List of Power stations, Substations, Windfarms, Phone exchanges Projects in NSW


BP SOLAR PLANT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 2 Australia Dr (Lot 56 DP773763), Homebush Bay, NSW 2128 of Solar Plant - Expansion type of New development. Proposed expansion of the existing BP Solar Cell & Module Plant. The proposal includes the installation of a high speed rotary dial automated screen printing process & changes to the solar cell surface anti-reflection coating process to incorporate plasma enhanced chemical vapour deposition of silicon nitride. Use of existing premises for solar cell & module manufacturing, warehousing, administration & extension of carparking area. Click for more details...

CALTEX REFINERY ELECTRICAL SUBSTATION
A project in the NSW Within Sutherland. Demolition of existing building & replacement of electrical substation. Click for more details...

JINDABYNE DAM
Dam - Addns project at Kosciuszko Rd, Jindabyne, NSW 2627 In The Council Area Of Snowy River of State. Modifications to dam outlet works to increase environmentally sustainable water flows into the Snowy River, construction of an auxiliary spillway, mini hydro power station & upgrade of existing spillway. Work includes: extensive civil works; coffer dam construction; tunnelling; bridge construction; concreting; pipework; buildings for power station; mechanical & electrical infrastructure for inlet/outlet works. Click for more details...

VALES POINT & MUNMORAH POWER STATIONS
Lift - Maintenance Renovations, Refurbishments etc. project In The Wyong Council Area. Major lift maintenance for a period of 2 years. Click for more details...

OLD TOONGABBIE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 191Z (Lot 1) Old Windsor Rd (DP780050) opposite Reynolds Rd, Old Toongabbie, Toongabbie, NSW 2146 of Electricity Substation type of New development. Upgrading of existing electricity substation & construction of a new control building. Click for more details...

MIDDLETON RD SUBSTATION
Private ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Warringah Council Area for New development. Construction of a new substation Click for more details...

METHANE CONVERSION PLANT
A project in the NSW Within Wollondilly. Single storey building at tower mine, Douglas Park, 2 storey at Appin Colliery. Concrete slab, brick construction, metal roof. Click for more details...

LUCAS HEIGHTS LAND FILL GAS POWER GENERATION PLANT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at New Illawarra Road, Lucas Heights, NSW 2234 of Power Generation - Extns type of New development. Expansion of existing landfill gas power generating plant, generating capacity to be increased from 12 mega watts to 25 mega watts of power with the addition of 8 more engines. Click for more details...

TRANSGRID/ENERGY AUSTRALIA CABLE
Sydney Park to Haymarket Substation, Sydney, NSW 2000 Has Transgrid/Energy Australia Cable currently at Construction stage. Construction of tunnel, 3.8 km x 3.4 m dia to carry 330 kv underground cable. Click for more details...

MINI HYDRO POWER INSTALLATIONS
Hydro Electric Power Stations (5) project at ., ., NSW 2999 In The Council Area Of Various of State. Development of facilities on Department's infrastructure at Brogo, Glennies Creek, Lostock, Toonumbar, Windamere. Click for more details...

WALLERAWANG POWER STATION
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Units 7 & 8 Wallerawang Power Station, Wallerawang, NSW 2845. Flue gas conditioning plant for Units 7 & 8. Click for more details...

MANILDRA SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Molong Rd, Manildra, NSW 2865 for New. Construction of civil & electrical works. Construction of control room Manildra 132/11 kv Substation. Click for more details...

WALLERAWANG POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) Renovations, Refurbishments etc. project at Power Station, Wallerawang, NSW 2845. This type is Electro Hydraulic Governor - Upgrade with State ownership. Upgrade of governor for Units 7 & 8. Click for more details...

RAYMOND TERRACE WOOD-FIRED POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for New development. . The Forest Products Association, it's subsidiary The Clean Green Energy Company Limited, National Power Australasia and financiers Babcock and Brown have formed a partnership to build the stations. The sites for power stations at Buladelah & Moruya have been abandoned Click for more details...

MUSCLE CREEK ROAD SHED
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Lot 5 Muscle Creek Road, Muscle Creek, NSW 2333 of Storage Shed type of New development. Construction of transportable storage shed for installation of micro dishes for Telsta towers. Click for more details...

RAILCORP SUBSTATIONS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at various within NSW, ., NSW 2999 for New. Establishment of panels of contractors for the construction of high-voltage electrical substations; upgrading of 33kV transmission lines; construction of new 33kV supplies, mainly in elevated steel troughing. Click for more details...

