List of Roads, Airstrips, Culverts, Retaining walls Projects in NSW


TASMAN PROJECT - MOUNT SUGARLOAF - ACCESS ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 25 km west of, Newcastle, NSW 2300 for New. Construction of an access road . Click for more details...

TASMAN COAL PROJECT - MOUNT SUGARLOAF - ROAD UPGRADE (NO3)
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Newcastle Council Area for New development. Contract includes the round about on John Renshaw Drive. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Parkes Council Area for New development. Northparkes Mines is a copper/gold producer near Parkes. The Company has work conducted on rates base contracts for the supply of daily services in various fields. Includes; provision of mobile machinery including (but not limited to) bobcat, backhoe, small trucks, small excavators, water cart as required; provision of labour for assistance with minor maintenance tasks; fencing etc as assistance to farming operations; civil and road repairs/maintenance as required. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

MOUNT OWEN COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Via, Singleton, NSW 2330. This type is Open Cut Mine - Production Increase with Private ownership. Includes proposal to increase Run of Mine (ROM) coal production at Mount Owen from 8Mtpa to 10Mtpa; extending mining operations at Mt Owen in the approved pit C area and the development of a shallow resource adjacent to the pit C area, referred to as the Eastern Rail Pit; developing an out of pit overburden dump known as the West Dump; continuing to operate a ROM receival facility. Click for more details...

MOUNT OWEN COAL OPERATIONS - ROM RECEIVAL FACILITY
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Singleton Council Area for New development. Construction and operation of a ROM receival facility and haul roads to enable Mount Owen Mine to process ROM coal from Ravensworth East and Glendell mines. Click for more details...

WERRIS CREEK COAL MINE - INFRASTRUCTURE
Werris Creek Coal Mine - Infrastructure is currently at the Planning stage, valued at about $ 1000000 it is Includes haul road, coal screening, crushing equipment and rail loadout area. Coal washery will be transferred from the former Gunnedah Colliery and will include conveyors, transfer towers and a 350 tonne capacity raw coal bin. Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...

POONCARIE MINERAL SANDS - GINKGO
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. The haul road will be constructed in two stages. The first stage will involve formation of the road to driveable condition using local materials. Upon commencement of transportation of extracted material from the mine site, crushed gravel will be back loaded from Broken Hill to construct pavement. The second stage will involve sealing works and will commence approx two years after the start of mine operations. The second stage is estimated to cost $8 million. A bridge will also be constructed over the Great Darling Anabranch. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Lake Macquarie Council Area of Private ownership. Bridge across the Great Northern rail line and 3.5 km connection road to from a T-intersection with the existing Newstan haul road. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

TRITTON COPPER PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

WESTSIDE COAL OPERATIONS
Road Realignment & Road Works project at At, Wakefield, NSW 2278 In The Council Area Of Lake Macquarie of Private. Realignment of Wakefield Rd. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

CAMDEN GAS PROJECT STAGE 2 - SUGARLOAF FARM EXTENSION
Resource - Coal Bed Methane project at Menangle Road, Gilead, NSW 2560 In The Council Area Of Campbelltown of Private. A two drilling programme will intersect the Bulli, Balgownie and Wongawilli coal seams. Development includes the construction and drilling of seven wells, the construction and operation of the gas gathering system and access roads, the connection of the wells to the stage 2 treatment plant and the operation and production of methane gas from the wells. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

MANGOOLA COAL PROJECT - NORTHERN ACCESS ROAD
A project in the NSW Within Muswellbrook. For the provision of a 5km approx sealed, internal access road. Click for more details...

MANGOOLA COAL PROJECT - WYBONG ROAD UPGRADE
Mangoola Coal Project - Wybong Road Upgrade is currently at the Construction stage, valued at about $ 2000000 it is For the upgrade of 7km of existing Wybong Road including widening, intersection enhancement & line marking. Click for more details...

CAMDEN GAS PROJECT - RAZORBACK WELLS - RESOURCE
Resource - Coal Bed Methane project at Finns Rd & Woodbridge Rd, Camden Park, NSW 2568 In The Council Area Of Wollondilly of Private. To construct nine coal seam gas wells including gas gathering systems and access roads. The wells will be connected to the Rosalind Park Gas Plant for production. Click for more details...

BAYSWATER/LIDDELL POWER STATION - ROAD MAINTENANCE
Road Maintenance Services project at At, Liddell, NSW 2333 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Work comprises Maintenance of bitumen surfaced roads and car parks; Maintenance of unsealed roads and car parks; Construction of new roads and car parks; Maintenance of road shoulders and table drains; Maintenance of Asphaltic concrete road surfaces; Miscellaneous roadwork items including supply and installation of guide posts and guard railing, and road line marking; Repairs to Coal Plant Roads and Repairs to River Road. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

ROCGLEN COAL PROJECT - ROAD DIVERSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road diversion. Click for more details...

ROCGLEN COAL PROJECT - NEW ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Gunnedah Council Area of Private ownership. For the provision of a new road. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...