State

Categories

Sub Categories

Click Here to Find Current Projects

List of Retaining walls, Seawalls Projects in NSW


GLENMORE PARK CARPARK
Civil Engineering (Retaining walls, Seawalls) project In The Penrith Council Area of Carpark/Retaining Wall type. Construction of a carpark & retaining wall. Click for more details...

LADY ROBINSONS BEACH
Civil Engineering (Retaining walls, Seawalls) project In The Rockdale Council Area of Groynes (5) type. Construction of 5 groynes, relocation of sand, stabilisation & restoration of beach. Click for more details...

BALMORAL SEAWALL
Civil Engineering (Retaining walls, Seawalls) project at Balmoral Beach, Balmoral, NSW 2091 of Seawall - Upgrade type of Addition development. Repair & maintenance of existing seawall. Click for more details...

DENILIQUIN EARTHWORKS
Civil Engineering (Retaining walls, Seawalls) project at Burton, Mahyer & Wyatt Sts (lot 5 DP593174), Deniliquin, NSW 2710 for New. Tree removal, Construction of a retaining wall, construction of an earth pad. Click for more details...

MOUNT KURING-GAI FUEL TANKS
759 (Lot 1) Pacific Hwy (DP712160), Mount Kuring-Gai, NSW 2080 Has Mount Kuring-Gai Fuel Tanks currently at Planning stage. Construction of a block wall, removal of an existing subterranean fuel tank & replacement with an above ground fuel tank. Click for more details...

SUTHERLAND SHIRE COUNCIL AREA FENCING
Civil Engineering (Retaining walls, Seawalls) project at various within Sutherland Shire Council areas, Sutherland, NSW 2232 for Supply & Install. Fencing supply, installation, repairs & maintenance. Click for more details...

REGIONAL BOAT RAMP FACILITY STAGE 2
Marine Dr, Tea Gardens, NSW 2324 Has Regional Boat Ramp Facility Stage 2 currently at Early Planning stage. Proposed construction of rock groyne & holding beach. Click for more details...

SOUTHERN SYDNEY FREIGHT LINE PROJECT (SSFL) - OVERALL
Rail Line New project In The Bankstown Council Area. Overall Project - Proposes construction of a dedicated single line freight rail line along the corridor of the main south line track for a distance of 30 kilometres. The SSFL will provide a third bi directional track for freight services, which would allow passengers and freight services to operate independently. The new non-electrified track, 30km in length, within a 36km railway corridor, would be located on the western side of the existing RailCorp passenger lines between Macarthur and the junction with the East Hills Line at Glenfield. At Glenfield it would cross over via a new grade-separated interchange, known as the Glenfield flyover, and continue through to Sefton on the eastern and southern side of the passenger lines. This will require construction and/or modification of road and rail bridges, retaining walls and embankments. Upgrades will also be required at 6 railway stations and their surrounding precincts - Leumeah, Minto, Casula, Warwick farm, Cabramatta & Sefton. Click for more details...

THE ENTRANCE ROAD ROADWORKS
Roadworks/Bridge - Upgrade project at The Entrance Rd (between Narrawa Ave & Carlton Rd), Erina, NSW 2250 In The Council Area Of Gosford of State. The work consists of the upgrading & widening of approximately 650m of The Entrance Road. The works include earthworks, stormwater drainage, subsurface drainage, pavement, bridgeworks, retaining walls, footpath/cycleway, pavement marking, signposting, control of traffic, utility relocations, property adjustments & ancillary works. Click for more details...

NORTH SYDNEY RAILWAY STATION
State ownership Civil Engineering (Retaining walls, Seawalls) project In The North Sydney Council Area for New development. To supply plant, labour & materials for the construction of in-situ concrete works associated with the deflection wall at North Sydney Station. Click for more details...

HORNSBY RAILWAY STATION - PLATFORM 5 PROJECT
Consultancy For Design Services - Railway Station - Upgrade/Addns project at Station St, Hornsby, NSW 2077 in the Civil Engineering (Retaining walls, Seawalls). Construction of a 5th platform for the Hornsby Railway Station. The additional platform will be built on the western side of the station where the bus interchange is presently located, moving the buses onto the existing taxi rank on Station Street. The project includes: 1700m of new track & overhead wiring; a new platform, stabling facilities & associated rail infrastructure, modifications to Pretoria Parade & Pacific Hwy road bridges, extension of existing aerial concourse, construction of retaining walls & noise walls, new maintenance sidings. Click for more details...

SHEPHERDS BAY
Shepherds Bay is currently at the Construction stage, valued at about $ 2999000 it is Remediation of former depot site. Construction of parkland and new sea walls and construction of a 26 metre long timber pier within Parramatta River for launching of small watercraft. Click for more details...

BENANG ST RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project for New development. Construction of a Loc-A-block retaining wall Click for more details...

ST GEORGE LEAGUES CLUB
Civil Engineering (Retaining walls, Seawalls) New project at 124 (Lot 1) Princes Hwy (DP81406), Kogarah, NSW 2217. This type is New Carpark/Function Centre - Refurbishment with Private ownership. Removal of existing bowling greens. Construction of new carpark for 512 cars, reconstruction of existing retaining wall & refurbishment of existing function room/restaurant of approx 595sq m which includes new elevated ground floor outdoor terrace of approx 428sq m. Click for more details...

FARMERS CREEK FLOOD MITIGATION WORKS
Retaining Wall project at Farmers Creek, Lithgow, NSW 2790 In The Council Area Of Lithgow of Local Govt. Construction of 130 metres of retaining wall of varying height. The current design is for a retaining wall constructed of steel solder piles & precast concrete infill beams. Click for more details...

BALMAIN EAST SEAWALL
Weston & Darling Sts, Balmain East, NSW 2041 Has Balmain East Seawall currently at Construction stage. Seawall repair & refurbishment Click for more details...

CLOVELLY BEACH CARPARK - COASTAL WALKWAY
Carpark/Walkway New project In The Randwick Council Area. Construction of the coastal walkway from the Surf Life Saving Club to pumpout station on Cliffbrook parade. Scope of work includes: demolition of existing structures; installation of plain & coloured concrete pathways; construction of concrete steps; landscaping; reconfiguration of the carpark layout which will be increased by approximately 47 carspaces; construction of concrete & sandstone walls; installation of fencing; drainage works; installation of street furniture & adjustments of utility service pits. Click for more details...

VILLA MARIA PRIMARY SCHOOL
A project in the NSW Within Hunters Hill. Alterations & additions to existing school. Scope of work includes: remove the existing demountables accommodating 5 classrooms & replace such structures with turf for playground purposes; internal conversion of the existing library into 1 classroom; internal conversion of the existing staff resources room into a special education facility; alterations & additions to the existing hall involving the internal conversion to a library & incorporating a staff resources area in to a new mezzanine floor; a lift will be installed at the front of the new link passage & at the rear of the forecourt to be formed between the existing 2 storey classroom structure on the western end of the frontage & the new complementing 2 storey building at the eastern end of the front site; construction of a new 2 storey building along the Mark St frontage to accommodate administration facilities & a hall at ground floor level & 4 classrooms & staff facilities at 2st floor level; connecting link between the existing classroom building & connected library with the new buuilding via an enclosed walkway incorporating lift access to the 1st floor level from a newly created forecourt area below; minor works along the Mark St frontage including the provision of new stairs & new access ramp, relocation of an existing driveway crossing, relocation of a series of retaining walls, creation of a courtyard & provision of a bin storage area. The new building will be constructed in selected face brink with contrasting sills & headers soldiers course. The roof will be clad in coloured mini orb metal. Vertical metal balustrading will be provided to the balcony along the rear elevation of the new building Click for more details...

BARANGAROO - HEADLAND PARK & NORTHERN COVE MAIN WORKS
Civil Engineering (Retaining walls, Seawalls) project for New development. Main works for the creation of the Barangaroo Headland Park and North Cove, including: Demolition or modification (yet to be determined) of the Sydney Harbour Control Tower; shaping of the shoreline including creation of the Northern Cove; & detailed design of the Headland Park including the final landform; landscape design, stormwater strategy, services & infrastructure, pedestrian pathways, Globe St extension, carpark within headland, park amenities & heritage interpretation. Land formation utilising fill from Stage 1. Construction of structural earth retaining walls utilising sandstone based materials. Creation of a naturalistic shoreline & northern cove through excavation & formation of retaining walls using boulders. General landscaping & planting. Construction of a network of pedestrian pathways connecting the foreshore walkway & surrounding areas. Construction of a shoreline promenade (dual use pedestrian path and cycleway). Jetty/viewing platform & public wharf extending into the Northern Cove from the southern shoreline. Location & use of the former Sydney Water Sewage Pumping Station for the purposes of an amenities building. Construction of a space for a future use (cultural facility) comprising initially 75,000m3 & ultimately up to 100,000m3. Installation of relevant services & infrastructure. Construction of services & piping/pumping infrastructure associated with air conditioning system (cooling water inlet/outlet) for the future cultural facility & carpark. Site remediation for limited contamination of fill material. Construction of a carpark totalling up to 300 spaces. Click for more details...