NEWS LIMITED CHULLORA
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) Addition project at 26-52 Hume Hwy, Chullora, NSW 2190. This type is Printing Facility - Altns & Addns with Private ownership. Proposal is to extend the existing printing, publishing and dispatch areas of the printing facility by approximately 8,444 sq m. The extensions will be along the eastern side of the building fronting the Hume Hwy. The development involves decommissioning of the existing substation and construction of a new substation, enclosing the dispatch areas, construction of a new staff change room and realignment of an internal road Click for more details...

TARALGA WIND FARM
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 4-5 kilometres east of, Taralga, NSW 2580 of Wind Farm type of New development. Construction of a wind farm consisting of a total of 61 turbines of capacity 1.5-3MW. Associated infrastructure including access tracks, underground & over ground electrical cabling, electrical substation, control building & TV re-transmitter. Click for more details...

COUNTRY ENERGY TRANSFORMERS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at ., ., NSW 2999 for New. Design, manufacture, testing, supply, delivery and installation of eight 33kV and 66kV Power Transformers. Click for more details...

HOLY CROSS COLLEGE RYDE
A project in the NSW Within Ryde. Construction of Technology & Applied Science building & walking links with awning for a covered walkway. Substation for the Holy Cross College & associated landscaping. Click for more details...

MACARTHUR SUBSTATION
Currently at the Construction stage In Campbelltown is a project estimated to be $ 15300000. This project Construction of a 330kV substation. The main elements comprise: construction of 3 tiered pad with approximate dimensions of 140m x 140m. The tiers would be made into the topography of the site in order to reduce cutting & minimise the visual appearance of the substation: Construction of a temporary access road from the Hume Highway into the site for delivery of 4 large transformers (up to 170 tonnes each) via road: Construction of a permanent access road from Glenlee Road for smaller construction vehicles & operations/maintenance vehicles: Placement of 2 x 330/132kv transformers which are approximately 4 metres high 3 metres wide & 10 metres long. Each transformer & their associated radiator systems contain approximately 110,000 litres of coolant oil. Porcelain bushings placed on top of the transformers (with approx height of 8 metres) would be used for connection to transmission wires throughout the substation: Construction of a dwarf wall around each of the main transformers that would be used as a bund to capture oil leaks & spills: Construction of a steel powder coated palisade style fence around the substation: Construction of a service road along the perimeter of the substation: Construction of a 120,000 litre water tank used for storage in case of fire: Construction of an auxiliary services building which include office, storage, communications, fire fighting equipment & amenity spaces for staff: Construction of a 7 space carpark along the access road near the main entry: Construction of a water storage tank & waste water treatment system for use by staff: Construction of a brick & steel roof pump house: Construction of a 30 metre high concrete monopole that support 2 x 1.8 metre diameter microwave dishes. Click for more details...

INTEGRAL ENERGY SUBSTATION - PGS 118
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at 22-28 (Lots 1-5 Secn 4) Hedges & Loscoe Sts (DP7605), Fairfield, NSW 2165. This type is Control Building with Private ownership. Construction of a new substation control building & 3 new power transformers & security fence Click for more details...

PORT KEMBLA SUBSTATION
Electrical Substation New project In The Wollongong Council Area. Proposed construction of a electricity substation. Click for more details...

ENERGYAUSTRALIA SUBSTATION - ROYAL NORTH SHORE HOSPITAL
Substation - 1/2 Storeys project at Lot 21 bnd by Pacific Hwy, Westbourne & Herbert Sts (DP863329), St Leonards, NSW 2065 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of 132/11kV substation on a 3000sq m site within the Royal North Shore Hospital campus to meet the anticipated electrical demand of the redeveloped hospital precinct. The proposed Substation development will be constructed by EnergyAustralia & includes civil & electrical works necessary to establish & commission the substation. The substation is proposed to be located where the existing Breast Clinic & Gore Hill laboratory are currently located. The proposed substation will comprise construction of 2 new transformer bays; construction of a substation building including 11kV switchroom, battery rooms, control rooms, cable basement & staff amenities; fencing, roadway & landscaping appropriate to the site. Construction will be a contemporary, masonry structure reflecting materials & forms found within the hospital precinct. The substation buildings are expected to be between 700 - 1000sq m over either 1 or 2 stories. Click for more details...

HYLAND RD REGIONAL PARK - TRANSGRID SUBSTATION
Substation project at Hyland Rd, Greystanes, NSW 2145 In The Council Area Of Holroyd of Private. Design & construction of a Gas Insulated Switchgear (GIS) Substation. Construction consists of: a 330 kV GIS building, a 330 kV GIS installation in breaker & half configuration (4 elements); a 132 kV AIS installation (2 bays); 2 x off 330/132 kV 375 MVA oil transformers & a modular control building (MCB) Click for more details...

CORONATION PARK NETBALL COMPLEX REDEVELOPMENT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Campbelltown Council Area of Local Govt ownership. Redevelopment of the Coronation Park Netball Complex. Redevelopment will include: replacement of the grass court area with asphalt, relocation & enhancement of the children's playground area. Demolition of existing administration office & amenities block. Redesign & installation of a new electricity substation. Redesign & construction of the carpark area. Increase car spaces from 70 to 210 & provide a set-down area for buses & ambulances. Better entrance/exist roadways to improve car flow. Click for more details...

AUBURN STABLING FACILITY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for New development. Transport Infrastructure Development Corporation invited experienced consultancies to tender for the role of Planning Approvals Contractor for the environmental Impact assessment to the Auburn Stabling Project Click for more details...

INTEGRAL ENERGY KEMPS CREEK
Substation - Refurbishment project at Cnr Devonshire & Cross Sts, Kemps Creek, NSW 2178 In The Council Area Of Liverpool of Private. Refurbishment of existing substation. Scope of work includes: alteration to the existing control building, construciton of a new extension consisting of a cable basement & ground floor housing switchboard room, cell 1, cell 2, 2 battery charge rooms & an auxiliary switch room. Click for more details...

BAYSWATER POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Muswellbrook Council Area of Bunds & Sumps - Rehabiltation type. Rehabilitation of concrete chemical containment bunds, waste sumps & linings located in the Demineralisation/Polisher Regeneration plant, Units 1/4 CW treatment plants & lime softening plant. The work will involve removal of deteriorated concrete & linings, refilling & relining of bunds & sumps with an appropriate coating material which is to be approved by the Principal together with the replacement of any deteriorated support brackets, nuts & bolts as approved by the Principal. Click for more details...

MOREE SOLAR FARM - BP SOLAR - SITE 1
Solar Farm project at 5km from, Moree, NSW 2400 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of a 150MW photovoltaic electricty generating equipment, with connection to the network via the Moree 132kV substation, characterised as an array of individual photovoltaic modules, themselves positioned into sets of subarrays, aligned to optimise solar energy capture.. The facility will use crystalline silicon technology optimised on trackers to maximise solar energy capture capacity. Works will also include security fencing around the perimetre of the facility; amenities building; & access arrangements. Click for more details...

ENERGYAUSTRALIA TIGHES HILL SUBSTATION
Substation project at 73 Elizabeth St, Tighes Hill, NSW 2297 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of new zone substation & associated infrastructure to provide additional capacity to the Tighes Hill area. Click for more details...

BATEMANS BAY SEWERAGE TREATMENT PLANT
Currently at the Construction stage In Eurobodalla is a project estimated to be $ 350000. This project Supply & installation of a 1000kVa substation for the sewerage treatment plant Click for more details...

ENERGYAUSTRALIA HOMEBUSH SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for New development. Stage 4 - Construction of new transformer bay 13. Stage 5 Construction of new transformer bay 11. Stage 6 - construction of a new staff carpark, boundary wall & demolition of existing structures Click for more details...

OLYMPIC PARK ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Strathfield Council Area of Private ownership. Construction of a substation located in the south west corner of Bicentennial Park. The substation building comprises amenities room, 132kV & 11kV switchrooms, control & battery room & 132kV & 11kV cable basements. External building & civil works include transformer roadway, 3 transformer bays, stormwater detention system; provision for 6 future capacitor banks & connecting circuits to the 11kV switchroom; external fencing & security gates. Electrical works include 2 auxiliary transformers; 3 50MVA transformers their associated busbars & termination structures; 132kV & 11kV switchgear; 132kV & 11kV underground cables into & out of Bicentennial Park utilising conduits established from the substation to Australia Av & Bennelong Pwy & other ancillary electrical wiring Click for more details...

GLENORIE & THE OAKS ZONE SUBSTATIONS
Currently at the Construction stage In Various is a project estimated to be $ 10000000. This project Construction of the Glenorie & The Oaks Zone Substations. Construction of an indoor type substation building for a rural environment that must accommodate a single 10MVa transformer for each site. The high level scope of work includes: Complete design and construct of the two Zone Substations;electrical fit-out of the two zone substations; transmission mains construction for The Oaks which includes civil works and installation of 33kV mains cable & transmission mains construction for Glenorie zone substation which includes civil works between the UGOH pole & the zone substation. Glenorie substation will be constructed at 43 Cattai Ridge Rd cnr Post Office Rd, Glenorie. The Oaks substation will be constructed at Silverdale Rd, The Oaks Click for more details...

CALTEX REFINERY TRANSFORMER & SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Sutherland Council Area of Private ownership. Construction of a new substation of 127.26sq m & single storey to act as a new 11kv switch room building within Area A. Construction of a new transformer building of 127.3sq m & single storey which converts the 11kv power to 6.3kv for redistribution around the Caltex site. Reinforced concrete slab on concrete piers, external walls 270 thick cavity face solid pressed double brickwork, 230 thick solid brick internal wall, aluminium doors, galvanised steel stairs & concrete roof. Click for more details...

ESSENTIAL ENERGY HIGH VOLTAGE ZONE SUBSTATIONS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Various Council Area of Private ownership. Provision of concrete civil services (mainly form & pour) at High Voltage Zone Substations across NSW. The contract is for a period of 3 years with an option to extend for a further 2 periods of 12 months Click for more details...

BAXTER HEALTH CARE COMPLEX
Baxter Health Care Complex is currently at the Construction stage, valued at about $ 4832000 it is Alterations and additions to existing health care complex, green energy plant upgrade. Cogeneration plant which comprises 2 gas motors and associated piping ducting. External stacks, ventilator and cooling towers. Enclosure of the awning area with cladding and acoustic louvers. Acoustic screens to cogen plant and to the existing building in the eastern elevation which houses an existing compressor. Click for more details...

ENDEAVOUR ENERGY BAULKHAM HILLS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Old Windsor Rd, Old Toongabbie, NSW 2146 of Civil Works - Underground Cabling type of New development. Proposed development would involve: replacement of an existing underground cable that runs between an underground to overhead conversion point (UGOH pole) located in Reynolds Park to the eastern side of the Baulkham Hills transmission substation (TS). The existing cable will be abandoned in situ. Installation of new underground cable from inside the TS to a nearby UGOH pole just east of the south-eastern corner of security fencing surrounding the TS. Replacement of 4 sections of overhead conductor near the southern boundary of the security fencing of the TS with 3 new sections of overhead conductor. Removal of one pole, the erection of one new pole & the replacement of 2 existing poles, near the southern boundary of the security fencing of the TS Click for more details...

ENDEAVOUR ENERGY DOONSIDE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Eastern Rd, Doonside, NSW 2767. This type is Underground Mains with Private ownership. Underground mains construction at the Doonside Zone Substation Click for more details...

ENDEAVOUR ENERGY WESTMEAD
Redbank Rd, Westmead, NSW 2145 Has Endeavour Energy Westmead currently at Construction stage. Upgrade of existing substation Click for more details...

INGLEBURN, MINTO & GUILDFORD SUBSTATIONS
Ingleburn, Minto & Guildford Substations is currently at the Construction stage, valued at about $ 6000000 it is Design & construction of Ingleburn, Minto & Guildford substations. Ingleburn Substation comprises 2 x 5MW 1500 VDC Traction Substation. Minto Substation comprises 2 x 5MW 1500VDC Traction Substation. Guildford Substation comprises 1 x 5MW 1500VDC Traction Substation Click for more details...

ENDEAVOUR ENERGY ABBOTSBURY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Fairfield Council Area of Substation - Upgrade type. Upgrade of existing Endeavour Energy substation Click for more details...

AUSGRID PUNCHBOWL
Substation project at 76 Bonds Rd, Punchbowl, NSW 2196 In The Council Area Of Bankstown of Private. Upgrade of Punchbowl zone substation. Scope of work includes: demolition of brick walls, amenities areas. Civil works & structural strengthening - extension to the cable pit, structural steelwork strengthening, steelwork or cable trays. Construction of toilet. Roof related works - new flashing, barge board, razor wire. External works: removal of gate, extension of external walkway. Upgrade to power & lighting & security system Click for more details...

ROZELLE BAY PRECINCT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Leichhardt Council Area of Services Enabling Works - Package 3b Power Supply type. Installation of high voltage conduits, cabling & a new kiosk substation. Connection of HV cables to existing network & substation commissioning. Decommissioning of existing substation & demolition of substation & associated high voltage cables. Scope of work includes: surface preparation & demolition, trench evacuation, installation of conduits, HV cables, KK substation, connection of HV cables from the points of connection from existing system to existing substation, demolition of existing substation & removal from site, restoration of areas. Click for more details...

CHARLESTOWN COMMUNITY MENTAL HEALTH FACILITY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Lake Macquarie Council Area of Electrical - Early Works type. Electrical early works. Scope of work includes: supply, install & commission a new electrical kiosk on the Charlestown Community Mental Health Facility site Click for more details...

KYOGLE ESSENTIAL ENERGY SUBSTATION
A project in the NSW Within Kyogle. Refurbishment of the existing Kyogle substation. Scope of work includes: construction a new control and switchboard building. Replacement of the existing 66kV circuit breaker and current transformer with a dead tank circuit breaker. Installation of 2 x 11kV transformer indoor circuit breaker panels with voltage transformers. Installation of a 66kV fault thrower. Construction of a second 66kV transformer circuit breaker bay and 66kV overhead powerline landing span. Installation of new transformer protection, control and SCADA. Augmentation of transformer bunds. Replacement of the security fence. Installation of 2 padmount auxiliary transformers. Replacement of one and removal of 3 x 66kV disconnectors. Replacement of 3 x 11kV disconnectors. Removal redundant equipment. Click for more details...

GULLEN SOLAR FARM
Private ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Goulburn Mulwaree Council Area for New development. Use of land, construction of buildings and carrying out of works for a solar farm for the purpose of electricity generating works. The project would consist of a large field of solar PV panels installed on support frames and connected by wiring to inverters. The inverters convert direct-current (DC) electricity to alternating current (AC) electricity. Underground AC cables would then connect the output of the solar farm to the existing wind farm electricity substation and grid connection point. The solar farm would produce approximately 22,000 megawatt-hours of clean renewable energy each year. Construction works involve site establishment including fencing, earthworks, set out & construction of access roads & sediment & erosion controls; installation of foundations (excavation and concrete footings) or driven piles. Installation of underground cabling. Assembly of the panel frames and mounts. Installation of the PV panels. Installation of the inverter/transformer units, including pouring of concrete pads for inverter/transformer units. Installation of low voltage cabling and combiner boxes. Construction of a spare parts storage shed. Substation works to connect the solar farm to the existing Gullen Range Wind Farm. Removal of temporary construction facilities and completion of restoration works. Solar panel arrays including up to 42,500 solar panels. 4 power conversion blocks (inverters, transformers, switchgear & fans). Storage building. Water storage tank. perimeter security fencing. Access roads. underground cabling. Click for more details...

IAN THORPE AQUATIC CENTRE
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 456-458 Harris St, Ultimo, NSW 2007 of Cogeneration Plant type of New development. Installation of cogeneration systems at the Ian Thorpe Aquatic & Fitness Centre. Click for more details...

MARULAN SOUTH ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Lot 196 South Marulan Rd, Marulan South, NSW 2580. This type is Substation with Private ownership. construction of a new 66/33/11kV zone substation at Marulan South. Scope of work includes: Civil Works - construction of foundations, drainage, waste water. water tank, pump & piping) switchyard surfacing (including aggregate), access roads, retaining walls, security fence (zone substation intruder fence), associate earthworks & final landscaping; installation of the earth grid, earthing of metal structures installed as part of these works and provision of earthing tails to provide future earth connections to electrical equipment. Electrical Works - provide for the electrical construction, erection, installation and testing for substation equipment & associated equipment. Substation Control Building Works - provides for the design, manufacture, supply, installation & construction at site of Prefabricated Control Building & associated equipment including prefabricated control building, control building associated equipment including; 415VAC distribution board and all associated power and lighting systems, cable trays, cable ladders, air conditioning, fire protection systems, safety shower system, staff amenities, plumbing, guttering & hydraulics, roof vents, all finishing & fitting-out; installation of control and protection panels and equipment, SCADA and metering equipment, batteries & battery chargers Click for more details...