Renovations, Refurbishments etc. project In The Laverton Council Area. Expansion to 1.5 million tonnes. Additional test work will be undertaken to obtain further information to fully optimise the process flow sheet at the 1.5 Mtpa throughput rate. Infrastructure proposed to be added are a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. The recent acquisition of additional tenenaments in the Laverton area has made the expansion of the plant economically viable. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Piping) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

KOGAN CREEK POWER STATION PROJECT - BOILER HOUSE/STEAM PIPING
Mining - Primary And Secondary Processing (Piping) project In The Western Downs Regional Council Area of Piping Package type. Piping for the steam-water cycle and auxiliary systems of the power plant including supports, hangers etc. Work consists of delivery, erection, testing, commissioning and documentation. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Piping) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Primary And Secondary Processing (Piping) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LIDDELL POWER STATION - MILL PYRITES
Mining - Primary And Secondary Processing (Piping) project at Via, Liddell, NSW 2333 for New. The supply and installation of new hydraulic pipelines and support structures from the Hydraulic Cabinets to the Mill Pyrites Hopper Isolating valves and Pyrites Spray Water Valves on Unit 1 A and B side, Unit 2 A side only and Unit 3 A and B sides. Installation of the new pipework will take place prior to outages. Cut over to the new pipework will begin during planned outages in Sept/Nov 2005, Dec/Jan 2006 and March/April 2006. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - GAS PIPELINE
Mining - Primary And Secondary Processing (Piping) project at Goldfields Gas Transit pipeline to proposed Refinery near, Wiluna, WA 6646 for New. The gas pipeline is proposed to run from the proposed refinery to the main Goldfields Gas transit pipeline. Goldfields gas pipeline is 35 km from the minesite where the refinery is to be located nearby. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MECHANICAL INSTALLATION OF WATER SYSTEMS
Mining - Primary And Secondary Processing (Piping) project at 50 Km North of, Hopetoun, WA 6348 of Mechanical/Piping Installation Of Water Systems type of New development. Mechanical and piping installation of water systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Primary And Secondary Processing (Piping). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - AIR VALVES
Ravensthorpe Nickel Project - Air Valves is currently at the Construction stage, valued at about $ 100000 it is Air valves for seawater pipeline. Click for more details...

RAVENSTHORPE NICKEL PROJECT - HIGH ALLOY ITEMS/PIPE SPOOLS
Currently at the Construction stage In Ravensthorpe is a project estimated to be $ 100000. This project Fabrication of high alloy items and pipe spools. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Piping) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

BODDINGTON GOLD MINE EXPANSION - CONSTRUCTION/ACCOMMODATION CAMP
Mining - Primary And Secondary Processing (Piping) project for New development. A 1250 person construction camp and associated civil works to be constructed. Facilities will include a permanent dry and wet mess and recreation facilities. The initial 200 person fly camp has been constructed. Click for more details...

BODDINGTON GOLD MINE EXPANSION - SEWAGE TREATMENT PLANT
Mining - Primary And Secondary Processing (Piping) project In The Boddington Council Area of Sewage Treatment Plant type. Sewage Treatment Plant will comprise an Aeration tank, Sludge Storage tank, Chlorination tank, Chlorine Dosing System and associated pipe and pumps. Production capacity will be 65 cubic metres per day. Click for more details...

GRANITES GOLD MINE - TAILING STORAGE FACILITY
Mining - Primary And Secondary Processing (Piping) project In The Unincorporated North Council Area of Private ownership. The Bunker Hill pit will be use for tailings disposal. A 4km tailings deposition pipeline and a process water return line will be constructed between the processing mill and the pit. Storage dams will also be constructed to contain any accidental spillages. When the pit is filled and has settled, waste rock will be used to cap the pit. Click for more details...

KING ISLAND SCHEELITE PROJECT - PIPING FOR PROCESSING FACILITY
Mining - Primary And Secondary Processing (Piping) project for New development. For the provision of piping for the processing facility. Click for more details...

LAKE VERMONT COAL PROJECT - PIPING FOR COAL PREPARATION PLANT
Piping - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - SUPPLY & INSTALL OF PIPING FOR CONCENTRATOR UPGRADE
Currently at the Tenders & Building stage In Orange is a project estimated to be $ 2000000. This project Supply & installation of piping for the concentrator upgrade. Click for more details...

CLERMONT COAL PROJECT - COAL HANDLING PREPARATION PLANT
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Isaac Regional Council Area for New development. Off site fabrication & installation of 2 major (2500tph) & 3 minor (300tph) conveyors, a dump hopper, a wash plant (300tph). Associated process piping. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - PIPING FOR MECHANICAL EQUIPMENT
Mining - Primary And Secondary Processing (Piping) project In The Isaac Regional Council Area of Private ownership. For the provision of piping for mechanical equipment for the new 5Mpta CHPP. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Primary And Secondary Processing (Piping) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Primary And Secondary Processing (Piping) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Primary And Secondary Processing (Piping) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Primary And Secondary Processing (Piping) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

WA-26-L & WA-191-P JOINT VENTURE FLETCHER-FINUCANE OIL DEVELOPMENT - SURF WELL CONNECTION CONTRACT
Subsea/Umbilicals/Risers/Flowlines project at North West Shelf 150km north of DAMPIER, ., WA 6999 In The Council Area Of Offshore of Private. A contract including 55km of flexible flowlines & more than 60km of umbilicals. Associated structures to connect wells to the existing Exeter-Mutineer facilities. Pre-commissioning activities & associated services. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - CONSTRUCTION SIGNAGE
Currently at the Construction stage In Ashburton is a project estimated to be $ 150000. This project For the provision of construction signage. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - CONTAINER HIRE
Greater Gorgon Gas Project - Carbon Dioxide Injection Pipeline & Well Site - Container Hire is currently at the Construction stage, valued at about $ 250000 it is For the provision of container hire. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - FIRE SAFETY EQUIPMENT
Mining - Primary And Secondary Processing (Piping) project at On, Barrow Island, WA 6712 for New. For the provision of fire safety equipment. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - HIRE OF CRANAGE
Hire Of Cranage project at On, Barrow Island, WA 6712 in the Mining - Primary And Secondary Processing (Piping). For the hire of cranage. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - HIRE OF WATER CART
Mining - Primary And Secondary Processing (Piping) project at On, Barrow Island, WA 6712 of Hire Of Water Cart type of New development. For the hire of water cart services. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - NDT SERVICE
Mining - Primary And Secondary Processing (Piping) project at On, Barrow Island, WA 6712 for New. For the provision of NDT service (including all equipment necessary to perform the work during installation). Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - PRECOMMISSIONING SERVICE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Carbon Dioxide Injection Pipeline & Well Site - Precommissioning Service currently at Construction stage. For the provision of precommissioning service. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SPILL KIT
Spill Kit project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of a spill kit. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SUPPLY OF HIRE VEHICLES
Supply Of Hire Vehicles New project In The Ashburton Council Area. For the supply of hire vehicles (4 x 4 light vehicles). Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SUPPLY OF PRECAST CONCRETE
Mining - Primary And Secondary Processing (Piping) project for New development. For the supply of 27 well cellars, concrete slab, & pig receiver foundation. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - INTERNAL PIPING
Internal Piping project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the provision of internal piping. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Mining - Primary And Secondary Processing (Piping) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BRINE OUTFALL PIPING FOR HEAVY LIFT FACILITY
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Ashburton Council Area for New development. For the supply & fabrication of brine outfall piping for heavy lift facility. To include: pipe works, pipe supports, & emergency escape access platform & ladders. Click for more details...

LONGFORD TO LONG ISLAND POINT GAS PIPELINE REPLACEMENT
Longford To Long Island Point Gas Pipeline Replacement is currently at the Construction stage, valued at about $ 10000000 it is Construction of a replacement 350mm diameter pipeline alongside the existing 700m pipeline which will be mothballed. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Mining - Primary And Secondary Processing (Piping) project for New development. For the provision of consultancy services on coatings. Click for more details...

APLNG LNG PLANT - HOSES & FITTINGS SUPPLY
Hoses & Fittings Supply project at At, Curtis Island, QLD 4680 in the Mining - Primary And Secondary Processing (Piping). For the provision of hoses & fittings. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect