List of Pumping Stations Projects in NSW


DENMAN WATER SUPPLY
Public Utilities (Pumping Stations) project In The Muswellbrook Council Area of Local Govt ownership. Augmentation of Denman Water Supply stage 2. Construction of new river intake structure & a high lift submersible pump station. Click for more details...

MURRUMBIDGEE IRRIGATION
Currently at the Construction stage In Griffith is a project estimated to be $ 700000. This project Construction of pressurised pipeline systems for supply of irrigation water. Work includes: Lateral 16 System pump station & approximately 2.2 km of pipeline ranging up to 450 22 dia (M1031); lateral 13a system & approximately 1.1km of pressurised pipeline ranging up to 375 mm dia. (M1032). Click for more details...

SEWERAGE PUMP STATION
Public Utilities (Pumping Stations) project for Addition development. Sewerage pump station upgrade including a major upgrade of electrical & mechanical components. Click for more details...

TAREE & WINGHAM EFFLUENT MANAGEMENT SCHEMES
State ownership Public Utilities (Pumping Stations) project In The Various Council Area for New development. Construction of Taree & Wingham Effluent Management Schemes. The work includes pumping stations, pipelines, storage dams etc. Click for more details...

ROBERTSON SEWERAGE SCHEME
Public Utilities (Pumping Stations) project at Lot 1 Kangaloon Rd (DP1077348), Robertson, NSW 2577 for New. Construct sewerage reticulation system through the township comprising of a gravity system & a DD&C pressure sewer component, including a major pump station, effluent storage dam 15 KM transfer main Click for more details...

HARRINGTON PARK WATER QUALITY & FLOOD MANAGEMENT
A project in the NSW Within Camden. Modifications to existing lake & construction of 4 additional lakes. Reticulation system, inclusive of pumping facilities & pipelines. Landscaping comprises: grassing; tree planting; aquatic landscaping. Click for more details...

TROY GULLY SEWAGE PUMPING STATION
Troy Gully Sewage Pumping Station is currently at the Construction stage, valued at about $ 560000 it is Construction of Troy Gully SPS Sewage overflow storage. Click for more details...

CESSNOCK SEWERAGE TREATMENT PLANT
A project in the NSW Within Cessnock. The establishment of a tertiary treatment plant & associated equipment to remove algal cells, other suspended solids, soluble phosphorus & faecal coliforms from the effluent discharged from the existing maturation ponds. Tertiary treatment will enable the plant to comply with suspended solids, algal cell, faecal coliform & phosphorus requirements. The work required under the contract includes: completion of detailed design (as the Contract nominates some equipment & designs); construction; testing, commissioning & process proving; provison of work as executed information, operation & maintenance manuals, & operator training. Design & construction is required for the following: pond pumping station. Pipework & headwalls to enable recirculation of final pond effluent to pond one. 12 ML/day tertiary flotation plant (DAF, IAF or DAF/IAF Hybrid), including polymer dosing system. Dosing pumps & pipework to allow transfer of chemical from the existing chemical dosing facility to the tertiary flotation plant. Approx 455m of sludge return pipeline, sludge lances & sludge storage tank. UV disinfection cell. Effluent quality sampling & flow monitoring infrastructure for EPA licence data collection. building/enclosure. Approx 325m of DN200 reclaimed water pipeline including a 10kL storage tank & duty pump. Approx 525m extension of DN80 watermain & installation of RPZD & flowmeter. Electrical works including conduits & electrical pits. Associated process instrumentation & control equipment including PLC/SCADA control. Site runoff & sediment control. Construction only of the following is required: 2 reinforced concrete causeways between maturation ponds. Approx 240m of pond wall rehabilitation (Type 1: Reno Mattress or Type 2: Rip Rap). Approx 1820 sq m of access road for the tertiary treatment plant. Click for more details...

TABOURIE LAKE SEWERAGE SCHEME
Public Utilities (Pumping Stations) project at from Burrill Lake to, Tabourie Lake, NSW 2539 for New. Scope of works includes construction of a sewer main from Tabourie Lake Village to the sewage pumping station SPS A including Tabourie Lake bridge crossing; construction of the sewage pumping station SPS A including all necessary infrastructure; construction of chemical dosing facilities at the sewage pumping station; construction of deodorisation bed frailties at the sewage pumping station; construciton of pressure/gravity main from sewage pumping station to Burrill Lake; Telemetry; completion of any design not completed; all necessary connection to existing infrastructures; any ancillary work required for a complete operating system; documentation including designs, Environmental Management Plan, Project OHS Management Plan, WAE drawings, QA documentation and Operations and Maintenance Manuals for the works; Provide video records of construction; testing, demonstration and commissioning of works; training of Shoalhaven Water Operators Click for more details...

TEA GARDENS VACUUM SEWERAGE PUMP STATION
Pt Lot 404 Myall St, Tea Gardens, NSW 2324 Has Tea Gardens Vacuum Sewerage Pump Station currently at Construction stage. Construction of a new vacuum pump station, 13 x 28 sq m which will house the vacuum pump station & transfer station. Sections of the building are below ground level & will require work in water charged ground up to 4 metres deep. Click for more details...

GOULBURN EMERGENCY WATER SUPPLY
Pump Station New project In The Goulburn Mulwaree Council Area. Construction of pump station, treatment lagoon & equipment. Click for more details...

MULI MULI SEWERAGE SCHEME - DOUBLE ENTRY REFER TO PROJECT ID2208534
Public Utilities (Pumping Stations) project for New development. Construction of sewerage reticulation system, pumping station, stormwater drainage network & the replacement of a water supply ring main in Muli Muli Community. Work also involves the construction of rising main to the Woodenbong Township. Click for more details...

LITHGOW CORRECTIONAL CENTRE - ENABLING WORKS
Public Utilities (Pumping Stations) project for Addition development. Scope of work includes: Hydraulics - Provide & install a natural gas mains extension from the existing Authorities gas main, a gas service from the gas mains extensions to the proposed prison site; a dedicated fire service supplied from the incoming water supply; divert the existing incoming water supply pipe around the propose Prison development site; a potable water service supplied from the incoming water supply; a sewer pumping station & an extension of the existing sewer drainage pipe work. Electrical On-Site works - provide & install underground HV cabling & ducting & modifications to existing services & Electrical Off-Site works - upgrade the existing overhead aerial mains Click for more details...

GOULBURN INFRASTRUCTURE WORKS
Currently at the Construction stage In Goulburn Mulwaree is a project estimated to be $ 1000000. This project Construction of sewerage, potavle water & road infrastructure. The will be 4 packages of work. Package 1: Construction of a 2ML potable water concrete surface reservoir. Package 2: Construction of 2 sewerage pumping stations. Package 3: Construction of approximately 2.5 klms of 250mm diameter potable water distribution main, approximately 0.9 k m of 225/300mm diameter sewer gravity main & approximately 1.2 km of 150/225mm diameter sewer rising mains. Click for more details...

MIDCOAST WATER PUMPS
State ownership Public Utilities (Pumping Stations) project In The Great Lakes Council Area for New development. Supply & delivery of 7 large electrically driven pumping units. Three separate sets of pumps are involved with duties ranging from 160 L/s @ 125m head for the smallest units to 410 L/s @ 83m head for the larger units. Click for more details...

WYONG SHIRE COUNCIL TELEMETRY CONTROL SYSTEM
Currently at the Tenders & Building stage In Lake Macquarie is a project estimated to be $ 450000. This project Supply, installation & commissioning of the telemetry control system associated with the transfer of water from Morisset Reservoir to Kanwal Reservoir via the Morissset to Wanervale trunk main. The works includes indoor & outdoor SCA manufacture for controls at Morisset water pumping station, Bushells Rdige Rd,control valve. Wallarah control valve & Kanwell Reservoir Click for more details...

BROGO RIVER WATER PUMP STATION AUGMENTATION
Public Utilities (Pumping Stations) project for New development. The works include the design, manufacture, supply, installation. testing & commissioning of the electrical control system Click for more details...

NEPEAN RIVER PUMP AND PIPELINE
Public Utilities (Pumping Stations) project In The Penrith Council Area of Private ownership. The proposal involves the construction and operation of a pump and pipeline to extract water from the Nepean River to facilitate the initial filling and long term water supply of the Penrith lakes. The intake structure and pipework will comprise twin 630mm diameter pipelines submerged in a minimum of 2 metres of water beneath the riverbed of the Nepean River. the pump station will be built into the eastern bank of the Nepean River approx 110 metres upstream of the Penrith weir. The pump station will be constructed below ground with the roof structure and the wall adjacent to the Nepean River the only parts visible above ground. The control building will be co-located with the existing public amenity building to the west of existing carpark. The control building will be approx 75sq m in area. A constructed wetland and quarantine lake will comprise 2 components of a multiple barrier approach that the Nepean River water will pass through prior to being discharged into the scheme. Click for more details...

VICTORIA ST PUMPING STATION PROJECT INCLUDED IN PROJECT ID823833
Local Govt ownership Public Utilities (Pumping Stations) project In The Shoalhaven Council Area for New development. Construction of a new pumping station to serve parts of the Western end of Berry. Above ground structures to include electrical cabinet and ventilation shaft. Click for more details...

PRINCE HWY PUMPING STATION
Public Utilities (Pumping Stations) project at Part Lot 7041 Princes Hwy (DP1059893), Burrill Lake, NSW 2539 of Pumping Station type of New development. Construction of a new sewage pumping station to pump sewage from Lake Tabourie & Burrill Lake towards Ulladulla sewage treatment plant. Above ground structures include electrical switch room & ventilation shaft. Click for more details...

CUMBERLAND COUNTRY GOLF COURSE IRRIGATION PIPELINE
Public Utilities (Pumping Stations) project at 246-248 Old Prospect Rd & other properties, Greystanes, NSW 2145 of Pipeline type of New development. Installation of 100mm irrigation pipeline & associated works within Lower Prospect Canal Reserve & other properties for the purpose of transporting irrigation water from an existing acquifier in the Boral Quarry to the Cumberland Country Golf Course. Connection points for branch lines to Gipps Rd Sporting Complex & Greystanes Sportsground via Hyland Rd & Bolaro Ave respectively are provided. Header tanks & a pumping station will be installed on Boral's property adjacent to the canal reserve Click for more details...

CAMELLIA & ROSEHILL RECYCLED WATER PROJECT
Camellia & Rosehill Recycled Water Project is currently at the Construction stage, valued at about $ 100000000 it is Construction & operation of recycled water scheme including a recycled water treatment plant, storage reservoirs, pumping stations. Pipeline connection to the Liverpool to Ashfield pipeline (LAP) ? the source of feed effluent for the recycled water treatment process. Distribution system including: an elevated surface reservoir at Woodville Golf Course on Barbers Road, Guildford & 2 surface reservoirs & 1 pumping station on the south-eastern corner of Durham Street & Grand Avenue, Rosehill. Approximately 20 kilometres of distribution pipeline. Click for more details...

BOWRAVILLE OFF RIVER WATER STORAGE
A project in the NSW Within Nambucca. Bowraville Off-River water storage project. The project consists of 2 work packages: A - Off-River Storage & Access Road & B - Water Collection & Transfer Infrastructure. Package A includes the following: clearing of approximately 64 ha of land at the storage site. Temporary site services & site facilities. Diversion works including conduit, intake tower base & valve house & associated inlet & outlet channels. Foundation stripping & preparation. Two permanent coffer dams will be constructed, one upstream & one downstream of the main embankment. Main zoned earthfill embankment including filters and upstream riprap materials. Embankment instrumentation, including piezometers & terminal readout stations, settlement points, v-notch weir, storage level gauges, rainfall gauge and water quality monitoring equipment. Spillway, spillway channel & dissipator structures, plus other downstream protection works. Destratification system for the dam storage. Intake tower with access bridge. Valve house. Pipework, valves and flow meter. Construction includes the upgrading of the section of Bobo Road between Valla Road and the storage area. The upgraded road will be approximately 1.5 km long and will have a 6m wide sealed carriageway and 1m wide unsealed shoulders. Package B includes - expansion of the borefield along the Nambucca River & South Creek to accommodate an additional 2 bores and expand field capacity to 26 ML/day. Construction of a new 90kL collection tank. Construction of a new 15 ML per day pumping station near the bore field collection tank. Construction of approximately 2,000 metres of 450 mm pipeline to connect the existing collection tank to the proposed off-river storage. Provision of power to the relevant facilities. Extension of the existing telemetry system. Stabilisation of the river bed & bank. Click for more details...

UNIVERSITY OF NEWCASTLE
Public Utilities (Pumping Stations) New project at Lot 16 University Dr (DP81750), Callaghan, NSW 2308. This type is Waste Water Pump Station with State ownership. Alterations & additions to existing waste water pump station. Scope of work includes: packaged pump station, wet well, pumps & discharge pipe work; rising main; emergency storage & connection to the existing sewerage system. Click for more details...

PLOUGHMANS CREEK STORMWATER HARVESTING
Public Utilities (Pumping Stations) project In The Orange Council Area of Stormwater Harvesting type. Construct a stormwater harvesting ccheme on Ploughmans Creek in Orange. The Harvesting Scheme will involve re-using stormwater captured from urban run-off, treating and re-using as a potable water supply. Works under this Contract will include the construction of pipelines required to transfer harvested stormwater from the west side of Orange and connect to the holding pond. Click for more details...

BUNDANOON DAM PUMPING STATION
Currently at the Construction stage In Wingecarribee is a project estimated to be $ 219000. This project The works comprise: Separable Part 1: Mechanical & minor civil works involving the decommissioning & removal of the existing 3 pump sets & the installation & commissioning of new 2 pump sets complete with associate suction/delivery pipe & minor civil works to facilitate the project. Separable Part 2: Electrical & control works involving the decommissioning & removal of existing pump electrics & controls & equipment, VSD's & control systems. Click for more details...

BALLINA SHIRE COUNCIL SEWERAGE PUMP STATION
A project in the NSW Within Ballina. Construction of sewerage pumping station & associated works Click for more details...

HIGHLANDS SOURCE PROJECT
New project of Public Utilities (Pumping Stations) project at Wingercarribee Reservoir, Goulburn, NSW 2580. Construction of the Highlands Source Project pumping station, a 5 ML/d pumping station located at the Wingercarribee Reservoir Click for more details...

NORTH WEST GROWTH CENTRE - PACKAGE 2
State ownership Public Utilities (Pumping Stations) project In The Various Council Area for New development. Construction & operation of drinking water & wastewater infrastructure to service the North West Growth Centre second release precincts (Box Hill, Box Hill Industrial & Schofields). Construction of new trunk lines for drinking water & wastewater. New pumping station. New reservoir site. Drinking water will comprises approximately 14 km of pipelines; 2 x storage reservoirs, including one surface reservoir & one elevated reservoir (Box Hill Reservoir); 2 x water pumping stations (Nelson Water Pumping Station & Box Hill Reservoir) & ancillary works. Wastewater infrastructure comprises approximately 10 km of pipelines to transfer wastewater to Riverstone Wastewater Treatment Plant and Rouse Hill Water Recycling plant & ancillary works Click for more details...

MURRAY-DARLING BASIN
Stock/Domestic Water Reticulation Systems project at Murray Darling Basin, ., NSW 2999 In The Council Area Of Various of State. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls and telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation & construction of stock and domestic water supply reticulation system. Installation &/or construction of pipelines, valves, tanks, troughs and all associated equipment to ensure efficient operation & supply Click for more details...

MURRAY-DARLING BASIN
Murray Darling Basin, ., NSW 2999 Has Murray-Darling Basin currently at Planning stage. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls & telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation &/or construction of pipelines, valves, tanks, troughs & all associated equipment to ensure efficient operation & supply Click for more details...

COLEBEE SEWAGE PUMPING STATION SP1181
Pumping Station New project In The Blacktown Council Area. Construction of sewage pumping station SP1181. Scope of work includes: civil works - An integrated reinforced concrete inlet manhole/wet well structure of approximately 9m depth; an integral valve chamber; an emergency relief chamber; 16m high vent shaft; pipes & fittings and other ancillary works within the pump station; civil works (eg surface drainage, overflow outlet structure, hardstand, all weather access road, earthworks, retaining walls); approximately 1000m of DN200 & DN250 PE100 PN16 sewer pressure main & connection to incoming water supply. Mechanical & Electrical works include supply, installation commissioning of 2 x submersible pump units & other ancillary works; an outdoor electrical kiosk; a chemical dosing unit (CDU) (Provisional); connection to incoming power supply; connection to incoming telecommunication network; Electricals & instrumentation controls & testing & commissioning of all equipments including factory acceptance testing, pre-site & site acceptance testing. Click for more details...

BYRON STREET PUMPING STATION SP3001 REPLACEMENT
Public Utilities (Pumping Stations) project at Byron St, Lennox Head, NSW 2478 for Renovations, Refurbishments etc.. Byron Street sewage pumping station replacement. To include supply, construction, testing & commissioning to deliver fully operational infrastructure under the Byron Street sewage pumping station. Associated civil works. Click for more details...

APEX PARK SEWAGE PUMPING STATION (SPS WS11)
Public Utilities (Pumping Stations) project at 150 Pacific Hwy, Wyong, NSW 2259 for New. Upgrade of existing sewage pumping station Click for more details...

AWABA WASTE DISPOSAL FACILITY
Public Utilities (Pumping Stations) project for New development. Construction of a package pump station & rising sewer main from the Awaba Waste Management Facility to Rathmines No 6 Waste Water Pump Station Click for more details...

BALD HILL RESERVE
Bald Hill Reserve is currently at the Construction stage, valued at about $ 2200000 it is Stage 2B of the Bald Hill Reserve upgrade. Scope of work includes: site establishment, control of pedestrian & traffic movement to and from site, demolition of existing footpaths, street furniture & foundations, construction of sewers, tankage, sewage pumping station, sewage forcemain, underbore & connection to Sydney Water's system, electrical main switch board & electrical distribution system & lighting, water distribution system, taps & drinking water fountains, telecommunication works, construction of carparks, retaining walls, concrete promenade & plaza, concrete bleachers, footpaths & ramp access, viewing platform & balustrading, street furniture, signage & artwork, landscaping, planting, restoration of the site. Click for more details...

GOOLGOWI & HILLSTON PUMPING STATIONS
New project of Public Utilities (Pumping Stations) project at Goolgowi & Hillston, Hillston, NSW 2675. Design & install solar systems on Goolgowi and Hillston pump sites. Scope of work consists: design & supply of material, equipment, labour & services necessary for installation of solar system including testing & commissioning on selected pump sites Click for more details...

BURRAWANG PUMPING STATION
State ownership Public Utilities (Pumping Stations) project In The Wingecarribee Council Area for New development. Electrical systems upgrade of Burrawang Pumping Station Click for more details...

CAERLEON SUBDIVISION
A project in the NSW Within Mid Western Regional. Water supply & sewage distribution infrastructure for the Caerleon Subdivision. Scope of work includes: Construction of one water trunk main Ø300mm x 3500m long, constructed from DICL (with alternative materials being considered as alternative tender submissions). Construction of 2 sewer rising mains Ø180mm x 2100m long, constructed from DICL (with alternative materials being considered as alternative tender submissions). Design & construct sewage pump station to service the fully developed catchment. Click for more details...

SEWAGE PUMP STATION G8
Local Govt ownership Public Utilities (Pumping Stations) project In The Gosford Council Area for New development. Construction of a new sewage pump station G8, retention tank, modification to rising main, decommissioning and demolition of existing pump station Click for more details...

COBAR WATER BOARD - TWIN PIPELINES
Public Utilities (Pumping Stations) project In The Cobar Council Area of Pipelines/Pump Station - Replacement type. Project comprises 4 sections. Nyngan to Cobar Pipeline including surge tank sites; Cobar storages; Nyngan Pump Station & Hermidale Pump Station. Nyngan - Cobar pipeline - part replacement - construction of a 29.4 km long 375 mm nominal diameter (DN375) ductile iron cement lined (DICL) pipeline from Nyngan Pump Station (PS) to Hermidale, including: supply & installation of cross connections between the new DN375 pipeline & existing DN375 & DN300 pipelines; supply & installation of air valves, scour & isolation valves including valve pits, surface boxes, discharge pipes; construction of thrust blocks & anchor blocks for bends, tees, tapers & valves; supply & installation of the pipeline connection at the Nyngan PS including all necessary valves, pipework, flow meter, pigging pits; construction of 2 pigging pits for the existing DN375 pipeline at Hermidale Pump station; transfer of existing service connections (11) from the 300 mm pipeline to the new pipeline & all associated works related to the pipeline such as concrete encasements, supports, marker posts & other minor works necessary for the proper completion & functioning of the pipeline. Nyngan Pump station - upgrade works - design & construct - 2 x 450 mm diameter x 6 m deep bores with PVC casings & sealed bottoms; 300 mm inlet pipe from the inlet channel to the bores with an inlet screen & a stop board; two submersible turbine pumps (pot type bore pumps), one duty & one standby, to operate in parallel with other existing main pump(s) at this pumping station; bore pump delivery pipework including valves & a flow meter (associated with the bore pumps); connection of the bore pumping system to the existing Nyngan pumps delivery pipework; instrumentation for the new pumping system such as pressure transmitters, level transmitters in the bores, pressure gauges; variable speed drives (VSD) with associated electrical switchgear for the new pumps & control system & calibration of existing two sets of DN 300 and DN 375 flow meters. Hermidale pump station - upgrade works - design/construct - three flow meters with necessary pipework including locating existing pipelines; two vertical multi-stage centrifugal type jacking pumps, one duty & one standby to operate in parallel with other main pump(s) at this pumping station; a building for jacking pumps; suction & delivery pipework including valves & a flow meter associated with the jacking pumps; connection of the new jacking pumping system to the existing Hermidale pumps suction an delivery pipework; instrumentation for the new pumping system such as pressure transmitters, pressure gauges for the jacking pumps delivery as well as a level sensor inside the balance tank to control the new pumps; Variable Speed Drives (VSD) with associated electrical switchgear for the new pumps & control system; modification to the ventilation ducts & louvres in the existing pump station building to suit the construction & operation of the proposed jacking pump building. Improvements to surge tanks along to Nyngan to Cobar pipeline - modification to the existing pipework including replacement of all above-ground pipework and valves at the Mount Boppy Surge tank; provision of a level sensor (for monitoring of water level) in Mount Boppy surge tank with necessary electrical & telemetry works; modification to the existing inlet pipework for surge tanks at chainages 44.41 km and 16.7 km. Improvements to control valves at Cobar staorages - installation of 2 sets of electrically actuated valves with necessary pipework including: pits, pressure transmitters (one on each rising main feeding to Cobar inground storage tank), power supply, electrical & telemetry works; locating & cutting the existing pipes and construction of a pit & cover for each; an isolation valve on the upstream side of the each valve outside the pit is also to be provided. te Click for more details...

DAVIS DR SEWER PUMP STATION
Davis Dr Sewer Pump Station is currently at the Construction stage, valued at about $ 122000 it is Construction of a sewer pump station Click for more details...

SEWAGE PUMP STATION C
Public Utilities (Pumping Stations) project In The Hawkesbury Council Area of Local Govt ownership. Replacement of an existing pump station & associated works. Scope of work includes: a new diversion manhole; new sewage pumping station with three pumps: two duty and one standby; new valve pit; odour control; new electrical equipment and controls; new permanently mounted diesel driven automatic generator; an above ground steel platform (approximately 10 m above ground level) housing all electrical equipment diesel generator & new sewage rising main from SPS C to McGraths Hill STP Click for more details...

SEWER PUMP STATION NO2
Public Utilities (Pumping Stations) project for New development. Remedial works to ewer pump station no 2. Scope of work includes: provision of safe access to the sewer pump station which will enable the remedial works to be carried out while the pump station by-pass is operational. The depth of the wet well is 11.2 m and 4.5 m diameter with 3 pumps. Click for more details...

NORTH BEGA SEWERAGE SCHEME
Sewerage Treatment Plant project at Lagoon St, North Bega, NSW 2550 in the Public Utilities (Pumping Stations). Construction of a sewerage reticulation system new pumping station & rising main. The SPS will initially transfer sewage from the Bega Cheese visitor centre (Lagoon St) & employee facilities (Ridge St & Lagoon St). Click for more details...

WYOMING PUMP STATION
Public Utilities (Pumping Stations) project In The Gosford Council Area of Pump Station - Refurbishment type. Refurbishment upgrade of the existing Wyoming major sewage pump station. Scope of work includes: replacement of the existing internal pipework, fittings, installation of pumps & electrical SCA equipment supplied by council. The upgrade works will require substantial bypass pumping operation & management for the duration of the upgrade works. Click for more details...

THE NORTH WALDAIRA WATER EFFICIENCY SCHEME (WES)
Public Utilities (Pumping Stations) project at ., Balranald, NSW 2715 for New. North Waldaira WES involves the installation of approximately 63km of high density polyethylene pipes of varying diameters, poly tanks, a steel tank, concrete troughs and pads, a river pump station and associated farm water and domestic non-potable water supply infrastructure. Scope of work includes: maintain protection of existing works & services. Reinstatement & restoration of the works. Supply, install & maintain site water, sewer, phone & electricity. Supply, install, maintain & clean site accommodation, sanitation and other ancillary facilities. Construct and maintain access required to complete the works. Construct, maintain & removal of temporary security fencing where required. Pipeline - supply & installation of polyethylene pipe, including all necessary fittings, valves and tees. Supply & installation of water storage tanks, at various sites, including foundation preparation and inlet and outlet fittings. Design & construct the river pumping station. Electrical services and power supply Click for more details...

SOMERSBY INDUSTRIAL ESTATE
New project of Public Utilities (Pumping Stations) project at Somersby Falls Rd, Somersby, NSW 2250. Construction of a new sewage pump station (SI4) & connection to existing gravity mains & rising main. Scope of works includes construction of new wet well, valve pit, raised switchboard platform, driveway hardstand & turning area. Click for more details...

TERRARA COURT OCEAN SHORES PUMP STATION
Local Govt ownership Public Utilities (Pumping Stations) project In The Byron Council Area for New development. Demolition of existing structures associated with the existing pump station. Conversion of the existing wet well into an inlet collection manhole. Dealing with existing flows, inclusive of bypass measures, tanker arrangements &/or any other measures required to ensure that existing flows are effectively dealt with in accordance with the relevant legislation, council requirements and the specification. Protection of existing services and structures during all stages of construction. Excavation for the pump well structure, pits, pipework, including support works and maintenance of the excavations. Forming & pouring of concrete pump well structure, valve pit, switchboard under slab, including covers & cast-in pipework. Epoxy lining of the new wet well and the collector manhole. Supply, assembly & installation of a raised switchboard structure, including stairs, conduit protection cubicle, cable trays, switchboard & all associated components. Supply, testing & installation of the electrical switchboard (complete with metering compliant to Essential Energy requirements, standby genset supply connections). Supply, install, commission pump station instrumentation & all electrical equipment for the control of pumps. Supply, installation & connection of all electrical & communications systems. Supply & installation of electrical conduits, cable pits & cable support structures (ladders, supports & covers). Supply, installation, testing & commissioning of 2 duty/standby submersible pumps. Supply, assembly, installation, hydrotesting & commissioning of all new pipework inclusive of all valves, fittings, thrust & anchor blocks. Backfilling & compaction of buried pipework & around the pump station. Reinstatement & clean up Click for more details...

CENTRAL COAST COUNCIL SEWAGE PUMP STATIONS
various locations in the Central Coast Council area, Gosford, NSW 2250 Has Central Coast Council Sewage Pump Stations currently at Construction stage. Supply, installation & commissioning of 4 chemical dosing units (CDUs) at sewage pump station sites - FB1, KA3, N23 & SD5 including removal of existing units. Click for more details...