State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pumping Stations Projects in QLD


GOLD COAST CITY COUNCIL - BEENLEIGH WATER RECLAMATION FACILITY
Reclaimed Water Transfer Pumping Station/Pipeline New project In The Gold Coast City Council Area. Construction of reclaimed water pumping station (separable Portion A) & associated pipelines (Separable Portions B & C). Click for more details...

GOLD COAST CITY COUNCIL
Currently at the Construction stage In Gold Coast City is a project estimated to be $ 470000. This project SCADA/Telemetry installations & upgrades to 50 pump station sites. Includes provision of new SCADA/telemetry systems to 39 existing sites as well as modification/upgrade to a further 11 sites. Click for more details...

ROSSMEAD ACRES
Rossmead Acres is currently at the Construction stage, valued at about $ 300000 it is Construction of reinforced concrete sewage pump station & rising main, supply, installation & commissioning of submersible sewage pumps & control equipment & associated works. Click for more details...

HERBERT RIVER SUGAR INDUSTRY
Currently at the Tenders & Building stage In Hinchinbrook Shire is a project estimated to be $ 500000. This project Herbert River Sugar Industry infrastructure requires works for individual projects involving: earthworks for levees, drains & wetlands; construction of culverts, concrete control structures & pump stations; mechanical contracts for the lubrication & installation of an overshot gate; electrical & controls for gates & pump stations. Click for more details...

SUNWATER
Public Utilities (Pumping Stations) project In The Burdekin Shire Council Area of Pump Station type. Work includes: remove existing 415V switchboard & control gear, supply/install/commission replacements; remove two existing pumpsets & line sharfts; remove/re-instate concrete pump plinths, floor; supply/delivery/install two new pumpsets including associated pipework, commission installation. Click for more details...

GOLD COAST CITY COUNCIL
Public Utilities (Pumping Stations) project In The Gold Coast City Council Area of Safety Nets For Wastewater Pumping Stations type. Work includes manufacture, supply & installation of safety nets. Click for more details...

CABOOLTURE PUMP STATION
Local Govt ownership Public Utilities (Pumping Stations) project In The Moreton Bay Regional Council Area for New development. Construction of a sewer pump station, sewer rising main and trunk water main. Click for more details...

CLIFTON SHIRE COUNCIL MOWEN STREET PUMP EQUIPMENT
A project in the QLD Within Toowoomba Regional. Manufacture, delivery to site, installation & testing of electrically driven direct coupled pumps, complete with motors, variable frequency inverters, switchboard control equipment, pipework, wiring & other ancillary equipment for high lift pumping station. The required duty is 40 L/s against a total head of 51 m. Click for more details...

GOLD COAST CITY COUNCIL PIMPAMA COOMERA WATER FUTURE PACKAGE D
Public Utilities (Pumping Stations) New project at Various Locations in, Gold Coast Mc, QLD 4217. This type is Reservoirs/Sewerage Treatment - Package D with Local Govt ownership. Includes the design and construction of potable and recycled water mains and sub-mains, pumping stations, reservoirs, wastewater gravity mains, wastewater rising mains and pumping mains. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

SUNWATER MECHANICAL/ELECTRICAL WORKS
Public Utilities (Pumping Stations) project In The Not Yet Determined Council Area of Mechanical/Electrical Works type. Pump Stations: Bore - design/supply/works test/install/connect/commission: submersible pump/motor, pipework, flowmeter, electrical power system; Main - install/connect/commission purchaser-supplied pumps/motors, valves. Design/supply/works test/install/connect/commission ancillaries/electrical power/services/controls system, pipework, flowmeters. Pipeline, storages - design/supply/works test/install/connect/commission systems: communications/SCADA/level sensors/flowmeters/solar power. Click for more details...

BAUHINIA SHIRE COUNCIL PUMP STATIONS
Public Utilities (Pumping Stations) project In The Central Highlands Regional Council Area of Pump Stations (2) type. For the supply, install and commissioning of two sewerage pump stations in the township of Rolleston. Click for more details...

MOUNT ISA CITY COUNCIL PUMP STATION/SEWER RISING MAIN
Public Utilities (Pumping Stations) project In The Mt Isa City Council Area of Pump Station/Sewer Rising Main type. Upgrade of Pump Station No. 4 - Disassembly of existing switchboard, pumps, valves and pipe work. Supply, installation and testing of 2 Grundfos submersible pumps. Supply, installation and testing of DN 150 & DN 100 DICL pipe, valves and steel fittings. Installation of pvc drainage pipe. Construction of valve pits. Supply of portable flowmeter. Supply, installation and testing of a new switchboard. Supply and installation of electrical cable from power pole to switchboard. Sewer Rising Main (2.6km) - 2644 cu.m of trench excavation & backfill for new Sewer Rising Main including supply and placement of : 1193 cu.m sand. 413 cu.m compact select backfill. 651 cu.m roadbase. 1128sq.m asphalt. 98 cu.m 20 MPa concrete. 3986m of DN 250"Blue Brute" PVC pipe. 1454m of DN100 "Blue Brute" PVC pipe. 27m of DN 250 DICL pipe. Supply and installation of air valve. Supply, installation and electrical connection of flow meter. Construction of valve pits. Click for more details...

BMP ALLIANCE PUMP STATION CONTROL BUILDING
Public Utilities (Pumping Stations) project In The Gold Coast City Council Area of Local Govt ownership. Construction of 400 sqm single storey control building at new wastewater pump station. Works include construction of a suspended concrete slab on piles (installed by others), building block walls, electrical installation & architectural detailing. Click for more details...

UPPER COOMERA BOOSTER PUMPING STATION
Public Utilities (Pumping Stations) project at Days Rd, Upper Coomera, QLD 4209 for New. Design & construction of Booster Pumping Station at Upper Coomera as part of Pimpama Upper Coomera Water Future Project - package d Click for more details...

PIMPAMA WASTEWATER PUMPING STATION
New project of Public Utilities (Pumping Stations) project at Yawalphah Rd, Pimpama, QLD 4209. Design & construction of Wastewater Pumping Station at Pimpama as part of Pimpama Upper Coomera Water Future Project - package d Click for more details...

BARGARA WESTERN BY PASS SEWER PUMPSTATION X STAGE 2
Pump Station - Diversion Works - Stage 2 New project In The Bundaberg Regional Council Area. Construction of approximately 130m of 375mm uPVC SN10 sewer main, 15m of 225mm uPVC SN10 sewer main, related maintenance holes and provisions for connection of future works, excluding the supply of pipes and associated fittings. Click for more details...

DIMBULAH WATER RESERVOIR
Water Reservoir project at ., Dimbulah, QLD 4872 In The Council Area Of Tablelands Regional of Local Govt. Design and Construction of a 200 megalitre water reservoir Click for more details...

ORMEAU RESERVOIRS
Reservoir project at Opermann Dve, Ormeau, QLD 4208 In The Council Area Of Gold Coast City of Local Govt. Design and Construction of a 13.6ML and an 8.4ML concrete reservoir adjacent to an existing concrete reservoir and associated works. Click for more details...

TOWNSVILLE WASTEWATER UPGRADE PROGRAM
New project of Public Utilities (Pumping Stations) project at ., Townsville, QLD 4810. Mather street Pump Station Upgrade located near the Mt St John Water Treatment Plant in Townvsille. The construction of a 106,500 EP sewerage treatment plant, 27km of pipelines, four main sewerage pump stations and minor ancillary works involving minor control and mechanical upgrades and decommissioning works. Click for more details...

LOGAN WATER INFRASTRUCTURE PLANNING & DELIVERY
Water Infrastructure project at ., Logan Central, QLD 4114 In The Council Area Of Logan City of Local Govt. Logan Water Infrastructure Planning & Delivery Program Alliance Agreement. Work includes pipelines, pump stations, reservoirs, treatment plants, acces roads, electrical & mechanical works & ancillary projects. Click for more details...

SUNSHINE COAST SEWERAGE PUMP STATIONS
Sewerage Pump Station (2) New project In The Sunshine Coast Regional Council Area. Construction of 2 sewerage pump stations. Click for more details...

LIBERTYRISE SEWERAGE PUMP STATION
New project of Public Utilities (Pumping Stations) project at Off Dalrymple Rd, Townsville, QLD 4810. Supply & construction of sewerage pump station PS LR1, rising main, & associated works. Click for more details...

NOOSA WASTE WATER TREATMENT PLANT RECYCLED WATER STAND PIPE CONSTRUCTION
Public Utilities (Pumping Stations) project at via, Noosa Heads, QLD 4567 of Recycled Water Stand Pipe Facility type of New development. To include construction of new stand pipe facility with the capability of installing a second stand pipe in the future. Supply & installation of a tee & valve from the proposed pump & pipe work for the future Girraween Sport Field irrigation. Provision of as constructed information & commissioning of new stand pipe facility. Click for more details...

NAMBOUR LANDFILL LEACHATE PUMP STATION & RISING MAIN
Public Utilities (Pumping Stations) project In The Sunshine Coast Regional Council Area of Landfill type. Construction of leachate pump station & rising main. To include fittings, rising main, electrical work & telemetry. Click for more details...

LINKWATER STONES ROAD SCADA EQUIPMENT UPGRADE
Public Utilities (Pumping Stations) project at Stones Rd, Sunnybank, QLD 4109 for New. Upgrade of SCADA equipment at the Linkwater Stones Road pump station. Click for more details...

CAIRNS REGIONAL COUNCIL WASTEWATER PUMP STATIONS & PIPES PROGRAM
Cairns Regional Council Wastewater Pump Stations & Pipes Program is currently at the Construction stage, valued at about $ 12000000 it is Contractor to manage the delivery of wastewater pump stations & pipes program. Click for more details...

WIDE BAY WATER CORPORATION TEDDINGTON RAW WATER INTAKE
Raw Water Intake/Pumping Station project at 14km South of, Maryborough, QLD 4650 In The Council Area Of Fraser Coast Regional of State. Construction of new raw water intake structure & pumping station to replace existing at Teddington Weir, 14km south of Maryborough. To include series of circular wedge wire inlet screen at different levels with pipework to raw water pumps which are to be housed in new dry well constructed outside of river channel. Click for more details...

AITKENVALE GRAVITY SEWER & RISING MAIN
Gravity Sewer & Rising Main project at Alfred St & Anne St, Aitkenvale, QLD 4814 in the Public Utilities (Pumping Stations). Cosntruction of a sewer pump station and associated rising main. Supply & construction of DN225 PE gravity sewer over Alfred Street. Supply & construction of DN280 PE rising main over a length of 42m from pump station PS9K into the DN300 AC common rising main in Anne Street. Supply & construction of a number of standard DN1200 maintenance holes. Click for more details...

AWOONGA DAM PUMP STATION VSD REPLACEMENT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 1500000. This project Replacement of two existing Emsby Robicon VSD's with two new adjustable speed drives. Works to include design, manufacture, testing, removal of existing drives, installation of new drives & testing & commissioning. Click for more details...

COOCHIN TWINS ESTATE RESIDENTIAL SUBDIVISION STAGES 5 & 6
Public Utilities (Pumping Stations) project In The Sunshine Coast Regional Council Area of Private ownership. Construction of 25 residential lots. To include a pump station, 3 park lots (5.128ha) & new road (515m). Stage 5 - 13 lots, area 2.709ha, new road 335m. Stage 6 - 12 lots, area 1.119ha, new road 180m. Click for more details...

EDEN PARK SEWAGE PUMPSTATION PS J1 & RISING MAIN
Private ownership Public Utilities (Pumping Stations) project In The Townsville City Council Area for New development. Supply & construction of the Eden Park sewage pump station & PS J1 & Rising Main. Click for more details...

GOLD COAST CITY COUNCIL LOW VOLTAGE SWITCHBOARD REPLACEMENTS
Public Utilities (Pumping Stations) project at Various locations, Gold Coast Mc, QLD 4217 for New. Replacement of low voltage switchboards at various locations in Gold Coast City Council. Locations to include SPS A38 - Seaworld Drive Main Beach, SPS A72 - Sunrise Boulevard Surfers Paradise & SPS B13 - Tallebugera Fitness Camp Palm Beach. SPS B42 - The Esplanade Miami, SPS B52 - Landau Court Miami, SPS OX16 - Monterey Keys Helensvale & SPS TH4 - Lang St Bilinga. SPS D54 - Pine Ridge Street Biggera Waters, SPS SS40 - Sullivans Road Andrews & SPS OX0 - Oxenford Southport Road Hope Island. WPS MA2 - Trentbridge Court Mount Nathan, WPS MU5 - Veronica Drive Tallai & WPS MU11 - Canopy Drive Bonogin. Click for more details...

CAIRNS REGIONAL COUNCIL SEWAGE PUMP STATION J UPGRADE
A project in the QLD Within Cairns Regional. Construction of works associated with the upgrade of the existing Sewerage Pump Station J located within Munro Martin Park on the corner of Grafton Street & Minnie Street. To include construction of a new 560OD PN16 PE100 rising main. Click for more details...

CAIRNS REGIONAL COUNCIL RISING MAIN K AUGMENTATION
Public Utilities (Pumping Stations) project at Sheridan St, Cairns North, QLD 4870 for New. Construction of a new 1000 mm PN16 SDR11 PE100 Pump Station K Rising Main. The existing rising main is located in the footpath of Sheridan Street between Lily Street & Rutherford Street in North Cairns. The new main will be a realignment along an approximate 5m offset inside the properties fronting Sheridan Street, these being the Cairns International Tennis Centre, the Tobruk Pool, the Cairns Hockey Fields & the Mother of Good Counsel School. The new DN1000 rising main is approximately 480m in overall length & will utilise a combination of trenched & trenchless construction methodologies. A Horizontal Directional Drill is planned for approximately 300m & a 50m Pipe Jack of 1200mm steel is proposed. Click for more details...

SURFERS PARADISE SEWAGE PUMP STATION A03 UPGRADE
Surfers Paradise Sewage Pump Station A03 Upgrade is currently at the Construction stage, valued at about $ 997000 it is Upgrade to the sewage pump station at Lionel Perry Park, Surfers Paradise. To include the design, manufacture, install, inspect, test & commission of replacement switchboards. Supply & replacement of pumps & valves & install new suction pipe. Internal/external refurbishment of the pump station building. Disposal of waste. Associated mechanical, electrical & civil works. Click for more details...

MACKAY REGIONAL SEWERAGE PUMP STATION RESILIENCE UPGRADES
Public Utilities (Pumping Stations) Renovations, Refurbishments etc. project at Various location across, Mackay, QLD 4740. This type is Sewerage Pump Statons - Upgrade with Local Govt ownership. Upgrades to 42 identified sewerage pump stations across Mackay region. Project includes installation & construction of new ventpoles, new switchboards including slabs or elevated structures, electrical conduits & relining of wet wells. Access improvements including driveways, culvert crossings & retaining wall, pump station structural modifications including removal of 3 buildings & construction of new well cover slabs, minor concrete pit & wet well condition assessments of existing sewage pump stations. Associated civil & construction works. Locations include Carbeen Street, Hargreaves Street, McMahon Street, Monique Court, Tramontana Street, Apsley Way & Renae Street, Andergrove. Parkview Court & Beaconsfield Road No 2, Beaconsfield. Dewars Road, Bakers Creek. Backs Beach Road, Camilleri Street, Eimeo Road No 1 & 2 & Shann Street, Eimeo. Caroline Street, Mirani. Downie Avenue, Ellis Avenue, Geoffrey Thomas Drive, Griffin Avenue, Shoal Point Road No. 1, Waverley St & Williams Avenue, Bucasia. Malcomson Street No 2, Suncrest Court & Flors Avenue, Mount Pleasant. Burgess Street, Forgan Street, Hamilton Street, Malcomson Street No 1 & Willetts Road, North Mackay. Farrellys Road, South Mackay. Nebo Road, Hart Street& Cullen Street, Mackay. Blackwood Street, David Muir Street No 1 & 2 & Pacific Esplanade, Slade Point. Pugsley Street No.2 & Saunders Street, Walkerston. Denman Avenue, Shoal Point. Click for more details...

LAKES CREEK NO 2 SEWAGE PUMP STATION CIVIL SAFETY UPGRADE
Public Utilities (Pumping Stations) project for Renovations, Refurbishments etc. development. Civil & electrical upgrade Lakes Creek No.2 Sewage Pump Station. To include new 2850mm x 1600mm rear switchboard slab, switch board, 6m pole lighting, relocation of washdown water supply & washdown stainless steel cubicle. Click for more details...

CALOUNDRA PUMP STATION UPGRADE
Public Utilities (Pumping Stations) New project at Various locations in, Caloundra, QLD 4551. This type is Pump Station - Upgrade with Private ownership. Mechanical & electrical works at 3 pump stations in Caloundra. Works to include retrofit of Well 1 (SPS-LMT002) for a high lift pump station with 3 duty pumps each 263 L/s variable speed capacity. Conversion of existing Well 2 (SPS-LMT001) pump station to a low lift station. To include construction electrical switchboard building. Construction of new DN450 sewage rising main from Well 1 to Well 2 inlet. Replacement with higher head pumps at SPS-CAL001 pump station. Click for more details...

ROCKHAMPTON COUNCIL SEWAGE PUMP STATION ELECTRICAL SAFETY & SWITCHBOARD UPGRADE
Sewage Pump Station - Upgrade New project In The Rockhampton Regional Council Area. Electrical safety & switchboard upgrade at the Lakes Creek No 2 Belmont Road & Prestige Estate Sewage Pump Station. To include new switchboard, installation of PVC conduits, 90 degree sweeps, LED Lighting & associated works. Click for more details...

CHINAMAN CREEK DAM SWITCHBOARD UPGRADE
Public Utilities (Pumping Stations) project at Chinaman Creek Dam Rd, Cloncurry, QLD 4824 of Pump Station - Switchboard Upgrade type of New development. Design, construction & installation of a new switchboard replacement at Chinaman Creek Dam Harvest Pumps. Click for more details...

GOLD COAST CITY COUNCIL SEWERAGE PUMP STATIONS
Public Utilities (Pumping Stations) project at various locations in Gold Coast City Council area, Surfers Paradise, QLD 4217 for New. Undertake sewerage pump station emergency storage augmentation at various locations. Work will be delivered in two separable portions according to catchment areas. Separable Portion 1 - Stapylton, Helensvale, Pimpama, Coombabah & Merrimac East Catchments. Separable Portion 2: Coombabah, Merrimac West & Elanora Catchments. Click for more details...

NAMBOUR LANDFILL PUMP STATION
Pump Station/Rising Main project at ., Nambour, QLD 4560 In The Council Area Of Sunshine Coast Regional of Local Govt. Construction of a complete system to pump sewerage combined with leachate from the Nambour landfill sewer pump station to the nominated connection location at the Unitywater sullage pipeline through to the sewerage treatment plant. Scope of work includes: supply, install & commission of sewer pump station. Decommissioning & demolition & disposal of existing septic tanks. Supply, install & commission of duel sewer/leachate rising main to sewerage treatment plant. Supply, install & commission internal leachate main from existing leachate wells to the onsite tank farm. Supply, install, test & commission all (internal and external to site) civil, electrical & mechanical equipment to fully operational status. Undertake repairs to existing leachate well infrastructure. Excavation and placement of sewer pipelines within the site. Installation of pumps and telemetry systems. Horizontal Directional Drilling - road under-boring both Bli Bli Road & the Bruce Highway from the Nambour Landfill site through to Unitywater Nambour sewerage plant Click for more details...

A05 SEWER PUMP STATION
cnr Veolia Driveway & QAL Access Rd, Gladstone, QLD 4680 Has A05 Sewer Pump Station currently at Construction stage. Supply & installation of new pumps, switchboard and pigging pit. Reconditioning of dry and wet well. Click for more details...

DALBY WATER DISTRIBUTION HIGH SERVICE PUMP STATION
Public Utilities (Pumping Stations) project at ., Dalby, QLD 4405 of Pump Station type of New development. Upgrade of the Dalby Water Distribution High Service Pump Station Click for more details...

CORAL COVE SEWER PUMP STATION
Public Utilities (Pumping Stations) project at Pebble Beach Dr, Coral Cove, QLD 4670 of Pump Station type of New development. Design, manufacture, transport &installation of Fibre Reinforced Plastic (FRP) Sewer Pump Station. Ancillary structures & fittings. 50m x DN150/DN100 PVC-O PN16 sewerage pressure main. Electrical Conduits. Coral Cove Sewerage Gravity main comprises 100m x DN225 PVC-U SN8 sewerage gravity main with ancillary structures & fittings Click for more details...

FOUR MILE PLANTATION IRRIGATION PUMP STATION
., Maryborough, QLD 4650 Has Four Mile Plantation Irrigation Pump Station currently at Construction stage. Supply, installation & commissioning of an effluent irrigation pump station including all pipework, electrical equipment, pumps & structures at Four Mile Plantation. Scope of work includes: installation & construction of pump station including all pipe work, pumps, electrical, structures & associated infrastructure Click for more details...

BOYS AVENUE RESERVOIR
Public Utilities (Pumping Stations) project In The Fraser Coast Regional Council Area of Local Govt ownership. Installation of approximately 250m of DN450 and DN600 pipework, valves, pits and other minor civil works to configure the operation of the existing reservoirs and pump stations at Boys Avenue and Aberdeen Avenue Click for more details...

INGHAM SEWERAGE PUMP STATIONS
A project in the QLD Within Hinchinbrook Shire. Scope of works includes: Refurbishment of the existing station including provision of pumps, valves, pipework and flow meters. Installation of steel access platforms for new electrical switchboards. Installation of new switchboards. Associated civil works, including excavation, dewatering, trenching and backfilling. Click for more details...

ROCKHAMPTON REGIONAL COUNCIL SEWERAGE PUMP STATIONS
Pump Stations - Switchboard Replacements New project In The Rockhampton Regional Council Area. Design & installation of replacement electrical switchboards at nominated sewage pumping stations, various civil works & the installation of a generator and load bank at Thozet Road Reservoir Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect