State

Categories

Sub Categories

Click Here to Find Current Projects

List of Roads, Airstrips, Culverts, Retaining walls Projects in WA


GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

NELSON POINT - IRON ORE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Port area via, Port Hedland, WA 6721 for Renovations, Refurbishments etc.. Extensive modifications will be required to the P12 conveyor prior to the installation of a new stacker (under construction in Perth). Work mainly involves civils & structural/mechanical services. Click for more details...

JUNDEE-NIMARY GOLD OPERATIONS
Approximately 40 km east southeast of, Wiluna, WA 6646 Has Jundee-Nimary Gold Operations currently at Construction stage. Contract to involve site clearance, general earthworks & associated services such as lighting. Design work completed. A gravel airstrip & apron area are required for new mine site. Click for more details...

NIMARY - GOLD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

PREMIER COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) Addition project at Near Shotts South Rd via, Collie, WA 6225. This type is Road Construction with Private ownership. This road is required to replace the Shotts South Rd which will be closed to permit extensions to mining operations. The new road will be built to MRD specifications, will be 7 m wide & will require a bitumen surface. Boxed culverts to be provided for this road which joins Coalfields Hwy. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 8 km east of, Collie, WA 6225 of Bulk Earthworks type of New development. Contract involves placement of waste dump & stockpile areas plus site levelling for new mine. Earthworks also required for rail line & site access roads. ((Tracklaying to be carried out by Westrail.)) Click for more details...

RAVENSTHORPE NICKEL PROJECT
Access Roads/Earthworks project at 50km north of, Hopetoun, WA 6348 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). The process plant location has been moved to the eastern side of Bandalup Hill. Some Jerdacuttup Road upgrades will no longer be required as heavy haulage will now be directed onto the South Coast Highway. Appropriate intersection design and construction will be required for the process plant access road to safely intersect the South coast highway. Proposed intersection approx 900 metres west of the Homestead Road turnoff to Oldfield. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

KOOLYANOBBING IRON ORE EXPANSION PROJECT
Koolyanobbing Iron Ore Expansion Project is currently at the Construction stage, valued at about $ 320000000 it is The proposal is comprised of the following main components: mining areas which include open cut mine pits, overburden landform and general operational areas. A haul road of approximately 10.7km length is required for the transport of the excavated ore from the mine to existing processing facilities at Koolyanobbing. A gravel pit will also be required for construction of the haul road. The haul road will traverse parallel to the southern side of the Mt Jackson Range and connect to an existing haul road that leads to Koolyanobbing. Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

COPERNICUS NICKEL & COPPER JV PROJECT - OPEN CUT MINING CONTRACT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at East Kimberley area via, Halls Creek, WA 6770. This type is Open Cut Mining/Haulage with Private ownership. The resource estimate is 852,000 tonnes of ore. A haul road is to be constructed as well. Click for more details...

BEENUP MINERAL SANDS MINE - HAULAGE ROUTE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Sues Rd Beenup (17 km northeast of Augusta) to, Nannup, WA 6275. This type is Road - Design, Construct & Maintenance with State ownership. Dedicated road haulage route for BHP's Beenup Mineral Sands project would follow from Beenup, along Sues Road to connect with the Bussell Hwy en route to the port at Bunbury. Contract involves the design, construction and maintenance for five (5) years of approximately 38 km of new roadworks along Sues Road from Jalbarragup Rd in the Shire of Augusta - Margaret River to the Nannup-Augusta Road (Brockman Highway) in the Shire of Nannup. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

PADDINGTON GOLD OPERATIONS - YUNNDAGA/LADY SHENTON/FIRST HIT/FALCONER
Mining Contract - Open-Cut - 3 Pits project at Numerous tenements near, Menzies, WA 6436 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). A contract period of 18 months is envisaged with an estimated strip ratio of 10:1 although this may vary from pit to pit. PanCon to mine & treat four deposits containing an estimated ore reserve of 535,000t grading 2.7gpt gold. This ore will form a supplement oxide feed to blend with Paddington's sulphide ore. Yunndaga pit to be mined first, however, tender to include the First Hit & Lady Shenton/Falconer deposits. Deeper drilling is progressing at Yunndaga. Work to incorporate some access road & waste dump construction. Contractor to provide own accommodation units for staff (mess & laundry on site). Click for more details...

TELFER GOLD OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for Renovations, Refurbishments etc. development. Contract involves re-surfacing & extending the existing runway. Some fill & compaction works required. Tender to include lighting, navigational system & fencing associated with this upgrade. Click for more details...

DARLOT GOLD OPERATIONS
A project in the WA Within Leonora. Includes surface haulage, crusher feed and road upgrading. Click for more details...

HOPE DOWNS IRON ORE PROJECT - DEWATERING
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 75 Km Northwest of, Newman, WA 6753. Mine water usage will be 6.94 Mega litres per day. Work comprises the construction of the dewatering pipeline and discharge facilities for the Hope north pit. Construction will also include collector pipes, main discharge pipeline, 13 buried 152 mm diameter polythene spur lines, access roads and a collector dam of 12 ML. Further development in 2007 and 2008 will be the conversion of the initial 12 production bores to reticulated power, construction of collector pipelines to the collector dam, provision of a pumping station and installation of a telemetry system to relay operating information to a central control/monitor point. Click for more details...

MOUNT WELD RARE EARTHS PROJECT - MINING CONTRACT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Laverton Council Area of Mining Contract - Opencut type. Work comprises the development of an initial pit 150 metres wide x 300 metres long x 65 metres deep, comprising 35 metres of overburden and 30 metres of ore zone. The total mining quantity of ore and waste is 2,890,800 BCM. Of this, 541,256 tonnes of high grade ore (318,230 BCM) is scheduled to be crushed and stockpiled at the site. Optional work that can be included in the contract include the construction of 8.8 km of haul roads to the site. Also the supply and operation of a comminution circuit, which may comprise a jaw crusher or potentially a trommel screen that is to produce 100%<100 mm HG CZ 15% moisture content ore product for stockpiling on load out stockpiles at a minimum annual rate of 137,000 wet tpa. Click for more details...

GWINDINUP TITANIUM MINERALS PROJECT - ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approximately 25 km southeast of, Bunbury, WA 6230 for New. For construction services for the road upgrade. Click for more details...

COYOTE GOLD PROJECT - DAMS/ROADS/AIRSTRIP
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. Construction of the airstrip has commenced and civil works for the plant, roads and dams will commence shortly. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

BHP BILLITON IRON ORE - NEWMAN ACCOMMODATION VILLAGE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The East Pilbara Council Area of Accommodation Village - 1000 Person type. A 1000 person accommodation village north of Les Tutt Drive, which is to be closed. Camp to have expected three year duration. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

PROSPERO/TALPINOS PROJECT - NICKEL RESOURCE
A project in the WA Within Leonora. Total Resource estimate is 1,330,000 tonnes @ 5.95% for 79,200 Ni. This comprises measured resources of 416,000 tonnes @ 6.39% for 26,600 tonnes of Ni, Indicated resources of 470,000 tonnes @ 6.42% for 30,200 tonnes of Ni and Inferred resources of 445,000 tonnes @ 5.03% for 22,400 tonnes of Ni. Talpinos has a resource estimate of 142,000 tonnes @ 7.4% for 10,500 Ni. Feasibility study on the development of the deposit includes geotechnical drilling, hydrogeological investigations, infill drilling to upgrade the resource estimate to a reserve. Mine development will include box cut excavation and associated waste dump, laydown area and decline development. A new haul road and service corridor linking the development to the exisiting Cosmo mine and concentrator will be constructed. A tailings storage facility, evaporation ponds, ventilation rises and secondary egress shafts will also be constructed. Click for more details...

WESTONIA GOLD PROJECT - ACCESS ROAD/EVAPORATION POND/EARTHWORKS
Currently at the Construction stage In Westonia is a project estimated to be $ 5000000. This project Earthworks will involve the construction of an access road, the construction and refurbishment of evaporation ponds and pit floor clean up. Click for more details...

MID WEST IRON & STEEL PROJECT - MUNCKTON ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Morawa Council Area of Road Upgrade type. Development to include the realignment, widening and sealing of Munckton Road. The existing road runs from the mine site at Koolanooka to the Mains roads network. It is approximately 20 km long. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 25 EXTENSION - RESOURCE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 8 Km North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Development comprises increasing ore production from approximately 7 Mtpa to 8 Mtpa. Mining will continue and be extended in Pits 1 and 3 into approved areas and in the case of Pit 3 below the water table. Overburden Storage Areas (OSA) and low grade ore stockpiles will be extended as well the progressive development of new OSA's and the placement of overburden in existing and new mined out pits. Haul roads and light vehicle access roads will be constructed to open pits, OSA's and mine infrastructure. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCESS ROAD CONTRACT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Shark Bay Council Area of Access Road type. To construct a 50 km length access from the North West Central Highway to the mine site. Click for more details...

HALLEYS EAST GOLD PROJECT
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at via Diemals Station Rd 200km north of, Southern Cross, WA 6426. A project based on a Resource Estimate (Inferred) at Halleys East of 678,000 tonnes containing 68,800 ounces (oz) gold. Construction of a haul road to Diemals Station Road for trucking of ore via Menzies to the Greenfields Mill 3km east of Coolgardie for processing. Click for more details...

CLOVERDALE MINERAL SANDS PROJECT - RESOURCE
Resource - Mineral Sands project at 6Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 3.5 million tonnes @ 18% heavy mineral sands. Heavy Mineral Concentrate production will occur at 450,000 tonnes per year. Mining will be carried out by scrapers or truck and shovel excavating the ore and hauling it to the in pit hopper. The ore will be conveyed from the Hopper to the existing wet screening plant at Yoganup West and the concentrator at Yoganup. After processing the ore will be transported by truck to Capel for further processing. The mine will use the existing infrastructure at Yoganup and only an earthmoving contractors area will be installed at the mine site. The Yoganup West access road will be extended to Clovendale for equipment movement. After mining is complete the site will be rehabilitated. Click for more details...

TOM PRICE AERODROME
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approximately 18km North of, Tom Price, WA 6751 of Aerodrome type of New development. It is proposed to construct an aerodrome capable of accommodating jet aircraft (e.g. Boeing 737, Airbus A320) and includes the following facilities: runway (approximately 3km in length); regular public transport apron; general aviation apron; terminal; car parking area; site for commercial/business use and a fuel compound. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

LAMBOO/NICOLSONS GOLD JOINT VENTURE PROJECT - ROADS & INFRASTRUCTURE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Halls Creek Council Area of Roads/Infrastructure type. For the provision of roads & infrastructure to include road base material. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - ACCOMMODATION CAMP - EXPANSION
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Via Geraldton Mt Magnet Rd 60km SE of, Mullewa, WA 6630. Planned expansion of an onsite accommodation camp. Access road. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

NAMMULDI BWT MINE EXPANSION PROJECT - ROAD MAINTENANCE & MISCELLANEOUS EARTHWORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road maintenance & miscellaneous earthworks. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - IMPACT ROLLER (INCLUDING PRIME MOVER/TRACTOR)
Roy Hill Iron Ore Project - General - Impact Roller (Including Prime Mover/Tractor) is currently at the Construction stage, valued at about $ 250000 it is For the provision of an Impact Roller (including Prime Mover/Tractor). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - PERMANENT ROADS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Ashburton Council Area of Private ownership. For the provision of permanent roads. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - ROAD & RAIL RELOCATION
Kalgoorlie North Gold Project - Road & Rail Relocation is currently at the Construction stage, valued at about $ 14500000 it is For the provision of road & rail relocation. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - CONSTRUCTION GENERAL SERVICES NO 4
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Vicinity of, Onslow, WA 6710. For the provision of Construction General Services No 4 including Construction & maintenance of road structures, Dewatering & drainage, Dust control, Erection & relocation of portable facilities & ablutions, Site traffic control, Transport of potable water, Install & maintain temporary construction electrical power distribution system, Install, maintain & operate sewage & water treatment facilities, Fuel management, General housekeeping & waste cleanup, Support personnel, Equipment support, Construction & maintenance of temporary facilities, Install & pressure test underground piping systems, Underground duct bank & cabling, Miscellaneous concrete works, Management of acid sulfate soils (ASS) encountered during work activities, Weather protection & clean up, Environmental maintenance, Information services & technology support, & other services as required. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS BULK EARTHWORKS & CIVIL WORKS
Bulk Earthworks & Civil Works project at 95km North-west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Bulk earthworks & civil works as part of the Yandi Oxbow Project. To include construction of a 4.5km hall road. Construction of a heavy vehicle bridhe over the existing railway. Over 700,000cm embankment construction. Over 3,200 lineal metres of culverts & upgrades, rerouting & extensions to existing light vehicle access roads. Click for more details...

YANDI OXBOW PROJECT (YOP) - BULK EARTHWORKS/CIVIL WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For bulk earthworks & civil works to sustain current production at the Yandi Mine. To include construction of a 4.5km haul road, construction of a heavy vehicle bridge over the existing railway, over 700,000cm of embankment construction, over 3200 lineal metres of culverts & upgrades, re-routing & extensions to existing light vehicle access roads. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - AIRSTRIP
Airstrip project at 120km South of, Port Hedland, WA 6721 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). For the provision of an airstrip for the mine site. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect