NULLAGINE PROJECT/ BULLFINCH CIP PLANT
Consultancy For Pre-Feasibility Study New project In The East Pilbara Council Area. Pre-feasibility study includes: confirming mine rate of production; establishment of base design parameters for the process plant and site infrastructure; determine suitability of equipment for the Bulfinch plant for incorporation into the Nullagine plant; develop capital and operating costs for the process plant to an accuracy consistent with a feasibility study of pus or minus 25 per cent; compile the process plant study report. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

BOODARIE DIRECT REDUCED IRON (DRI) / HOT BRIQUETTED IRON (HBI) PLANT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. A three year contract. Includes execution of shutdown services for the four individual trains in the plant. Click for more details...

MEEKATHARRA GOLD OPERATIONS - BLUEBIRD PLANT
Currently at the Planning stage In Meekatharra is a project estimated to be $ 1000000. This project Modifications will include changing the circuit, incorporating some parts (already on hand) not currently in use. To accommodate the harder ore, rates will be adjusted from 3mtpa to 1 -1.5mtpa. Click for more details...

LOY YANG A POWER STATION
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The La Trobe Council Area of Cathodic Protection Services type. Maintenance of cathodic protection system. Click for more details...

THALANGA COPPER OPERATIONS
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Charters Towers Regional Council Area of Private ownership. The Thalanga mine reopened in mid June 2002. The processing facility is scheduled to reopen in October 2002 approx. Click for more details...

PHOSPHATE HILL OPERATIONS
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Phosphate Hill approx 190 km south east of, Mount Isa, QLD 4825 for New. Scheduled statutory maintenance shutdown. Click for more details...

MUNGARI WEST PROJECT - WHITE FOIL
18 km northeast of, Coolgardie, WA 6429 Has Mungari West Project - White Foil currently at Construction stage. Resource of 11.8 million tonnes at 2.42g/t gold for 915,000 ounces of gold. Click for more details...

HAZELWOOD POWER STATION
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The La Trobe Council Area of Private ownership. Routine and defect maintenance. Click for more details...

HAZELWOOD COAL OPERATIONS
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at At, Morwell, VIC 3840 of Plant Maintenance Services For Mine type of New development. Routine & defect maintenance. Click for more details...

KOGAN CREEK POWER PROJECT - COATING & SURFACE PROTECTION
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. Application of protective coatings (including scaffolding, necessary protective measures during blasting and/or coating and extended surface preparation in case of need) on site for generally prime coated pipes, pipe supports, tanks etc. in order to obtain corrosive protection. Click for more details...

RENISON BELL TIN OPERATIONS
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Burnie Council Area of Electrical Installation Packages - Various type. Various packages associated with mine and processing facilities refurbishments. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - ACID PLANT SHUTDOWN
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at 50 km east of, Leonora, WA 6438 for New. 21 day shutdown planned. Click for more details...

MURRIN MURRIN NICKEL PROJECT - HYDROGEN SULPHIDE PLANT SHUTDOWN
A project in the WA Within Leonora. 10 DAY shutdown planned. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - OREBODY 25 PLANT MODIFICATIONS
Orebody 25 Plant - Modifications project at Via, Newman, WA 6753 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). Modifications at Orebody 25 will produce additional brockman lump and fines products. Click for more details...

NORTHPARKES COPPER/GOLD - ELECTRICAL/MECHANICAL/MAINTENANCE SERVICES
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Parkes Council Area for New development. Electrical and Mechanical labour and Services for Surface and Underground operations. The labour and service requirements include qualified mechanical and electrical tradespersons for surface and underground shutdowns, surface and underground scheduled maintenance, shift cover in both surface and underground maintenance teams, trade assistants, provision of scaffold and qualified scaffolders, off-site fabrication and refurbishment facilities and services and qualified poly welders. Click for more details...

LIDDELL POWER STATION - MAINTENANCE CONTRACT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 500000. This project The work covered by this specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell Coal handling Plant and Hunter Valley gas Turbines for a period of two years. Click for more details...

LIDDELL POWER STATION - INSULATION/SUPPLY/REPAIRS
Insulation/Cladding Repairs/Provision Of Temporary Scaffolding/Rigging Services New project In The Muswellbrook Council Area. The work covered by this specification involve the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the contract manager. The provision of labour to carry out general rigging work and mobile crane operation. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The work covered by this specification involves the provision of labour hire services in the form of trades and/or non-trades labour, materials and equipment as and when directed by Macquarie Generation, to undertake repairs and maintenance of the miscellaneous power and lighting system. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET - CONSTRUCTION CONTRACT
Construction Contract For Plant New project In The Whyalla Council Area. Construction contract will include benefication facilities, a slurry pipeline, conversion of the pellet plant, construction of a desulphuriation plant and the upgrade of storage and handling facilities. Click for more details...

BOWEN BASIN COAL MINES SHUTDOWN MAINTENANCE CONTRACT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. Shutdown maintenance work will be conducted at seven coal mines in the Bowen over 5 years. Mine sites are South Walker Creek, Goonyella, Peak Downs, Saraji, Norwich Park, Gregory and Blackwater. Maintenance work will include care of the 33 draglines and 8 shovels that BMA operates in the Bowen basin. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

LIDDELL POWER STATION - MILLING PLANT
A project in the NSW Within Muswellbrook. Work comprises the overhaul of RP 803 Bowl Mill Rolls and includes surveys and reports on the mill internals, the repair of eroded RP 803 Bowl Mill internals, the removal and replacement of three mill roll assemblies and doors, replacement of worm shafts and bearings and the replacement of eroded and holed PF piping system components and greasing of milling plant. Response time to a request for repair work shall be less than 24 hours, i.e. time from receipt of request to time of readiness to commence work on the plant. The contracted work will be carried out on a Schedule of Rates basis, as and when directed by the Contract Manager. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

LIDDELL POWER STATION - TURBINE/AUXILIARIES
Turbine/Auxiliaries - Overhaul Services project at Via Liddell, Muswellbrook, NSW 2333 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). The Contract shall consist of 2 separable portions. Separable Portion 1 shall include all turbo-generator and feedheating plant overhaul work to be performed on Unit 1, the anticipated length of the outage is four (4) weeks. Separable Portion 2 shall include all turbo-generator and feedheating plant overhaul work required to be performed on Unit 3, the anticipated length of the outage is six (6) weeks. Click for more details...

LIDDELL POWER STATION - PERIODIC UNDERWATER INSPECTION/MAINTENANCE
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Via, Liddell, NSW 2333 of Periodic Underwater Inspection And Maintenance type of New development. This Specification is for the provision of underwater diving services as and when required by the principal and includes the underwater inspection, cleaning and maintenance of plant or equipment at Bayswater and Liddell Power Stations. The locations and the type of work to be executed under the contract shall include, but not be limited to, the following: Inspection of CW Pump and associated pipework; Inspections, cleaning and maintenance of Cooling Tower Screens; Inspection and maintenance of pump pits and associated equipment; Inspection and maintenance of dam outlet works and structures; Inspection and cleaning of River Trash Rakes; Removal of the marine growth and other deposits from Ash and Dust Pump Pits; Underwater welding and cutting to various other items of plant as required; Inspection of and impression moulds on various pump impellors and provision of a written and/or photographic report on the various activities listed above. Click for more details...

LIDDELL POWER STATION - MAINTENANCE OF EXTERNAL ELECTRICAL POWER DISTRIBUTION SYSTEMS
A project in the NSW Within Muswellbrook. Work comprises the routine inspection and breakdown maintenance work on the electrical power distribution systems external to the Bayswater and Liddell Power Stations as and when required by the Principal for a two year period from the date of issue of the Principal's Contracts. These distribution systems are owned and operated by the Principal. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

LIDDELL POWER STATION - HYDRAULIC EQUIPMENT MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 800000. This project Work comprises the dismantling, inspection, report, repair, reassembly, servicing and testing of hydraulic and pneumatic items, that will include but not be limited to the refurbishment of various components for a period of two years. The Contractor may also be called to perform on-site repairs to any hydraulic component of installed equipment at Liddell. Click for more details...

LAWLERS NICKEL OPERATIONS INTEGRATION
Processing Plant - Closure project at Near, Leinster, WA 6437 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). Lawler operations being integrated with new owner Gold Fields' existing Agnew operations. To include closure of the Lawler processing plant. Click for more details...

LIDDELL POWER STATION - CRANE MAINTENANCE & INSPECTION
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Muswellbrook Council Area of Cranes - Periodic Inspection & Maintenance type. Periodic and major inspections of cranes including maintenance. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - SUPPLY & INSTALL OF PIPING FOR CONCENTRATOR UPGRADE
Currently at the Tenders & Building stage In Orange is a project estimated to be $ 2000000. This project Supply & installation of piping for the concentrator upgrade. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL INSTALLATION FOR CONCENTRATOR UPGRADE
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at 25 km south west of, Orange, NSW 2800 of Mechanical - Install For Concentrator Upgrade type of New development. Mechanical installation for the concentrator upgrade. Click for more details...



GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

RIO TINTO PILBARA SHUTDOWN, MAINTENANCE & STRUCTURAL INTEGRITY CONTRACT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Various Council Area of Shutdown/Maintenance/Refurbishment Services type. Three year extensions to shutdown & maintenance services contracts for Pilbara coastal & inland west operations. Contracts for the refurbishment of iron ore assets also incorporated. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY SHUTDOWN
Gove Peninsula North West Arnhem Land via, Gove, NT 0880 Has Alcan Gove Bauxite Operations - Refinery Shutdown currently at Construction stage. Phased shutdown of refinery in order to suspend production. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

WEST ANGELAS DEPOSIT B - EPCM CONTRACT
Currently at the Construction stage In East Pilbara is a project estimated to be $ 22000000. This project For the provision of engineering, procurement, construction management services. To include additional heavy mining equipment; extension to the process plant, including a new ore stacker; extension to existing non-process infrastructure; & enhancements to the site utilities & services. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - MAINTENANCE/SHUTDOWN/ENGINEERING/PROJECT SERVICES
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Gladstone Regional Council Area of Maintenance/Shutdown/Engineering/Project Services type. For the provision of maintenance, shutdown, engineering & project services for the LNG facility. Click for more details...