List of Pumping Stations Projects


LEWISHAM SEWERAGE SCHEME
Public Utilities (Pumping Stations) New project at Not known, Lewisham, TAS 7173. This type is Reticulation/Pumping Station & Rising Main with Local Govt ownership. The work involves the supply, installation and testing of sewerage infrastructure serving approximately 150 properties via approximately 1600 m of carrier main, a pump station and 1100 m of rising main. Click for more details...

RAILTON EFFLUENT REUSE SCHEME
Local Govt ownership Public Utilities (Pumping Stations) project In The Kentish Council Area for New development. Design and construction of two small pump stations, irrigation pipework and the supply and installation of a 250 metre radius pivot irrigator. Click for more details...

WATERVALE SYSTEM (CLARE VALLEY SCHEME)
Clare & Mintaro sites for linking Morgan-Whyalla & Swan Reach-Paskeville systems to districts in, Clare, SA 5453 Has Watervale System (Clare Valley Scheme) currently at Construction stage. Construct booster pump stations at Mintaro & Clare for part of overall pipeline. Click for more details...

MARDI DAM
New project of Public Utilities (Pumping Stations) project at Lot 1 Old Maitland Rd (DP 2111747), Mardi, NSW 2259. The Gosford Wyong Councils' Water Authority has identified the need to increase its capacity to deliver water from the Mardi Water Treatment Plant to its water distribution system. It is proposed to affect this increase in capacity by upgrading a number of components of its existing headwork system, including; (a) Spillway bridge, roadworks and Spillway; (b) New Transfer System from Mardi Dam to Mardi Water Treatment Plant: Including a new Inlet Tower, inlet channel, raw water pipeline, transfer pump station and associated works & (c) New High Lift Pump Station: Involving a new Pump Station at Mardi Water Treatment Plant to deliver treated water to the Gosford & Wyong Systems. Also includes High Voltage Power Ring Main and other associated works. (d) Mardi to Mangrove pump station. (e) Tuggerah diversion pipeline. Click for more details...

TABOURIE LAKE SEWERAGE SCHEME
Public Utilities (Pumping Stations) project at from Burrill Lake to, Tabourie Lake, NSW 2539 for New. Scope of works includes construction of a sewer main from Tabourie Lake Village to the sewage pumping station SPS A including Tabourie Lake bridge crossing; construction of the sewage pumping station SPS A including all necessary infrastructure; construction of chemical dosing facilities at the sewage pumping station; construction of deodorisation bed frailties at the sewage pumping station; construciton of pressure/gravity main from sewage pumping station to Burrill Lake; Telemetry; completion of any design not completed; all necessary connection to existing infrastructures; any ancillary work required for a complete operating system; documentation including designs, Environmental Management Plan, Project OHS Management Plan, WAE drawings, QA documentation and Operations and Maintenance Manuals for the works; Provide video records of construction; testing, demonstration and commissioning of works; training of Shoalhaven Water Operators Click for more details...

LARAPINTA STAGE 4
Public Utilities (Pumping Stations) New project at Larapinta Dr/Kramer st end Rubina St & extn Albrecht Dr, Alice Springs, NT 0870. This type is Headworks - Stage 2 with State ownership. Construct extension Albrecht Dr, water pumping station, water supply sewerage & power supply headworks. Click for more details...

BRINDABELLA & WHITSUNDAY DRS SEWERAGE PUMPING STATION
Public Utilities (Pumping Stations) New project at Lot 1126 Brindabella Dr & Lot 7300 Whitsunday Dr, Shell Cove, NSW 2529. This type is Sewerage Pumping Station with Private ownership. Construction of a sewer pump station at Shell Cove in the Shellharbour LGA. The sewer pump station will replace an existing temporary sewer pump station. The works comprise construction of 10m dia well, installation of pumps & electrical systems, above ground structures including a small building for the purpose of housing a Telstra mini exchange & decommissioning of an existing sewer pump station. Click for more details...

BURNS BEACH SPS3, HAMERSLEY SPS3 & SPS6 SEWERAGE PUMPING STATION
Private ownership Public Utilities (Pumping Stations) project In The Various Council Area for New development. Works comprise of construction of emergency overflow storage culverts at Burns Beach SPS3, Hamersley SPS3 & SPS6 sewerage Pumping Stations. Click for more details...

GOLD COAST CITY COUNCIL PIMPAMA COOMERA WATER FUTURE PACKAGE D
Public Utilities (Pumping Stations) New project at Various Locations in, Gold Coast Mc, QLD 4217. This type is Reservoirs/Sewerage Treatment - Package D with Local Govt ownership. Includes the design and construction of potable and recycled water mains and sub-mains, pumping stations, reservoirs, wastewater gravity mains, wastewater rising mains and pumping mains. Click for more details...

BELLVIEW ON BELLMERE PUMP STATION
Pump Station project at Bishop Ln & River Dr, Bellmere, QLD 4510 in the Public Utilities (Pumping Stations). Construction of sewer pump station & associated works for a residential subdivision. Click for more details...

WANNEROO ROAD WASTEWATER PUMPING STATION (NEERABUP)
Public Utilities (Pumping Stations) project at Wanneroo Rd, adjacent to The Kestrels Development, Tapping, WA 6065 of Wastewater Pumping Station type of New development. Supply & installation of Type 10 Wasterwater Pumping Station & construction of 150 m long pressure main. Works include mechanical fittings, connections & electrical components for pump station. Click for more details...

DOLPHIN POINT RD PUMPING STATION
A project in the NSW Within Shoalhaven. Construction of a new sewage pumping station to pump sewage from Lake Tabourie & Burrill Lake towards Ulladulla sewage treatment plant. Above ground structures include electrical switchroom & ventilation shaft. Click for more details...

LARK HILL REGIONAL SPORTSPLEX
A project in the WA Within Rockingham. Works to comprise of construction of earthworks, stormwater drainage, precast concrete walls, reinforced concrete paving, asphalt paving, synthetic grass laying surface, reticulation, players & umpires enclosures, water storage tanks, pumphouse, mesh fencing & Principal supplied towers & luminaires for floodlighting. Click for more details...

UPPER COOMERA BOOSTER PUMPING STATION
Public Utilities (Pumping Stations) project at Days Rd, Upper Coomera, QLD 4209 for New. Design & construction of Booster Pumping Station at Upper Coomera as part of Pimpama Upper Coomera Water Future Project - package d Click for more details...

PIMPAMA WASTEWATER PUMPING STATION
New project of Public Utilities (Pumping Stations) project at Yawalphah Rd, Pimpama, QLD 4209. Design & construction of Wastewater Pumping Station at Pimpama as part of Pimpama Upper Coomera Water Future Project - package d Click for more details...

KINGS PARK AND BOTANIC GARDENS PUMPING STATION
Pump Station 1, Kings Park, Fraser Av, West Perth, WA 6005 Has Kings Park And Botanic Gardens Pumping Station currently at Construction stage. Works comprise installation of new filtration system at Pump Station No 1. Click for more details...

MILLAR ROAD LANDFILL FACILITY
A project in the WA Within Rockingham. To include the construction of cell 12 clay liner, pump station & associated works. Click for more details...

PORTARLINGTON GOLF CLUB PUMPING STATION
New project of Public Utilities (Pumping Stations) project at 92 Hood Rd, Portarlington, VIC 3223. Construction of pumping station for stormwater Click for more details...

GREEN GULLY RESERVE IRRIGATION SYSTEM
Public Utilities (Pumping Stations) project at Green Gully Reserve, Green Gully Rd, Keilor Downs, VIC 3038 of Irrigation System type of New development. Design and construct a booster pump station, including pumps, housing, associated pipe work, treatment measures connections and flow meters to irrigate 5 existing and two proposed sports grounds at Green Gully Reserve in Keilor Downs. The construction of the irrigation system upgrades will be considered as provisional items with the total number of grounds selected being at the discretion of Council. The overall scheme involves the diversion and treatment of stormwater from one Melbourne Water stormwater drain, Kealba Park Main Drain, and one Brimbank City Council stormwater drain, Green Gully Close Main Drain located at Green Gully Reserve. Click for more details...

STUBBS TERRACE IRRIGATION BORE
Irrigation Bore project at Stubbs Tce, Subiaco, WA 6008 In The Council Area Of Subiaco of Local Govt. Quotations are invited from suitable organisations for the construction, development & testing of a major bore, supply & installation of a submersible bore pump & flow meter & the fabrication & installation of an irrigation control cabinet. Click for more details...

HORSLEY ROAD RESERVOIR PUMPING STATION/PIPELINES
Public Utilities (Pumping Stations) project In The Denmark Council Area of Pumping Station/Pipelines type. Works may comprise construction of a below ground pumping station, Horsley Rd, 1100 m of 375 pipeline 1300 m of 500 mm pipeline, 145 m of 400 mm pipeline & 710 m of 375 mm pipeline. The locations of the proposed pipelines are in reserves of South Coast Hwy, Hardy St, Smith St, Kearsley Rd, shire reserves, private land & existing easements. Click for more details...

BOTANIC GARDENS & PARKS AUTHORITY FILTRATION SYSTEM
State ownership Public Utilities (Pumping Stations) project In The Perth Council Area for New development. Works to comprise installation of a new filtration system at Pump Station No 2 at Kings Park & Botanic Gardens. Click for more details...

MEADSTONE DAM
From ROYAL GEORGE to, Cleveland, TAS 7211 Has Meadstone Dam currently at Planning stage. The new dam will deliver 30,000 ML to the communities of Royal George, Apslawn, Cranbrook, Llewellyn, Conara and Cleveland with an irrigable area of 8,000 ha. Click for more details...

COLIBAN WATER PRESSURE MONITORING STATIONS
Public Utilities (Pumping Stations) project at Various locations in Coliban Water's region, Bendigo, VIC 3550 for New. Design and construction of pressure monitoring stations across our region, works include the installation of pressure transmitter, switchboard, SCADA system and associated pipe works. Click for more details...

NUMURKAH RAW WATER STORAGE
163 O'Kanes Rd, Numurkah, VIC 3636 Has Numurkah Raw Water Storage currently at Construction stage. Construction of a 280ML earthen raw water storage, installation of 4.6km DN300 transfer pipeline, installation of 120m DN375 channel offtake, pipeline, installation of 390m DN375 storage inlet pipeline, construction of a pump station and building and design and construction of a main switch board. Click for more details...

BARWON WATER ALLIANCE LAKE ROAD SEWAGE PUMP STATION CONSTRUCTION
Public Utilities (Pumping Stations) project for New development. Construction of the Lake Road pump station. Click for more details...

PORT HEDLAND WASTEWATER TREATMENT PLANT COLLOCATION
Wastewater Treatment Plant/Pumping Station/Pipeline - Collocation project at To be collocated with South Hedland Wastewater Treatment Plant on Shoata Rd, South Hedland, WA 6722 In The Council Area Of Port Hedland of State. Works to comprise collocation of the Port Hedland Wastewater Treatment Plant with the South Hedland Wastewater Treatment Plant, which will undergo a substantial upgrade. A new pumping station will be required at the Port Hedland wastewater treatment plant site to transfer the flow to 9.5ML/day capacity through a new pumping main to South Hedland. A new pipeline & pumping station will also be required to transport treated wastewater from South Hedland back to Port Hedland for re-use. The final route is still being determined however, road reserve will be followed where possible to minimise impact to the environment & community. Click for more details...

WATER CORPORATION - WATER TREATMENT PLANT/PUMPING STATION - DENHAM
Renovations, Refurbishments etc. project of Public Utilities (Pumping Stations) project at Reserve 28924 off Monkey Mia Rd, Denham, WA 6537. To include the installation of a new transfer pump station, south of an existing evaporation pond. The new station structure will measure 10m by 3.3m with a ceiling height of 2.7 metres. Click for more details...

MIDDLE ARM INDUSTRIAL & WEDDELL TRANSMISSION WATER MAIN CONTRACT 1
New project of Public Utilities (Pumping Stations) project at Jenkins Rd (Stuart Hwy road reserve to 400m west Finn Rd), Weddell, NT 0836. Construction of additional water infrastructure along Jenkins Road. To include: transmission mains, booster pump station, ancillary pipework, off-takes & structures. Associated civil & earthworks. Click for more details...

BUNDALONG WATER PUMP STATION
Public Utilities (Pumping Stations) project In The Moira Council Area of State ownership. Construction of a raw water pump station for Bundalong, Victoria. Click for more details...

MURRAY-DARLING BASIN
Murray Darling Basin, ., NSW 2999 Has Murray-Darling Basin currently at Planning stage. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls & telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation &/or construction of pipelines, valves, tanks, troughs & all associated equipment to ensure efficient operation & supply Click for more details...

OAKLANDS PARK STORMWATER REUSE SCHEME MECHANICAL & ELECTRICAL CONSTRUCTION WORKS
Public Utilities (Pumping Stations) New project at Bounded by Oaklands Rd, The Parade, Sturt River & Noarlunga Railway, Oaklands Park, SA 5046. This type is Mechanical/Electrical Works with Local Govt ownership. Mechanical & electrical works associated with construction of 3 pump stations & 6 submersible pumps in ground water ASR wells. Supply & install pipes & cables into Common Services Trench. Install conduits for consumer mains to new transformer. Design, supply & install sub-boards & buried power distribution cables from transformer to new metering board, pump station & ASR wells. Convert portion of existing steel shed to secure building & demolish remaining portion. Click for more details...

BROMELTON PIPELINE TRUNK WATER MAIN
., Bromelton, QLD 4285 Has Bromelton Pipeline Trunk Water Main currently at Construction stage. Supply & installation of 6.1km pipeline (trunk water main) connecting Beaudesert Water Treatment Plant to Bromelton Structure Plan Area which will provide water supply to stage 1 of this area. Click for more details...

SUNSET ROAD PUMP STATION
Pump Station New project In The Brisbane City Council Area. Construction of new pump station. Click for more details...

JUNJUWA COMMUNITY - SEWER PUMP STATION WORKS
Sewer Pump Station - Upgrade project at Junjuwa Community 2.5 km north of, Fitzroy Crossing, WA 6765 in the Public Utilities (Pumping Stations). Works to include upgrade of the sewer pump station at Junjuwa Community comprising of: labour, material, supply & fixing of all necessary equipment & components for the complete installation of the sewage pump station to include chopper submersible pumps with ultrasonic level sensor & controller, wet wall covers, discharge valves chamber, magnetic meter chamber, main switchboard, air conditioned container for main switchboard, diesel backup pump. Click for more details...

MOOBI ROAD PUMP STATION
A project in the NSW Within Upper Hunter. Replacement of 2 submersible sewage pumps, an electrical switchboard, water level sensors & SCADA equipment at the pump station Click for more details...

DERBY SPORTS RECREATION RESERVE 23127
Currently at the Tenders & Building stage In Derby-W Kimberley is a project estimated to be $ 3000000. This project Tenders are being sought from civil contractors for the installation of a Sewer Pump Station & associated pressure main on Reserve 23127. Click for more details...

ROSEDALE SPS & TOMAKIN STP
Pump Station/Balance Tank New project In The Eurobodalla Council Area. Construction of a new sewage pumping station including emergency overflow tank, building for a switchroom, chemical storage, septicity control, deodorisation system, pipework, valve pit & associated civil works at Rosedale. Construction of an Influent Balance tank, odour control at Tomakin STP, retaining wall & overflow line to tertiary lagoons. Click for more details...

MOUNT COMPASS COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Public Utilities (Pumping Stations) project for New development. The township of Mt Compass is located approximately 60km south of Adelaide on Victor Harbor Rd. The township consists of approximately 400 houses & a small commercial area. Wastewater is collected by a system of gravity drains, pump stations & rising mains. Wastewater, which includes septic tank effluent & full sewer, is currently discharged to the wastewater treatment plant located at Sand Mine Rd. The existing plant has reached its capacity & a new plant has to be constructed. A storage lagoon to discharge the treated effluent & to balance water for reuse has been recently installed at an old mine site west of the existing treatment plant. Project will deliver a reuse water balance lagoon to buffer additional flows from this expansion. The Principal invites tenders from Tenderers for the provision of the Wastewater Treatment Plant at Mount Compass. The project will deliver the Wastewater Treatment Plant at Mount Compass as part of the Mount Compass Community Wastewater Management System (CWMS). The project includes: 1) Construction of two concrete tanks 10m diameter & 4m deep each; 2) Construction of Control Shed including adjacent veranda & concrete pad; 3) Construction of screen support platform & installation of screen; 4) Supply & Installation of Waste Activated Sludge (WAS) tank (50kL); 5) Supply & Installation of two chlorine contact tanks (50 kL each); 6) Supply & Installation of treated water balance tank (50 kL); 7) Supply & Installation of treated water screen filter; 8) Supply & Installation of chlorine dosing system; 9) Supply & Installation of rainwater tank & rainwater reuse system; 10) Supply & Installation of all process pipework including valves, actuators, fittings, supports & flush systems; 11) Supply & Installation of all pumping & process equipment; 12) Supply & Installation of all specified instrumentation; 13) Supply & Installation of all electrical conduits; 14) Testing & Commissioning; 15) As constructed drawings. The project does not include electrical connection & control system. These items will be delivered by the Principal. The following list indicates the main elements of the Works sufficient to ensure that the Tenderer is aware of the scope of the Tender. It does not detail duties, actions or items of supply on minor works which are self evident or inherent to the satisfactory completion of the scheme as described within the tender documents. Preliminaries: These include - a) The transportation of all personnel, plant & materials to & from the site & the provision of temporary site accommodation; b) The provision of all personnel, facilities & amenities for the administration of the works of the scheme including temporary connections to Telstra/NBN, ETSA & SA Water; c) All setting out of the works, including locating services, survey for identifying boundary locations, connection points & temporary bench marks etc; d) Provision of office facilities for the Superintendents Representative for the duration of the works; e) Provision for quality control & assurance, environmental controls & traffic management; f) Provision for all site security; g) Obtaining all licenses & payment of fees where required for conduct of the Works & compliance with all regulations relating to the Works; h) Compaction testing of trench backfill; & i) Other preliminaries as required by the Tenderer as outlined in the tender schedule. Click for more details...

GOLD COAST CITY COUNCIL LOW VOLTAGE SWITCHBOARD REPLACEMENTS
Public Utilities (Pumping Stations) project at Various locations, Gold Coast Mc, QLD 4217 for New. Replacement of low voltage switchboards at various locations in Gold Coast City Council. Locations to include SPS A38 - Seaworld Drive Main Beach, SPS A72 - Sunrise Boulevard Surfers Paradise & SPS B13 - Tallebugera Fitness Camp Palm Beach. SPS B42 - The Esplanade Miami, SPS B52 - Landau Court Miami, SPS OX16 - Monterey Keys Helensvale & SPS TH4 - Lang St Bilinga. SPS D54 - Pine Ridge Street Biggera Waters, SPS SS40 - Sullivans Road Andrews & SPS OX0 - Oxenford Southport Road Hope Island. WPS MA2 - Trentbridge Court Mount Nathan, WPS MU5 - Veronica Drive Tallai & WPS MU11 - Canopy Drive Bonogin. Click for more details...

BOURKE WATER SUPPLY
Public Utilities (Pumping Stations) project at ., Bourke, NSW 2840 for New. Construction of a Bore Water Transfer System from Walkdens Bores to the Bourke Water Treatment Plant (WTP). Scope of work includes: Walkdens Bores headwork, cooling system, bore water storage tank, pump/electrical/chlorine building, high lift pumps, chlorine dosing system, connections to Bourke WTP including installation of valves on existing bore water rising main. Click for more details...

JABIRU SEWER PUMP STATION UPGRADE
Located Within, Jabiru, NT 0866 Has Jabiru Sewer Pump Station Upgrade currently at Construction stage. Upgrade works to the sewer pump station located in Jabiru, located 250km East of Darwin. Click for more details...

KING'S LEIGH ESTATE SEWER PUMP STATION (SPS) 723
Public Utilities (Pumping Stations) project In The Wyndham Council Area of State ownership. Design & construction of SPS 723, sewer rising main & other associated works. Click for more details...

CASUARINA PRISON - FIRE WATER PUMPS UPGRADE
Public Utilities (Pumping Stations) project In The Kwinana Council Area of Fire Water Pumps - Upgrade - Supply & Install type. Works to include the replacement of the fire water pumps at Casaurina Prison to include the removal & installation of new fire pumps & associated works. Click for more details...

MURRAY GOULBURN COOPERATIVE DEDICATED WATER SUPPLY PUMP STATIONS
Murray Goulburn Cooperative Dedicated Water Supply Pump Stations is currently at the Construction stage, valued at about $ 750000 it is Design & construction of pump stations for the Murray Goulburn Cooperative Dedicated Water Supply. Click for more details...

DENHAMS BEACH SEWAGE PUMP STATION
Pump Station - Upgrade project at ., Denhams Beach, NSW 2536 in the Public Utilities (Pumping Stations). Upgrade of sewage pump stations BB36 & BB38. Scope of work includes: design, supply, install concrete emergency storage tanks at both sewage pump stations. Install well washers & new hatches in both BB36 & BB38 wet wells. Construct extension of access road to pump station BB38 & associated works. Click for more details...

NORMANVILLE PUMP STATION (NO 16) WORKS
Currently at the Construction stage In Yankalilla is a project estimated to be $ 350000. This project The Principal invites tenders for the provision of construction of Community Waste Management Scheme (CWMS) Pump Station (No. 16) & associated infrastructure at corner of Hay Flat Rd & Main South Rd, Normanville. District Council of Yankalilla is proposing to construct a new wastewater pump station at 42 Main South Rd Normanville & additional emergency storage at existing site Pump Station 3 off Jetty Rd, Normanville. This work will include but not be limited to the following: 1) Site Preparation; 2) Construction of New Pump Station Building; 3) Supply & Install Community Waste Management Scheme (CWMS) Infrastructure; & 4) Commissioning of Pump Station. Click for more details...

DROUIN WATER BOOSTER PUMP STATION UPGRADE
Public Utilities (Pumping Stations) project In The Baw Baw Council Area of State ownership. Drouin Water Booster Pump Station Upgrade (Mechanical & Electrical Works). Construction of new Booster Pump Station at Drouin, switchroom structural modifications, supply & installation of all associated pipes, fittings, valves, pumps, electrical & control switchboards, commissioning of booster pumps. Click for more details...

SHAFT STREET PUMP STATION
Public Utilities (Pumping Stations) project at Shaft St, Edmonton, QLD 4869 of Pump Station type of New development. Construction of a pump station. The station will be a below ground concrete structure around 25 m in length, 8m in width & around 3m in depth. A deep 1.5m sump at one end of the station will house 3 identical stormwater pumps (supplied by Council). The pumping station will pump potential floodwaters into the creek via a chute arrangement Click for more details...

WESTERN PORT HIGHWAY PUMP STATION WORKS
Western Port Hwy, Cranbourne West, VIC 3977 Has Western Port Highway Pump Station Works currently at Construction stage. Construction of sewer pumping station, branch sewer & rising main works for an industrial land subdivision in Cranbourne West. Works to include 95L/sec sewerage pumping station, 670KL storage tank approximately 945m of DN315 rising main & approximately 90m of DN gravity sewer main & associated works. Click for more details...