State

Categories

Sub Categories

Click Here to Find Current Projects

List of Roads, Airstrips, Culverts, Retaining walls Projects


CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

TASMAN COAL PROJECT - MOUNT SUGARLOAF - ROAD UPGRADE (NO3)
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Newcastle Council Area for New development. Contract includes the round about on John Renshaw Drive. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

MOUNT OWEN COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Via, Singleton, NSW 2330. This type is Open Cut Mine - Production Increase with Private ownership. Includes proposal to increase Run of Mine (ROM) coal production at Mount Owen from 8Mtpa to 10Mtpa; extending mining operations at Mt Owen in the approved pit C area and the development of a shallow resource adjacent to the pit C area, referred to as the Eastern Rail Pit; developing an out of pit overburden dump known as the West Dump; continuing to operate a ROM receival facility. Click for more details...

NIMARY - GOLD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

PREMIER COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) Addition project at Near Shotts South Rd via, Collie, WA 6225. This type is Road Construction with Private ownership. This road is required to replace the Shotts South Rd which will be closed to permit extensions to mining operations. The new road will be built to MRD specifications, will be 7 m wide & will require a bitumen surface. Boxed culverts to be provided for this road which joins Coalfields Hwy. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

KOOLYANOBBING IRON ORE EXPANSION PROJECT
Koolyanobbing Iron Ore Expansion Project is currently at the Construction stage, valued at about $ 320000000 it is The proposal is comprised of the following main components: mining areas which include open cut mine pits, overburden landform and general operational areas. A haul road of approximately 10.7km length is required for the transport of the excavated ore from the mine to existing processing facilities at Koolyanobbing. A gravel pit will also be required for construction of the haul road. The haul road will traverse parallel to the southern side of the Mt Jackson Range and connect to an existing haul road that leads to Koolyanobbing. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of, Blackwater, QLD 4717. The EIS proposes relocating the proposed haul road route to Curragh Coal mine 1.5-3km further east of MacKenzie River, a variation from the original Pisces project as proposed by Stanwell. The proposed haul road corridor is 25 km. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

OREBODY 18 IRON ORE PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) at Approx 30 km east of, Newman, WA 6753. This type is Rail Spur with Private ownership. BHP plans to mine 116 million tonnes or iron ore over the next 12 - 15 years. Part of the development will be the construction of a 8 km long rail spur connecting the mine via the Jimblebar spur to the main Newman to Port Headland railway. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

AVEBURY NICKEL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at West of, Zeehan, TAS 7469 of Decline Development type of New development. The decline tunnel has a length in excess of 1,200metres and will access the upper sections of the Viking deposit. Detailed drilling will be carried out from the decline to evaluate the nickel mineralisation. The decline will also provide access to the higher grade upper sections for any early production. Click for more details...

POONCARIE MINERAL SANDS - GINKGO
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. The haul road will be constructed in two stages. The first stage will involve formation of the road to driveable condition using local materials. Upon commencement of transportation of extracted material from the mine site, crushed gravel will be back loaded from Broken Hill to construct pavement. The second stage will involve sealing works and will commence approx two years after the start of mine operations. The second stage is estimated to cost $8 million. A bridge will also be constructed over the Great Darling Anabranch. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

GWINDINUP TITANIUM MINERALS PROJECT - ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approximately 25 km southeast of, Bunbury, WA 6230 for New. For construction services for the road upgrade. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

LEFROY GOLD TAILINGS RETREATMENT PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Dorset Council Area of Private ownership. A project based on tailings on the Lefroy mining lease estimated at 140,000t containing 6000 ounces (oz) of gold. Recovery of material from the tailings dams for transport via local roads & highways to the existing Beaconsfield carbon-in-pulp (CIP) processing plant & subsequent underground disposal. To include construction of access roads, vegetation clearing, construction of new drainage channel/mound & a pond. Removal of tailings by loaders which will fill trucks for transport to Beaconsfield. Click for more details...

PROSPERO/TALPINOS PROJECT - NICKEL RESOURCE
A project in the WA Within Leonora. Total Resource estimate is 1,330,000 tonnes @ 5.95% for 79,200 Ni. This comprises measured resources of 416,000 tonnes @ 6.39% for 26,600 tonnes of Ni, Indicated resources of 470,000 tonnes @ 6.42% for 30,200 tonnes of Ni and Inferred resources of 445,000 tonnes @ 5.03% for 22,400 tonnes of Ni. Talpinos has a resource estimate of 142,000 tonnes @ 7.4% for 10,500 Ni. Feasibility study on the development of the deposit includes geotechnical drilling, hydrogeological investigations, infill drilling to upgrade the resource estimate to a reserve. Mine development will include box cut excavation and associated waste dump, laydown area and decline development. A new haul road and service corridor linking the development to the exisiting Cosmo mine and concentrator will be constructed. A tailings storage facility, evaporation ponds, ventilation rises and secondary egress shafts will also be constructed. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

MID WEST IRON & STEEL PROJECT - MUNCKTON ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Morawa Council Area of Road Upgrade type. Development to include the realignment, widening and sealing of Munckton Road. The existing road runs from the mine site at Koolanooka to the Mains roads network. It is approximately 20 km long. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

MANGOOLA COAL PROJECT - NORTHERN ACCESS ROAD
A project in the NSW Within Muswellbrook. For the provision of a 5km approx sealed, internal access road. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - TRANSMISSION LINE/SUBSTATION
A project in the SA Within Coober Pedy. Construction will comprise the building of a 164 km 132 kV transmission line and substation at the mine site. The power line will comprise approx 500 towers x 26 metre height pre-constructed of galvinised steel poles or lattice. Towers will take approx two days to construct on site. About 50,000 metres of service track will be constructed to service the transmission line. A substation and associated switchyard will be constructed at the mine site and will have a land area of 1 Hectare. The annual consumption of the mine and association infrastructure will be 211.1 GWh per annum. Click for more details...

CLOVERDALE MINERAL SANDS PROJECT - RESOURCE
Resource - Mineral Sands project at 6Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 3.5 million tonnes @ 18% heavy mineral sands. Heavy Mineral Concentrate production will occur at 450,000 tonnes per year. Mining will be carried out by scrapers or truck and shovel excavating the ore and hauling it to the in pit hopper. The ore will be conveyed from the Hopper to the existing wet screening plant at Yoganup West and the concentrator at Yoganup. After processing the ore will be transported by truck to Capel for further processing. The mine will use the existing infrastructure at Yoganup and only an earthmoving contractors area will be installed at the mine site. The Yoganup West access road will be extended to Clovendale for equipment movement. After mining is complete the site will be rehabilitated. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY ACCESS ROADS
Bonaparte Gas Pipeline Project - Temporary Access Roads is currently at the Construction stage, valued at about $ 1800000 it is For the provision of temporaty access roads along the pipeline route. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Various civil & concrete works for the mine site. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS - ACCESS ROAD UPGRADE
Excavation/Embankment Construction/Culverts/Pavement/Floodways project at via, Pannawonica, WA 6716 In The Council Area Of Ashburton of Private. Upgrade of the existing access road between the Great Northern Highway & West Angelas mine. To include 19,000cu m of excavation, 266,000cu m of embankment construction, 5,300m of culverts, 31km of bitumen sealed pavement plus installation of 2 floodways. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - ACCOMMODATION CAMP - EXPANSION
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Via Geraldton Mt Magnet Rd 60km SE of, Mullewa, WA 6630. Planned expansion of an onsite accommodation camp. Access road. Click for more details...

PEAK DOWNS COAL OPERATIONS - DYSART ROAD RELOCATION
A project in the QLD Within Isaac Regional. Relocation of a 16.4km section of Dysart Rd some 46-62km north of Dysart to allow for continued eastward expansion of the open cut pit. To include new bitumen sealing & association drainage. Relocation of existing fibre optic cable. Construction of a new at grade level rail crossing. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

NAMMULDI BWT MINE EXPANSION PROJECT - ROAD MAINTENANCE & MISCELLANEOUS EARTHWORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road maintenance & miscellaneous earthworks. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

BARALABA NORTH JOINT VENTURE COAL PROJECT - MINE ACCESS & MINE HAUL ROADS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Banana Shire Council Area for New development. Construction of mine access & mine haul roads. Click for more details...

PILGANGOORA LITHIUM PROJECT - ROAD & RAIL CROSSING UPGRADES
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 120km South of, Port Hedland, WA 6721. For the provision of road & rail crossing upgrades. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect