PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - RAIL INFRASTRUCTURE
A project in the WA Within East Pilbara. Additional rolling stock and associated infrastructure to complement the Dampier port expansion and mine requirements. Click for more details...

HOPE DOWNS IRON ORE PROJECT - RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. A 58 km rail line from the Hope Downs iron ore deposit to Rio Tinto rail network. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

BHP BILLITON IRON ORE OPNS - ASSET DEVELOPMENT PROJECTS -RAIL
Via, Newman, WA 6753 Has Bhp Billiton Iron Ore Opns - Asset Development Projects -Rail currently at Early Planning stage. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE WAGONS
Ore Wagons project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Design, supply and assembly of 2 prototype ore wagons and 820 ore wagons. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 50 km north east of, Southern Cross, WA 6426 of Rail Sidings/Ore Waggons type of New development. Improvements for railway to Esperance Port include extending ten passing loops to accommodate longer ore trains and the purchase of 141 new ore waggons. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - RAIL & ROLLING STOCK
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes procurement of additonal rolling stock and additional railway to support the new mines and car dumper. Click for more details...

BHP BILLTION RAPID GROWTH PROJECT 2 - PORT ADDITIONS
Via, Port Hedland, WA 6721 Has Bhp Billtion Rapid Growth Project 2 - Port Additions currently at Planning stage. Includes construction of a new car dumper and ancillary works. Initial capacity fo car dumper 8Mtpa. Ultimate capacity of 40Mtpa, following future expanison projects. Additional car dumping capacity will allow upgrades to existing dumpers to be undertaken ready for future market growth. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - RAIL INFRASTRUCTURE - TRACKWORK
Trackwork project at Near, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Trackwork at Iowa Siding Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - TRACKWORK
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Near, Newman, WA 6753. This type is Trackwork with Private ownership. Trackwork at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - SIGNALLING
Signalling project at Near, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Signalling at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - COMMUNICATIONS
Private ownership Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area for New development. Communications at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - LOCOMOTIVES CONTRACT
Locomotives - Supply New project In The East Pilbara Council Area. To supply 15 Dash 9 CW44 locomotives. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL SLEEPERS CONTRACT
Rail Sleepers - Supply project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Supply of 420,000 Rail Sleepers and cross ties for the railway line. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - TRACK LAYING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Track Laying type. To lay track for 255 Km rail line. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK RAIL LOOP MODIFICATIONS
Rail Loop Modifications New project In The East Pilbara Council Area. Rail Loop Modifications. The new Newman Hub layout covers modifications at the yard entry, modifications for the new train load-out, modifications for the new car dumper and installation of facility for loco servicing. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - SANDING PLANT
Currently at the Tenders & Building stage In East Pilbara is a project estimated to be $ 600000. This project For the supply of a sanding plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - LOW SPEED WEIGHBRIDGE
Newman Hub, Newman, WA 6753 Has Iron Ore Rapid Growth 4 Project - Low Speed Weighbridge currently at Tenders & Building stage. For the supply of a low speed weighbridge. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - END OF TRAIN REPEATERS
End Of Train Repeaters - Supply project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). For the supply of end of train repeaters. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SWITCHYARD SUBSTATION & TRANSMISSION EQUIPMENT
Switchyard/Substation & Transmission Equipment - Supply Of New project In The Collie Council Area. For the supply of switchyard/substation and transmission equipment. Click for more details...

KOOLANOOKA-BLUE HILLS HEMATITE PROJECT - RAIL SIDING INSTALLATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Approx 100 km south of, Mullewa, WA 6630 for New. For the construction of the Tilley rail siding. Construction period likely to be 6 weeks. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment includ Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - RAIL SPUR LINE
Rail Spur Line New project In The East Pilbara Council Area. A project to extend the existing Lang Hancock Railway. Construction of a 52km spur line from the new Hope Downs 4 mine to south of the existing Hope Downs 1 Mine to provide connection to rail & port infrastructure. Associated rail bridges over the Weeli Wolli & Coondiner Creeks. Click for more details...

PILBARA IRON ORE OPERATIONS EXPANSION - RAIL CAR WEIGHING PROJECT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Various Council Area of Private ownership. A project to removing existing rails in loadout areas at the Marandoo, Hope Downs & West Angelas mines & install track dynamic weigh scales. To weigh rail cars of 140tonnes approx axial load as they pass over. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

PORT HEDLAND INNER HARBOUR - BHP BILLITON STOCKYARD EXPANSION CIVIL WORKS
Port Hedland Inner Harbour - Bhp Billiton Stockyard Expansion Civil Works is currently at the Construction stage, valued at about $ 50000000 it is Upgrade of the existing ore blending stockyard at Nelson Point. To include bulk earthworks, stone column ground improvement works, rail, concrete works, piping & instrumentation for dust suppression & road works. Click for more details...

RIO TINTO PILBARA AUTOMATED TRAIN PROGRAM - ECP BRAKING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Various Council Area of Private ownership. A project towards driverless trains on Rio Tinto's 1500km long remote heavy-haul rail line from mines to port in the Pilbara region. To include locomotive control systems upgrades then installation & system integration of electronically controlled pneumatic (EPC) braking. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 & 4 - PORT LANDSIDE & PORT MARINE - CONVEYOR BELT INSTALL & SPLICE SERVICES
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Boodarie Industrials Estate, SW of, Port Hedland, WA 6721. For the provision of conveyor belt install & splice services. Click for more details...

CANNON GOLD PROJECT - RAILWAY CROSSING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Kalgoorlie-Boulder Council Area of Railway Crossing type. For the provision of a railway crossing. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - ROAD & RAIL RELOCATION
Kalgoorlie North Gold Project - Road & Rail Relocation is currently at the Construction stage, valued at about $ 14500000 it is For the provision of road & rail relocation. Click for more details...

PILGANGOORA LITHIUM PROJECT - ROAD & RAIL CROSSING UPGRADES
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 120km South of, Port Hedland, WA 6721. For the provision of road & rail crossing upgrades. Click for more details...