TRINITY CATHOLIC COLLEGE
Civil Engineering (Retaining walls, Seawalls) New project at 12-14 (Lots 42,43, 17,1 & 16) Alice St (Secn 5 DP982836, DP87395), Auburn, NSW 2144. This type is Retaining Wall/Basketball Court with Private ownership. Scope of work includes: demolition of the existing sandstone & masonry wall along part of the Park Rd alignment & construction of a 1.97m high masonry & palisade fence with a 3m high black chain wire fence behind. Replacement of part of the existing concrete surface to the basketball court adjacent to the fence. Click for more details...

PINE AVENUE & THE SERPENTINE CONCRETE CRIB RETAINING WALLS
Civil Engineering (Retaining walls, Seawalls) New project at Pine Ave & The Serpentine, Ballina, NSW 2478. This type is Retaining Walls with Local Govt ownership. Design and Construction of concrete crib retaining walls. Click for more details...

NEWTOWN RAILWAY STATION
Civil Engineering (Retaining walls, Seawalls) project In The Sydney Council Area of Early Works Package type. Early works package for the Easy Access upgrade of the station. Scope of work includes piling, demolition & retaining walls Click for more details...

ENNIS & MILSON RDS CIVIL WORKS
Civil Engineering (Retaining walls, Seawalls) project In The North Sydney Council Area of Fence /Rock Face - Stabilisation type. Part 1 - fence reconstruction works at Ennis Road, Milsons Point - Work includes the construction of a hardwood timber fence (182m) + the installation of a 'Brifen' high tensile steel rope through the all the posts; replacement of the AC footpath in concrete (550sq m) & other associated civil works. Part 2 - 135m of rock face stabilisation works at Milsons Road, Cremorne Point - works include rock bolting (11 off); shotcreting (150sq m); doweling (120 off) & other associated civil works Click for more details...

UNIVERSITY OF NSW - CARPARK
Currently at the Construction stage In Randwick is a project estimated to be $ 1648000. This project Construction of on-grade carparking at grid 2 for 163 cars. Cosntruction of a 600mm retaining wall in the western campus of UNSW Click for more details...

WERINGA AV EMBANKMENT WORKS
Embankment Works New project In The North Sydney Council Area. Embankment stabilisation works. Scope of work includes the construction of 55 linear metres of Elsholz kerb, footpath & timber fence; installation of soil nails (21 off), shotcreting (100sq m) & other associated civil works Click for more details...

HOUSING NSW UNITS
Housing Nsw Units is currently at the Construction stage, valued at about $ 200000 it is Structural rectification of brick gable wall Click for more details...

GOULBURN BASE HOSPITAL - SUB-ACUTE BED PROGRAM
State ownership Civil Engineering (Retaining walls, Seawalls) project In The Goulburn Mulwaree Council Area for New development. Works comprise maintaining access path from helipad to hospital by building a retaining wall around the future carpark. Construct a new path , detail excavation & installation of electrical cable trench & pits across the carpark. Building of retaining wall on remaining side of the carpark. Detail excavation for footing & construction of brick piers for ANU demountable building. Disconnection of services to the ANU demountable building. Allow for relocation of demountable building & reconnecting services & infill, leveling & completion of the carpark & roadworks Click for more details...

KYOGLE COUNCIL GABIONS
Civil Engineering (Retaining walls, Seawalls) project In The Kyogle Council Area of Gabion/Mattresses type. Rock filled gabion & mattresses in various locations in the Kyogle Council Click for more details...

MEREWETHER OCEAN BATHS REDEVELOPMENT - CONSULTANCY
Ocean Baths - Redevelopment project at Henderson Pd, Merewether, NSW 2291 In The Council Area Of Newcastle of Local Govt. Landscape design for the Merewether Baths redevelopment Click for more details...

UNIVERSITY OF WESTERN SYDNEY RESIDENTIAL ESTATE
A project in the NSW Within Campbelltown. Construction of retaining walls for Stages 1A & 1B. Stage 1A - 1050 lineal metres & 1216sq m (approximately). Stage 1B 1310 lineal metres & 1603sq m (approximately). Click for more details...

JOHN STREET RESERVE
John Street Reserve is currently at the Construction stage, valued at about $ 288000 it is Remediation works, tree removal & new landscaping of John Street Reserve. Scope of work includes: demolition of the existing retaining wall. Part reconstruction of the existing wall & construction of a new retaining wall. Site soil remediation within the works area & soft works landscaping Click for more details...

THE WATERFRONT, SHELL COVE
Civil Engineering (Retaining walls, Seawalls) project at ., Shell Cove, NSW 2529 for New. Civil & maritime construction of the Shell Cove Boat Harbour. Stage 2 construction package includes approximately 850,000³ of bulk earthworks. Excavation of the eastern portion of the boat harbour basin. Formation of surcharge mounds with placement of excavated material (approximately 1 million³). Treatment of approximately 300,000m³ of acid sulphate soil. Construction of boat harbour edges including 820 lineal metres of pre-cast concrete walling & 1,760 lineal metres of rock revetment Click for more details...

MURRUMBATEMAN TRANSFER STATION
Civil Engineering (Retaining walls, Seawalls) project In The Yass Valley Council Area of Waste Transfer Station type. Construction of a waste transfer station & internal roads. Drainage works. Construction of pushpit, compactor pit & retaining wall. Treatment of pavement areas with bituminous spray seal, asphalt & concrete wearing courses Click for more details...

LAHC - ERSKINEVILLE
Civil Engineering (Retaining walls, Seawalls) project for New development. Replacement of existing retaining wall & associated works Click for more details...

PASTORAL CCT AGED CARE FACILITY
New project of Civil Engineering (Retaining walls, Seawalls) project at 11 (Lot 310) Pastoral Cct (DP1111685), Pemulwuy, NSW 2145. Bulk earthworks for future aged care facility. Scope of work includes: site establishment, removal of trees, site preparation & earthworks. Construction of retaining walls & associated earthworks Click for more details...

ONSLOW AV RETAINING WALLS
Currently at the Construction stage In Sydney is a project estimated to be $ 120000. This project Repair to a sandstone block retaining wall that has deteriorated in 2 places in Onslow Av. Click for more details...

MAGENTA SHARED PATHWAY
New project of Civil Engineering (Retaining walls, Seawalls) project at Wilfred Barrett Dr, Magenta, NSW 2261. Construction of a 1530m concrete pathway at Magenta. Scope of work includes: tree removal, 3m wide concrete path at grade, concrete boardwalk (Ultrafloor System), retaining walls, drainage works & landscape works. The pathway location is between Evans Rd & the Red Gum Trail (Wyrrabalong National Park) car park on Wilfred Barrett Dr, Magenta. Click for more details...

RIVER RD
Civil Engineering (Retaining walls, Seawalls) project at River Rd, Lane Cove, NSW 2066 for New. Embankment stabilisation with soil nails. Click for more details...

RENOWN RD
Renown Rd is currently at the Construction stage, valued at about $ 287000 it is Slope stabilisation works at Renown Rd. Click for more details...

THOMAS HOGAN RESERVE
Civil Engineering (Retaining walls, Seawalls) project at Francis St, Bondi, NSW 2026 for New. Refurbish the existing playground. Removal of existing features & installation of new playground equipment, landscaping, concrete works, street furniture, retaining walls, softfall & planting Click for more details...

BRUNSWICK NORTHERN BREAKWATER REMEDIAL WORKS
Civil Engineering (Retaining walls, Seawalls) New project at Located Within, Brunswick Heads, NSW 2483. This type is Breakwater - Remedial Works with State ownership. Remedial works to the northern breakwater at Brunswick Heads. Click for more details...

ROSEMOUNT RD STABILISATION
Civil Engineering (Retaining walls, Seawalls) project at Rosemount Rd, Denman, NSW 2328 for New. Stabilisation of embankments at Rosemount Rd cutting in Denman. Scope of work may occur at 2 sites: Site 2 - is located approximately 6.8km from the intersection of Virginia and Rosemount Road; Rosemount Road at this location traverse in North Easterly direction and the cutting is located east of the road; approximate length of this site is 250m & the maximum height of the sub-vertical cutting varies from 4m to 10m. Site 1 (Provisional Item) - is located approximately 5km from the intersection of Virginia and Rosemount Road; approximate length of the site is 90m & the maximum height of the sub-vertical cuttings varies from 3m to 5m; Rosemount Road at this location traverses in North Westerly direction & the cutting is located east of the road. Scope of work includes: Protect environment from erosion and sediment, water pollution, air pollution, noise & ground vibration. Clean bench & restore drainage flow. Split/scale rock blocks. Scale down face and crest of loose rock & soil material & regrade slope. Install shotcrete & tie into natural ground. Clean verge & clear vegetation from cutting face Click for more details...

WOOLOOWARE BAY SHARED PATHWAY
Civil Engineering (Retaining walls, Seawalls) project at ., Woolooware, NSW 2230 for New. Construction of a shared pathway. Design of viewing boardwalks, decks & pile systems. Drainage. Remediation & reclamation works. Construction of seawalls. Sandfill & saltmarsh planting. Construction of sand island. Construction of concrete pathway and pavements. Construction of bird hide. Supply & install of shade structures. Landscaping Click for more details...

CASEYS BEACH SEAWALL
Civil Engineering (Retaining walls, Seawalls) project at Beach Rd, Sunshine Bay, NSW 2536 of Seawall - Replacement type of New development. Construction of a replacement Seawall at Caseys Beach. Scope of work includes: remove & construct an 80m length of the southern seawall, replace the access stairs & install warning signs Click for more details...

TOONGABBIE CREEK
Civil Engineering (Retaining walls, Seawalls) New project at Peter Pde, Old Toongabbie, NSW 2146. This type is Levee - Remediation Works with Local Govt ownership. Repair & remediation work on an existing levee adjacent to Toongabbie Creek. The levee is located on the southern side of Toongabbie Creek on Peter Parade near its intersection with Chircan St. Scope of work includes: locating a& protection of all authority services including the Northern Suburbs Ocean Outfall Sewer 1800mm dia, Integral Energy power poles, smaller connecting sewer lines, watermains and communication assets. Excavation of failed section. Temporary works to provide a safe construction area and Coordination of works so as not to increase the risk of further failure should a flood event occur during the construction period. Approximately 75ea x 900mm dia reinforced concrete piles. Approximately 108m long reinforced concrete pile cap & retaining wall. Reinstatement & extension of blocked stormwater lines. Placement of reno mattresses & Rip Rap. Placement and compaction of fill to design levels. Repair & reinstatement of the existing block work retaining wall, footpath and pedestrian safety fence. Click for more details...

RALSTON DRIVE VEHICLE REPAIR STATION & RETAINING WALLS
Ralston Drive Vehicle Repair Station & Retaining Walls is currently at the Construction stage, valued at about $ 950000 it is Proposed construction of a vehicle repair station & retaining walls. Associated car parking & landscaping. Click for more details...

STANWELL PARK CHILDERN'S CENTRE RETAINING WALL
Retaining Wall/Surface Car Park project at 22 Stanwell Ave, Stanwell Park, NSW 2508 In The Council Area Of Wollongong of Local Govt. Removal of failed pine log 18m retaining wall adjacent to the Centre?s carpark. Replacement with sleeper designed retaining wall. Resurfacing of bitumen carpark, approximately 150 sqm. Construction of new kerb. Construction of new concrete path into the Centre. Line marking within the carpark. Installation of wheel stop barriers and guardrails within carpark. Removal of a number of small Casuarina saplings and one small shrub adjacent to the carpark Click for more details...

MOUNT LINDESAY ROAD
Civil Engineering (Retaining walls, Seawalls) project for New development. Construction of flood damage restoration works on Mount Lindesay Rd & on Rivertree Rd between Legume & Woodenbong east of Liston. Scope of work involves: installation of gravity retaining walls at 5 sites on Mount Lindesay Rd & associated earthworks. Installation of sheet piling at 2 sites on Rivertree Rd with associated pipe drainage & earthworks. Click for more details...

STANHOPE BRIDGE
Currently at the Construction stage In Singleton is a project estimated to be $ 149000. This project Embankment rectification & road approach repairs at Stanhope Bridge. Scope of work includes: embankment rock protection. Transition barrier refurbishment. Road approach refurbishment Click for more details...

MORRISON BAY SEAWALL
Morrison Bay Seawall is currently at the Construction stage, valued at about $ 1072000 it is Renewal works on the seawall located at Morrison Bay Park. Scope of works comprises 2 separable portions. Separable Portion 1 comprises: construction of the Morrison Bay seawall & the associated landscape and civil works. Separable Portion 2 comprises: supply & delivery of the sandstone for the construction of the Morrison Bay seawall. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect