List of Processing & materials handling equipment maintenance incl. shutdowns Projects in WA


NULLAGINE PROJECT/ BULLFINCH CIP PLANT
Consultancy For Pre-Feasibility Study New project In The East Pilbara Council Area. Pre-feasibility study includes: confirming mine rate of production; establishment of base design parameters for the process plant and site infrastructure; determine suitability of equipment for the Bulfinch plant for incorporation into the Nullagine plant; develop capital and operating costs for the process plant to an accuracy consistent with a feasibility study of pus or minus 25 per cent; compile the process plant study report. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

BOODARIE DIRECT REDUCED IRON (DRI) / HOT BRIQUETTED IRON (HBI) PLANT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. A three year contract. Includes execution of shutdown services for the four individual trains in the plant. Click for more details...

MEEKATHARRA GOLD OPERATIONS - BLUEBIRD PLANT
Currently at the Planning stage In Meekatharra is a project estimated to be $ 1000000. This project Modifications will include changing the circuit, incorporating some parts (already on hand) not currently in use. To accommodate the harder ore, rates will be adjusted from 3mtpa to 1 -1.5mtpa. Click for more details...

LAVERTON GOLD OPERATIONS - TREATMENT PLANT REFURBISHMENT/EXPANSION
Treatment Plant - Refurbishment/Expansion Renovations, Refurbishments etc. project In The Laverton Council Area. Expansion to 1.5 million tonnes. Additional test work will be undertaken to obtain further information to fully optimise the process flow sheet at the 1.5 Mtpa throughput rate. Infrastructure proposed to be added are a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. The recent acquisition of additional tenenaments in the Laverton area has made the expansion of the plant economically viable. Click for more details...

FORTNUM GOLD PROJECT - PLANT RECOMMISSIONING
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Meekatharra Council Area of Processing Plant - Recommissioning type. 1 million tonnes per annum gold treatment plant. Findings of the pre-feasibility study include treatment plant recommissioning cost of approximately $1.6 million for a production rate of 60,000 to 70,000 ounces. Click for more details...

MUNGARI WEST PROJECT - WHITE FOIL
18 km northeast of, Coolgardie, WA 6429 Has Mungari West Project - White Foil currently at Construction stage. Resource of 11.8 million tonnes at 2.42g/t gold for 915,000 ounces of gold. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Near, Collie, WA 6225 of Expansion Of Capacity type of New development. An expansion to 3.5 million tonnes per annum ( increase of 250,000 tonnes). To be undertaken over the next two years with minimum interruptions by utilising planned maintenance shutdowns. Includes additions to precipitation circuit, modifications to digestion area emission control system, additional baixite residue washing and disposal facilites, upgrade of power supply. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - ACID PLANT SHUTDOWN
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at 50 km east of, Leonora, WA 6438 for New. 21 day shutdown planned. Click for more details...

MURRIN MURRIN NICKEL PROJECT - HYDROGEN SULPHIDE PLANT SHUTDOWN
A project in the WA Within Leonora. 10 DAY shutdown planned. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - OREBODY 25 PLANT MODIFICATIONS
Orebody 25 Plant - Modifications project at Via, Newman, WA 6753 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). Modifications at Orebody 25 will produce additional brockman lump and fines products. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TESTING/CALIBRATION OF INSTRUMENTS
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Ravensthorpe Council Area for New development. Site services for testing and calibration of instruments. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

LAWLERS NICKEL OPERATIONS INTEGRATION
Processing Plant - Closure project at Near, Leinster, WA 6437 in the Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns). Lawler operations being integrated with new owner Gold Fields' existing Agnew operations. To include closure of the Lawler processing plant. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

RIO TINTO PILBARA SHUTDOWN, MAINTENANCE & STRUCTURAL INTEGRITY CONTRACT
Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Various Council Area of Shutdown/Maintenance/Refurbishment Services type. Three year extensions to shutdown & maintenance services contracts for Pilbara coastal & inland west operations. Contracts for the refurbishment of iron ore assets also incorporated. Click for more details...

WEST ANGELAS DEPOSIT B - EPCM CONTRACT
Currently at the Construction stage In East Pilbara is a project estimated to be $ 22000000. This project For the provision of engineering, procurement, construction management services. To include additional heavy mining equipment; extension to the process plant, including a new ore stacker; extension to existing non-process infrastructure; & enhancements to the site utilities & services. Click for more details...