MOUNT TODD GOLD MINE
Mining - Civil Services (Power stations, Power generation) project In The Katherine Town Council Area of Private ownership. Contract to provide a 32 megawatt gas turbine power facility for mine expansion. Click for more details...

GROOTE EYLANDT MANGANESE
New project of Mining - Civil Services (Power stations, Power generation) project at North west of Groote Eylandt Gulf of Carpentaria, Darwin, NT 0800. Three new generators. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Currently at the Early Planning stage In Darwin City is a project estimated to be $ 1000000. This project The company has had discussions with a number of possible suppliers. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Civil Services (Power stations, Power generation). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Civil Services (Power stations, Power generation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Civil Services (Power stations, Power generation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BATCHELOR SUBSTATION PROJECT
Batchelor Rd, Batchelor, NT 0845 Has Batchelor Substation Project currently at Construction stage. The project comprises the construction of a new power distribution infrastructure in the Batchelor region to the proposed Compass Resources Brown Oxide mine. Development includes a new 132 kV transmission line of 3.7 km along Batchelor road, two new substations and a new 22 kV underground XLPE cable feeder of 10.6 km from Batchelor road to the mine site. Construction work will involve the design certification and installation of control room, disconnection uplift transport handling temporary storage and placement of all items from the Edith River substation that are to be relocated and reinstalled at Batchelor substation, erection of all electrical equipment, connection of the earth wire conductors to electrical equipment and testing of the completed earthing system, attachment of conductors and insulators to the landing structure, 132 kv transmission line erection and commissioning, electrical installation work not otherwise specified, installation of communications and 240 V power between the crib room and the control room. Click for more details...

BATCHELOR SUBSTATION PROJECT - INDOOR SWITCHING ROOM
Currently at the Construction stage In Darwin City is a project estimated to be $ 719000. This project Design, construction, testing and commissioning of a 22 KV Transportable Indoor Switching Room. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

BATCHELOR SUBSTATION PROJECT - OXYGEN CONDUCTOR
Mining - Civil Services (Power stations, Power generation) project at Batchelor Road, Batchelor, NT 0845 of Oxygen Conductor - Supply & Deliver type of New development. Supply and delivery of an Oxygen Conductor. Click for more details...

BATCHELOR SUBSTATION PROJECT - ELECTRICAL PACKAGE
New project of Mining - Civil Services (Power stations, Power generation) project at Batchelor Road, Batchelor, NT 0845. Electrical works for the Batchelor 132/22 KV Substation. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS EXPANSION - POWER STATION
Mining - Civil Services (Power stations, Power generation) project at 60km southwest of, Borroloola, NT 0854 for New. Construction of a 53MW capacity gas powered power station to be used in conjunction with part of the existing 24MW power station to deliver 68MW overall. To include 6 Wartsila 34SG engines. Gas to continue to be brought to the site by the Daly Waters to McArthur River natural gas pipeline. Click for more details...

BOOTU CREEK MANGANESE PROJECT - POWER STATION CONTRACT EXTENSION
Mining - Civil Services (Power stations, Power generation) project for New development. Extension of 4MW power station generation supply contract for further 2 years. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...