State

Categories

Sub Categories

Click Here to Find Current Projects

List of Retaining walls, Seawalls Projects


CAMDEN PARK OPEN SPACE WORKS
Drainage/Car Park/Park New project In The Wollondilly Council Area. Earthworks for reshaping play area, tennis court, carpark, rock walls, landscaping. Click for more details...

MAITLAND LEVEE
Levee - Rehabilitation - Stage 3 project at Hunter River at Hill & Semphill Sts, Maitland, NSW 2320 in the Civil Engineering (Retaining walls, Seawalls). Work includes: construction of 300 m x loc-a-bloc retaining wall; backfilling; stormwater drainage; 450 m x levee bank earthworks; landscaping. Click for more details...

QUINNS BEACH
New project of Civil Engineering (Retaining walls, Seawalls) project at Fred Stubbs Memorial Grove, Reserve 22915 67 Ocean Dr, Quinns Rocks, WA 6030. Works comprise construction of one groyne & 86,000 t of sand renourishment for coastal protection works at Quinns Beach. Click for more details...

SAHT - MOUNT GAMBIER
Civil Engineering (Retaining walls, Seawalls) project In The Mount Gambier Council Area of State ownership. Fence replacement to unit complex in Mount Gambier region. Click for more details...

MOUNTS BAY ROAD RIVER WALL
Civil Engineering (Retaining walls, Seawalls) project at Mounts Bay Rd, Crawley, WA 6009 for Renovations, Refurbishments etc.. Erosion caused by tidal surge on Swan River requires restablisation of sections of river wall on Mounts Bay Rd. Click for more details...

PORTRUSH ROAD
Civil Engineering (Retaining walls, Seawalls) Supply & Install project at Portrush Rd btwn Greenhill & Kensington Rds, Toorak Gardens, SA 5065. This type is Walls/Fences For Roadworks - Upgrade with State ownership. Construction of masonry walls & other fences along specified secns of Portrush Rd. Click for more details...

OLD PORT - ARTHUR HEAD RESERVE
Reserve - Conservation/Upgrading project at Arthur Head Reserve, end of High St, Fremantle, WA 6160 In The Council Area Of Fremantle of Local Govt. Scope of works to comprise Conservation works, restoration of Joan Campbell Interpretive Structure of Long Jetty, Conservation of dunes & coastal vegetation, restoration of the original sea wall circa 1840, conservation works to the Kerosene Store (former), currently Kodogo Arthouse, to be managed directly by the City of Fremantle in liaison with the consultant's implementation of the Old Port Project (involves separate Lotterywest grant), conservation & upgrade works to masonry of the Kerosene Store, upgrading public amenity & heritage interpretation works, disabled access to beach, showers, new railway fence design to TPTA requirements, new paving, interpretation of the former Fisherman Co-op building & upgrading the transition btwn thoroughfare & tenant alfresco facing the Old Port area, part reconstruction of dunes & coastal vegetation on dunes, tree relocation & planting, access to beach - for services, emergency vehicles & heavy machinery. Click for more details...

GOLD COAST CITY COUNCIL
Civil Engineering (Retaining walls, Seawalls) project In The Gold Coast City Council Area of Retaining Boulder Wall type. Construction of approx 6 oceanfront boulder walls over a 2 year period. Click for more details...

LEE WHARF - STAGE 3 PUBLIC ASSET WORKS
Lee Wharf - Stage 3 Public Asset Works is currently at the Construction stage, valued at about $ 1500000 it is Public asset works associated with Stage 3 of the Lee Wharf development. The scope of work includes: the removal of existing wharf remains & concrete seawall; construction of new rock revetment seawall, foreshore promenade & minor bulk earthworks Click for more details...

CITY OF MANDURAH - LIMESTONE RETAINING SEAWALL
Civil Engineering (Retaining walls, Seawalls) project at Stingray Point, Mandurah, WA 6210 of Seawall type of New development. Works to comprise of construction of 400 m section of Limestone Retaining Seawall at Stingray Point, Mandurah. Click for more details...

YARRAWA RD CIVIL WORKS
Civil Works project at Lot 26 Yarrawa Rd, Prestons, NSW 2170 In The Council Area Of Liverpool of Private. Stage 1 comprises land filling, retaining walls, sedimentation & erosion control measures Click for more details...

CHURCHLANDS SUBDIVISION
New project of Civil Engineering (Retaining walls, Seawalls) project at 71 Pearson St, Churchlands, WA 6018. Works to comprise construction of retaining walls & fencing for subdivision. Click for more details...

BELVEDERE HILLS ESTATE - STAGE 1D
Subdivision Retaining Wall New project In The Wanneroo Council Area. Construction of a subdivision retaining wall for the Belvedere Hills Estate Stage 1D. Click for more details...

NORTH EAST WATERWATCH PROGRAM EVALUATION & STRATEGIC PLAN
Civil Engineering (Retaining walls, Seawalls) project In The Various Council Area of State ownership. North East Waterwatch Program evaluation and development of a three year strategic plan (2009-2011). Click for more details...

OSBORNE PARK WORKS DEPOT
Civil Engineering (Retaining walls, Seawalls) project In The Stirling Council Area of Local Govt ownership. Construction of a steel piled wall at the City of Perth's Osborne Park Works Depot. Click for more details...

SMIRK ROAD RETAINING WALL
Retaining Wall project at 76 (Lot 13) Smirk Rd, Baldivis, WA 6171 In The Council Area Of Rockingham of Private. Works to comprise construction of a retaining wall. Click for more details...

JOHNS STREET DEMPSTER GARDENS RESIDENTIAL SUBDIVISION
Residential Subdivision (37) Lots - Stage 2 project at Located at Johns St & will run westward to Synrot St, Esperance, WA 6450 In The Council Area Of Esperance of Private. Works to include the construction of Stage 2 subdivision comprising of earthworks, retaining walls, roads, sewer, water & power. Click for more details...

CLYDE AVENUE RETAINING WALL
New project of Civil Engineering (Retaining walls, Seawalls) project at Lot 9000 Clyde Av, Baldivis, WA 6171. Works to include the construction of a retaining wall. Click for more details...

BARRENJOEY PARKWAY RETAINING WALL
Currently at the Construction stage In Rockingham is a project estimated to be $ 165000. This project Works to comprise construction of a retaining wall. Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - EPPING TO THORNLEIGH THIRD TRACK (ETTT)
Civil Engineering (Retaining walls, Seawalls) project In The Hornsby Council Area of Rail Track/Railway Stations/Civil Works type. The proposal involves the construction of an additional track (or third track) on the western side of the existing tracks between Epping & Thornleigh. Scope of work also includes: modifications to 4 stations, including construction of new lifts & footbridges. Modifications to road, rail & pedestrian bridges. Construction of a new rail bridge over the M2 Motorway. Construction of cuttings, embankments, viaducts & retaining walls. Construction of new maintenance access roads adjacent to some lengths of the new track. Modifications to the existing overhead wiring and signalling systems. Associated civil & rail systems works. Track work involves the construction of a third track (approximately 6 km) within the Main North Line corridor on the western side of the existing tracks; the proposal would connect into the Down Suburban line just to the north of Epping Station and the Down Main (via a turnout) to the south of Thornleigh Station; the new track would generally be at the same level as the existing tracks; the alignment would be positioned as close to the existing tracks as possible with the exception of in the vicinity of the M2 Motorway where the alignment is located further to the west due the constraints of constructing a new bridge for the third track across the M2 Motorway. Station works - to accommodate the new third track some works are required at and in the vicinity of the following stations: Cheltenham - new footbridge, lifts & stairs, platform modification and station electrical systems. Reconfigured car parking & footpath; Beecroft ? modifications to existing pedestrian tunnel; reconfigured carparking & footpath; Pennant Hills - extended station concourse (northern footbridge); new lift & stairs; modifications to existing footpath, roadway & southern footbridge; Epping - minor platform adjustments. Bridge works would be required at Works would be required at the following locations: bicycle underpass at Epping; Devlins Creek culvert crossing (underbridge); M2 Motorway underbridge; Cheltenham Road overbridge; Copeland Road overbridge; Chapman Avenue overbridge; Pennant Hills Road overbridge; Pennant Hills Station footbridge. The proposal would also involve construction of & modification to signalling huts, communications facilities & other rail services infrastructure, the construction or modification of cuttings, embankments & retaining walls Click for more details...

MOUNTS BAY ROAD RIVERWALLS - STAGE 4A
Civil Engineering (Retaining walls, Seawalls) project at Along Mounts Bay Rd, Perth, WA 6000 for Renovations, Refurbishments etc.. To include repairs to the existing river wall along Mounts Bay Rd, located east of the Old Swan Brewery, & construction of a rock revetment river wall along Mounts Bay Rd, to be located opposite Kings Park Av. Click for more details...

MAKYBE DRIVE RETAINING WALL
Currently at the Construction stage In Rockingham is a project estimated to be $ 114000. This project Works to include construction of a retaining wall. Click for more details...

SUBIACO COMMON EMBANKMENT WORKS - STAGE 1
Landscaping/Retaining Wall/Planting project at Mere View Wy, Subiaco, WA 6008 in the Civil Engineering (Retaining walls, Seawalls). Works to include landscape construction on the south eastern embankment in Subiaco Common of a total area of approximately 690sqm comprising of design & construction of an embankment retaining system of approximately 40m in length of each retaining wall & runs from the existing Kookaburra Walk stairs eastwards & design, supply & installation of planting including all soft landscaping, addns of soil improvers & application of mulch. Click for more details...

BUNNINGS DISTRIBUTION CENTRE EARLY WORKS
Earthworks/Retaining Wall project at 9 (Lot Easement) Interchange Dr (DP1178165), Eastern Creek, NSW 2766 in the Civil Engineering (Retaining walls, Seawalls). Bulk earthworks to reshape site to accommodate building platforms for future buildings, retaining walls & sediment & erosion control measures. The bulk earthworks will create 2 building pads. A large single building pad adjacent to Interchange Drive & a smaller building pad adjacent to the northern side. There will be 5 retaining walls to be constructed using different methods - Type 1 - soldier piers or rock anchors & shotcrete wall or concrete masonry wall. Type 2 - concrete or concrete masonry retaining wall. Type 3- keystone or approved equivalent concrete/masonry product Click for more details...

MACPHERSON STREET RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project In The Broome Council Area of Private ownership. To include the construction of a retaining wall/rear boundary wall. Click for more details...

MACALISTER IRRIGATION DISTRICT SOUTHERN TINAMBA BALANCING STORAGE
Civil Engineering (Retaining walls, Seawalls) project at ., Tinamba, VIC 3859 for New. Proposed construction of Southern Tinamba balancing storage, as part of the Macalister Irrigation District upgrade. Click for more details...

PORT HUGHES BOAT RAMP REDEVELOPMENT
Sections 1895 & 1894, Port Hughes, SA 5558 Has Port Hughes Boat Ramp Redevelopment currently at Construction stage. The Principal invites tenders for the provision of Design & Construction. The Principal has been working with a community steering party with regards to the upgrade of the Port Hughes boat ramp since 2008. The steering party settled on a design that would balance the requirement of the community for increased all weather access & the impact of the surrounding environment & the associate sand movement. The Principal with require construction services for the redevelopment of the Port Hughes Boat Ramp with consideration given to the approved plan. Council will be looking for tenderers to input their skills & knowledge by providing non-conforming alternative where appropriate, with particular attention given to the construction methods for the wharf area & the boat fender. Other items of note include, but are not limited to : a) The Port Hughes Boat Ramp is restricted by a number of factors including geological rock formations & sand movement to its current footprint. The aim of this project is to maximise the available manoeuvring area & throughput & therefore increase the utilisation & capacity of the facility. b) The wharf area (which is also the dredging vehicle access) should have a vertical wall, with suitably spaced boat stops (fenders) & recessed ladders. The ultimate final design of this should consider wave reflection & pricing should be presented in a way that allows flexibility with its overall length & therefore allowing the project to be completed within its defined budget. Note: the aim of this is to keep the wharf area approximately 250mm above the average high tide level, acknowledging that in winter storms it may be topped & the last 30m forming a ramp for excavator / truck access to the mouth of the harbour. c) Details on construction methods & the length of time where the facility will be unavailable for public use should be considered & documents as part of tender submissions. Click for more details...

AUREA BOULEVARD RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project at Lot 9004 Aurea Blvd, Golden Bay, WA 6174 of Retaining Wall type of New development. Works to include construction of a retaining wall for an estate development. Click for more details...

MARGARET RIVER POLICE STATION
Retaining Wall - Civil project at 47 Willmott Av, Margaret River, WA 6285 in the Civil Engineering (Retaining walls, Seawalls). Works to include the stabilization of an existing retaining wall of approx 25m long & varies from 300mm to 400mm retained, to retaining in excess of 1200mm at the highest point. Works also to comprise of: excavation behind the wall to the depth as shown on the attached detail of the wall, backfill the excavation with stabilised sand fill, reinstate upper gravel area & compact, excavation dimensions generally in accordance the drawings. Click for more details...

LAHC - ERSKINEVILLE
Civil Engineering (Retaining walls, Seawalls) project for New development. Replacement of existing retaining wall & associated works Click for more details...

ROCHESTER CIRCLE GROUPED DWELLINGS
Civil Engineering (Retaining walls, Seawalls) project at 113 (Lot 332) Rochester Cir, Balga, WA 6061 for New. Works proposed to include construction of 3 grouped dwellings, retaining walls & fencing, to be known as 113A, 113B & 113C Rochester Cir, Balga. Click for more details...

PEPPERING WAY MULTIPLE DWELLINGS
Currently at the Construction stage In Stirling is a project estimated to be $ 1985000. This project Works to include the construction of 10 multiple dwellings, retaining walls & fences to be known as Units 1-10, 10 Peppering Wy.. Click for more details...

ROCKINGHAM ROAD CIVIL WORKS
Private ownership Civil Engineering (Retaining walls, Seawalls) project In The Cockburn Council Area for New development. Construction of retaining walls on Lots 19 & 25, Rockingham Rd, Munster. Click for more details...

NARRUNG WAY GROUPED DWELLINGS
15 (Lot 6749) Narrung Wy, Nollamara, WA 6061 Has Narrung Way Grouped Dwellings currently at Construction stage. Works to include the construction of 3 grouped dwellings to be known as 15A, B & C Narrung Wy. Click for more details...

GIRRAWEEN STREET RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project In The Armadale Council Area of Private ownership. Works to include construction of a retaining wall. Click for more details...

WARRAGUL DEPOT WASH BAY UPGRADE
Depot Wash Bay - Upgrade Renovations, Refurbishments etc. project In The Baw Baw Council Area. Council Depot Wash Bay Upgrade. Works include installation of a chemical/ oil separator/ filtration unit, retaining wall construction, concreting, electrical & plumbing works for the expansion of the existing wash bay within Council's Normanby Street Warragul Depot. Click for more details...

FRANCIS ROAD RETAINING WALLS
New project of Civil Engineering (Retaining walls, Seawalls) project at 20 Francis Rd, Port Denison, WA 6525. Works to include the construction of a retaining wall for an estate development. Click for more details...

LAMBETH CIRCLE RETAINING WALLS
A project in the WA Within Kwinana. Works to include the construction of retaining walls for undisclosed number of lots. Click for more details...

MAGENTA SHARED PATHWAY
New project of Civil Engineering (Retaining walls, Seawalls) project at Wilfred Barrett Dr, Magenta, NSW 2261. Construction of a 1530m concrete pathway at Magenta. Scope of work includes: tree removal, 3m wide concrete path at grade, concrete boardwalk (Ultrafloor System), retaining walls, drainage works & landscape works. The pathway location is between Evans Rd & the Red Gum Trail (Wyrrabalong National Park) car park on Wilfred Barrett Dr, Magenta. Click for more details...

BALIVANICH LOOP RETAINING WALLS
Civil Engineering (Retaining walls, Seawalls) project In The Armadale Council Area of Private ownership. Works to include construction of retaining walls. Click for more details...

TOWRADGI ROCK POOL
Civil Engineering (Retaining walls, Seawalls) New project at Towradgi Point, Towradgi Rd, Towradgi, NSW 2518. This type is Concourse Upgrade - Stage 2 with Local Govt ownership. Stage 2 scope of work includes: demolition of existing approximately 124sq m concrete concourse; construction of new approximately 124sq m reinforced concrete concourse; construction of new approximately 17m concrete seawall; construction of new approximately 11m barrier/retaining wall & installation of new approximately 12m handrail fencing. Click for more details...

LAHC - ADAMSTOWN & JESMOND
Civil Engineering (Retaining walls, Seawalls) project In The Newcastle Council Area of State ownership. Replacement of retaining wall & other associated works. Click for more details...

MACKAY BEACHES STAIRWAYS
New project of Civil Engineering (Retaining walls, Seawalls) project at Various locations including, Armstrong Beach, QLD 4737. Design & construction of stairway at Armstrong Beach, Far Beach & 2 x stairways at Grasstree Beach. Click for more details...

RETAINING WALL & EARTHWORKS
Retaining Wall & Earthworks is currently at the Construction stage, valued at about $ 6000000 it is Earthworks & construction of a retaining wall. Click for more details...

ENCHANTRESS LANE RETAINING WALL
New project of Civil Engineering (Retaining walls, Seawalls) project at 2 (Lot 40) Enchantress La, Dawesville, WA 6210. Works to include the construction of retaining walls. Click for more details...

ORBOST WASTEWATER TREATMENT PLANT & BRUCE'S TRACK REUSE FACILITY BIOSOLIDS BUND
143 Mitchells Rd, Newmerella & 115 Bruce Rd, Nungurner, VIC 3909 Has Orbost Wastewater Treatment Plant & Bruce's Track Reuse Facility Biosolids Bund currently at Construction stage. Orbost Wastewater Treatment Plant (WWTP) & Bruce?s Track Reuse Facility Biosolids Bund Construction Project. The major components of the contract works include: Separable portion A: earthworks & HDPE lining of an existing bunded area at Bruce?s Track Reuse Facility (approximately 3,500 cubic meters), & associated under- drainage. Separable portions B & C: Construction of two clay-lined drying bunds (of approximately 7,750 cubic meters & 4,400 cubic meters volume), & associated under-drainage at the Orbost WWTP. Click for more details...

PARK RESERVE SYNTHETIC SOCCER FIELD
Synthetic Soccer Field project at Park Ave, Doncaster, VIC 3108 In The Council Area Of Manningham of Local Govt. Construction of a sythetic soccer field at Park Reserve in Doncaster. The synthetic playing field will have a footprint of approximately 7,400 square metres & the facility will be utilised as, a sports field for Football (soccer) ? full size & mini field requirements, general public recreation. The works include, site establishment, demolition, construction of a viewing mound, drainage works, retaining wall construction, asphalt path works, concrete works & other associated civil works, water works, fencing & protective netting installation, electrical works, construction of synthetic soccer pitch including subgrade preparation, shock pad, surfacing & line marking to specified sports standards, maintenance, & testing to the International Federation Performance Standard - FIFA Quality Program for Turf (FIFA 1 Star). Click for more details...

TARWIN STREET DAM WALL
Civil Engineering (Retaining walls, Seawalls) project In The Baw Baw Council Area of Dam Wall type. The works involve the supply of all necessary labour, plant, equipment, materials & expertise for the construction of a dam wall at the retardation basin in Tarwin Street, Warragul. Click for more details...

WHITEWOOD RD RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project In The Litchfield Shire Council Area of Retaining Wall type. Construction of a retaining wall Click for more details...

MORRISON BAY SEAWALL
Morrison Bay Seawall is currently at the Construction stage, valued at about $ 1072000 it is Renewal works on the seawall located at Morrison Bay Park. Scope of works comprises 2 separable portions. Separable Portion 1 comprises: construction of the Morrison Bay seawall & the associated landscape and civil works. Separable Portion 2 comprises: supply & delivery of the sandstone for the construction of the Morrison Bay seawall. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect