State

Categories

Sub Categories

Click Here to Find Current Projects

List of Slurry pipelines Projects


SALLY MALAY NICKEL PROJECT
Currently at the Tenders & Building stage In Wyndham-E Kimberley is a project estimated to be $ 500000. This project Water pumps, process/reagent pumps bore pumps. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

SYNTHETIC RUTILE ENHANCEMENT PROCESS (SREP)
Mining - Infrastructure (Slurry pipelines) project at Possibly near, Geraldton, WA 6530 of Treatment Plant - Turnkey Package type of New development. Plant construction by early 1996 is envisaged following recent tests which produced synthetic rutile with acceptable levels of uranium & thorium. Trials on product were carried out in the United States. Contract work to involve piping, pumping, tankage, structural steelworks & some associated services such as electricals. This process is environmentally beneficial as it eliminates the use of sulphur in kilns (Narngulu). Click for more details...

ARGYLE DIAMOND OPERATIONS
Road/Pipework & Tailings Dam project at Mine site via, Argyle, WA 6239 in the Mining - Infrastructure (Slurry pipelines). Construction of a gravel road of about 4.2 km in length is required. Contract to include laying of approximately 6 km of polyethylane pipe some of which is to lie parallel to the new road. Project now incorporates some tailings dam foundations, general earthworks & embankments. Click for more details...

NIMARY - GOLD
Mine - Treatment Plant - Relocation Addition project In The Wiluna Council Area. Second hand Labouchere plant purchased from Dominion Mining. Contract to involve dismantling the carbon-in-pulp plant & transporting it from site 180 km north of Meekatharra to new mine 40 km northeast of Wiluna. Plant to then be reassembled & some modifications to be undertaken prior to recommissioning. The 500,000tpa carbon-in-pulp/carbon-in-leach plant to be expanded to 650,000tpa. Additional requirements include tankage, structural steel, mechanical & piping works. Refurbishment of existing facilities & installation of new equipment also included in this tender. Work scheduled for completion 31 October 1995. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Private ownership Mining - Infrastructure (Slurry pipelines) project In The Various Council Area for New development. The 1,380 km gas pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. Installation will follow the main pipelaying activity. Gas measuring equipment to also be installed at Yarraloola, Newman, Mt Keith, Leinster and Kalgoorlie. Click for more details...

NIMARY - GOLD
A project in the WA Within Wiluna. Installation only required for approximately 20 km of water & slurry polypipe. Actual distance pending outcome of final survey. Click for more details...

PARKESTON POWER STATION
A project in the WA Within Kalgoorlie-Boulder. A 200mm spur line extending over 8 km is required to connect the new power station with the Pilbara-Goldfields pipeline. This pipe will be buried in a 400mm trench with a minimum of 750mm of cover. Construction period of 3 months is envisaged for this project. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - SUMP/SLURRY PUMPS
A project in the WA Within East Pilbara. Slurry and Sump Pumps. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Mining - Infrastructure (Slurry pipelines) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Infrastructure (Slurry pipelines) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT HEDLAND INFRASTRUCTURE CONSTRUCTION
Lot 4 Clark St, Port Hedland, WA 6721 Has Roy Hill Iron Ore Project - Infrastructure - Port Hedland Infrastructure Construction currently at Construction stage. For the provision of infrastructure construction. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect