RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Non-Construction Items (Supply/fabrication) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Non-Construction Items (Supply/fabrication) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Non-Construction Items (Supply/fabrication) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

CAMEBY DOWNS COAL PROJECT - STRUCTURAL STEEL FOR CHPP
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 10000000. This project For a 1.8Mtpa processing facility. Click for more details...

KUNIOON CONSULTANCY FOR COST REVIEWER OF SURFACE MINE INFRASTRUCTURE
Non-Construction Items (Supply/fabrication) project In The South Burnett Regional Council Area of Consultancy For Surface Mine Infrastructure Cost Reviewer type. To provide services as a Cost Reviewer as to provide an independent review of detailed cost estimates that will be prepared by a third party, to support its business case for the development of a new coal mine at Kunioon in the South Burnett region. The Cost Reviewer will provide independent review and advice to Tarong Energy with regards to the completeness and accuracy of the cost estimates. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - PIPING FOR MECHANICAL EQUIPMENT
Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area of Private ownership. For the provision of piping for mechanical equipment for the new 5Mpta CHPP. Click for more details...

NEWLANDS COAL TRADE MAINTENANCE SERVICES
Private ownership Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area for New development. For the provision of trade maintenance services in the township of Glenden. Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Non-Construction Items (Supply/fabrication) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - PIPELINE - MATERIALS CONTRACT
Pipeline - Supply project at Curtis Island via, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Supply of 1050mm (42 inch) diameter AP 15L X70 coated steel pipe for the 340km long main export line. Supply also of 1050mm diameter coated steel pipe for the 195km gas collection header. Click for more details...

MORANBAH NORTH COAL OPERATIONS - CRANE SUPPLY
A project in the QLD Within Isaac Regional. Contract supply of cranes to the 4.5million tonne per annum (Mtpa) Moranbah North underground coal operations. A 3 year contract to cover all maintenance works at the mine. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Non-Construction Items (Supply/fabrication) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - PIPING SPECIALTY ITEMS
Non-Construction Items (Supply/fabrication) project for New development. Strainers, pipe supports, gaskets & bolts. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - LIGHT POLES
Light Poles - For Coal Handling & Preparation Plant project at 35km west of, Nebo, QLD 4742 in the Non-Construction Items (Supply/fabrication). Supply of light poles with Isolating Switch 1 Phase-10 Amp & junction box. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - GENERAL INSTRUMENTS
35km west of, Nebo, QLD 4742 Has South Walker Coal Operations - Chpp - General Instruments currently at Construction stage. Flow sensors & transmitters, coriolis meters, level switches & gauges, radar level & ultrasonic level transmitters, pressure gauges, sirens & alarms & temperature indicators. Click for more details...

SOUTH WALKER COAL OPERATIONS - CHPP - FIRE EQUIPMENT
Currently at the Tenders & Building stage In Isaac Regional is a project estimated to be $ 100000. This project Fire extinguishers, fire hose reels, fire hoses, fire hydrant valves, sprinklers & sprinkler valve sets. Click for more details...

DAUNIA COAL PROJECT - SEWERAGE PUMPS
Sewerage Pumps project at 25km southeast of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Supply of submersible, grinder type, sewerage pumps including couplings & guide rails. Click for more details...

CAVAL RIDGE COAL PROJECT - PIPE SUPPORTS & HANGERS
Pipe Supports & Hangers project at 16km south of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Supply of supports & hangers to be located throughout the Mine Infrastructure Area (MIA). Click for more details...

CAVAL RIDGE COAL PROJECT - BRIDGE BEAMS
Private ownership Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area for New development. Supply of pre-cast concrete beams for bridges. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - QUARRY MATERIALS
Quarry Materials - Supply project at Various locations, ., QLD 4999 in the Non-Construction Items (Supply/fabrication). Supply of quarry materials for earthworks & road works associated with the APLNG pipeline. Locations include: Miles, Wandoan, Lighthouse, Fairview, Cockatoo, Mungungal, Biloela/Callide, Mt Larcom & Gladstone. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LAYDOWN ROAD MATERIALS
Non-Construction Items (Supply/fabrication) project for New development. Supply of gravel for the formation of 7 approx Linepipe Stockpile laydown roads running from Miles to Mt Larcom. Supply also of crushed concrete & crushed rock of various sizes. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - DRILLING RIG SUPPLY
Non-Construction Items (Supply/fabrication) New project at Bowen & Surat Basins, ., QLD 4999. This type is Drilling Rig Supply Contract with Private ownership. Supply of a drilling rig (Rig 2) for 6 months with a 6 month extension option. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - TOOLING SUPPLY
Non-Construction Items (Supply/fabrication) project at via, Curtis Island, QLD 4680 of Tooling Supply Contract type of New development. Supply over 1-2 years of large volumes of tooling requirements. To include general & specialist mechanical tools, electrical & instrumentation (E&I) tools, some original equipment manufacture (OEM) tools, pressure vessel tools, tool boxes & tool kits. Click for more details...

WEIPA BAUXITE OPERATIONS - MINING MACHINERY HIRE
via Peninsula Developmental Rd around, Weipa, QLD 4874 Has Weipa Bauxite Operations - Mining Machinery Hire currently at Construction stage. Contract to include dump trucks weighing up to 200t for the ongoing operations at East Weipa & Andoom. Click for more details...

MINERVA COAL OPERATIONS BLASTING SERVICES CONTRACT
Minerva Coal Operations Blasting Services Contract is currently at the Construction stage, valued at about $ 10000000 it is Drill & blast contract including full down-the-hole services & product supply. Click for more details...

APLNG LNG PLANT - DATA LOGGING EQUIPMENT & MAINTENANCE
Data Logging Equipment & Maintenance - Liquefied Natural Gas Plant project at At, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. For the provision of data logging equipment & maintenance. Click for more details...

APLNG LNG PLANT - DIESEL SUPPLY
New project of Non-Construction Items (Supply/fabrication) project at At, Curtis Island, QLD 4680. For the provision of diesel. Click for more details...

APLNG LNG PLANT - FILTER SUPPLIES
Aplng Lng Plant - Filter Supplies is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of filters. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - HOSES & FITTINGS SUPPLY
Hoses & Fittings Supply project at At, Curtis Island, QLD 4680 in the Non-Construction Items (Supply/fabrication). For the provision of hoses & fittings. Click for more details...

APLNG LNG PLANT - PALLET RACKING SUPPLY
Non-Construction Items (Supply/fabrication) project for New development. For the provision of warehouse pallet racking. Click for more details...

APLNG LNG PLANT - SITE VEHICLES
Site Vehicles project at At, Curtis Island, QLD 4680 in the Non-Construction Items (Supply/fabrication). For the provision of site vehicles. Click for more details...

MOUNT ISA MINES OPERATIONS - SILICA CONTRACT
Currently at the Tenders & Building stage In Mt Isa City is a project estimated to be $ 2000000. This project A 3 year contract for the supply of fine silica for smelter flux. Glencore to organise drill & blast in an area between no.5 tailings dam & 5/7 West Wall (ML 8058). Transportation of broken rock to a run-of-mine (ROM) pad prior to going to a designated processing site. Pre-screening if necessary prior to crushing, size separation through screening & if required washing. Haulage of the silica to the fine & coarse stockpiles near the lead smelter (Rowles Reserve) & copper smelter sites (Barnes Boulevard - North & South, Stacker). The contractor to supply primary & secondary crushers, mobile stack & screening plant conveyors as well as 45t excavators with bucket/hammer attachments, 980 wheel leaders, 25t dump trucks & a water truck, Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Non-Construction Items (Supply/fabrication) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

QCLNG OPERATIONS - LIFTING EQUIPMENT SPECIALIST
Lifting Equipment Specialist New project In The Various Council Area. A 3 year contract for the supply of lifting equipment. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
A project in the QLD Within Gladstone Regional. For the provision of plant hire for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Non-Construction Items (Supply/fabrication) project at ., Curtis Island, QLD 4680 of Septic Pump Out type of New development. For the provision of Septic Pump Out Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
New project of Non-Construction Items (Supply/fabrication) project at ., Curtis Island, QLD 4680. For the provision of Fuel Supply for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Non-Construction Items (Supply/fabrication) project for New development. For the provision of Fencing Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

ARROW ENERGY CSG-LNG BOWEN BASIN GAS PROJECT
Non-Construction Items (Supply/fabrication) project In The Isaac Regional Council Area of Private ownership. Reliable raw water supply is required to accommodate early water requirements for both future construction activities & village supply. Works will include the construction of a new HDPE pipeline from an existing tie-in location to a number of supply locations throughout Phase 1 of the BGP project including Right of Way clearing, earth dam construction, installation of HDPE pipes, piping components, mechanical equipment, property reinstatement & traffic management. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - CONSTRUCTION SURVEY
Non-Construction Items (Supply/fabrication) project for New development. For the provision of construction surveys at the mine site. Quality verification surveys. Establishment of control points or benchmarks. Clearing & grubbing set outs/pegging & Levels of all features where applicable, including invert levels of drains, sewers, puts, embedded item locations & other features. As-constructed surveys/verification. RTK (Real Time Kinematic) GNSS (Global Navigation Satellite System) ground surveying over the general project site with data to be provided in Company specified formats with coding lists supplied with data. These include, but may not be limited to inroads (company specific software). Microstation. Maintaining the Digital Terrain Model (DTM). Support of company construction team in monitoring excavation, trenching & backfill permitting requirements. Support of company construction team in monitoring utility avoidance programs. Perform monthly construction quantity calculations (including identifying cut & fill volumes of various types of earthworks, areas of surface treatment, or concrete quantities & submit data to the company in a format suitable for verification of process claims by other contractors & progressing reporting. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - CONVEYOR IDLERS
Conveyor Idlers project at 40km SW of, Weipa, QLD 4874 in the Non-Construction Items (Supply/fabrication). For the provision of conveyor idlers including design, manufacture, factory acceptance testing & supply of Conveyor Idlers. An Idler shall be a complete assembly containing a steel support frame & nominal rolling elements. The scope of work includes impact, carry, return, transition, weigh belt quality, training & retractable idlers for 1200mm, 1500mm, 1800mm, 2200mm & 2400mm belt widths. To reduce handling & noise issues, idlers shall be designed & constructed to be as lightweight as possible & idler roller mass shall not exceed 20kg without Company approval & assessment of replacement procedures. Steel shells shall be manufactured from precision finished electric resistant steel welded to AS 1450 Grade 200 or better. Shafts shall be machined from carbon steel to AS 1442 or AS 1443 & shall be designed to AS 1403 for infinite life. Idlers for a given belt width shall be interchangeable. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - RADIAL STACKER
New project of Non-Construction Items (Supply/fabrication) project at 40km SW of, Weipa, QLD 4874. For the provision of a radial stacker which shall be a complete assembly including loading transfer chute, boom conveyor with walkway & handrail on both sides & crossover, guarding, bogies, slew assembly, wheels, travelling buffers, end stops, storm tie down mechanism, anchor points & utility suspension frames to facilitate water & cable transfer onto the machine. The radial stacker shall not include luffing or telescoping functions. The radial stacker will operate on wheels on a hardstand & shall be an un-manned boom type stacker with radial motion & operate in automatic mode using level sensors to determine the height of the stockpile & when to relocate radially. Technical data for the radial stacker is below: Belt width ? 1200mm. Capacity ? 1,288 t/hr. Boom length ? 40m (approx). Boom incline ? 8 degrees. The design of the radial stacker shall comply with the requirements of the FEM (Federation Europeenne de la Manutention) Rules & AS4324.1 ? Mobile Equipment for the Continuous Handling of Bulk Materials. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROJECT CLOTHING
Non-Construction Items (Supply/fabrication) project at 40km SW of, Weipa, QLD 4874 for New. For the supply & delivery of safety clothing, boots & protective equipment, including 25,000 x SHIRTS - Long Sleeve Cool Lightweight Gusset Cuff 2 Tone Shirts - Reflective Tape colour navy/yellow. Two tone shirt with standard hard buttons (No snaps). Button flap pockets. Left pocket pen division. Underarm natural cotton mesh vents for increased airflow100% Cotton. Two ventilated mesh back pleats. Back double mesh, vertical vents with natural cotton mesh. Full gusset cuff. Fabric 100% Cotton Pre-shrunk Drill -Ventilation - 100% Cotton Mesh 155gsm - Reflective Tape - Double layered yoke on upper back. Reinforced, top-stitched seams. Two button adjustable full gusset cuff. Contrast coloured panel on lower front & back. Taped around sleeves & body in Hoop Pattern. Must comply - AS/NZS 1906.4:2010 day & night use. Company specified logo and words "AMRUN PROJECT" embroidery required above left shirt pocket, black in colour, Vickerman font. (Company-specified logo to be provided). 25,000 x pairs of PANTS - 8 Pocket Cargo Pants 3m reflective tape. Colour - navy. Various sizes -YKK zippered front fly opening. Flat front with relaxed fit. Adjustable side-tab, metal waist adjuster. Side leg cargo pockets with reinforced stitching, pleated pocket bags & touch-tape closures. 6 reinforced belt loops. Concealed coin pocket. Taped around both legs. Angled side pockets with durable pocket bags. Back welt pockets with mitred corner, flap covering & touch-tape closure. Side welt pockets with reinforced stitching -100% Cotton Preshrunk Drill 310gsm. 100% Cotton Preshrunk Drill Pocketing 140gsm. 3M reflective tape. 3,000 x RAIN JACKETS - Premium Hi-Viz Day/Night High Visibility rain Jackets 34oz in yellow only. 150D polyester/PU shell with lightweight polyester mesh lining. Reflective tape, bio motion protection. Zip front with Velcro storm closure, wind & waterproof, sealed seams, pouch/stowaway set, foldaway storm hood, concealed elasticized storm cuffs, 2 Velcro fastened lower pockets, vented back for added comfort. 100% waterproof, 100% breathable. 3,000 X HARD HATS: ?vgard? vented advanced with the words ?AMRUN PROJECT" embossed on the front, black in colour, Vickerman font. Ratchet suspension - pro-lock or "knob" ratchet. Colour: White. Must comply - AS/NZS 1801:1997. 1,000 x HARD HAT BRIMS: Wide Brim attachment. Assorted colours ? white, navy, yellow. 5,000 x Safety Boots - Men?s 6 inch boot Various sizes needed (3-16). Widths a, b, c, d, ee. Poly Rubber Sole 150mm lace up. Wide profile steel toe cap design with maximum cushioning sole & slip resistant outer sole (Black/Wheat in colour). Must comply - AS/NZS 2210.3:2009. 3,000 x Sports Bag, 60x60 Blk/Yellow woven synthetic bag with sturdy zipper. Embossed on both sides in white with words "AMRUN PROJECT", Vickerman font. Proof to be approved by Company. Bag sized to fit: 6 shirts, 6 pants, 1 pair of boots & 1 hard hat. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PRE-EMPLOYMENT MEDICALS
Pre Employment Medicals New project In The Weipa Shire Council Area. For the provision of Pre-Employment Medicals including the following: Assist in the development of comprehensive health questionnaire focused on the position profiles. Review & recommend medical testing protocols to ensure that the physical & environmental demands of the position profiles are considered as part of the preplacement medical. Arrange pre-placement medical examinations (including grip test, lung function capacity) for project applicants as advised. Coordinate the conduct of the pre-placement medical testing with regards to the physical & work environments demands of the applicant?s proposed position. Analyse the applicant?s test results & supply a profile based on the risk of the applicant developing or aggravating a condition while performing the proposed position. Provide occasional written & verbal reports as required by the Project. Maintain confidential records of all test results as appropriate. Provide an appeals process & an avenue for applicants to discuss results if required. Click for more details...

LORENA JOINT VENTURE GOLD OPERATIONS RECOMMENCEMENT - MOBILE MINERAL PROCESSING PLANT
Non-Construction Items (Supply/fabrication) project for New development. For the supply, commissioning & operation of a mobile mineral processing plant. Units to be constructed off-site & transported to site fully commissioned. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - VESSEL INSPECTION
New project of Non-Construction Items (Supply/fabrication) project at 20km North of, Wandoan, QLD 4419. For the provision of Pressure Vessel Inspection including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. Internal Inspections: The successful service provider shall conduct internal inspections & record information about the condition of the internal surfaces, welds & process components of pressure equipment. This usually requires confined space vessel entry or visual inspections using equipment such as boroscopes, video scopes & cameras or alternatively ultrasonic or radiographic testing. External Inspections: The purpose of the external inspection is to detect anomalies or defects such as corrosion, leaks, bulging, signs of excessive heat or cold, or signs of cracking including comprehensive visual inspection, which may be supplemented by non-destructive examination methods such as dye penetrant, magnetic particle, ultrasonic & radiography inspection. The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ARTESIAN BORES
Artesion Bores New project In The Weipa Shire Council Area. For the supply & delivery of all materials including casing & screens, drilling fluids & chemicals, grout & cements, hangers, packers & seals, headworks & associated pipe fittings & valves. To include: Supply of all materials & labour, excluding concrete for associated concrete slabs. Construct concrete slabs at six bore sites. Installation of isolating valve, blind plate, & bore casing. Supply & installation of temporary silt traps, oil traps, drilling fluid, bunds/tanks & all other environmental measures required by Environmental Protection Agency & the Company. All testing & reporting for verification of compliance to specifications. Supply of technical drawings, documents, as-built information & drilling logs. Supply of documentation required by the Company for statutory licences & approvals. Site clean-up & labelling of bore, including clean-up & disposal of any spills. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - TEMPORARY POWER FOR CONSTRUCTION OFFICE FACILITIES
Private ownership Non-Construction Items (Supply/fabrication) project In The Weipa Shire Council Area for New development. Provision of diesel generators & self bunded diesel storage tanks in various sizes to supply power to construction office facilities across site. Click for more details...