State

Categories

Sub Categories

Click Here to Find Current Projects

List of Sub-sea equipments, floating production facilities Projects in NT


TASSIE SHOAL METHANOL PROJECT - LNG PRODUCTION FACILITY/STORAGE TANKS
Lng Production Facility/Storage Tanks project at Tassie Shoal in the Timor Sea 275 km north of, Darwin Mc, NT 0820 in the Oil & Gas (Sub-sea equipments, floating production facilities). A 2.5 million tonnes per annum LNG production and export facility. Includes construction for two concrete structure each containing conventional nickel steel LNG storage tanks. These structure would provide support for the LNG production module. The facility would be serviced and provisioned out of Darwin. Click for more details...

TASSIE SHOAL METHANOL PROJECT - JETTY/OFFSHORE MOORINGS
Jetty/Offshore Moorings New project In The Darwin City Council Area. Key components of the Tasie Shoal project include a jetty (200 metres long for loading methanol onto export tankers); and two offshore moorings ( one on Tassie Shoal and one beside Tassie Shoal) for use by service boats, tugs and visiting fishing vessels. Click for more details...

ELANG
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Sub-sea equipments, floating production facilities). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect