List of Sand mining - suction dredging Projects


DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining (Sand mining - suction dredging). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

MAGUIRES CROSSING PROJECT
Currently at the Early Planning stage In Kempsey is a project estimated to be $ 10000000. This project Located about 3 hours trucking distance north of the company's dry processing plant at Hawks Nest in which spare capacity exists. The project contains a measured/inferred resources estimate of 26 million tonnes grading 0.53% HM. Click for more details...

LUDLOW MINERAL SANDS PROJECT - OPERATING MINE
Mining (Sand mining - suction dredging) project at 34 km south of, Bunbury, WA 6230 of Operating Mine - Mineral Sands type of New development. Rehabilitation works to include: earthworks; topsoil replacement; tree planting programme & landscaping. Click for more details...

SALT ASH SAND EXTRACTION
New project of Mining (Sand mining - suction dredging) project at Janet Parade, Salt Ash, NSW 2318. Involves the extraction of sand from an area of approximately 1.9 hectares off Janet Parade at a rate of up to 29,000 cubic metres per annum. The proposed method of extraction is a front end loader. Transportation of sand off-site by truck via Jant Parade. No processing on site. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining (Sand mining - suction dredging) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

YOGANUP 215 STRAND EXTENSION - MINERAL SANDS RESOURCE
Resource - Mineral Sands project at 11 Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 40,000 tonnes of Heavy Mineral Concentrate. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO - RESOURCE
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo - Resource currently at Construction stage. Resource at gingko as at mid 2004 Measured 162Mt ore 5,767 kt heavy minerals, Indicated 43Mt, 856kt heavy minerals. Road construction and a construction camp will be part of the development. Click for more details...

VELLA SANDS PROJECT
New project of Mining (Sand mining - suction dredging) project at Cnr Stevensons and Cemetery Rds, Cranbourne, VIC 3977. Permit approval has been granted for the sand mining plant expected to produce approximately 40 million tonnes of sand over the next 40 years. The plant is to be built on the Lang Lang Bass sand belt, located approximately 300-450 metres from South Gippsland highway and is expected to be in operation seven days per week on a 24 hour basis. Click for more details...

MINDARRA SPRINGS MINERAL SANDS PROJECT -GINGIN - RESOURCE
65 km north of, Perth, WA 6000 Has Mindarra Springs Mineral Sands Project -Gingin - Resource currently at Exploration, Drilling, Survey & Assessment stage. The Gingin tenments have recently been granted. Click for more details...

POONCARIE MINERAL SANDS PROJECT - ROAD/RAIL TRANSPORT
Road/Rail Transport Of Product New project In The Central Darling Council Area. A transport logistics package. Haulage of concentrate between mine site and mineral separation plant at Broken Hill. Involves 440,000tpa concentrate to Broken Hill and 130,000 tpa residue back to site for disposal. Rail transport of product from separation plant by rail to SA port. The NSW government has approved the use of AB triple truck configurations for concentrate haulage from the mine site to the MSP. Trucks in this size will permit over 60 tonne payloads to be carried and thus minimise transport costs. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

KEYSBROOK HEAVY MINERAL SANDS PROJECT - MINING CONTRACT
Mining (Sand mining - suction dredging) project for New development. For the provision of open cut mining services for production of 30Mtpa. Click for more details...

GINGIN MINERAL SANDS PROJECT - RESOURCE
Mining (Sand mining - suction dredging) project In The Gingin Council Area of Resource - Mineral Sands type. Proved Ore Reserve of 8.3Mt at 16% contained Heavy Mineral. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining (Sand mining - suction dredging) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - MINING CONTRACT
Mining Contract - Open Cut project at 28 km east of, Ouyen, VIC 3490 in the Mining (Sand mining - suction dredging). For the open cut mining contract to use a 900 tonne re-locatable mining unit. Click for more details...

ASHBURTON RIVER SAND & SHINGLE OPERATIONS EXPANSION
Mining (Sand mining - suction dredging) project at via Old Onslow Rd 32km S of, Onslow, WA 6710 of Operating Mine - Expansion type of New development. Sand & gravel extraction during the dry season from the Ashburton River bed & banks between Ten Mile Pool & Mungaroo Well. Excavation to 4m deep with material processed by sand separation followed by crushing & screening to produce aggregates placed in product stockpiles for distribution. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...