GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

YABULU NICKEL REFINERY EXTENSION - COOLING WATER TOWER CONTRACT
Mining - Civil Services (Power stations, Power generation) project at Refinery site at, Yabulu, QLD 4818 for New. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Click for more details...

TOWNSVILLE POWER STATION
Civil Contract - For Power Station Modification project at via, Yabulu, QLD 4818 in the Mining - Civil Services (Power stations, Power generation). Civil works & foundations for conversion of a gas powered plant to a co generation plant for production of electricity. Click for more details...

TARONG NORTH POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project at Tarong Rd (adjacent to existing power station), Tarong, QLD 4615 for New. Additional coal fired plant to supply 800-850MW Click for more details...

TOWNSVILLE POWER STATION
Addition project of Mining - Civil Services (Power stations, Power generation) project at via, Yabulu, QLD 4818. Conversion and expansion of the existing peak-load jet-fuel-fired plant into a gas-fired base-load plant. Expansion of capacity form 160 mega watts to 220 megawatts. Click for more details...

KARUMBA PORT
, Karumba, QLD 4891 Has Karumba Port currently at Construction stage. 4 megawatts installed & approx 2.2 megawatts operating diesel fueled power station. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

ROSEBY COPPER PROJECT - POWER
Mining - Civil Services (Power stations, Power generation) project at North west of, Cloncurry, QLD 4824 of Power Generation - Diesel type of New development. Diesel power generation. Options under consideration include purchase of generation equipment by the company, and provision and operation of diesel generation equipment by a contractor. Click for more details...

KOGAN CREEK POWER PLANT
Kogan Creek Power Plant is currently at the Construction stage, valued at about $ 1000000 it is Water Treatment Plant: raw water treatment (gravel filters) capacity 2x95m3/h potable water treatment (activated carbon filters) capacity 150m3/d demineralisation plant (ion exchange with circ. regeneration system) capacity. Click for more details...

KOGAN CREEK POWER PROJECT - CHIMNEY/CLADDING WORKS
New project of Mining - Civil Services (Power stations, Power generation) project at South of, Brigalow, QLD 4412. This contract involves the construction of the chimney, the concrete and finishing work and the cladding work.. Click for more details...

KOGAN CREEK POWER PROJECT - CHEMICAL DOSING SYSTEM
Mining - Civil Services (Power stations, Power generation) New project at South of, Brigalow, QLD 4412. This type is Chemical Dosing System - Supply with Private ownership. Includes ammonia dosing plant, oxygen dosing plant, auxiliary cooling system biocide dosing and auxiliary cooling system sulphuric acid dosing plant. Click for more details...

KOGAN CREEK POWER PROJECT - HVAC
A project in the QLD Within Western Downs Regional. Ventilation system for steam turbine hall. Click for more details...

KOGAN CREEK POWER PROJECT - MECHANICAL ERECTION CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. Mechanical erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of workshop and Store Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

KOGAN CREEK POWER PROJECT - FIRE FIGHTING SYSTEM
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area for New development. Includes pumps, extinguishers. Click for more details...

KOGAN CREEK POWER PROJECT - CABLE SUPPORT STRUCTURE
A project in the QLD Within Western Downs Regional. Prefabricated concrete component parts. Click for more details...

KOGAN CREEK POWER PROJECT - COMMUNICATION SYSTEM
A project in the QLD Within Western Downs Regional. Includes telephone system with PABX and hardwired and cordless telephones (cordless telephones must operate in the complete power plant area). Also includes an alarm response pocket pager system with on- and off-site pagers Click for more details...

KOGAN CREEK POWER PROJECT - BATTERY
Mining - Civil Services (Power stations, Power generation) project at South of, Brigalow, QLD 4412 for New. Lead-acid type battery with a design life of 20 years. Design operating voltage 220 V, rated capacity approx. 1500 Ah (10 h). Click for more details...

KOGAN CREEK POWER PROJECT - UNIT PROTECTION
Mining - Civil Services (Power stations, Power generation) project at South of, Brigalow, QLD 4412 of Unit Protection/Synchronization/Measure/Metering type of New development. For Kogan Creek Power Station one (1) Lot generator and transformer protection system including synchronization equipment and measuring - and metering system is required. The protection system shall be fully redundant and the relays shall be of the numerical type. The meters shall be numeric high-precision electricity meters. Click for more details...

KOGAN CREEK POWER STATION PROJECT - BOILER HOUSE/STEAM PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Piping Package type. Piping for the steam-water cycle and auxiliary systems of the power plant including supports, hangers etc. Work consists of delivery, erection, testing, commissioning and documentation. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. HITO510 BCP (Motor Casing) Type grandless quanity: 1 Discharge rate: 855/h Total Head:911kpa Motor Capacity:400 kw(Max), Voltage 690V. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 of Damper Drive type of New development. Qty: 61, Electircal actuated type. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. HIT501 Motor Valve DN40-DN300, QTY: 39, ASME Design. HIT502 General Valve DN15-DN700, QTY: 441, ASME Design. HIT504 Relief Valve Electrical actuated type, ASME design ASME V stamp is required. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 100000. This project Exp. Joint & Damper for Boiler Duct Work. Exp. Joint: 77 Quantity, Material: Carbon Steel, Size: Min.2mx2m, Max. 10.5x5m. Damper; 52 qty, Material: Carbon Steel Size: Min.2mx2m, Max.22.5mx6m. Total weight approx 200ton. Click for more details...

KOGAN CREEK POWER STATION - IDF & MOTOR
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 for New. Induced Draft Fan(Axial Type) and Motor Quantity:2sets, Capacity:36,800m3/min/fan Pressure Rise:7,320Pa, Air temp:125. Specification by BHK. Design, Materal & Fabrication by Supplier. Click for more details...

KOGAN CREEK POWER STATION - ORIFICE & FLOW NOZZLE
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 1000000. This project Ventury type and orifice type, ASME design ASME S stamp is required. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Inner Casing type. The Inner Casing main components consist of 6t, 3.2t Plate, Shape Steel, Bellow, etc. Material: Carbon Steel, Low Alloy Steel (Total weight) Approx. 200ton. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project for New development. The Windbox main components consist of 6t, 3.2t Plate, Shape Steel, etc. Material: Carbon Steel (Total weight) Approx. 70ton. Click for more details...

KOGAN CREEK POWER STATION - HOISTS/LIFT
Kogan Creek Power Station - Hoists/Lift is currently at the Construction stage, valued at about $ 400000 it is Pulverizer Hoist: Capacity: 20ton, Quantity: 2sets. Specification by BHK. Design, Materal & Fabrication by Supplier. Hoists for AH and Fan: Manual Hoist: 10,000kg-quantity:2sets, 25,000kg-quantity:2sets, 30,000kg-quantity:4sets, Electric Hoist: 1,500kg-quantity:1set, 2,000kg-quantity:1set(range of lift:76m) Specification by BHK. Design, Materal & Fabrication by Supplier. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project for New development. Spring hanger, constant hanger, snubber. Click for more details...

TARONG NORTH POWER STATION
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Furnace Ash Removal type. Includes supply of all labour, equipment and supervision in order to remover and transport furnace ash from Tarong North Power station to a designated unloading point. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

KOGAN CREEK POWER STATION - BCP(PUMP CASING) - SUPPLY
A project in the QLD Within Western Downs Regional. BCP (Pump Casing) type grandless quantity: 1 Discharge rate:855/h Total Head: 911kpa Motor Capacity:400kw (Max), Voltage 690V. Click for more details...

KOGAN CREEK POWER STATION - FAN - SUPPLY
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 for New. Sealing Air Fan Capacity: 600m3/min., Head: 6.67kPa, Quantity: 2 sets. Click for more details...

KOGAN CREEK POWER STATION - TANKS
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Site Erected Tanks type. Demineralised water tank (1200m3) carbon steel, Service water tank (200m3) carbon steel. Click for more details...

