State

Categories

Sub Categories

Click Here to Find Current Projects

List of Retaining walls, Seawalls Projects in New South Wales


BEROWRA WATERS RD RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project In The Hornsby Council Area of Retaining Wall type. Construction of permanent retaining wall above roadway, to consist of back-to-back galvanised steel channel soldiers spaced at 2 & 3 metres centres with precast prestressed concrete planks spanning horizontally between soldiers. Click for more details...

FORMER PRINCE HENRY HOSPITAL SITE
Currently at the Construction stage In Randwick is a project estimated to be $ 4000000. This project Infrastructure works including roads, services, stormwater drainage, water, sewer, electricity, gas, telecommunication services, associated earthworks, retaining structures, irrigation reticulation, street landscaping works. Click for more details...

NORTH BEACH BATHING PAVILION
Civil Engineering (Retaining walls, Seawalls) New project at Lot 70 Cliff Rd (DP751299), Wollongong, NSW 2500. This type is Bathing Pavilion with Local Govt ownership. Refurbishment of North Beach Bathers Pavilion. The proposal comprises adaptive re-use of the Bathers Pavilion; a kiosk with an area of 7.9sq m & an external capacity of 24 patrons; cafe with a GFA of 234sq m with an internal patron capacity of 78 & external capacity of 75 patrons; fitout of lifeguard facilities & amenities; new toilet facilities, change rooms & lockers; provision of external surrounding promenade & paths; upgrade & erection of seawalls & retaining walls; new garbage facility with adjacent truck layback; new substation. Additional parking is proposed to be located at the north Wollongong beach carpark approx 20m NW of the site for 11 carparking spaces (including 2 accessible spaces) , 2 motorcycle spaces and bike racks. Landscape works, involving: replacement of existing dilapidated crib lock retaining wall to the west of the pavilion with a stone clad wall; widening of existing shared path at North Beach to 6m; upgrading & improving accessibility of existing heritage pathway from Cliff Road to North Beach with lower riser and wide tread stairs; removal of existing toilets behind the North Beach Bathers Pavilion & widening of shared pathway to 6.4m; replacement of existing rock filled reno mattresses and gabions at the grassed embankment, south of the Pavilion, with Triton mattress system or equal; provision of P2 compliant external lighting for security; provision of bicycle parking facilities; provision of historical interpretive structure, south of the Pavilion. Click for more details...

MAITLAND LEVEE
Levee - Rehabilitation - Stage 3 project at Hunter River at Hill & Semphill Sts, Maitland, NSW 2320 in the Civil Engineering (Retaining walls, Seawalls). Work includes: construction of 300 m x loc-a-bloc retaining wall; backfilling; stormwater drainage; 450 m x levee bank earthworks; landscaping. Click for more details...

LADY ROBINSONS BEACH
Civil Engineering (Retaining walls, Seawalls) project In The Rockdale Council Area of Groynes (5) type. Construction of 5 groynes, relocation of sand, stabilisation & restoration of beach. Click for more details...

TERRIGAL & WAMBERAL OCEAN SEAWALL
New project of Civil Engineering (Retaining walls, Seawalls) project at Ocean View Dr, Terrigal, NSW 2260. Construction of a concrete seawall to run the length of the Terrigal & Wamberal beaches. Click for more details...

MOUNT KURING-GAI FUEL TANKS
759 (Lot 1) Pacific Hwy (DP712160), Mount Kuring-Gai, NSW 2080 Has Mount Kuring-Gai Fuel Tanks currently at Planning stage. Construction of a block wall, removal of an existing subterranean fuel tank & replacement with an above ground fuel tank. Click for more details...

SILVERWATER SEAWALL
Seawall - Upgrade project at Lot 1 River St (DP714160), Silverwater, NSW 2128 In The Council Area Of Auburn of Private. Reconstruction of existing seawall, new public access corridor & associated works. Click for more details...

SUTHERLAND SHIRE COUNCIL AREA FENCING
Civil Engineering (Retaining walls, Seawalls) project at various within Sutherland Shire Council areas, Sutherland, NSW 2232 for Supply & Install. Fencing supply, installation, repairs & maintenance. Click for more details...

RYDE RETAINING WALL
Ryde Retaining Wall is currently at the Construction stage, valued at about $ 70000 it is Demolition & reconstruction 42 metres of sandstone retaining wall within the road reserve. The works also include the provision of pavements, steps & associated property works. Click for more details...

GREAT WESTERN HIGHWAY - STAGE 5
Civil Engineering (Retaining walls, Seawalls) New project at from Station St, Woodford to Winbourne Rd, Hazelbrook, NSW 2779. This type is Roadworks - Upgrade with State ownership. Final stage of the upgrade the highway. This work consists of the construction of retaining walls, earthworks, drainage & pedestrian bridge. Scope of work includes: Widening of the existing carriageway from one lane in each direction to a four lane divided carriageway. Retaining walls. Relocation of Integral Energy, Telstra, Jemena & Sydney Water assets. Provide new utilities. Provide new road drainage and water basins. Upgrading of existing road drainage to minimise impacts on flooding. Changes to intersections.Provision of a shared pedestrian/cycleway on the western side of the Great Western Highway. Landscaping improvements. Adjustments to properties. Works within the Main Western Railway Corridor. Click for more details...

SOUTHERN SYDNEY FREIGHT LINE PROJECT (SSFL) - OVERALL
Rail Line New project In The Bankstown Council Area. Overall Project - Proposes construction of a dedicated single line freight rail line along the corridor of the main south line track for a distance of 30 kilometres. The SSFL will provide a third bi directional track for freight services, which would allow passengers and freight services to operate independently. The new non-electrified track, 30km in length, within a 36km railway corridor, would be located on the western side of the existing RailCorp passenger lines between Macarthur and the junction with the East Hills Line at Glenfield. At Glenfield it would cross over via a new grade-separated interchange, known as the Glenfield flyover, and continue through to Sefton on the eastern and southern side of the passenger lines. This will require construction and/or modification of road and rail bridges, retaining walls and embankments. Upgrades will also be required at 6 railway stations and their surrounding precincts - Leumeah, Minto, Casula, Warwick farm, Cabramatta & Sefton. Click for more details...

NORTH SYDNEY RAILWAY STATION
State ownership Civil Engineering (Retaining walls, Seawalls) project In The North Sydney Council Area for New development. To supply plant, labour & materials for the construction of in-situ concrete works associated with the deflection wall at North Sydney Station. Click for more details...

WOY WOY CYCLEWAY
Local Govt ownership Civil Engineering (Retaining walls, Seawalls) project In The Gosford Council Area for New development. Proposed construction of a 1.1 kilometre bike path & pedestrian path. The scope of work includes: construction of a 3 metre wide reinforced concrete pathway; reconstruction of approximately 30 metres of sandstone sea retaining wall & the relocation of a short length of man-made seawall behind Nos 160-162 Brick Wharf Rd; construction of approximately 30 metres of raised boardwalk over a minor tidal inlet; minor construction of culverts & pipe works over existing drainage systems; provision of line marking & sign posting & construction of kerb & gutter & road shoulder works in Allfield Rd adjoining pathway Click for more details...

LAKE ILLAWARRA ENTRANCE
Breakwater Renovations, Refurbishments etc. project In The Shellharbour Council Area. Construction of a northern breakwater and extension of the southern breakwater at Windang. Click for more details...

DRIFTWAY DRIVE 15 LOT SUBDIVISION
Residential Subdivision (15 Lots) project at Lots 2018 & 2019 Driftway Dr & Grazier Cct (DP1081608), Pemulwuy, NSW 2145 In The Council Area Of Holroyd of Private. Proposed 15 lot residential subdivision with lot ranging in size from 302 sq m to 510 sq m, 2 residue lots, construction of an acoustic wall & associated earthworks. Click for more details...

SHEPHERDS BAY
Shepherds Bay is currently at the Construction stage, valued at about $ 2999000 it is Remediation of former depot site. Construction of parkland and new sea walls and construction of a 26 metre long timber pier within Parramatta River for launching of small watercraft. Click for more details...

YARRAWA RD CIVIL WORKS
Civil Works project at Lot 26 Yarrawa Rd, Prestons, NSW 2170 In The Council Area Of Liverpool of Private. Stage 1 comprises land filling, retaining walls, sedimentation & erosion control measures Click for more details...

CLOVELLY BEACH CARPARK - COASTAL WALKWAY
Carpark/Walkway New project In The Randwick Council Area. Construction of the coastal walkway from the Surf Life Saving Club to pumpout station on Cliffbrook parade. Scope of work includes: demolition of existing structures; installation of plain & coloured concrete pathways; construction of concrete steps; landscaping; reconfiguration of the carpark layout which will be increased by approximately 47 carspaces; construction of concrete & sandstone walls; installation of fencing; drainage works; installation of street furniture & adjustments of utility service pits. Click for more details...

MOUNT ETTALONG ROAD STABILISATION
Mount Ettalong Rd, South, Umina, NSW 2257 Has Mount Ettalong Road Stabilisation currently at Tenders & Building stage. Schedule of rates contract for the scaling, supply & installation of 1.5m, 3m & 6m rock bolts, rock fall mesh, shotcrete, rock catch fencing & associated work on the southern side of Mt Ettalong Road Click for more details...

COROWA ROAD JETTY DEVELOPMENT
Civil Engineering (Retaining walls, Seawalls) New project at 67 (Lot 2) Corowa Rd, Mulwala, NSW 2647. This type is Jetties (2)/Boat Lifts (2)/Retaining Wall with Private ownership. Proposed construction of two jetties, two boat lifts and a retaining wall. Click for more details...

NORTH SYDNEY COUNCIL INFRASTRUCTURE WORKS
Civil Engineering (Retaining walls, Seawalls) project In The North Sydney Council Area of Civil Works type. Council's Schedule of Rates Contract for the 2011 & 2012 financial years for the maintenance of infrastructure works & associated services. Tenderers may choose to submit rates on selected parts or all categories. Part 1 - Civil works - Drainage; road reconstruction; kerb & gutter; footpaths - concrete, paving & asphalt; minor repairs; general landscaping; sandstone retaining wall repairs. Part 2 - Linemarking & sign posting. Part 3 - disposal of construction mater - ac profiling, timber & concrete. Part 4- Engineering surveying. Part 5- CCTV pipeline inspections & pipe cleaning. Pat 6 - footpath paver & plaza cleaning. Part 7 - property infrastructure - general property maintenance & repair services - plumbing, timber seats & tables, timber ordinance fencing & painting. Part 8 - under awning lighting. part 9 - graffiti removal - from public & private properties. Part 10 - cleaning of gross pollutant traps. Part 11 - pest control. Part 12 shelter cleaning. Click for more details...

EDMONDSON PARK ACOUSTIC WALL
Civil Engineering (Retaining walls, Seawalls) New project at Camden Valley Way, Edmondson Park, NSW 2174. This type is Retaining Wall with State ownership. Construct a retention/acoustic wall. Design, supply & construction of 308 metres of acoustic wall & embellishment features for Talana Stage 3 & 4. Work includes: 289 metres of concrete retaining & acoustic walls from 2 - 4 metres high; 34 motif relief in concrete; 6 mild steel sculpture fixtures; 11 stainless steel sculpture features, 19 metres of steel plated feature wall from 2 - 3 metres high; 60 metres of masonry wall from 400mm to 1600mm high. Siteworks include excavation of foundations, drainage, backfilling of excavated areas & against all walls Click for more details...

GOULBURN BASE HOSPITAL - SUB-ACUTE BED PROGRAM
State ownership Civil Engineering (Retaining walls, Seawalls) project In The Goulburn Mulwaree Council Area for New development. Works comprise maintaining access path from helipad to hospital by building a retaining wall around the future carpark. Construct a new path , detail excavation & installation of electrical cable trench & pits across the carpark. Building of retaining wall on remaining side of the carpark. Detail excavation for footing & construction of brick piers for ANU demountable building. Disconnection of services to the ANU demountable building. Allow for relocation of demountable building & reconnecting services & infill, leveling & completion of the carpark & roadworks Click for more details...

HUNTER INSTITUTE - KURRI KURRI CAMPUS - BLOCKS P & O
State ownership Civil Engineering (Retaining walls, Seawalls) project In The Cessnock Council Area for Renovations, Refurbishments etc. development. Construction of the Plant & Heavy Vehicle training centre. Scope of work includes: Block Q4 -a new 2 storey 1500sq m brick & metal clad building with attached covered walkways. It incorporates accommodation for practical teaching spaces on the ground floor & 6 x lecture rooms/laboratories on the first floor, together with student amenities, toilets & associated communications & cleaning facilities; the building includes a lift. Major refurbishment & alterations to Block O, a single storey metal clad building. It incorporates facilities for staff, including offices, interview & meeting rooms, open plan offices, staff amenities & associated toilets, store, cleaner & communications rooms. Block P ? a large volume single storey brick & metal clad building. The works involve refurbishment of existing workshop & practical teaching space & alterations to workshop space. Block P ? construction of new 535sq m metal clad extension to accommodate a new workshop & two new practical teaching spaces. Block PP ? construction of new 510sq m metal clad extension to accommodate a new workshop & storage space. Upgrading, alteration & extension of existing electrical systems including power, internal & external lighting, security, fire detection, communication & data systems. Upgrading, alteration & extension of hydraulic services including gas, potable hot, warm & cold water, fire services, rainwater harvesting & stormwater systems. Upgrading, alteration & extension of mechanical services including, welding gas, compressed air, systems & mechanical ventilation systems. Construction of new covered walkways & outdoor areas Modification of existing car park. Partial reconstruction of access road. Construction of extensive gabion retaining walls. New paving, landscaping & associated site works & services. Click for more details...

LAHC - WARREN
Retaining Wall project at 20 Warren St, Nyngan, NSW 2825 In The Council Area Of Bogan of State. Construction of a retaining wall & associated works Click for more details...

MEREWETHER OCEAN BATHS REDEVELOPMENT - CONSULTANCY
Ocean Baths - Redevelopment project at Henderson Pd, Merewether, NSW 2291 In The Council Area Of Newcastle of Local Govt. Landscape design for the Merewether Baths redevelopment Click for more details...

GOLDSTEIN RESERVE MEMORIAL
Civil Engineering (Retaining walls, Seawalls) New project at 175-249R Arden St, Coogee, NSW 2034. This type is Memorial with Local Govt ownership. Construction of a memorial for fallen life savers at the southern end of Goldstein Reserve. Construction of a granite memorial wall,earthworks, drainage, electrical, small retaining walls, paving, landscaping & installation of a bronze sculpture Click for more details...

UNIVERSITY OF WESTERN SYDNEY RESIDENTIAL ESTATE
A project in the NSW Within Campbelltown. Construction of retaining walls for Stages 1A & 1B. Stage 1A - 1050 lineal metres & 1216sq m (approximately). Stage 1B 1310 lineal metres & 1603sq m (approximately). Click for more details...

ST LUKES GRAMMAR SCHOOL
Currently at the Construction stage In Warringah is a project estimated to be $ 645000. This project Alterations & addition to existing school. Upgrade of the existing vehicular access & carpark area adjacent to Headland Road. The carpark will provide for 2 accessible spaces & 5 standard car spaces with a turning area. The eastern end of the carpark remains unchanged from the existing circumstances. The driveway & carpark area will be constructed of black coloured concrete/asphalt with the pedestrian areas constructed of concrete pavement to minimise potential and vehicular conflict. A new vehicle access drive will be provided to the western end of the carpark in a similar location to the existing driveway. The existing kerbing will be removed to provide a level drive and pedestrian pathway. The existing stairs from the entry to the main office and school will be altered to accommodate the new grades including two additional steps & brick walls & handrails. A new lift will be installed to provide disabled access from the carpark to the school entry/administration building. The lift is to be located adjacent to the existing stairs. New boundary/entry walls are proposed adjacent to the vehicular & pedestrian entries & signage. The existing senior lawn/quadrangle will be upgraded incorporating new walls, landscaping & decks. Click for more details...

LAHC - DAPTO
Retaining Walls project at 356-366 Princes Hwy, Dapto, NSW 2530 In The Council Area Of Wollongong of State. Reconstruction of retaining walls, fences & other associated works Click for more details...

BELGRAVE ESPLANADE SEAWALL
Seawall New project In The Sutherland Council Area. Reconstruction of the seawall at Belgrave Esplanade. Scope of work involves: construction of a new seawall in 4 sections totalling approximately 66 lineal metres. Click for more details...

MAGENTA SHARED PATHWAY
New project of Civil Engineering (Retaining walls, Seawalls) project at Wilfred Barrett Dr, Magenta, NSW 2261. Construction of a 1530m concrete pathway at Magenta. Scope of work includes: tree removal, 3m wide concrete path at grade, concrete boardwalk (Ultrafloor System), retaining walls, drainage works & landscape works. The pathway location is between Evans Rd & the Red Gum Trail (Wyrrabalong National Park) car park on Wilfred Barrett Dr, Magenta. Click for more details...

HW16 MALLANGANEE WEST
A project in the NSW Within Richmond Valley. installation of a bored piled wall as part of the Mallanganee Ssip repair. Scope of work generally comprises: installation of bored piles & reinforced concrete capping beam. Click for more details...

ROGER SUMMERS RESERVE
Seawall/Footpath - Stages 2 & 4 New project In The Sutherland Council Area. Seawall & footpath upgrade. Scope of work includes: stage 2 - upgrade of eastern side of Brighton St/adjacent western edge of Roger Summers Reserve - work includes: construction of a concrete walkway; construction of concrete stairs; construction of new access to the Sydney Water Sewer pumping station; fabrication & installation of fencing; installation of lighting & drainage infrastructure; installation of bollards, seating & signage. Stage 2A - terracing of an existing grass embankment & installation of dimension sandstone blocks as seating walls/retaining structures; (this stage may or may not be included in the contract). Stage 4 - construction of a revetment wall along Bundeena Creek which includes supply & installation of dimension sandstone for the wall, moving of existing stone along the creek to form creek armouring & construction of a footpath behind the wall Click for more details...

LAHC - ADAMSTOWN & JESMOND
Civil Engineering (Retaining walls, Seawalls) project In The Newcastle Council Area of State ownership. Replacement of retaining wall & other associated works. Click for more details...

CHURCH POINT CARPARK
Carpark/Roadworks/Seawall project at McCarrs Creek Rd, Church Point, NSW 2105 in the Civil Engineering (Retaining walls, Seawalls). Construction of a piered seawall and pedestrian boardwalk. Re-alignment of McCarrs Creek Road including drainage. Construction of a 2 level car park & facade. Access connection from carpark to existing pontoon Click for more details...

CLIFF RD TO TRAMWAY ACCESS STAIRS
Access Stairs project at various locations in, Wollongong North, NSW 2500 In The Council Area Of Wollongong of Local Govt. Scope of work includes: approximately 55m x reinforced concrete stairs to replace the existing pedestrian access stairs that run between Cliff Road & the Tramway Shared Path adjacent to the Continental Pool, North Wollongong. Demolition of existing pedestrian access stairs. Earthworks preparation. Installation of concrete and screw piles with beam footing. Installation of approximately 55m of concrete access stairs. Associated drainage works. Associated retaining walls. Associated landscaping & balustrading works Click for more details...

SOUTH CURL CURL
Seawall New project In The Warringah Council Area. Construction of a buried seawall, toe reinforcement of an existing seawall & restoration of a damaged section of carpark at South Curl Curl beach, Curl Curl. Scope of work includes:installation of new concrete secant pile wall, capping beam, and permanent anchors including associated earthworks; backfilling excavation zones using stockpiled material; installation of rock blanket; disposal of materials which are excess to requirements; partial demolition & excavation of existing promenade to the landward side of the beach access ramp; supply, placement & compaction of material to fill cavities beneath the excavation zone; retention/replacement of signage & services; construction of new pavements subgrades. Click for more details...

LYNE PARK
Lyne Park is currently at the Construction stage, valued at about $ 388000 it is Reconstruction of seawall at east Lyne Park, Rose Bay. The seawall to be reconstructed will be primarily starting at Chainage 72 & extending for approximately 60 metres Click for more details...

HENDERSON PARK
Civil Engineering (Retaining walls, Seawalls) project In The Port Stephens Council Area of Local Govt ownership. Installation of a revetment wall to replace an existing, failing structure at Henderson Park. The structure is approximately 170 metres in length & approximately one metre in height. The works are located adjacent to the Port Stephens Great Lakes Marine Park. The revetment wall will be constructed using proven engineering methods consisting of a geo-synthetic cloth lined secondary rock armour, overlain by a larger primary rock armour layer Click for more details...

GENTLEMANS POOL
A project in the NSW Within Wollongong. Upgrade works to Gentleman?s Rock pool repair includes: shotcrete repair of existing West and East Seawall. Structural repairs to existing pool walls. Localised resurfacing repairs. Transition repair to existing wall Click for more details...

TOONGABBIE CREEK
Civil Engineering (Retaining walls, Seawalls) New project at Peter Pde, Old Toongabbie, NSW 2146. This type is Levee - Remediation Works with Local Govt ownership. Repair & remediation work on an existing levee adjacent to Toongabbie Creek. The levee is located on the southern side of Toongabbie Creek on Peter Parade near its intersection with Chircan St. Scope of work includes: locating a& protection of all authority services including the Northern Suburbs Ocean Outfall Sewer 1800mm dia, Integral Energy power poles, smaller connecting sewer lines, watermains and communication assets. Excavation of failed section. Temporary works to provide a safe construction area and Coordination of works so as not to increase the risk of further failure should a flood event occur during the construction period. Approximately 75ea x 900mm dia reinforced concrete piles. Approximately 108m long reinforced concrete pile cap & retaining wall. Reinstatement & extension of blocked stormwater lines. Placement of reno mattresses & Rip Rap. Placement and compaction of fill to design levels. Repair & reinstatement of the existing block work retaining wall, footpath and pedestrian safety fence. Click for more details...

RALSTON DRIVE VEHICLE REPAIR STATION & RETAINING WALLS
Ralston Drive Vehicle Repair Station & Retaining Walls is currently at the Construction stage, valued at about $ 950000 it is Proposed construction of a vehicle repair station & retaining walls. Associated car parking & landscaping. Click for more details...

UPPER KANGAROO RIVER ROAD
Civil Engineering (Retaining walls, Seawalls) project at Upper Kangaroo River Rd, Kangaroo Valley, NSW 2577 for New. Restoration of a narrowed 15m long section of road affected by down slope slip, using piles. Scope of work includes: stabilisation of road shoulder; construction of traffic barrier; stabilisation of the downhill slip exposed face; gravel resheet & regrade of road. Reinstatement of road drainage Click for more details...

SOUTH SYDNEY HOSPITAL SITE HERITAGE WALL
Civil Engineering (Retaining walls, Seawalls) New project at Joynton Ave, Zetland, NSW 2017. This type is Wall Raising - Reconstruction/Restoration with Local Govt ownership. Restoration & reconstruction of heritage wall including repair of cracking to brickwork & stonework, removal of graffiti, existing sandstone capping, raising brickwork, procurement of new sandstone capping to match existing & additional brickwork, interim asphalt overlay & ramps on footway, grading of verge to tie into the existing Joynton Ave, concrete footings, piers & new brickwork for infill works, wall strengthening works, raising brickwork to final levels & reinstallation of sandstone capping. Click for more details...

PERTHVILLE FLOOD MITIGATION WORKS
Civil Engineering (Retaining walls, Seawalls) New project at Various locations in, Perthville, NSW 2795. This type is Flood Mitigation Works with Local Govt ownership. Scope of works include: excavation of levee exploration trench. Demolition, clear & grubbing of work site area of all structures, debris & fencing. Removal, storage, protection, & reinstallation of Memorial within Bridge Street Park. Topsoiling & revegetation of disturbed areas. Installation of creek riffles chainages. Supply & install culvert units. Construction of concrete head walls & wing walls. Construction of gabion basket retaining wall, including handrail & handrail slab. Supply & install Monowills or equivalent handrail adjacent to concrete path. Construct reinforced concrete wall levee & footing. Construct gabion retaining wall. Construct RC stormwater pits. Removal of redundant existing stormwater infrastructure. Construction of pump/ penstock chamber & cover shed. Supply & install flood pump and motor. Supply and install penstock & penstock motor equipment. Design, supply & install all electrical equipment including cabling, variable speed drive and control gear, cabinet, conduits, multitrode control etc. Click for more details...

GLENIFFER BRAE RETAINING WALL
Civil Engineering (Retaining walls, Seawalls) project In The Wollongong Council Area of Retaining Wall type. Repair of the existing retaining wall Click for more details...

CASEYS BEACH SEAWALL
Seawall - Upgrade Addition project In The Eurobodalla Council Area. Upgrade of Caseys Beach seawall between Short Creek Bridge & BB02 sewage pumping station to ensure foreshore stability & reduce damage to the sewage pump station. Works include flatter slope design, extension of the wall further into the beach & new concrete stairs with handrails from the car park. Click for more details...

STANHOPE BRIDGE
Currently at the Construction stage In Singleton is a project estimated to be $ 149000. This project Embankment rectification & road approach repairs at Stanhope Bridge. Scope of work includes: embankment rock protection. Transition barrier refurbishment. Road approach refurbishment Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect