List of Roads, Airstrips, Culverts, Retaining walls Projects in QLD


TWIN HILLS GOLD PROJECT - ROAD INTERSECTION
Twin Hills Gold Project - Road Intersection is currently at the Tenders & Building stage, valued at about $ 500000 it is Work comprises the construction of the intersection of Twin Hills operations access road and the Gregory Development road, which is 125 km north of Cleremont. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

ERNEST HENRY COPPER/GOLD MINE
Ernest Henry Copper/Gold Mine is currently at the Construction stage, valued at about $ 8000000 it is 35.5 km long x 9 m wide, running along a ridge route on the east of & parallel to Zingari Rd. The contract will include construction of road & associated drainage works. Precaste concrete culvert units for the latter will be supplied under a separate contract. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Various civil & concrete works for the mine site. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

CLONCURRY COPPER GOLD PROJECT - ACCESS ROADS
Access Roads project at 40km northeast of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. Access roads expected to include an 8km main access road from Zingari Road to the Mount Margaret area & a 9km light vehicle track from the A2/A6 Highway via Fisher Creek Road for access to the Monakoff area. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

BARALABA NORTH JOINT VENTURE COAL PROJECT - MINE ACCESS & MINE HAUL ROADS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Banana Shire Council Area for New development. Construction of mine access & mine haul roads. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

CLONCURRY COPPER GOLD PROJECT - HAUL ROADS
Haul Roads project at 40km northeast of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. Haul roads to include from the Mount Margaret run-of-mine (ROM) pad area to the Monakoff & Monakoff East pits & ROM stockpile pads. An 8km haul road also to the nearby Ernest Henry Mine for ore processing. Click for more details...

MIDDLEMOUNT COAL OPERATIONS - STAGE 2 EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area of Operating Mine - Expansion type. A pulverised coal injection (PCI) & coking coal open cut mine based on an estimated resource of 122.6million tonnes (Mt). The stage 2 expansion project to increase production from 1.8million tonnes per year (Mtpa) to 5.4Mtpa of run-of-mine (RoM) coal for 23 years. Removal of overburden & coal to continue by conventional truck, shovel & excavator. To includes a 30kL/day package potable water treatment plant (WTP), a sewage treatment plant (STP), the 650m x 200m go line area (including office, crib facility, amenities, kitchen/dining area), flood protection levees & diversion of Roper Creek & Thirteen Mile Gully. Later upgrading of feed conveyors, coal stackers, screens, valves & control systems of the existing coal handling & preparation plant (CHPP) to increase capacity from 400 to 700 tonnes per hour (t/h) for 4Mt/y product coal. Extension of the existing vehicle workshop to include 4 additional covered & 2 outdoor bays with aprons. Additional 600,00l diesel & 1.2ML fuel storage facilities. Associated out-of-pit spoil dumps & additional haul/access roads. Possibility of a dragline & associated 200m x 200m construction pad. Later diversion of part of the Bingegang (Saraji) pipeline. Some of the additional 397 operational personnel expected to be accommodated in an extension to The MAC Middlemount village. Click for more details...

DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

BAAL GAMMON TIN & COPPER PROJECT - HAUL ROAD
Haul Road project at 7 km west of, Herberton, QLD 4872 In The Council Area Of Tablelands Regional of Private. Provision of a haul road. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

NEWLANDS & GLENDEN ROADWORKS PROJECT
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Around, Glenden, QLD 4743. Roadworks associated with the Newlands Camp including internal roads & car park. Upgrade of Collinsville Elphinstone Road & the camp access intersection. Extension also of Hess Avenue & Gibb Street in Glenden. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - HAUL ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. Bauxite will be hauled from the Bauxite Hills DSO Project mining area to the barge loading facility. Trucks will use internal roads connected to a main north-south haul road linking with the Mine Infrastructure Area (MIA) & barge loading facility. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

MORANBAH NORTH COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. 21 lots. Click for more details...

APLNG LNG PLANT - ROAD MAINTENANCE SERVICES
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Gladstone Regional Council Area of Private ownership. For the provision of road maintenance services. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - MAIN ACCESS ROAD DESIGN
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area for New development. The Main Access Road - design contract is for Goonyella. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ROAD REPAIRS
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Various, ., QLD 4999. Contracts for asphalt repair of highways & local roads servicing the construction of the APLNG pipeline. Local contractors to supply all necessary equipment/plant & materials. Works to be carried out generally from Miles through Wandoan, Lighthouse, Cockatoo, Mungungal, Biloela & Gladstone. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of, Blackwater, QLD 4717. The EIS proposes relocating the proposed haul road route to Curragh Coal mine 1.5-3km further east of MacKenzie River, a variation from the original Pisces project as proposed by Stanwell. The proposed haul road corridor is 25 km. Click for more details...

DUGALD RIVER BASE METAL PROJECT - PERMANENT ACCOMMODATION VILLAGE
Accommodation Modules/Ancillary Buildings/Services project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Construction of a 500 bed permanent accommodation village for the 25 year life-of-mine. Single storey modules with 3 bedrooms each. Associated kitchen, dining, laundry, recreation facilities. Parking. Click for more details...

HAIL CREEK COAL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approx 35 km north west of, Nebo, QLD 4742 for New. 24 km of fencing. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - MINING CONTRACT
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Poitrel via, Moranbah, QLD 4744. Includes infrastructure, administration facilities, workshops etc. Click for more details...

PEAK DOWNS COAL OPERATIONS - DYSART ROAD RELOCATION
A project in the QLD Within Isaac Regional. Relocation of a 16.4km section of Dysart Rd some 46-62km north of Dysart to allow for continued eastward expansion of the open cut pit. To include new bitumen sealing & association drainage. Relocation of existing fibre optic cable. Construction of a new at grade level rail crossing. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LAYDOWN ROAD MATERIALS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. Supply of gravel for the formation of 7 approx Linepipe Stockpile laydown roads running from Miles to Mt Larcom. Supply also of crushed concrete & crushed rock of various sizes. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

SARAJI COAL MINE
Saraji Coal Mine is currently at the Construction stage, valued at about $ 200000 it is Unsealed back access road. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - FENCING
Currently at the Tenders & Building stage In Various is a project estimated to be $ 2000000. This project Contracts to repair & restore damaged fences, remove redundant fences & construct new fences & associated grids & gates on various rural properties. Supply also of fencing materials. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

QR - FENCING
Fencing project at Goonyella via, Moranbah, QLD 4744 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). 21 km of fence construction. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

POITREL COAL MINE PROJECT - CREEK DIVERSION/LEVEE BANKS
A project in the QLD Within Isaac Regional. The proposal includes diversion of New Chum Creek to the east of the mine and levee banks along the flood plain of the Isaac River to the south and New Chum Creek to the east. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

MORANBAH REGION EXPANSION PROJECT - SITE ESTABLISHMENT & MANAGEMENT FACILTIES
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Around, Moranbah, QLD 4744 for New. Package for construction of access roads (X003). Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - FINAL ROADWORKS STAGE 1
A project in the QLD Within Mackay Regional. Work to comprise repairing existing roads after major works are completed at the terminal. Final Site Wide Civil Works Stage 1. Click for more details...