KOGAN CREEK POWER STATION - POWER CONTROL CENTRE
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 for New. Power Control Centre (PCC), two Power Control Centre (Container) suitable for the installation of LV switchgear shall be provided. The PCCs are based on a welded steel frame with roof and wall elements in sandwich construction with slot and feather system. The operating floor serves for the accommodation of the electrical components, underneath this floor a cable floor is arranged. The base frame of the PCCs is supported by four concrete columns (not in offer scope) on each site. Each PCC represents a shipping unit, therefore all tools required for lifting of the PCCs shall be provided for each PCC. The design of the PCCs shall be such that a LPL=Lightning Protection Level of class I is fulfilled. Inside the PCCs there is a LPZ = Lightning Protection Zone of 1S. Each PCC shall be fitted with - air conditioning system - lighting system including socket outlets. Click for more details...

KOGAN CREEK POWER PROJECT - ELEVATOR
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. 1 elevator in the steam turbine building stop levels are provided on the mayor grating elevations (4 landings). The elevation has two loading sides. The supplier will provide planning, calculation, design, manufacturing, inspection at works and the relevant documentation. The lift will be packed and delivered free on site DDU, supervision of erection and commissioning, acceptance test and test load provision. Operating and maintenance manuals will also be provided. Click for more details...

TARONG POWER STATION - PULVERISER GRINDING COMPONENTS
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Pulveriser Grinding Components - Supply type. Schedule of rates tenders are invited for the manufacture, testing and delivery of pulveriser grinding components suitable for IhI VS23.5 coal mills at Tarong North power station. Click for more details...

MOUNT ISA MINE UNDERGROUND HIGH VOLTAGE RETICULATION SYSTEM PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Electrical upgrades and installation works for the high voltage reticulation system for 2007 and 2008. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

MT STUART POWER STATION EXPANSION
Mt Stuart Power Station Expansion is currently at the Construction stage, valued at about $ 92000000 it is For a new 126MW gas turbine generator. Although the power station runs on jet fuel, the Company's existing two turbine generators on site can also be converted to run on natural gas in the future. To include substantial civil & concrete works. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Civil Services (Power stations, Power generation) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

TARONG & TARONG NORTH POWER STATIONS
Mining - Civil Services (Power stations, Power generation) project at ., Tarong, QLD 4615 of Consultancy For Engineering Services type of New development. Engineering Services for various proposed plant modifications. Click for more details...

MOUNT STUART POWER STATION EXPANSION CONTROL BUILDING
Mount Stuart Power Station Expansion Control Building is currently at the Construction stage, valued at about $ 2000000 it is Construction of building and fitout excluding telecommunications. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Civil Services (Power stations, Power generation) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

BYERWEN COAL PROJECT - HIGH VOLTAGE POWER DISTRIBUTION EQUIPMENT
Mining - Civil Services (Power stations, Power generation) project In The Isaac Regional Council Area of High Voltage Power Distribution Equipment type. For the provision of High Voltage Power Distribution equipment, including: Item A: 66kV Switching Station Supply: Installation & commissioning of a skid mounted 66kV circuit breaker complete with isolators, VT?s, CT?s, protection, metering & control devices. Item B: 66/11kV Relocatable Sub-station: Supply, installation & commissioning of a 10/12MVA, 66/11kV skid mounted substation complete with 66kV circuit breaker, ONAN/ONAF transformer & 11kV switchgear. Item C: 11kV, Pad mounted, 3000kVAR Power Factor Correction Unit Supply & commissioning of an enclosed, pad mounted 11kV, 3000kVAr rated Power Factor Correction Unit. 11kV Fault rating: 1kV/25kA/3s Ingress protection: IP55 SCR switching modules: 2 x 400amp/12kV Capacitors: 12, Unit rating: 3000kVAr. No of switched steps: 4 (in 1:1 ratio). Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Civil Services (Power stations, Power generation) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...