State

Categories

Sub Categories

Click Here to Find Current Projects

List of Rehabilitation, Environmental mgmt, Decontamination Projects in VIC


DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL MINE/POWER STATION - WEST FIELD
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. Part of ongoing approvals process for West Field expansion. Click for more details...

DOUGLAS MINERAL SANDS PROJECT - ACAPULCO/BONDI/ECHO
A project in the VIC Within West Wimmera. A $270 million project to develop the Douglas mine, mineral separation plant and associated infrastructure. The project approved is larger than the original proposal. The initial capacity of the mineral separation plant has been almost doubled from 30 to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect