State

Categories

Sub Categories

Click Here to Find Current Projects

List of Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways Projects in SA


SAHT - THE PARKS
Various locations in The Parks area, ., SA 5999 Has Saht - The Parks currently at Tenders & Building stage. Concrete paving to 10 properties in the Parks. Click for more details...

DAVOREN PARK FOOTPATH REPLACEMENT PROGRAM
Footpath Replacement For Suburb project at Within, Davoren Park, SA 5113 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Supply & lay of footpaths replacements of varying quantities at various sites through Davoren Park. Click for more details...

HAMPSTEAD ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Supply & Install development. Supply & install segmental pavers to Hampstead Road. Click for more details...

COBBLER CREEK CONSERVATION PARK
Carparks/Visitor Centres For Park project at Within conservation park, Salisbury East, SA 5109 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construct carparks & visitor facilities within park. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at Unley Rd (btwn South Tce & Greenhill Rd), Adelaide, SA 5000. This type is Streetscaping Works For Road - Upgrade - Phase 1 with Local Govt ownership. Clearing & grubbing, earthworks, 1,150m approx x kerb & channel, shared service trenching, street lighting, minor drainage, asphalt pathways & miscellaneous works. Click for more details...

DEPT OF TRANSPORT
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Elliston Council Area for Addition development. 3 km x construction, drainage & primary seal. Click for more details...

MILLICENT & DISTRICT HOSPITAL
Mount Gambier Rd, Millicent, SA 5280 Has Millicent & District Hospital currently at Construction stage. Includes minor boxing for roadworks. Click for more details...

SOUTH EAST HIGHWAY - MAJOR IMPROVEMENTS (NEW ALIGNMENT)
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Subcontract project at South East Hwy Glen Osmond -, Crafers, SA 5152. This type is Hotmix Asphalt For Highway Road Works & Tunnel - Supply & Lay with State ownership. Supply & lay hotmix asphalt for 4.7 km approx x new route construction & 3.6 km x realignment & widening. Click for more details...

SWAN REACH-MANNUM ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Ridley Council Area of Road - Sealing - Stage 3 type. 21 km approx x sprayseal bituminous surfacing & associated works. Click for more details...

SOUTHERN FOOD GROUP
Sliproads For Food Processing Plant/Administration Facility project at Apcel Straight Snuggery near, Tantanoola, SA 5280 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Sliproads for food processing facility. Click for more details...

SOUTH EAST HIGHWAY - MAJOR IMPROVEMENTS (NEW ALIGNMENT)
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. 4.7 km approx new route construction & 3.6 km of realignment & widening. Carriageways that would consist of three lanes in each direction. Three interchanges including one at Mt Osmond with provision for all movements & directional interchanges at each end of the bypassed secn of Mt Barker Rd. Lighting proposed for full length of the new route. Work includes: new corridor from Devil's Elbow to Crafers, upgrade existing roadworks from Glen Osmond to Crafers, interchange at Mt Osmond Rd & interchange at Portrush, Cross, Glen Osmond & Mount Barker Rds. Click for more details...

EYRE HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at RN2000 Eyre Hwy (btwn Ceduna & Lincoln Gap), ., SA 5999 of Road - Widening - Secns 10 (9) & 11 (10) type of Renovations, Refurbishments etc. development. Rehabilitation & widening of various secns of existing road. Secn 10 (9): 5 km west of Wirrulla & Puntabi & secn 11 (10): btwn Puntabi & Ceduna. Click for more details...

WALLAROO - PORT WAKEFIELD ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Copper Coast Council Area of Road - Upgrade - Stage 2b1 type. Reconstruct 300 m approx of Port Rd (btwn Harris & Doswell Tce) with kerbs, gutters, underground drainage, on-road parking & shareed footpath/bicycle path on northern side. Click for more details...

SWAN REACH - MANNUM ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Swan Reach-Mannum Rd (btwn Walkers Flat & 27 km South West of Walkers Flat - Mannum Rd), Swan Reach, SA 5354 for New. Undisclosed km part 21 km approx overall x sprayseal bituminous surfacing & associated works. Click for more details...

CITY OF UNLEY
Various sites in Council Area of, Unley, SA 5061 Has City Of Unley currently at Construction stage. Annual footway reconstruction. Click for more details...

KADINA ROADWORKS
Roadworks - Upgrade project at Various sites within Council area of, Wallaroo, SA 5556 In The Council Area Of Copper Coast of Local Govt. Road upgrades. Click for more details...

KAURI RESERVE
Currently at the Construction stage In Holdfast Bay is a project estimated to be $ 300000. This project Comprising spray seal 80 space carpark over existing landfill, general earthworks, stormwater, lighting, kerbing, signage & line marking. Click for more details...

NORTHGATE RESIDENTIAL SUBDIVISION
Roadworks project at Lot 106 Northgate, Northfield, SA 5085 In The Council Area Of Port Adelaide Enfield of Private. Roadworks & services. Click for more details...

MIMILI ABORIGINAL COMMUNITY - ANANGU PITJANTJATJARA LANDS
Currently at the Construction stage In Far North is a project estimated to be $ 2500000. This project Construction of approximately 3.5 kms sealed & unsealed roadways, supply & installation of stormwater system, supply & installation of new dual pipewater supply system & provision of common effluent scheme with associated pumping station & effluent treatment ponds. Click for more details...

QUEEN ELIZABETH HOSPITAL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Addition project at Woodville Rd, Woodville South, SA 5011. This type is Enabling Works/Services Relocation/Demolition For Hospital - Redevelopment with State ownership. Work includes diversion of stormwater, sewer, domestic & fire water, steam & condensate, natural gas, high & low voltage electrical & communications inground services in staged program. Nurses Education annex of CDRC building will be demolished with services decommissioned & made safe. Services including air conditioning, refrigeration systems, domestic hot, cold & fire water, electrical & communications between Nurses Education & CDRC buildings will be diverted. New air conditioning & domestic hot water systems will be installed in CDRC building. Structural strengthening of services tunnel from boiler house under roadway to Maternity building & structural works to CDRC demolition facade are also required. Click for more details...

MARION BAY TO CORNY POINT ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Marion Bay to Corny Point Rd, Corny Point, SA 5575 of Roadworks - Upgrade - Stage 3 type of Renovations, Refurbishments etc. development. Approx 13 km road works & seal upgrade. Click for more details...

CITY OF WEST TORRENS - SEALING
Crack/Joint Sealing For Various Sites Renovations, Refurbishments etc. project In The West Torrens Council Area. Crack & joint sealing for various sites within council area. Click for more details...

SEPTEMBER BEACH - LINCOLN NATIONAL PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Port Lincoln Council Area of State ownership. 2 x picnic platforms with curved roof, 3 x timber boardways with handrails & treads, 1 x concrete sleeper walkway to beach & 15 approx gravel carpark. Click for more details...

MOUNT PLEASANT - MAIN STREET
A project in the SA Within Mount Pleasant. Consultant to prepare Main St streetscaping & traffic management master plan. Click for more details...

THE PARADE OFFICE/CARPARK
A project in the SA Within Norwood & Payneham & St Peters. Change use from consulting rooms & dwelling to office including construction of new car park to rear & minor building modifications. Click for more details...

DTEI BITUMINOUS WORKS PREQUALIFICATION
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Various Council Area for New development. Prequalification for various bituminous works to be carried out throughout South Australia. Click for more details...

COCHRANE BUSINESS PARK STAGE 2
Cochrane Business Park Stage 2 is currently at the Planning stage, valued at about $ 400000 it is Stage 2 comprises refurbishment of existing building as 1,200 sq m approx office space. Demolition of small rear warehouse & construction of 10 m high 3,000 sq m warehouse building. Work also includes provision of rear carparking for 86 off-street parking spaces (currently 47 spaces) & loading canopy rear of new warehouse. Click for more details...

PORT AUGUSTA CITY COUNCIL - PARKS GARDENS & FOOTPATH MAINTENANCE
Renovations, Refurbishments etc. project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various sites within council area of, Port Augusta, SA 5700. 2 year period contract for maintenance & upkeep of council's parks, gardens & footpaths. Click for more details...

CITY OF NORWOOD PAYNEHAM & ST PETERS HOTMIX RESEAL PROGRAM 2006/2007
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Edge planing & hotmix overlay of various roads within council area of City of Norwood, Payneham & St Peters in 2006/2007 financial year. Includes: edge planing of 2m each side of carriage way, end planing, (as directed) remove/correct structural defects within seal, placement of 24,844 sq m of 30 mm thick AC10 C320 mix seal over existing pavement, & edge & end planing & reseal of 726 sq m of 2 roundabouts with 50 mm polymer modified binder AC10 AB2. Roads include: roundabout - St Peters St to Fourth Av 398 sq m, roundabout - St Peters St to Second Av 328 sq m, First Ln - St Peters St to end (adjacent library) 543 sq m, Botanic St - Osborne St to Hackney Rd 1535 sq m, Morcomb St - Dover St to Henry St 1309 sq m, Fifth Av - St Peters St to Stephen Tce 3963 sq m, Fifth Av - Harrow Rd to St Peters St 2618 sq m, River St - first bend to Tenth Av 2329 sq m, Westbury St - Hackney Rd to Osborne St 2080 sq m, Fourth Ln - Winchester St to end 1460 sq m, Luhrs Rd - Portrush Rd to Ashbrook Av 6572 sq m, Marden Rd - Grigg St to Kent St 1935 sq m, Hereford Av - intersection with Albermarle Av 500 sq m & Ashbrook Av - Magill Rd to Albermarle Av 1720 sq m. Total: 25,570 sq m. Click for more details...

BURNSIDE ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various streets within council district, Burnside, SA 5066 for New. Spray sealing of residential streets, approx 50,330 sqm ranging from an estimated 285 sqm-3,750 sqm street sections for 2008-2009. Click for more details...

FLINDERS PORT BULK STORAGE & TRANSFER FACILITY HARDSTAND
Hardstand project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Hardstand area for bulk storage & transfer facility. Click for more details...

TONSLEY PARK REDEVELOPMENT CIVIL ENGINEERING CONSULTANCY
Consultancy For Civil Engineering Design New project In The Marion Council Area. Engineering design for all civil construction including site remediation & minor demolition; road & footpath reconstruction & new road & footpath construction; stormwater management including Water Sensitive Urban Design works; new & replacement sewer drainage; potable & non-potable water supply & headworks; common service trench including tri-generation fluid reticulation network & pit & pipe for communications services & electrical works including electrical networks & the undergrounding of existing cables. Click for more details...

LIGHT REGIONAL COUNCIL ASPHALT SURFACING & DRAINAGE
Roadworks - Asphalt/Spray Seal Surfacing/Drainage New project In The Light Regional Council Area. Construction of asphalt pavements on Old Adelaide Rd, Roseworthy Rd & Bethel Rd. Application of sprayed bituminous surfacing on Templers Rd, Mudla Wirra Rd, Stonewell Rd, Ronda Ave, Wiechert Rd, Lange Rd, Barkley Dr & Kerr Rd, Stelzer Rd & Roseworthy Rd. Supply & installation of pipes, culverts, drainage structures, gabions, reno mattresses & mesh panels. Associated earthworks. Click for more details...

CITY OF BURNSIDE ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Williams Ave, Dulwich, SA 5065 for New. The construction of replacement concrete kerb, gutter & associated minor works Click for more details...

LOXTON WAIKERIE EAST TERRACE REVITALISATION PROJECT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at East Tce, Loxton, SA 5333 for New. East Terrace is the central shopping area for Loxton which attracts local community members and visitors alike. Revitalising the main street will refresh East Terrace by building upon the strengths of Loxtons existing row shops and village style atmosphere. Stage 1 of the Our Hub Our Pride East Terrace Revitalisation project will see the following outcomes: paved road crossings to calm traffic movements promoting pedestrian safety; greater facilities for increased flexibility to conduct major cultural, social and retail events; increased opportunity for artistic expression through the use of the entertainment shell; foster increased community expression; increase amenity and modern infrastructure to attract and retain visitors in the shopping precinct; environmental efficiencies through subsurface irrigation; inclusion of sustainable plantings; internet accessibility throughout the precinct to attract and retain the modern community; increased trade potential through web based business information. Works to include; pavement plan - for the main street entrance/exit and Drabsch Street crossover; urban design plan - of the street furniture, paving, lighting, seating, bollards, PA system, phone charging points, landscaping etc; entertainment wall- detailed drawings of the entertainment wall suitable for Development Application; subsurface plan- for services such as water, electricity, PA system, subsurface irrigation etc. connecting relevant street furniture. Click for more details...

RURAL CITY OF MURRAY BRIDGE ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Cypress Tce Maurice Rd Hindmarsh Rd & Old Swanport Rd, Murray Bridge, SA 5253 of Roadworks type of New development. Upgrades to reconstruct 6.3 km of existing pavements on Cypress Tce, Maurice Rd, Hindmarsh Rd & Old Swanport Rd & upgrade 5 intersections along the route to meet B-Double (HML) standards. Click for more details...

WHYALLA CITY PLAZA UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Forsyth & Patterson Sts, Whyalla, SA 5600 of Parklets (4) - Construction type of New development. The Principal invites tenders from Tenderers for the provision of the construction of four separate Parklets to be constructed outside existing food vendor outlets in the Whyalla City Plaza along Forsyth & Patterson Streets as part of the City Plaza Upgrade Project. The Parklets are new outdoor dining & social spaces, positioned adjacent existing food vendors in the City Plaza. The work comprises of demolition & excavation of the existing infrastructure in the area; installation of new paving; installation of new planter boxes; installation of new furniture & fittings & installation of new lighting & shade structures. All parklet locations are in the City Plaza along the same street. The Principal aim to achieve a cost effective & aesthetically appealing solution to the provision of Parklets, all the while minimising disruption to operating traders, in particular the food vendors themselves. Electrical Works: All of the Parklets specify the installation of LED uplights under selected trees & the installation of LED pole top lights at selected locations. The Tenderer will be responsible for installation using an appropriately licensed & qualified electrician for installation & commissioning. The Tenderer should make allowance for trenching & cabling from a suitable supply location. Click for more details...

TAURAGAT WELL ROAD RECONSTRUCTION
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Coorong D C Council Area for New development. The Principal invites tenders from Tenderers for the provision of Road Reconstruction of Tauragat Well Rd, CH 18.28 to CH 24.05 km. Also the design & then reconstruction of CH24.05 to CH24.45 km. The work comprises the reconstruction & sealing works. Tenderers shall be responsible for determining rubble sources for the project with the Principal controlling the quarry agreement once the site is determined. Responsibility for supply of water for road construction shall be with the Tenderer. The Scope of works include: 1) Rubble sourcing, extraction & crushing; 2) Sourcing water supply for the project; 3) Roadway widening, reconstruction & sealing; 4) Design & Construct of the final 400m of the project where design drawings are not available; 5) Associated earthworks; 6) Reshaping & regrading of property accesses; 7) Associated clearing works; & 8) Sealing of the reconstructed pavement (including line marking). Click for more details...

QUEEN STREET SIDE ENTRY PIT CONSTRUCTION
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Queen St, Norwood, SA 5067. The Principal has allocated funding within the 2015/16 Capital Work budget for a number of drainage projects. The Principal now invites tenders for design & construction of the following project: Queen Side Entry Pits (SEP) : There is a low spot in Queen St, Norwood just south of the Bath Hotel. while there are a number of SEPs in the stormwater network, these are insufficient to collect the stormwater in medium sized rain events & as such, the Principal has had a concept design prepared by Tonkin Consulting to increase the flood protection to a 20 year standard. The scope of works includes, but is not limited to the following: 1) Removal of 1 SEP & accompanying pipework; 2) Supply & Installation of 6 new Double SEPs & associated pipework & concrete kerbing tie-ins; 3) Installation of 4 connections to the creek culvert; 4) Removal & replacement of a section of concrete kerbing; 5) Pavement reinstatements, including associated line marking. Design Requirements: A detailed design as such is not required from the Principals point of view, however, the successful Tenderer will be required to determine the vertical alignment of the pipe s to avoid the services on site. The following minimum criteria shall also be met: a) Minimum 1 percent grade on all pipes; b) Minimum 500mm cover on all pipes; & c) All pipes shall be 375mm RRJ RCP & minimum class 3. Click for more details...

LAVERSTOCK ROAD ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Laverstock Rd (at intersections of Minchington & Brixton Rds), Elizabeth North, SA 5113 for New. The Principal invites tenders for the implementation of Traffic Control Devices (concrete protuberances) on Laverstock Rd, Elizabeth North. The works are to include implementation of two traffic control devices at the intersection of Minchington Rd & Brixton Rd, along Laverstock Rd. These intersection rearrangements involve the construction of concrete protuberances & median to slow vehicular traffic & redirect their path through the intersections, as well as associated lighting & line marking. The Tenderer shall be responsible for the supply of all materials, supervision, labour & machinery necessary for the design, demolition, construction, laying, compaction, finishing & cleaning up of the identified site/s. Click for more details...

FARNE TERRACE & FIRST STREET DRAINAGE WORKS
A project in the SA Within Marion. The Principal invites tenders for provision of drainage works at Farne Tce, Marion & First Ave, Hallett Cove. 1) Farne Tce Drainage Project: Stormwater inundation has been as issue in Farne Tce for many years. There is no connecting downstream infrastructure at this location so the railway corridor has naturally created a stormwater trap in the road network, the low point being the Farne Tce/Alison Ave junction. In 1976 the Marion Council designed a makeshift stormwater drainage system in an attempt to resolve some of the immediate issues of inundation/flooding at the Farne Tce/Alison Ave junction. This installation was inconsistent with the SWSDS Scheme & avoided the hard task of crossing the railway corridor as well as the expense of constructing the downstream infrastructure necessary to convey it. It also grossly undersized to manage the overall catchment on the south-eastern side of the railway corridor. This makeshift system connects to the same main trunk drain, albeit further upstream. In addition, the existing pipe was found to be compromised as its capacity has been severely reduced as a result of the intrusion of mass tree roots. The pipe has since been hydro-vaced & roots cut. Nevertheless, this can only be considered a temporary solution & it is preferable to replace the infrastructure & not salvage any component. The replacement system in Farne Tce will provide some improvement over the existing infrastructure, with a more extensive length of pipe & greater number of side entry pits. Additionally, this new infrastructure will provide more immediate benefits in protecting the Marion Station Underpass from stormwater ingress & potential flooding. 2) First St Drainage Project: Stormwater from the street is collected by one side entry pit, located at the northern end & on the western side of the street. However, there is also a surcharge pit at the southern end that discharges stormwater into First St. This is collected from a low point in The Cove Rd & then transferred to First St via a connecting 300mm pipe in an easement through private properties. Until the advent of 1 First St property being developed, there were no apparent stormwater issues being experienced by residents. Once the house was built on this property, the owner began contacting the Council reporting street stormwater entering the property, posing a potential threat to the house. The resident at the rear property of 25 South Ave also began reporting this water also flowing through his property. To alleviate the stormwater issues experienced in First St, the Council proposes to install a new underground pipe system that will connect the existing surcharge pit at the southern end to the existing pipe system in South Ave. This will result in the elimination of excess overland flows in the street predominately emanating from The Cove Rd. Additional improvements will be made to the existing infrastructure in First St to achieve standard configurations & improve operating efficiency. Works Included: The works includes, but is not limited to, the following for both projects: a) Supply project specific management plans, to be approved by the Principal prior to starting work, which will include the following: 1) A Risk Assessment for the proposed work & an associated Risk Management Plan; 2) Traffic & Pedestrian Management Plans; 3) Environmental Management Plans; b) Deliver Farne Tce Drainage project, in accordance with Construction Drawings, Technical Requirements & General Requirements (supplied); c) Deliver First Ave Drainage project, in accordance with Construction Drawings, Technical Requirements & General Requirements (supplied); d) Clean up of sites including removal of all surplus material; e) Provide a twelve (12) month defect liability period from the date of practical completion, as accepted by Council. The Work Click for more details...

UPPER YORKE ROAD ROADWORKS
Upper Yorke Road Roadworks is currently at the Construction stage, valued at about $ 3000000 it is The work under this tender consists of the pavement rehabilitation & sealing on RN3842 Upper Yorke Rd (Bute to Kulpara) MM0.5 - MM9. The work consists of: a) Extension of proposed culverts/pipes; b) Installation of new culverts at proposed intersections; c) Sub-base preparation for both shoulders & main carriageway with centreline adjustment; d) Granular overlay; & e) Bituminous surfacing. During the course of the work the Tenderer shall not leave the site to undertake work outside this Contract without the approval of the Superintendent. Separable Portion A - Separable Portion A includes all activities up to & including primer sealing & temporary pavement marking. Separable Portion B - Separable Portion B includes final sealing & final pavement marking. Supply of Materials - All materials shall be supplied by the Tenderer. Click for more details...

PUKATJA (ERNABELLA) WASTE MANAGEMENT FACILTIES
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Far North Council Area for New development. This tenders is for the establishment of waste management facilities at a new location & closure of the old waste disposal site at Pukatja (Ernabella) in the Anangu, Pitjantjatjara Yankunytjatjara (APY) Lands. The work includes the establishment of waste management facilities at a new site, including the construction of: 1) a compound for disposal of domestic waste in trenches, 2) drying beds for bio-solids, 3) an area with individual bays & an adjacent apron for the sorting and storage of materials recovered from the waste stream, 4) an area for storage of large items such as abandoned vehicles, water tanks & concrete items, & 5) a cleared area, prepared for the installation of a hazardous waste material storage facility. Work also includes the construction of an earth mound between the new waste site the NT Border - Umuwa Rd to screen the site from the road & an access track to the waste site & the NT Border - Umuwa Rd. The existing Pukatja waste disposal site, which consists of more than one area, is to be closed. Waste shall be buried in either existing or to be constructed excavation(s) within the identified areas or compacted in mounds at ground level. All compacted waste material shall be capped with cover material. Mounding, compacting & capping waste shall only be allowed if there is insufficient space to bury waste in excavations. Large objects within the site, including abandoned vehicles, water tanks & large concrete items shall be removed from the areas to be closed & stored at designated locations with other like materials. Items such as tyres & wheels with tyres shall also be removed from the areas to be closed & stockpiled in separate locations with like materials. The storage areas for materials recovered from the existing waste disposal site shall be on or adjacent to the closed waste site. The work under the Tender consists of: a) New site identification & establishment; b) Closure of existing Waste Management Site; c) Establishment of new Waste Management facilities on the new site; d) Fencing & erection of signs; & Waste Management Site Access Track & junction & Screening Mound. Supply of Materials: The Principal shall supply all signs, posts & materials for the installation of signs at the new waste management site & the old waste disposal site. All other materials shall be supplied by the Contractor. Click for more details...

ALDINGA DISTRICT CENTRE UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Main St & Town Square, Aldinga Beach, SA 5173 of Civil Works/Landscaping/Irrigation/Electrical/Drainage type of New development. Works to deliver a new main street to connect McRae St with Pridham Blvd, Aldinga Beach & a new town square with a remodelled GP Plus carpark including, but not limited to: 1) Demolition; 2) Civil; 3) Stormwater; 4) Street & Public Lighting; 5) Installation & connection of services; 6) Supply & Installation of street & town square furniture; 7) Landscaping & irrigation works. Exclusions: a) Public art installation; b) Building works associated with the construction of new Aldinga Library to directly adjoin the new main street footpath being constructed as part of this project; c) Non contestable works as defined in the supplied electrical lighting drawings. Click for more details...

MURRAY MALLEE REGIONAL ROADWORKS
Roadworks project at Various locations within the region, ., SA 5999 In The Council Area Of Various of State. The Principal invites tenders for the following: Description of Works: The work under this tender consists of the bituminous surfacing (Crumb Rubber) & pavement marking of various roads in the Murray Mallee area of South Australia as listed within the Work Summary. The Work Summary has been categorised into Defined & Provisional work. Provisional Work is work undertaken at the sole discretion of the Superintendent, who will provide written notification to the Contractor is this work is required. All bituminous sealing works in this tender are Performance based. During the course of the work, the Contractor shall not leave the site to undertake work outside this contract without the approval of the Superintendent. Supply of Materials: All materials shall be supplied by the Contractor unless indicated otherwise. Click for more details...

MCDONALDS RESTAURANT MOUNT GAMBIER
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Mount Gambier Council Area of Carpark/Dual Laneway type. Increase to carpark & construction of dual laneways. Click for more details...

SANDSTONE AVENUE CULVERT WORKS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Sandstone Ave, Naracoorte, SA 5271. The Principal invites tenders for the upgrade of a culvert on Sandstone Avenue, Naracoorte. The Contractors scope of works includes but is not limited t, the provision of supervision, labour, materials, transport, plant & equipment necessary to complete the planning, set out, removal, supply, installation, certification & maintenance of the civil, asphalt, concrete works, excavation, reinstatement, line marking & storm water works as required. Click for more details...

KAURI COMMUNITY & SPORTS CENTRE CAR PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. The Principal is seeking tenders for construction of a car park for 56 vehicles at the Kauri Community & Sports Centre, Lipson Ave, Seacliff. The project will be on a sloping demolished site, previously the Seacliff Sports Club building. The civil works will require retaining walls, drainage, lighting, landscaping, kerb & watertables, extending the existing car park. The construction may require the use of specialised construction techniques to the fact that the area is a former landfill site. Additional Information: On site, adjacent the Lipson Ave car park, there is an existing area behind temporary fencing with blue shade mesh, known as the Hockey Warm Up Area. The area currently contains stockpiled material for use as fill, for the proposed car park area. This area will be designated as a flat grassed area complete with irrigation, following completion of the car park civil works & returned to its previous condition. Note: there is an existing water supply & irrigation system on this area. Allow for the levelling of this area, with Landscape Type 02, removal all rubble/rocks, provide 200 mm of top soil & turf, provide sub-surface irrigation under turf & irrigation control cox to each landscaped zone. Remove all unwanted materiel from site on completion. Click for more details...

CHURCHILL ROAD CATCHMENT DRAINAGE DIVERSION WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Churchill Rd, Elizabeth St & Devonport Tce, Prospect, SA 5082 for New. The Principal invites tenders for provision of the following: The scope of works for the Churchill Road Catchment drainage diversion works comprises the following activities: 1) Demolition & modifications to existing side entry pit including reinstating existing pipe connections; 2) Modifications & partial demolition to existing Churchill Road 1650 & 675 pneumatic core drain; 3) Construction of a flow splitter chamber at the junction of Elizabeth Street/Churchill Road junction; 4) Supply installation & backfill of new Reinforced Concrete Box Culverts; 5) Construction of new junction pits side entry pits & stormwater pipe connections; 6) Saw cut for new drainage & pit works; 7) Reinstatement of road pavements; 8) Reinstatement of disturbed kerbing, kerb & gutter & spoon drain; 9) Liaison with service authorities to arrange relocation or protection of assets where relevant; 10) Linemarking & signage reinstatement; 11) Miscellaneous minor works; 12) Construction Traffic Management; 13) Construction Environmental Management Plan; 14) Quality control & testing. Click for more details...

TORRENS ROAD ROADWORKS
Footpaths/Kerbing/Crossovers project at Torrens Rd, Riverton, SA 5412 In The Council Area Of Riverton of Local Govt. The Principal invites tenders for the construction of footpath, kerbing & crossovers in Torrens Road, Riverton. Site of the proposed works is on the eastern side of Torrens Road, between Elliot Street & Hannaford Avenue. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect