State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pumping Stations Projects in VIC


HORSESHOE BEND ROAD PUMPING STATION
cnr Horseshoe Bend & The Esplanade, Torquay, VIC 3228 Has Horseshoe Bend Road Pumping Station currently at Construction stage. Pipeline construction at Horseshoe bend road pump station. Click for more details...

MELBOURNE ROAD PUMP STATION
Sewerage Pump Station,Rising Main, Gravity Sewer - Construction New project In The Mornington Peninsula Council Area. The construction of a 2100mm diameter pump station, valve pit and associated pumps, pipework, fittings and electrical works, 12m of rising main and 130m of gravity sewer main. Click for more details...

CRAIGEBURN NO.2 WATER SUPPLY PUMPING STATION
New project of Public Utilities (Pumping Stations) project at Craigieburn, Craigieburn, VIC 3064. Tenders are invited for the construction of a 320 L/s capacity water supply pumping station in Craigieburn . The works include 4 pumpsets, electrical works, pipework, a 108 square metre brick building and site works. Click for more details...

MACEDON SEWER PUMP STATIONS
., Gisborne, VIC 3437 Has Macedon Sewer Pump Stations currently at Tenders & Building stage. The construction of four submersible sewer pump stations, each 1.8m in diameter. Tenders may submit for the entire works OR portions of the work, which include electrical, mechanical and civil works, emergency storages rising mains and water main extensions. Click for more details...

FLEMINGTON RACECOURSE INTERNAL DRAINAGE WORKS
Public Utilities (Pumping Stations) project In The Moonee Valley Council Area of Local Govt ownership. The Victoria Racing Club invites Expressions of Interest from appropriately qualified parties interested in undertaking the construction of 5 No. Stormwater Pump Stations. Click for more details...

WATER PUMP STATION UPGRADES
Public Utilities (Pumping Stations) project at ., Melton, VIC 3337 of Water Pump Station Upgrades - Design & Construction type of New development. Design & construction of four water pump station upgrades and associated works in the Sunbury and Melton regions Click for more details...

METUNG PUMP STATION BUILDING
Public Utilities (Pumping Stations) project at Off Stirling Street, Metung, VIC 3904 of Pump Station Building type of New development. Works include the construction of a pump station building inclusive of a generator room at the Authority's Water Storage Site. Click for more details...

TUNGAMAH PIPELINE PROJECT
Pipeline Construction New project In The Moira Council Area. The work consists of 360km of pressurised pipeline (50mm-300mm diameter), 140ML earthen storage, pump station and electrics. Click for more details...

FINDON ROAD PUMPING STATION
Pumping Station New project In The Whittlesea Council Area. Proposed construction of a water pumping station to aid the North Epping area Click for more details...

SPRINGHILL ESTATE STAGE 2
Sewerage Pump Station & Rising Main project at North Road, Langwarrin, VIC 3910 In The Council Area Of Frankston of Local Govt. Construction of a sewerage pump station and rising main to serve the Springhill Estate, Stage 2, Langwarrin. Click for more details...

QUARRY ROAD STORAGE RESERVOIR & PUMPSTATION
Storage Reservoir & Pumpstation Construction project at 640 Quarry Road, Cosgrove, VIC 3631 In The Council Area Of Greater Shepparton of Local Govt. Construction of a storage reservoir and pumpstation. Click for more details...

WONTHAGGI DESALINATION PLANT
Wonthaggi Desalination Plant is currently at the Construction stage, valued at about $ 3500000000 it is Construction & operation of one of the largest reverse-osmosis desalination plants in the world. To be located near Wonthaggi in the Bass Coast Region of Victoria, to facilitate the production and supply of desalinated water to Melbourne and potentially parts of the Westernport and South Gippsland regions. The desalination plant will be required to be capable of supplying 150 billion litres of desalinated water a year with the capacity to increase production to 200 billion litres if required. Commitment to renewable energy projects to offset the plants use of energy. Work towards minimising the impact on the invironment with an environmentally friendly and sensitive development encompassing green design from natural landscape to a constructed dune formation, with a living green roof. The development is expected to have minimal visual impact. This will be possible due to the power line being placed underground. Delivery of fibre optic cable to the local community. Click for more details...

PORTARLINGTON GOLF CLUB PUMPING STATION
New project of Public Utilities (Pumping Stations) project at 92 Hood Rd, Portarlington, VIC 3223. Construction of pumping station for stormwater Click for more details...

GREEN GULLY RESERVE IRRIGATION SYSTEM
Public Utilities (Pumping Stations) project at Green Gully Reserve, Green Gully Rd, Keilor Downs, VIC 3038 of Irrigation System type of New development. Design and construct a booster pump station, including pumps, housing, associated pipe work, treatment measures connections and flow meters to irrigate 5 existing and two proposed sports grounds at Green Gully Reserve in Keilor Downs. The construction of the irrigation system upgrades will be considered as provisional items with the total number of grounds selected being at the discretion of Council. The overall scheme involves the diversion and treatment of stormwater from one Melbourne Water stormwater drain, Kealba Park Main Drain, and one Brimbank City Council stormwater drain, Green Gully Close Main Drain located at Green Gully Reserve. Click for more details...

SUNRAYSIA MODERNISATION PROJECT
Sunraysia Irrigation districts Merbein, Red Cliffs &, Mildura, VIC 3500 Has Sunraysia Modernisation Project currently at Construction stage. Renewal of main infrastructure in Sunraysia Irrigation Districts Merbein, Central Mildura and Red Cliffs. All Districts Focus ? Package 6 works total $120.3 million. Merbein Works total $44.2 million will include; Upgrade Merbein Pump Station for Low Pressure Pipeline Supply; Merbein Standpipe; Merbein Low Pressure Pipeline and Channel Decommission Stage 1 to Spur 11/2; Irrigation metering program Merbein District; D&S Metering Merbein District Sub. Red Cliffs Works total $39.4 million will include: Red Cliffs PS Upgrade; Red Cliffs Low Pressure Pipeline and Channel Decommission Stage 1 to Relift PS B&C; Irrigation metering program Red Cliffs District; D & S Metering Red Cliffs District. Mildura Works total $36.7 million will include: Mildura Central and Mid Areas PS Upgrade; Benetook PS Upgrade; K Area Relift PS; K Area Low Pressure Supply Pipeline; Upgrade C Section and Decommission Pipes in Urban area; Irrigation Metering Program Mildura District; D & S Metering Mildura District. Click for more details...

CORIO WEST PUMP STATION UPGRADE
Pump Station Upgrade project at 27 Goldsworthy Rd, Corio, VIC 3214 in the Public Utilities (Pumping Stations). Corio West Pump Station Upgrade. Click for more details...

WATER DALE ESTATE SEWER PUMP STATION
Public Utilities (Pumping Stations) project In The Bass Coast Council Area of State ownership. Construction of a sewer pump station at Water Dale Estate. Click for more details...

GREENVALE PUMP STATION
Public Utilities (Pumping Stations) project In The Hume Council Area of State ownership. Construction of a pump station and small section of water main in Greenvale. The existing pump station feeds water into Greenvale-Yuroke-Sydenham water main, the new pump station will be built to increase pressure and feed to Greenvale-St Albans water main. The dimensions of the Greenvale Pump station when constructed is approximately 6.1 metres high, 8.2 metres wide and 20.2 metres long. Associated works include demolition of a small building and landscaping and revegetation on the creek and around the construction works. Click for more details...

MILDURA MERBEIN SALT INTERCEPTION
Salt Interception/Bore/Pipeline New project In The Mildura Council Area. Refurbishment and expansion of the existing salt interception scheme to increase the capacity from 25,000 to 60,000 tonnes of salt per year. The project aims to prevent 100 tonnes of salt a day reaching the Murray River. The project includes a new 4km pipeline, a series of bores between the Merbein pumping station and Lock 11 in Mildura and replacement of existing pipeline. Click for more details...

BARWON WATER ALLIANCE BANNOCKBURN PUMP STATION
Pump Station New project In The Golden Plains Council Area. Complete the construction (mechanical, electrical & civil works) of the Bannockburn Pump Station and associated pipework. Click for more details...

GEELONG BOTANIC GARDENS STAGE 1
Cnr Dodbury Dr & Eastern Park Dr, Geelong, VIC 3220 Has Geelong Botanic Gardens Stage 1 currently at Construction stage. Water tanks, pumping station and irrigation systems for the Geelong Botanic Gardens. Click for more details...

GLENROWAN SEWERAGE SCHEME
State ownership Public Utilities (Pumping Stations) project In The Wangaratta Council Area for New development. Supply and installation of the sewerage reticulation network, pump stations, transfer mains and associated works for the Glenrowan sewerage scheme. Click for more details...

BARWON WATER COLAC WATER SUPPLY UPGRADE
Gerangamete Treatment Plant, Murroon, VIC 3243 Has Barwon Water Colac Water Supply Upgrade currently at Construction stage. The project will involve constructing a new off-take from the Wurdee Boluc Channel, near Muroon & the existing Barwon Downs Bore field Pipeline; pump station at the Gerangamete Treatment Plant, Barwon Downs; & an 11 km pipeline from there to the existing Colac supply pipeline. While the supplementary supply would normally be sourced from the Wurdee Boluc channel, water also could be accessed from the bore field under extreme dry conditions as a further security measure. Click for more details...

WODONGA PUMP STATION
Currently at the Tenders & Building stage In Wodonga is a project estimated to be $ 200000. This project Design, supply and construction of additional pump for Wodonga No 1 Pump Station, Wodonga. Wodonga No. 1 Pump Station is a critical pump station in the Wodonga sewage network. The station consists of an inlet into two wet wells from which three pumps feed into three rising mains, two 300 mm and one 450 mm. The maximum capacity of the station is 330 l/s. Following recent wet weather events North East Water (NEW) has found the requirement to retrofit a permanent diesel pump to the pump station. The pump shall have suction from wet well 1 and feed into the 450 mm rising main. The pump shall be connected to the existing control system and automatically start at a high level in the wet wells. Click for more details...

BARWON HEADS DRAINAGE UPGRADE CLIFFORD PARADE STORMWATER PUMP STATION
Public Utilities (Pumping Stations) project In The Greater Geelong Council Area of Stormwater Pump Station type. Stage 3 of the Barwon Heads Drainage Upgrade - Clifford Parade Stormwater Pump Station construction. Click for more details...

CARDINIA RESERVOIR DRAINAGE PUMP STATION UPGRADE
Public Utilities (Pumping Stations) project In The Cardinia Council Area of Drainage Pump Station - Upgrade type. Upgrade to Cardinia Reservoir drainage pump station. Click for more details...

EASTERN TREATMENT PLANT OUTFALL PUMP STATIONS UPGRADE
Eastern Treatment Plant Outfall Pump Stations Upgrade is currently at the Construction stage, valued at about $ 8548000 it is Upgrade of the outfall pumping station pump drive at the Eastern Treatment Plant (sewerage treatment disposal). Click for more details...

HAMILTON WATER RECLAMATION PLANT IRRIGATION WORKS
Winter Storage Tank/Pumps/Pipes New project In The Southern Grampians Council Area. Hamilton Water Reclamation Plant (WRP) irrigation works will include: increasing the irrigation area by 58 ha on Wannon Water land to the west of the WRP & construction of an additional 150ML winter storage tank & associated pipework & pumps. Click for more details...

CASTERTON WATER TREATMENT PLANT NEW LAMELLA CLARIFIER
Public Utilities (Pumping Stations) project at Casterton-Penola Rd, Casterton, VIC 3311 of Clarifier/Pipework/Chemical Dosing/Pumps type of New development. Design & construction of new Lamella clarifier at Casterton Water Treatment Plant. The works include, but are not necessarily limited to, the matters or things referred to in the following outline description of the Works & this Specification. Flocculation tank(s) & clarifier(s); Flocculation mixers; Sludge removal system from the clarifier(s). Pipework including: All required valves & fittings Tie ins for clarifier inlet pipe, clarifier outlet pipe, overflow pipe & clarifier sludge pipe; Reinforced concrete works. Access walkways to & on top of flocculation & clarifier tanks; Remove segment of security fence, construction of temporary fencing & construction of access track. Sample water pipework, valves & connection(s) (including sample pump if required). New analysers & instrumentation including: pH analyser for combined inlet to flocculation tank, Turbidity analyser(s) for clarified water, Level switches in or flocculation tank(s) & clarifier overflow; Flow meter in new clarifier sludge pipe; Inlet Main Flowmeter. Electrical, control system works for connection to the WTP PLC & SCADA system for monitoring & integrated control of the new clarifier with the overall WTP operation. Lighting for access at the clarifier & flocculation tanks. Associated O&M manuals & "As Constructed" drawings. All other works necessary for satisfactory operation of the new clarifier system. Control philosophy document & HAZOP workshop for the proposed clarifier system. Relocation of existing services. New clarifier roof (provisional) & pressure filter backwash pump system (provisional). Testing & commissioning period. Proof of performance testing. Training of Wannon Water personnel; & Defects Liability Period services. Click for more details...

BALLARAT SOUTH WASTEWATER TREATMENT PLANT AUGMENTATION WORKS
Primary Solids Project project at Hummfray St South, Ballarat, VIC 3350 In The Council Area Of Ballarat of State. Ballarat South Wastewater Treatment Plant Augmentation Works - Primary Solids Project. The works comprise all construction activities including the supply (with the exception of the new drum thickeners), installation, testing and commissioning. Click for more details...

RIVERSTONE WETLAND, STORMWATER OUTFALL, SEWER PUMP STATION AND FOOTBRIDGE
A project in the VIC Within Whittlesea. Construction of a wetland, stormwater outfall, sewer pumpstation & footbridge & the filling of dams. Click for more details...

LANGSLOW STREET SEWERAGE PUMPING STATION
Public Utilities (Pumping Stations) project In The Mount Alexander Council Area of State ownership. Design & Construction of a sewer pump station in Langslow Street, Castlemaine. Works include civil, mechanical, electrical & telemetry works. Click for more details...

CHURCH STREET SEWER PUMP STATION UPGRADE
New project of Public Utilities (Pumping Stations) project at Church St, Cowes, VIC 3922. Design, build & operation of the works necessary to implement the Church Street Sewer Pump Station Air Treatment Facility. Click for more details...

NORTH WARRANDYTE SPS738 PUMP STATION
New project of Public Utilities (Pumping Stations) project at Various locations within the Municipality of, Greensborough, VIC 3088. S4 CONSTRUCTION PANEL ONLY. The suburb of North Warrandyte is located approximately 25km north-east of the Melbourne Central Business District (CBD). The area contains approximately 1000 properties which form part of the Yarra Valley Water (YVW) Backlog Sewerage scheme. The North Warrandyte scheme has been separated into several construction packages, those being: Package A ? Reticulation (70% complete); Package B ? Reticulation (90% complete); Package C ? Reticulation (90% complete); SPS738 Rising Main Construction (60% complete); SPS738 Pump Station Construction; Yarra River Siphon Construction. This tender relates to the construction of the SPS738 Pump Station. This project includes (but is not limited to) the construction of the following: Pump station site including access track & site drainage; Pump wet well (3.5m diameter, 10m deep) & Emegency Relief Structure; Installation of pumpsets & associated equipment, pipework, & fittings; Connection to the existing inlet MH & rising main. Click for more details...

ECHUCA NEW SEWER RISING MAINS & SEWER PUMP STATION UPGRADE
Public Utilities (Pumping Stations) project at ., Echuca, VIC 3564 for New. Installation of approximately 1500 m of a DN280 Sewer Trunk Main on Northern Highway, Echuca. Installation of approximately 450 m of a DN315 Sewer Trunk Main on Anstruther St, Echuca. Upgrading of Sewer Pump Station #17 on Northern Highway, Echuca. Construction of bypasses around Sewer Pump Station #11 & #17. Click for more details...

HUNTLY/EPSOM SEWER RISING MAINS & SEWER PUMPING STATIONS
Public Utilities (Pumping Stations) project In The Greater Bendigo Council Area of Rising Mains/Pumping Stations (2) type. Construction of approximately 12 kms of sewer rising mains connecting Huntly/Epsom to Bendigo Water Reclamation Plant, including two new pump stations & various modifications of existing infrastructure. Works include civil, mechanical, electrical & telemetry works. Click for more details...

SALE STEAD STREET SPS UPGRADE
Sewer Pump Station - Upgrade project at Stead St, Sale, VIC 3850 in the Public Utilities (Pumping Stations). SPS upgrade at Stead Street, Sale. Click for more details...

BELLBIRD PARK RECLAIMED WATER IRRIGATION CONSTRUCTION
A project in the VIC Within Baw Baw. Reclaimed water irrigation construction at Bellbird Park, Drouin. The works involve the supply of all necessary labour, plant, equipment, materials & expertise for the set out & construction of various pipe works, pump stations, irrigation systems, subsoil drainage & storage structures, electrical & control systems works. Click for more details...

DONALD & HALLS GAP SEWER PUMP STATION REFURBISHMENT
Public Utilities (Pumping Stations) project In The Buloke Council Area of Sewer Pump Station - Refurbishment type. Installation of pumps (up to 5 kW) & associated electrical switchboards, pipework & fittings to refurbish five operational sewerage pump stations in the towns of Donald & Halls Gap. Click for more details...

ARARAT SEWER AUGMENTATION PROJECT
Public Utilities (Pumping Stations) project In The Ararat Council Area of State ownership. The construction of a sewerage pump station, gravity trunk main & pressure rising main in Ararat. The works include: design & construction of an 8.7 m deep DN3200 mm pump well with duty standby pumps, electrical switchboard, associated pipework & fittings; supply & installation of approximately 1,075 m DN300 mm PVC gravity sewer pipe; supply & installation of approximately 2,700 m of DN225 mm uPVC pressure sewer pipe; connections to existing sewer infrastructure at either end of the pipeline. Click for more details...

GIPPSLAND WATER BUILDING SERVICES
Public Utilities (Pumping Stations) project for New development. Building services. Click for more details...

HEYWOOD WATER RECLAIMATION PLANT UPGRADE
Public Utilities (Pumping Stations) New project at ., Heywood, VIC 3304. This type is Pump Station & Rising Mains with State ownership. Upgrade of Heywood WRP including pipeworks, electrical, mechanical & associated civil works. The Scope of Works is as follows: supply & construction of transfer pump stations & associated works. Supply & installation of transfer rising mains & associated works. Supply & installation of Floating Offtake Works & associated works. Supply & installation of various pipe connection works. Supply & installation of switchboards & associated works. Click for more details...

WIMMERA MALLEE PIPELINE ? SOUTH WEST LODDON WATER SUPPLY EXTENSIONS
Public Utilities (Pumping Stations) project at Wedderburn &, Charlton, VIC 3525 for New. The design & construction of extensions to the Wimmera Mallee Pipeline network to supply raw water to rural customers in the South West Loddon area, close to Wedderburn & Charlton. The Contract scope of works includes: Obtain all necessary approvals & permissions. Design & construct approximately 40 kilometres of rural pipeline & pump station(s). Installation customer connections in accordance with GWM Water?s rural customer charter. Click for more details...

DAYLESFORD WASTEWATER PUMP STATION UPGRADE WORKS
Wastewater Pump Station - Upgrade New project In The Hepburn Council Area. Construction of upgrade works to various wastewater pumping stations. Works to include design & construction of electrical assets, minor mechanical & civil works. Click for more details...

KING'S LEIGH ESTATE SEWER PUMP STATION (SPS) 723
Public Utilities (Pumping Stations) project In The Wyndham Council Area of State ownership. Design & construction of SPS 723, sewer rising main & other associated works. Click for more details...

MURRAY GOULBURN COOPERATIVE DEDICATED WATER SUPPLY PUMP STATIONS
Murray Goulburn Cooperative Dedicated Water Supply Pump Stations is currently at the Construction stage, valued at about $ 750000 it is Design & construction of pump stations for the Murray Goulburn Cooperative Dedicated Water Supply. Click for more details...

LINCOLN SQUARE STORM WATER HARVESTING PUMPING SYSTEM
Local Govt ownership Public Utilities (Pumping Stations) project In The Melbourne Council Area for New development. Lincoln Square Storm Water Harvesting Pumping System. Works include, Design, Supply & install a new stainless steel pump house enclosure. Irrigation Pumps & pumping system, supply / Installation of UV, Irrigation system. Manual / As built, Commissioning. Miscellaneous works. Click for more details...

HILLSIDE WATER PUMPING STATION
A project in the VIC Within Brimbank. Design & Construction of the Electrical Upgrade at the Hillside Water Pumping Station, Melton Highway, Hillside. Click for more details...

RIDDELLS CREEK RECYCLED WATER PLANT
Pumps/Pipeworks/Electrics project at Riddells Creek Recycled Water Plant, Riddells Creek, VIC 3431 in the Public Utilities (Pumping Stations). Civil works for a DN3500 fibreglass recycled water pump station at the Riddells Creek Recycled Water Plant (RWP). The next stage of the project will be to complete the installation & commissioning of the new pumps, pipework & associated electrics for the pump station. Click for more details...

WESTERN PORT HIGHWAY PUMP STATION WORKS
Western Port Hwy, Cranbourne West, VIC 3977 Has Western Port Highway Pump Station Works currently at Construction stage. Construction of sewer pumping station, branch sewer & rising main works for an industrial land subdivision in Cranbourne West. Works to include 95L/sec sewerage pumping station, 670KL storage tank approximately 945m of DN315 rising main & approximately 90m of DN gravity sewer main & associated works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect