BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

LAKE VERMONT COAL PROJECT - RAIL SPUR
Rail Spur New project In The Isaac Regional Council Area. A rail spur from site to the existing adjoining rail line. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - RAIL INFRASTRUCTURE
A project in the WA Within East Pilbara. Additional rolling stock and associated infrastructure to complement the Dampier port expansion and mine requirements. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

HOPE DOWNS IRON ORE PROJECT - RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. A 58 km rail line from the Hope Downs iron ore deposit to Rio Tinto rail network. Click for more details...

BOOTU CREEK MANGANESE PROJECT - RAIL SIDING/RAIL HAULAGE
Bootu Creek Manganese Project - Rail Siding/Rail Haulage is currently at the Construction stage, valued at about $ 1000000 it is Rail siding to be constructed to enable rail containers to be loaded so that the product can be transported to the Port of Darwin for export to China. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - RAIL
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at North of Poitrel via, Moranbah, QLD 4744. Ballast, track, electrification. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 50 km north east of, Southern Cross, WA 6426 of Rail Sidings/Ore Waggons type of New development. Improvements for railway to Esperance Port include extending ten passing loops to accommodate longer ore trains and the purchase of 141 new ore waggons. Click for more details...

MINERVA COAL PROJECT - RAIL
Currently at the Construction stage In Central Highlands Regional is a project estimated to be $ 5000000. This project Coal to be railed on Emerald to Springsure rail link. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

QR - OVERHEAD TRACTION WIRING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Central Highlands Regional Council Area of State ownership. Various overhead traction wiring projects. Click for more details...

GOONYELLA TO ABBOT POINT EXPANSION PROJECT NORTHERN MISSING RAIL LINK
Goonyella To Abbot Point Expansion Project Northern Missing Rail Link is currently at the Construction stage, valued at about $ 500000000 it is Staged works to include - construction of 69km rail line, interconnection to existing systems at Goonyella & Newlands, upgrade line to increased axle loading, lengthen loops on Newlands system to accommodate Goonyella length trains. Upgrade works Buckley to Newlands Mine. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

DAWSON SOUTH STAGE TWO PROJECT - COAL HANDLING PREPARATION PLANT
Dawson South Stage Two Project - Coal Handling Preparation Plant is currently at the Construction stage, valued at about $ 400000000 it is Development comprises the development of a Coal handling Preparation Plant (CHPP) to process 5 Mtpa. Coal will be delivered by an overland conveyor with the CHPP processing at 2000 tonnes per hour in two stage mode and 3400 tonnes per hour in single stage mode. The plant will comprise six fully automated stacker and reclaimer machines, dense medium cyclones, spirals and flotation circuits. Coal will then be loaded by a high capacity automated reclaimers to a new rail load out facility. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - TRACKWORK
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Near, Newman, WA 6753. This type is Trackwork with Private ownership. Trackwork at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - COMMUNICATIONS
Private ownership Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area for New development. Communications at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - LOCOMOTIVES CONTRACT
Locomotives - Supply New project In The East Pilbara Council Area. To supply 15 Dash 9 CW44 locomotives. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL SLEEPERS CONTRACT
Rail Sleepers - Supply project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Supply of 420,000 Rail Sleepers and cross ties for the railway line. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - BRIDGES
Bridges New project In The East Pilbara Council Area. To design and construct bridges for a 255 Km rail line. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - SANDING PLANT
Currently at the Tenders & Building stage In East Pilbara is a project estimated to be $ 600000. This project For the supply of a sanding plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - END OF TRAIN REPEATERS
End Of Train Repeaters - Supply project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). For the supply of end of train repeaters. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SWITCHYARD SUBSTATION & TRANSMISSION EQUIPMENT
Switchyard/Substation & Transmission Equipment - Supply Of New project In The Collie Council Area. For the supply of switchyard/substation and transmission equipment. Click for more details...

BICKHAM COAL COMPANY - BULK SAMPLE EXCAVATION PROJECT - RAIL LOADING FACILITY UPGRADE
Currently at the Early Planning stage In Upper Hunter is a project estimated to be $ 10000000. This project For the provision of upgrade services for the rail loading facility. Scope of work not yet determined. Click for more details...

KOOLANOOKA-BLUE HILLS HEMATITE PROJECT - RAIL SIDING INSTALLATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Approx 100 km south of, Mullewa, WA 6630 for New. For the construction of the Tilley rail siding. Construction period likely to be 6 weeks. Click for more details...

SPRINGVALE COAL OPERATIONS - RAILWAY SIDING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at 16km northwest of, Lithgow, NSW 2790. This type is Railway Siding - Construction with Private ownership. Construction of a new siding at the existing Lidsdale siding which has a coal loading capacity using front end loaders of 2million tonnes per annum (Mtpa). Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

GOONYELLA TO ABBOT POINT (GAP) EXPANSION PROJECT
A project in the QLD Within Various. Development of a new ballast quarry at Byerwen, located 85km south of Collinsville. Supply and delivery of railway ballast as specified. Supply of pavement materials as specified. Supply of other quarry produts as specified. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - WET ORE PROCESSOR SMP
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Structural/Mechanical/Piping - For Wet Ore Processor type. Contract for the provision of structural, mechanical & piping engineering services for a 15 million tonnes per annum (Mtpa) wet ore processor to accommodate 220t capacity haul trucks. To include primary & secondary crushing & screening, waste fines thickening & discharge return lines, stockpiling of lump & fines product, reclaiming & train loadout. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - RAIL SPUR LINE
Rail Spur Line New project In The East Pilbara Council Area. A project to extend the existing Lang Hancock Railway. Construction of a 52km spur line from the new Hope Downs 4 mine to south of the existing Hope Downs 1 Mine to provide connection to rail & port infrastructure. Associated rail bridges over the Weeli Wolli & Coondiner Creeks. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

BULGA COAL OPERATIONS - TRAIN REFEULLING FACILITY
Train Refeulling Facility project at 16km southwest of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a rail refuelling facility adjacent to the existing Bulga Coal rail loop. To include a 1000kL diesel storage tank (12m x 2.5m); 5000L oil & 10,000L water storage tanks, oily water separator, 60 m long steel maintenance gantry as well as a roof over the main area. Mechanical & electrical equipment including switching panels, pumps & lighting. Above ground power line from existing easement & then underground power lines to the new facility. Existing access road upgrade. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - NORTH COAST ALDOGA UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via, Gladstone, QLD 4680 for New. Construction of additional rail track along the North Coast Rail Line to provide some triplication. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

PILGANGOORA LITHIUM PROJECT - ROAD & RAIL CROSSING UPGRADES
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 120km South of, Port Hedland, WA 6721. For the provision of road & rail crossing upgrades. Click for more details...