State

Categories

Sub Categories

Click Here to Find Current Projects

List of Swimming baths & assoc. facilities, Saunas, Spas, Solaria Projects in QLD


JOHN PAUL COLLEGE SWIMMING POOL
Private ownership Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Logan City Council Area for New development. Construction of a 25m long, 10 lane wide inground pool. Reinforced concrete. Click for more details...

NICHOLSON TERRACES RESIDENTIAL DEVELOPMENT
Currently at the Construction stage In Brisbane City is a project estimated to be $ 6000000. This project Construction of 2 storey residential building with 18 x 3 bedroom units & construction of 18 x 3 bedroom townhouses in 3 separate buildings. Garages. Total parking for 65 cars. Swimming pool. Associated landscaping. Click for more details...

PARKERS ROAD RETIREMENT VILLAGE STAGES 2
Lots 412 Parkers Rd via, Cannonvale, QLD 4802 Has Parkers Road Retirement Village Stages 2 currently at Construction stage. Construction of a retirement village. Stage 2: 2 x 2 storey 3 bedroom units. Concrete block, metal roof. To include civil works for entire site & provision of all services. Swimming pool. Associated landscaping. Click for more details...

PENINSULAR RESORT
Units (70)/Shops (19) - 10 Storey project at Brisbane Rd Mooloolaba Espl & Burnett St, Mooloolaba, QLD 4557 In The Council Area Of Sunshine Coast Regional of Private. Concrete with applied finish & glass. Basement carpark with security system. Fire hose & reel. Mechanical ventilation. Swimming pool. Landscaping. Area of land 5,612 sq m. Click for more details...

PITT STREET SPORTS CENTRE
Private ownership Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Moreton Bay Regional Council Area for New development. Swimming pool, indoor gymnasium, coffee shop, sporting goods display & office. Click for more details...

EASTERN SUBURBS LEAGUES CLUB AQUATIC CENTRE
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 31 Panitya St (Lot 295 SL 1662), Greenslopes, QLD 4120 of Aquatic Centre type of New development. Proposed material change of use for replacement of existing 50 m pool with a 26 m pool & 20 m pool, new recreational pool, amenities buildings including cafe/kiosk, barbecue recreational area & new car parking area. Click for more details...

LANDMARK @ THE GAP APARTMENTS
Landmark @ The Gap Apartments is currently at the Construction stage, valued at about $ 6000000 it is Construction of 3 & 4 storey residential building with 27 x 3 bedroom & 4 x 2 bedroom units with single & double garages. Pre-cast concrete floors, concrete filled sheeting walls, glass balustrades, aluminium screens, metal roof. 2 levels of basement parking. Swimming pool, gym, barbecue area. Associated landscaping & visitor parking for 7 cars. Click for more details...

WATER STREET SHORT TERM ACCOMMODATION UNITS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 46-50 Water St (Lot 6 & 7 RP 11584), South Brisbane, QLD 4101. This type is Units (66) - 10 Storey with Private ownership. Demolition of 2 existing dwellings & construction of 10 storey residential building for short term accommodation with 18 x 2 bedroom units, 17 of which will be dual key & 31 x 1 bedroom units. Reinforced concrete columns, rendered concrete block, powdercoated aluminium louvres, glass balustrades, sail canopy to roof deck. 2 levels of basement parking. Roof deck with Swimming pool & barbecue area. Associated landscaping. Click for more details...

ECHELON MIXED DEVELOPMENT
Echelon Mixed Development is currently at the Construction stage, valued at about $ 20000000 it is Construction of a 5 storey residential building with shops & cafe, 35 x 2 bedroom & 7 x 3 bedroom units including a managers unit. 2 levels of basement parking. Swimming pool. Landscaping and associated works. Concrete floors, rendered blockwork walls, metal roof. Click for more details...

EVANS AVENUE TOWNHOUSES
Evans Avenue Townhouses is currently at the Construction stage, valued at about $ 3000000 it is Construction of 16 x 2 bedroom 2 storey townhouses in 3 separate buildings. Barbecue & recreation communal area. 1 pool. Parking for 32 cars. Single garages. Associated landscaping. Click for more details...

ECLIPSE STREET & WOOD STREET MOTEL
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at Eclipse St (between North & Leichardt St) & Wood St, Springsure, QLD 4722 of Motel type of New development. Construction of single storey motel with 28 motel rooms in 14 buildings, restaurant & conference facilities. Pre-fabricated steel frame, screw piered, timber floor, timber cladding, fibre cement sheeting, metal roof to be delivered to site & assembled. Plumbing & electrical work at site. Parking for 45 cars. Swimming pool. Associated landscaping. Click for more details...

DORNOCH TERRACE UNITS
Units (18) - 5 Storey New project In The Brisbane City Council Area. Construction of 5 storey residential building with 18 units. 4 x 1 bedroom, 13 x 2 bedroom & 1 x 4 bedroom units. Rendered concrete block, prefinished panel facade system, aluminium rivacy screens, lightweight feature panels, anodised aluminium shade structure, solid concrete block & glass balustrades, metal roof. Basement parking. Lift. Swimming pool. Associated landscaping. Click for more details...

SMITHFIELD SPORT & RECREATION PRECINCT
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project for New development. Proposed sport & recreation precinct incorporating the sporting complex & aquatic centre in Smithfield & surrounding facilities. Stage 1: 2 x tennis courts, amalgamating pool facilities & Surf Life Saving Training facility. Click for more details...

PADUA COLLEGE SWIMMING POOL
A project in the QLD Within Brisbane City. Construction of 25 m x 20 m x 1.35 - 1.8 m deep, 8 lane complete installation including filtration, fittings & equipment. Click for more details...

MANLY ROAD RESIDENTIAL DEVELOPMENT STAGE 1
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 312 Manly Rd (Lot 2 SP 111080), Manly West, QLD 4179 for New. Construction of residential development with 15 x 2 & 3 bedroom townhouses. Rendered concrete block, fibre cement sheeting, lightweight cladding, timber & powdercoated aluminium batten screens, metal roof. Garages. 15m lap pool & barbecue area. Associated landscaping. Click for more details...

KURANDA AQUATIC CENTRE
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Tablelands Regional Council Area of Swimming Pools/Amenities/Kiosk/Administration Building type. TMSC2007-24 - Design and Construction of Swimming Pools, Pump House and Associated Equipment. TMSC2007-25 - Construction of Ablution Block and Kiosk/Administration Building. TMSC2007-26 - External Works and Access Road. TMSC2007-27 - Construction of Bulk Earthworks. TMSC2007-28 - Design and Construction of Landscaping. Click for more details...

PACIFIC PINES RESIDENTIAL DEVELOPMENT TOWNHOUSES STAGES 1 & 2
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at Pitcairn Wy (Lot 44 SP194054), Pacific Pines, QLD 4211 for New. Construction of 53 attached dwellings in 16 buildings. Barbecue & terraced amphitheatre area. Swimming pool. To be staged. Stage 1, 27 units. Stage 2, 26 units. Fibrous cladding, weatherboard, clear glass balustrades, solar panels & metal roof. Parking. Associated landscaping. Click for more details...

CAMBRIDGE RESIDENCES STAGE 1
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Gold Coast City Council Area of Private ownership. Construction of 164 x 1, 2 & 3 bedroom units in 2 separate buildings (1 x 6 storey & 1 x 9 storey). 2 levels of basement parking. Swimming pool & barbecue facilities. Extensive landscaping. Click for more details...

INFINITY APARTMENTS
Units (349)/Serviced Apartments (199) - 77 Storey project at 43 Herschel St, Brisbane, QLD 4000 In The Council Area Of Brisbane City of Private. Construction of 77 storey mixed used building. To include 107sq m retail space on ground floor, with 349 units & 199 service apartments above. 23 x 1 bedroom, 32x 1 bedroom with media room, 232 x 2 bedroom, 40 x 2 bedroom with media room, & 22 x 3 bedroom units. 43 studio, 75 x 1 bedroom, 27 x 1 bedroom with media room & 54 x 2 bedroom serviced apartments. Prefabricated prefinished aluminium composite cladding, stone clad steel portal fins with glass wall recess, glass facade, composite clad vertical blades, polished black stone, translucent canopy, green walls. 11 levels basement parking. Recreational facilities to include 20m lap pool, spa, games room, gymnasium, residents theatre & barbecue facilities. Extensive landscaping incorporating wate features Click for more details...

KINGS CHRISTIAN COLLEGE NEW AQUATIC CENTRE
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Gold Coast City Council Area of Private ownership. Construction of a 9 lane aquatic centre. 197sq m foyer, 25m pool, 1055sq m grandstand. 1246sq m sports hall. Indoor court, gymnasium & classroom on upper level, change rooms, staff rooms. Stage 1, enclosing basketball court & covered outdoor area. Powdercoated aluminium adjustable louvres, 300mm hurricane vents in roof, galvanized structural columns, painted wall system, colour coated metal cladding & metal roof. parking & associated landscaping. Click for more details...

MANNING STREET UNITS STAGE A
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 23-27 Manning St, (Lot 1-6 BU 12485, Lot 107 RP 13874, Lots 1 & 11 SP 119378), Milton, QLD 4064. This type is Units (65) - 15 Storey - Stage A with Private ownership. Demolition of existing dwellings. Construction of 15 storey residential building with 33 x 1 bedroom & 32 x 2 bedroom units. 4 levels basement parking. 2 lifts. Swimming pool. Associated landscaping. Click for more details...

MACADIE WAY TOWNHOUSES STAGES 1-4
Townhouses (39) - 2 Storey - Stages 1-4 project at 40 Macadie Wy (Lot 24 SP 816716), Merrimac, QLD 4226 In The Council Area Of Gold Coast City of Private. Construction of 38 x 4 bedroom townhouses & 1 managers unit in 10 separate buildings in 4 stages. Stage 1 -11 townhouses in 4 separate buildings. Stage 2 - 6 townhouses in 2 separate buildings. Stage 3 - 11 townhouses in 3 separate buildings. Stage 4 11 townhouses in 4 separate buildings. Weatherboard cladding, metal cladding, colour coated metal roof. Swimming pool. Barbecue area. Double garages. Parking for 98 cars. Associated landscaping. Click for more details...

MACKAY EAST TOURIST RESORT STAGE 1
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 2B East Gordon St, Bimmingon Esp (Lot 500 SP 180689), Mackay East, QLD 4740 for New. Construction of 57 room motel. To include managers residence. Rendered & painted concrete, lightweight cladding, metal roof. Swimming pool. Associated parking & landscaping. Click for more details...

RIVER DRIVE TOWNHOUSES
Private ownership Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Moreton Bay Regional Council Area for New development. Demolition of existing dwelling. Construction of 96 townhouses (42 in duplex formation, 6 detached). Separate recreation building with gymnasium, store room, covered loggia & swimming pool. Bagged & painted brick, board cladding, aluminium balustrades, concrete roof tiles. Garages. Associated landscaping. Construction of internal road. Click for more details...

CENTRAL VILLAGE MIXED USE DEVELOPMENT CAMBRIDGE TOWERS STAGE 1
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 332-342 Waters St, 62-68 Brunswick St (Lots 11-12 RP 10552, Lot 1 RP 10553, Lot 1 RP 42507), Fortitude Valley, QLD 4006 of Units (164)/Shops/Office - 20 Storey - Stage 1 type of New development. Retention & conversion of Heritage listed Drill Hall into recreation facility & construction of 20 storey tower with 483sq m commercial/retail space on ground floor in form of Soho units which allow for commercial/retail/residential uses & 164 units above. 110 x 1 bedroom & 50 x 2 bedroom units. Concrete columns, pre-cast concrete, shopfront glazing, glass balustrade, vertical fins, timber stainless steel wire trellis, aluminium profile fin, metal framed roof. Podium carpark. 2 lifts. Resort style beach, lagoon swimming pool, lap pool, plunge pool & pool deck. Shade structures, pergolas. Barbecue facilities. Extensive landscaping. Click for more details...

HIGH STREET MIXED DEVELOPMENT
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 38 & 46 High St (Lot 22 SP 192650), Toowong, QLD 4066. This type is Serviced Apartments (76)/Units (60)shops - 12 Storey with Private ownership. Construction of 12 storey mixed use building. 5 retail tenancies (586sq m) & lobby on ground floor. 41 x 1 bedroom & 35 x 2 bedroom serviced apartments on levels 2-7. 25 x 1 bedroom, 30 x 2 bedroom & 5 x 3 bedroom units on levels 8-12. Rendered & painted concrete, glass balustrades, powdercoated aluminium screens. 2 lifts. Swimming pool & gymnasium on level 2. 4 levels basement parking. Associated landscaping. Click for more details...

OPERA APARTMENTS
Units (182) - 17 Storey project at 47-49 Cordelia St (Lots 66-67 B 359), South Brisbane, QLD 4101 In The Council Area Of Brisbane City of Private. Construction of 17 storey residential building. 264sq m retail space on ground floor & 182 x 1, 2 & 3 bedroom units. Concrete panels, glass balustrades, powdercoated aluminium blades, powdercoated aluminium louvres. Parking for 231 vehicles. Roof deck with swimming pool & residents lounge. 2 lifts. Associated landscaping. Click for more details...

SPIRE APARTMENTS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Brisbane City Council Area of Private ownership. Construction of 42 storey mixed use development. To include retail space on ground floor fronting Ann street. 340 x 1 & 2 bedroom units. Roof terrace with swimming pool & rooftop dining room, outdoor kitchen & gymnasium. Recreational facilities to include library & theatre. 3 Lifts. 4 levels basement & 6 podium levels parking for 267 vehicles. Associated landscaping. Click for more details...

SUNSET DRIVE TOWNHOUSES STAGES 1 & 2
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at Sunset Dr, Cnr Parklands Blvd (Lot 1 RP 161437), Little Mountain, QLD 4551 for New. Construction of 61 townhouses in 16 separate buildings on vacant site in 2 stages. Stage 1 - 34 x 2 & 3 bedroom townhouses in 8 separate buildings. Stage 2 - 27 x 2 & 3 bedroom townhouses in 8 separate buildings. Brick veneer, weatherboard cladding, powdercoated aluminium framed glazing, metal roof. Single garages. Total parking for 132 cars. Swimming pool. Barbecue area. Associated landscaping. Click for more details...

BLACKWATER AQUATIC CENTRE
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at Hunter St, Blackwater, QLD 4717. This type is Aquatic Centre with State ownership. Construction of Blackwater Aquatic Centre. To include 50m x 10 lane competition pool, 25m x 6 lane covered heated pool, 200sq m splash pad/water play area & 4 separate buildings. Building A - Single storey building to provide amenities, equipment stores, plant room, cleaners room, control room, chemical store, heater space & HWU store. Building B - Single storey building to provide kiosk/reception/servery, kitchen, office, amenities, first aid room & meeting/multi-purpose room. Building C - Single storey building to provide amenities, cleaners store & HWU store. Building D - shade canopy over pools (25m & partial 50m pools). Signage & lighting. Car parking for 55 vehicles. Associated landscaping. Click for more details...

ASHMORE ROAD UNITS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 263 Ashmore Rd (Lot 1 RP 71889), Benowa, QLD 4217 for New. Construction of 8 x 2 bedroom units in 4 separate buildings. Double garages. Total parking for 20 cars. Swimming pool. Associated landscaping. Click for more details...

FULLER STRET UNITS
23, 25 & 29 Fuller St (Lot 12 RP 219760), Lutwyche, QLD 4030 Has Fuller Stret Units currently at Construction stage. Construction of 5 storey residential building with 31 x 2 bedroom & 7 x 1 bedroom units. Rendered & painted blockwork, aluminium framed glazing, glass balustrades, metal roof. 1 levels basement parking & ground level parking for 57 car.s Lift. Swimming pool. Barbecue area. Associated landscaping. Click for more details...

THE HIGH GARDEN APARTMENTS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project for New development. Removal/demolition of 3 existing dwellings. Construction of 6 storey residential building with 4 x 1 bedroom, 32 x 2 bedroom & 4 x 3 bedroom units. To include 46sq m shop/office tenancy on ground floor. Rendered blockwork, linear board cladding, glass balustrades, metal roof. Parking for 55 cars. Lift. Roof deck with spa. Associated landscaping. Click for more details...

COORPAROO SQUARE TRANSIT ORIENTED DEVELOPMENT STAGE 1
Private ownership Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Brisbane City Council Area for New development. Demolition of existing buildngs. Construction of mixed use development in 2 towers. Tower 1 (19 storey) - 454sq m retail/restaurant space & 390sq m office space on ground level, 700 seat cinema. Tower 2 (13 storey) - 620sqm retail/restaurant space & 385sq m office space on ground floor. Total of 251 x 1 & 2 bedroom units in upper levels Basement parking. Lap pool. Associated landscaping. Click for more details...

NEWSTEAD SERIES RESIDENTIAL PROJECT - THE CARLYLE & THE DONALDSON APARTMENT BUILDINGS
Evelyn St, Austin St, 99 Breakfast Creek Rd (Lot 2 SP 117789), Newstead, QLD 4006 Has Newstead Series Residential Project - The Carlyle & The Donaldson Apartment Buildings currently at Construction stage. Construction of 7 & 8 storey residential building with 131 units. 44 x 1 bedroom, 80 x 2 bedroom & 7 x 3 bedroom units. Rendered concrete, select brickwork, recycled timber screens, aluminium screens, tinted glazing. Lifts. Swimming pool. Associated landscaping. Click for more details...

QUEENS ROAD TOWNHOUSES
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Brisbane City Council Area of Townhouses (54) - 2 Storey type. Construction of 54 x 3 bedroom 2 storey townhouses. To include barbecue facility & swimming pool. Car parking for 120 vehcles. Associated landscaping. Click for more details...

IMPERIAL HOTEL BACKPACKERS HOSTEL CONVERSION STAGES 1 & 2
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) Renovations, Refurbishments etc. project at 41 Railway St (Lot 13, RP54842), Gatton, QLD 4343. This type is Backpackers Hostel - 3 Storey - Conversion - Stages 1 & 2 with Private ownership. Redevelopment of existing Imperial Hotel to provide backpackers hostel in 2 stages. Stage 1 - Conversion of internal front areas of buildng to provide 14 rooms to accommodate 49 people, 2 take-away food outlets, amenities, communal area, kitchen, living area, storage space, office & reception area. Stage 2 - Construction of 3 storey building at rear of existing hotel to provide ground floor guest laundry, amenities & secure storage. First & second floor each to provide 20 units for 40 people, common room, kitchen & amenities. Outdoor area & 1 pool. Associated car parking & landscaping. Click for more details...

AVANTI STREET TOWNHOUSES
Currently at the Construction stage In Gold Coast City is a project estimated to be $ 450000. This project Construction of 3 x 3 bedroom 2 storey townhouses in 3 separate buildings. 3 swimming pools. Concrete slab, rendered concrete block columns, rendered weatherboard cladding, rendered lightweight cladding, rendered brick work, feature stone walls, aluminium framed glazing, glass balustrades, panel lift double garage doors & metal roof sheeting. Carparking for 7 cars. Associated landscaping. Click for more details...

DAWSON PARADE RESIDENTIAL DEVELOPMENT STAGES 1 & 2
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 83 Dawson Pde, 11-13 Rolleston St, Keperra, QLD 4054 of Units (47)/Townhouses (14) - 2 & 3 Storey - Stages 1 & 2 type of New development. Removal of existing workshop & dwelling. Construction of 14 x 3 bedroom 2 bathroom townhouses in 2 separate 2 storey buildings & 47 x 2 & 3 bedroom units in 2 separate 3 storey buildings in 2 stages. Stage 1 - 9 x 3 bedroom attached townhouses & 3 storey residential building (North Wing) with 11 units. Stage 2 - 5 x 3 bedroom attached townhouses & 3 storey residential building (South Wing) with 36 units. Rendered brick, lightweight cladding, aluminium framed glass balustrades, metal roof. Basement & at grade parking for 96 cars. Swimming pool. Associated landscaping. Click for more details...

VUZE CLEVELAND
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Redland Shire Council Area of Townhouses (12) - 3 Storey type. Removal/demolition of existing dwelling. Construction of 6 x 4 bedroom & 6 x 3 bedroom 3 storey townhouses in 5 separate buildings. Rendered brickwork, feature polished block work, rendered painted greenboard, lightweight cladding, aluminium framed glazing, glass balustrades, metal cladding sunhoods, select outdoor wall lighting, metal double garage doors, roof insulation & metal roof sheeting. 8 swimming pools. Car parking for 29 vehicles. 749sq m landscaping. Click for more details...

PARKSIDE WISHART
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Brisbane City Council Area of Townhouses (115) - 2 Storey type. Construction of 115 x 2 bedroom townhouses in 37 separate buildings. Face brick, select weatherboard cladding, fibre cement sheeting, concrete roof tiles. Garages & visitor parking for 276 cars. Swimming pool & barbecue area. Associated landscaping. Click for more details...

BRISBANE QUARTER W HOTEL BRISBANE
Hotel - 34 Storey - Stage 1 project at 272-318 George St & Adelaide St, Brisbane, QLD 4000 In The Council Area Of Brisbane City of Private. Construction of basement & 3 level podium with 2 levels retail space, restaurants & cafe & meeting rooms, ballroom & restaurant for hotel. 34 storey hotel tower shell to provide 305, 6 star hotel suites. Swimming pool, steam & sauna rooms, bar & lounge area. Lifts. 7 levels basement parking for 943 cars. Click for more details...

SORRENTO MIXED DEVELOPMENT
15 Duncan St, West End, QLD 4101 Has Sorrento Mixed Development currently at Construction stage. Demolition of existing industrial building. Construction of 7 storey mixed use building with 116sq m retail tenancy on ground floor. 6 x 1 bedroom & 24 x 2 bedroom units above. Rendered concrete, texture brick, frosted glazing, frameless glass balustrades, powdercoated aluminium vertical screens. 2 levels basement parking for 34 cars. Lift. Roof terrace with spa & barbecue/out door kitchen. Associated landscaping. Click for more details...

DOGGETT STREET UNITS
A project in the QLD Within Brisbane City. Demolition of existing dwelling & warehouses. Construction of 10 storey residential building with 10 x studio, 21 x 1 bedroom, 65 x 2 bedroom & 20 x 3 bedroom units. Rendered & painted concrete, vertical metal cladding, glass balustrades, select feature tiles, feature timber cladding. 4 levels basement & ground level parking for 131 cars. 2 lifts. Swimming pool, sauna & barbecue facilities. Associated landscaping. Click for more details...

MAIN BEACH UNITS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 3531 Main Beach Pde (Lot 11, M73865), Main Beach, QLD 4217. This type is Units (7) - 10 Storey with Private ownership. Removal/demolition of existing dwelling. Construction of 10 storey residential building with 7 x 3 bedroom units over 8 levels. Rendered & painted concrete block, sandstone cladding, zinc cladding, powdercoated aluminium framed glazing, louvres, glass balustrades & timber screening. Basement car parking for 17 vehicles. Lift. Swimming pool. Associated landscaping & civil works. Click for more details...

EDEN LANE MIXED DEVELOPMENT STAGES 3 & 4
A project in the QLD Within Brisbane City. Design & construction of 2 x 8 storey mixed use buildings with retail/restaurant space on ground floor & total of 100 units above in 2 stages. Stage 3 - 8 storey building with 25sq m retail/restaurant space on ground floor & 51 units above. 1 level basement & at grade parking for 56 cars. 2 lifts. Stage 4 - 8 storey building with 150sq m retail/restaurant space on ground floor & 49 units above. 1 level basement & at grade parking for 57 cars. 2 lifts. Recreation facilities to include swimming pool, barbecue facilities with outdoor dining area, reading room & outdoor cinema. Associated landscaping. Click for more details...

HARBOUR QUAYS AGED CARE FACILITY
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 36 Compass Dr (Lot 504 SP 190852), Biggera Waters, QLD 4216. This type is Aged Care Facility - 3 Storey with Private ownership. Construction of 103 bed aged care facility in 5 x 3 storey interconnected buildings. Rendered concrete block, powdercoated aluminium framed glazing, powdercoated aluminium framed glass balustrades, metal framed pergola, metal louvre screening & metal roof. Air conditioning. Basement car parking for 25 vehicles. Lifts. Basement level communal facilities to include hydrotherapy pool, day spa, gymnasium, media room, change rooms & amenities. Associated landscaping. Click for more details...

COTTON TREE MIXED USE DEVELOPMENT
A project in the QLD Within Sunshine Coast Regional. Removal of existing retail, commercial & residential buildings. Construction of mixed use development with ground floor restaurants, retail & office tenancies & 143 units in 2 separate towers. Northern tower to include 1145sq m restaurant & retail tenancies, 14 x 1 bedroom, 30 x 2 bedroom & 29 x 3 bedroom units. Southern tower to include 400sq m office tenancies, 28 x 1 bedroom & 42 x 2 bedroom units. Painted precast concrete walls, painted blockwork, painted vertical cladding, stone wall, painted precast concrete balustrades & sunhoods, shopfront glazing, powdercoated aluminium framed glazing & powdercoated awnings. 2 basement levels & ground level car parking for 289 vehicles. To include 202 residents, 37 visitors, 40 shops & 10 offices car parks. 4 lifts. Communal facilities on level 1 Northern building to include swimming pool, spa, barbecue area. Ground level Southern building to include recreation deck. Associated landscaping. Click for more details...

HIDDEN COVE
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) New project at 5a Acacia Dr (Lot 8 CP861993), Hamilton Island, QLD 4803. This type is Villas (14) - Stage 1 with Private ownership. Construction of 14 x 2 x 2 storey bedroom luxury villas. Swimming pool. Associated parking & landscaping. Click for more details...

JUMP SWIM SCHOOL ORMEAU
Swim School - Fitout project at Unit 1, 52 Blanck St (Lot 1 SP195426), Ormeau, QLD 4208 in the Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria). Fitout of 1 tenancy to the existing commercial building for swim school to include change room, kids zone, open shower, store/pump equipment room, franchise office, reception/foyer & ground pool. Associated signage. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect