State

Categories

Sub Categories

Click Here to Find Current Projects

List of Power stations, Power generation Projects


HAZELWOOD COAL MINE/POWER STATION
Hazelwood Coal Mine/Power Station is currently at the Construction stage, valued at about $ 100000 it is Includes design, manufacture, factory testing, supply and delivery. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...


Mining - Civil Services (Power stations, Power generation) project for New development. The power station will run on waste heat and produce approximately 7 mW of electricity from hot gas produced in the processing of synthetic rutile. Under full operation, the new plant will require about 13 mW of electricity, the balance to be supplied by Western Power. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

OREBODY 18 IRON ORE PROJECT
A project in the WA Within East Pilbara. BHP plans to mine 116 million tonnes of ore over the next 12 -15 years. Part of the development will be the construction of a 35 km, 66kV powerline from BHP's gas fired power station at Nweman to the mine Click for more details...

TARONG NORTH POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project at Tarong Rd (adjacent to existing power station), Tarong, QLD 4615 for New. Additional coal fired plant to supply 800-850MW Click for more details...

KARUMBA PORT
, Karumba, QLD 4891 Has Karumba Port currently at Construction stage. 4 megawatts installed & approx 2.2 megawatts operating diesel fueled power station. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Currently at the Early Planning stage In Darwin City is a project estimated to be $ 1000000. This project The company has had discussions with a number of possible suppliers. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Currently at the Construction stage In Ravensthorpe is a project estimated to be $ 10000000. This project The power and steam generation plant includes three steam turbines, three package boilers, two diesel generators and mechanical and electrical equipment. Available steam from the acid plant will also be used in the steam turbines to generate electrical power. Click for more details...

KOGAN CREEK POWER PROJECT - CLADDING WORKS
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. Procurement, fabrication and erection of: 14,050 m² single skin wall / roof steel cladding, 7,810 m² double skin wall / roof steel cladding, 550 m² single / double leaf steel doors painted, 260 m² folding steel doors painted. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 100000. This project Exp. Joint & Damper for Boiler Duct Work. Exp. Joint: 77 Quantity, Material: Carbon Steel, Size: Min.2mx2m, Max. 10.5x5m. Damper; 52 qty, Material: Carbon Steel Size: Min.2mx2m, Max.22.5mx6m. Total weight approx 200ton. Click for more details...

KOGAN CREEK POWER STATION - ORIFICE & FLOW NOZZLE
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 1000000. This project Ventury type and orifice type, ASME design ASME S stamp is required. Click for more details...

KOGAN CREEK POWER STATION - HOISTS/LIFT
Kogan Creek Power Station - Hoists/Lift is currently at the Construction stage, valued at about $ 400000 it is Pulverizer Hoist: Capacity: 20ton, Quantity: 2sets. Specification by BHK. Design, Materal & Fabrication by Supplier. Hoists for AH and Fan: Manual Hoist: 10,000kg-quantity:2sets, 25,000kg-quantity:2sets, 30,000kg-quantity:4sets, Electric Hoist: 1,500kg-quantity:1set, 2,000kg-quantity:1set(range of lift:76m) Specification by BHK. Design, Materal & Fabrication by Supplier. Click for more details...

TARONG NORTH POWER STATION
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Furnace Ash Removal type. Includes supply of all labour, equipment and supervision in order to remover and transport furnace ash from Tarong North Power station to a designated unloading point. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

KOGAN CREEK POWER STATION - POWER CONTROL CENTRE
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 for New. Power Control Centre (PCC), two Power Control Centre (Container) suitable for the installation of LV switchgear shall be provided. The PCCs are based on a welded steel frame with roof and wall elements in sandwich construction with slot and feather system. The operating floor serves for the accommodation of the electrical components, underneath this floor a cable floor is arranged. The base frame of the PCCs is supported by four concrete columns (not in offer scope) on each site. Each PCC represents a shipping unit, therefore all tools required for lifting of the PCCs shall be provided for each PCC. The design of the PCCs shall be such that a LPL=Lightning Protection Level of class I is fulfilled. Inside the PCCs there is a LPZ = Lightning Protection Zone of 1S. Each PCC shall be fitted with - air conditioning system - lighting system including socket outlets. Click for more details...

LIDDELL POWER STATION - GENERATOR TRANSFORMER/REWIND
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Generator Transformer/Rewind - Supply type of New development. The contract involves the removal of the transformer to the contractors work site. The transformer is a 585 MVA, 22/350 kV generator, 200 t in weight. Carry out an inspection and assess the transformers condition. Rewind and rehabilitate the transformer. electrically and mechanically test the transformer. Return the transformer to the site and place in storage. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

COOPERATIVE RESEARCH CENTRE FOR CLEAN POWER FROM LIGNITE
Cooperative Research Centre For Clean Power From Lignite is currently at the Construction stage, valued at about $ 6300000 it is Research facility to be constructed to test mechanical thermal dewatering brown coal at a large scale. Design and construct a 2500 tonne hydraulic press, 2m diameter 80 bar pressure test cell and 2500 sqm building. Concrete floor, steel frame and cladding. Click for more details...

TARONG POWER STATION - PULVERISER GRINDING COMPONENTS
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Pulveriser Grinding Components - Supply type. Schedule of rates tenders are invited for the manufacture, testing and delivery of pulveriser grinding components suitable for IhI VS23.5 coal mills at Tarong North power station. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

LIDDELL POWER STATION - TUBE/PIPE/HOSE FITTING SUPPLY
Miscellaneous Tube/Pipe/Hose Fittings - Supply New project In The Muswellbrook Council Area. The developer is seeking to establish and foster a vendor relationship for the supply of Tube, Pipe and Hose Fittings. The principle objective of this contract is for the supply and delivery of tube, pipe and hose fittings on an as required basis by Macquarie Generation. The successful tenderer/vendor will be required to provide technical support and information on current materials, and on new or substitute materials, which are compatible with the existing plant and equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - EAST YARD SUBSTATION
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - East Yard Substation currently at Construction stage. Substation with three seperable portions. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - FIRE DETECTION & ALARMING
Mining - Civil Services (Power stations, Power generation) project at 15 Km South east of, Collie, WA 6225 for New. For the supply of fire detection and alarming. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - MOTOR OPERATED VALVES
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Private ownership. For the supply of motor operated valves. Click for more details...

LIDDELL POWER STATION - MAINTENANCE OF EXTERNAL ELECTRICAL POWER DISTRIBUTION SYSTEMS
A project in the NSW Within Muswellbrook. Work comprises the routine inspection and breakdown maintenance work on the electrical power distribution systems external to the Bayswater and Liddell Power Stations as and when required by the Principal for a two year period from the date of issue of the Principal's Contracts. These distribution systems are owned and operated by the Principal. Click for more details...

LIDDELL POWER STATION - ELECTRIC MOTORS/LOW VOLTAGE - OVERHAUL/REPAIR
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work includes the rewind and repair of low voltage electric motors for Liddell Power Station as and when directed by Macquarie Generation for a three (3) year period from the date of issue of Macquarie Generation's Contract. Rewinding and repairs will be required for a.c. and d.c. motors designed for voltages up to 440 Volts and rating up to 315 kW. The majority will be 3 phase a.c., cage rotor, induction motors. The Specification includes, but is not limited to, work associated with stator coils, rotor coils, stator iron, bearings, rotor, heaters, heat exchangers, temperature sensors and general mechanical work. All work shall be carried out off-site at the Contractors'/Subcontractors' premises. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Civil Services (Power stations, Power generation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - POWER SUBSTATION EXPANSION
Mining - Civil Services (Power stations, Power generation) project for New development. The existing 220/33 kV substation will be effectively rebuilt to increase transformation capability and provide a more secure mesh bus configuration to improve power supply via a new second transmission line. The design will be similar to the Millstream power station utilising power transformers, high and medium voltage switchgear, protection and control systems. Click for more details...

HAZELWOOD POWER STATION/COAL MINE - FACILITY MANAGEMENT SERVICE
Facility Management Service New project In The La Trobe Council Area. Civil and site services including security and emergency services. Click for more details...

LIDDELL POWER STATION - FABRIC FILTER-BAG CHANGEOUTS
At, Liddell, NSW 2333 Has Liddell Power Station - Fabric Filter-Bag Changeouts currently at Construction stage. Liddell Power Station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. This Specification calls for the replacement of Fabric Filter bags on Units 1, 3 and 4 Passes #1-A,B & E, Passes #3-A,B,C,D & E, Passes #4 - A,B & C. Click for more details...

LIDDELL POWER STATION - ASH DAM CIVIL MAINTENANCE WORK
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Ash Dam Civil Maintenance Work type of New development. The work will include the construction of new earth fill embankments and raising of existing embankments at the Liddell Ash Dam. The work required involves maintenance and minor modification of existing earthworks, including earthfill embankments and slurry channels at Liddell Ash Dam. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

MT STUART POWER STATION EXPANSION
Mt Stuart Power Station Expansion is currently at the Construction stage, valued at about $ 92000000 it is For a new 126MW gas turbine generator. Although the power station runs on jet fuel, the Company's existing two turbine generators on site can also be converted to run on natural gas in the future. To include substantial civil & concrete works. Click for more details...

YALLOURN JOINT VENTURE COAL OPERATIONS - YALLOURN COAL FIELD REALIGNMENT PROJECT
Mining - Civil Services (Power stations, Power generation) project at Eastern Rd, Yallourn North, VIC 3825 for New. A project to reduce overburden removal in the southeast portion of the coal fields supplying the Yallourn W Power Station by boundary alteration. Relocation further to the east of the Maryvale Coal Field boundary. Coal & overburden systems to be located on this field's western batter with overburden placement at the base of the adjacent, currently producing East Field Mine. Construction activities associated with conveyors to include embankments & formation across the East Field Mine, footing installations as well as mechanical, structural & electrical installation. Associated infrastructure to include roads & ramps, installation of high voltage reticulation & fire services reticulation. Diversion also of the Morwell West Drain as its upper reaches will be subject to mining. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Civil Services (Power stations, Power generation) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Civil Services (Power stations, Power generation) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe to service and m Click for more details...

NULLAGINE GOLD PROJECT - POWER STATION
Power Station project at Near, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. To build own and maintain a 9MW power station. Click for more details...

YARNIMA CCGT POWER STATION POWER BLOCKS CONSTRUCTION
New project of Mining - Civil Services (Power stations, Power generation) project at At, Newman, WA 6753. Construciton of the main power blocks for the power station. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - POWER STATION
Currently at the Construction stage In Weipa Shire is a project estimated to be $ 5000000. This project For the design procurement, construction, testing & long term operation & maintenance of a nominal 20 MW diesel-powered power station with an expected ~18 MW peak load, minimum 2MW load & average ~14 MW load by the Independent Power Producer (IPP) to supply sole customer Rio Tinto for the offtake of electricity. Diesel fuel will be free issued from a local fuel farm by Rio Tinto to the IPP. To include: Power system studies. Undertaking of all engineering to facilitate the procurement, construction, pre-operational testing & commissioning of the power station & ancillary equipment within the power station boundary. Coordination with the Amrun Project Team in the design of engineering interfaces between the power station & the mine project at the designated battery limits. Provision of vendor data to the Amrun Project Team to support downstream electrical studies on the distribution system. Conducting of studies to confirm compliance with network technical rules. Conducting of studies to confirm emissions (stack, noise and vibration) compliance within project approval limits. Scope of Works extends to the following battery limits: HV terminals of step-up transformers. Control & communications within power station (integrated with mine operations). Potable water/ fire water/ diesel & sewer at the fence-line. Cleared & grubbed surveyed pad (Amrun Project Team to arrange site clearance & grubbing). Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Civil Services (Power stations, Power generation) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

GRUYERE JOINT VENTURE GOLD PROJECT - POWER SUPPLY
New project of Mining - Civil Services (Power stations, Power generation) project at 200km East of, Laverton, WA 6440. For the provision of power supply. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect