State

Categories

Sub Categories

Click Here to Find Current Projects

List of Slurry pipelines Projects in QLD


BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

GEORGINA BASIN PHOSPHATE PROJECT - FERTILISER COMPLEX
Mining - Infrastructure (Slurry pipelines) project at MICA CREEK 10km south of, Gunpowder, QLD 4825 for New. Chemical processing including a 1600ktpa sulphuric acid plant, a 600ktpa phosphoric acid plant, a 1200ktpa Di/Mono Ammonium Phosphate (DAP/MAP) plant & a 30ktpa aluminium fluoride plant. Associated utilities & facilities. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS SLURRY PUMPS
Process Slurry Pumps New project In The Weipa Shire Council Area. For the provision of Process Slurry Pumps at the South of Embley Project. To include 2 end-suction, horizontal centrifugal pumps & drives for severe, abrasive slurry transport service. The pumps will be arranged in series for a maximum flowrate of 4800m3/hour flow at approximately 31m differential head per pump stage. 24 vertical spindle centrifugal pumps & drives for severe, abrasive slurry transport service. The pumps will be arranged in 12 duty/standby configurations for flows up to 800m3/hour flow at approximately 20m head. The slurry will be made up of abrasive bauxite fines, with a solids concentration of approximately 30% weight & a slurry specific gravity of approximately 1.21. The vertical spindle centrifugal pumps will be mounted in sumps. The pumps will be designed for continuous service as they are critical to the beneficiation process. The pump units shall be direct coupled to the motor & have no wet end bearings. Double volute designs are preferable. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - MINE INFRASTRUCTURE (MIA)
Mining - Infrastructure (Slurry pipelines) New project at 40km SW of, Weipa, QLD 4874. This type is Mine Infrastructure with Private ownership. For the provision of Mine Infrastructure & to include: Detailed excavation & grading. Install concrete foundations, slabs & platforms. Install wire, cable & electrical infrastructure. Install pipes, valves & fittings. Services to battery limits, Kerbs & footpaths. External lighting. Supply of nominated materials & structures. Supply & construct Operations Control Centre. Supply & construct the crib & change rooms. Supply & construct the heavy vehicle workshop c/w lube, re-fuelling & compressed air facilities. Supply & construct the warehouse, fixed plant workshop & welding bay combined. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect