State

Categories

Sub Categories

Click Here to Find Current Projects

List of Supply/fabrication Projects


MONASH CITY ANNUAL SUPPLY
Non-Construction Items (Supply/fabrication) project at Various Sites within Monash City, Glen Waverley, VIC 3150 for New. Annual Supply Contract. Supply and Placement of Bituminous Products. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PAL DIP TUBES
Non-Construction Items (Supply/fabrication) project In The Ravensthorpe Council Area of Pal Dip Tubes/Inserts type. Pal Dip Tubes and Inserts. Click for more details...

BATCHELOR SUBSTATION PROJECT
Batchelor Rd, Batchelor, NT 0845 Has Batchelor Substation Project currently at Construction stage. The project comprises the construction of a new power distribution infrastructure in the Batchelor region to the proposed Compass Resources Brown Oxide mine. Development includes a new 132 kV transmission line of 3.7 km along Batchelor road, two new substations and a new 22 kV underground XLPE cable feeder of 10.6 km from Batchelor road to the mine site. Construction work will involve the design certification and installation of control room, disconnection uplift transport handling temporary storage and placement of all items from the Edith River substation that are to be relocated and reinstalled at Batchelor substation, erection of all electrical equipment, connection of the earth wire conductors to electrical equipment and testing of the completed earthing system, attachment of conductors and insulators to the landing structure, 132 kv transmission line erection and commissioning, electrical installation work not otherwise specified, installation of communications and 240 V power between the crib room and the control room. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - HV CABLE
Geraldton Port Berth 5 Iron Ore Expansion Project - Hv Cable is currently at the Construction stage, valued at about $ 500000 it is Supply of HV Cable. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Non-Construction Items (Supply/fabrication) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK SERVICES
Services project at Newman Hub, Newman, WA 6753 In The Council Area Of East Pilbara of Private. The scope includes water & fire services to new transfer stations, crushing building, screening building, 3 sample stations, stockyard, car dumper, TLO. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELT SCRAPERS
New project of Non-Construction Items (Supply/fabrication) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Belt Scrapers Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - WEIGHING INSTRUMENTS
15km Southeast of, Collie, WA 6225 Has Worsley Alumina Efficiency/Growth Project - Weighing Instruments currently at Tenders & Building stage. For the supply of weighing instruments. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ORIFICE PLATES & ASSEMBLEYS
Orifice Plates/Assemblies - Supply Of project at 15km Southeast of, Collie, WA 6225 in the Non-Construction Items (Supply/fabrication). For the supply of orifice places and assembleys. Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Non-Construction Items (Supply/fabrication) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Non-Construction Items (Supply/fabrication) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - PIPING VALVES
Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area of Private ownership. Ball, butterfly, knife gate, non-return, pinch & small bore valves. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - MAG FLOW METERS
New project of Non-Construction Items (Supply/fabrication) project at 35km west of, Nebo, QLD 4742. Supply of mag flow meters (sensor & transmitter). Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - FIRE EQUIPMENT
Currently at the Tenders & Building stage In Isaac Regional is a project estimated to be $ 100000. This project Fire extinguishers, fire hose reels, fire hoses, fire hydrant valves, sprinklers & sprinkler valve sets. Click for more details...

CAVAL RIDGE COAL PROJECT - LIGHT VEHICLE WASH STATION
Light Vehicle Wash Station project at 16km south of, Moranbah, QLD 4744 in the Non-Construction Items (Supply/fabrication). Washing station for light vehicles. To include tanks, pumps, spray bars, etc. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

PILBARA TRANSPORTABLE BUILDINGS SUPPLY CONTRACT
New project of Non-Construction Items (Supply/fabrication) project at Pilbara Region, ., WA 6999. Five year contract to construct at least 240 ancillary buildings annually including for administration units, crib rooms, administration units & security offices. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - QUARRY MATERIALS
Quarry Materials - Supply project at Various locations, ., QLD 4999 in the Non-Construction Items (Supply/fabrication). Supply of quarry materials for earthworks & road works associated with the APLNG pipeline. Locations include: Miles, Wandoan, Lighthouse, Fairview, Cockatoo, Mungungal, Biloela/Callide, Mt Larcom & Gladstone. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LAYDOWN ROAD MATERIALS
Non-Construction Items (Supply/fabrication) project for New development. Supply of gravel for the formation of 7 approx Linepipe Stockpile laydown roads running from Miles to Mt Larcom. Supply also of crushed concrete & crushed rock of various sizes. Click for more details...

ROY HILL IRON ORE PROJECT - FUEL MANAGEMENT SYSTEM FOR MOBILE EQUIPMENT
Non-Construction Items (Supply/fabrication) project at 110km North of, Newman, WA 6753 of Fuel Management System For Mobile Equipment type of New development. For the provision of a fuel management system for mobile equipment. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - LOGISTICS & INFRASTRUCTURE - OFFSHORE ROTARY WING AVIATION SERVICES
A project in the WA Within Broome. For the provision of offshore rotary wing aviation services. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - BULK STEEL PLATES
Currently at the Construction stage In Broome is a project estimated to be $ 1500000. This project For the provision of bulk steel plates. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - OPTIC FIBRE CABLE
Optic Fibre Cable New project In The Broome Council Area. For the provision of fibre optic cable. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - UHF ANTENNAS
Uhf Antennas project at Approx 475km NNE, Broome, WA 6725 In The Council Area Of Broome of Private. For the provision of UHF antennas. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - SUBSEA - INSTALLATION SERVICES - ANCHOR HANDLING TUGS (TOG MOR)
A project in the WA Within Ashburton. For the provision of anchor handling tugs (Tog Mor). Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SUPPLY OF HIRE VEHICLES
Supply Of Hire Vehicles New project In The Ashburton Council Area. For the supply of hire vehicles (4 x 4 light vehicles). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COUPLERS
Couplers project at Vicinity of, Onslow, WA 6710 in the Non-Construction Items (Supply/fabrication). For the provision of couplers. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CRYOGENIC MANUAL VALVES
Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area of Cryogenic Manual Valves type. For the provision of cryogenic manual valves. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BRINE OUTFALL PIPING FOR HEAVY LIFT FACILITY
Private ownership Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area for New development. For the supply & fabrication of brine outfall piping for heavy lift facility. To include: pipe works, pipe supports, & emergency escape access platform & ladders. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - WINCHES & HOISTS
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Winches & Hoists currently at Construction stage. For the supply of winches & hoists. Click for more details...

WEIPA BAUXITE OPERATIONS - MINING MACHINERY HIRE
via Peninsula Developmental Rd around, Weipa, QLD 4874 Has Weipa Bauxite Operations - Mining Machinery Hire currently at Construction stage. Contract to include dump trucks weighing up to 200t for the ongoing operations at East Weipa & Andoom. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - OVERHEAD CRANES
Currently at the Construction stage In East Pilbara is a project estimated to be $ 10000000. This project For the provision of overhead cranes. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - HYDROLYSING SERVICES
Non-Construction Items (Supply/fabrication) project at Vicinity of, Onslow, WA 6710 for New. For the provision of Hydrolysing/Aquamilling Services. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - IMPACT ROLLER (INCLUDING PRIME MOVER/TRACTOR)
Roy Hill Iron Ore Project - General - Impact Roller (Including Prime Mover/Tractor) is currently at the Construction stage, valued at about $ 250000 it is For the provision of an Impact Roller (including Prime Mover/Tractor). Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - UNMANNED AERIAL VEHICLE (UAV) SURVEY SERVICES
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Onshore Lng Plant - Unmanned Aerial Vehicle (Uav) Survey Services currently at Tenders & Building stage. For the provision of Unmanned Aerial Vehicle (UAV) Survey Services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - OFFSHORE JACK UP RIG
Chevron Australia - Operations - Offshore Jack Up Rig is currently at the Construction stage, valued at about $ 5000000 it is For the provision of offshore jack up rig. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - TUBULAR RUNNING SERVICES
A project in the WA Within Exmouth. For the provision of tubular running services. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - PROVISION OF CONDUCTORS & ASSOCIATED SERVICES
Conductors/Associated Services - Provision project at 49km off the coast of, Exmouth, WA 6707 In The Council Area Of Exmouth of Private. For the provision of conductors & associated services. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - WELL COMPLETION EQUIPMENT & INSTALLATION SERVICES
Non-Construction Items (Supply/fabrication) project In The Exmouth Council Area of Private ownership. For the provision well completion equipment & installation services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - VEHICLE LEASE & MAINTENANCE
New project of Non-Construction Items (Supply/fabrication) project at On & off, Barrow Island, WA 6712. For the provision of Vehicle Lease & Maintenance for personnel transport provision including full fleet lease of light vehicles (consisting of standard work utilities & wagons), flatbed trucks & a minivan. Chevron also requires the Contractor to provide management & maintenance of these leased vehicles from an offsite location. Vehicle requirements for steady state operations are estimations only & are as follows: 1 of minivan; 53 of 4x4 dual cab; 7 of 4x4 wagon; & 2 of single cab flatbed trucks. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - SURVEY CONSULTANCY
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of a survey professional for an estimated 600 hours over a 40 week period, to conduct site works on an on call basis. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - BUSSING HIRE & OPERATION
Non-Construction Items (Supply/fabrication) project In The Weipa Shire Council Area of Private ownership. For the provision of Bussing Hire & Operation & to include: Service the following routes during construction of the Project; Weipa Airport to NoE Site Camp(s), Weipa Airport to Project accommodation village, NoE Site Camp(s) to Weipa Airport, Project accommodation village to Weipa Airport, Additional services between Aurukun & Project accommodation village as required. Provide fully maintained, serviced & operated new, air-conditioned buses, suitable for use on unsealed roads, including management & supervision of the personnel for the bussing service. Provide busses with an average seating range between 25-40 personnel (Note: Rio Tinto may propose alternatives: it is likely that connecting chartered flights will have a capacity of 70-100 seats). Provide buses that have seat belts for all passenger seats. Provide & operate fully stocked maintenance & repair facilities for the Contractor?s buses. The facilities must be located so that the Contractor is able to respond in a timely manner to effect repairs, etc. so that schedules are maintained. Provide spare buses & mobile maintenance personnel and equipment. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PRE-EMPLOYMENT MEDICALS
Pre Employment Medicals New project In The Weipa Shire Council Area. For the provision of Pre-Employment Medicals including the following: Assist in the development of comprehensive health questionnaire focused on the position profiles. Review & recommend medical testing protocols to ensure that the physical & environmental demands of the position profiles are considered as part of the preplacement medical. Arrange pre-placement medical examinations (including grip test, lung function capacity) for project applicants as advised. Coordinate the conduct of the pre-placement medical testing with regards to the physical & work environments demands of the applicant?s proposed position. Analyse the applicant?s test results & supply a profile based on the risk of the applicant developing or aggravating a condition while performing the proposed position. Provide occasional written & verbal reports as required by the Project. Maintain confidential records of all test results as appropriate. Provide an appeals process & an avenue for applicants to discuss results if required. Click for more details...

LORENA JOINT VENTURE GOLD OPERATIONS RECOMMENCEMENT - MOBILE MINERAL PROCESSING PLANT
Non-Construction Items (Supply/fabrication) project for New development. For the supply, commissioning & operation of a mobile mineral processing plant. Units to be constructed off-site & transported to site fully commissioned. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SUBSEA -PRODUCTION HYDRAULIC POWER UNIT
Wa-28-L Greater Enfield Oil & Gas - Subsea -Production Hydraulic Power Unit is currently at the Construction stage, valued at about $ 10000000 it is For the provision of a one off Production Hydraulic Power Unit for Greater Enfield Project. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - HYDRAULIC FLYING LEADS
New project of Non-Construction Items (Supply/fabrication) project at 49km off the coast of, Exmouth, WA 6707. Provision for the supply of hydraulic flying leads for Greater Enfield Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect