List of Tailings, Dams, Water supply dams Projects


KWINANA ALUMINA REFINERY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area of Runoff Water Storage Pond type. Total storage capacity of 2.5GL of which 0.5GL is available for emergency mud storage. Final impounded surface 21 hectares approx. The main purpose is to store high quality process water. The pond will also be available for excessive rainfall runoff and emergency mud storage. Liner will be clay in conjunction with a geosynthetic membrane. Clay to be excavated and trucked from Alcoa's clay reserves at Wellard/Baldivis. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

NIMARY - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

PLUTONIC GOLD OPERATIONS - RESOURCE
Operating Mine project at 180 km North east of, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. The Plutonic gold operation comprises both open pit and underground operations. There is also a CIL plant which operates sulphide and oxide circuits on site for the processing of ore. The mine can produce between 1.3 Mtpa to 1.8 Mtpa. In 2005, 251,000 ounces of gold were produced. Ore reserves are 14 Mt @ 5.2 gpt Au. Development work proposed includes increased mining at the Freshwater mine, in pit Tailing storage facilities at the Callp and Pirana pits. Work at the Freshwater mine is entitled the Trout Mining Project. Click for more details...

BROWNS OXIDE PROJECT - NICKEL/COBALT/COPPER/LEAD RESOURCE
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - Nickel/Cobalt/Copper/Lead Resource currently at Construction stage. The ore is to be mined, crushed, ground and slurried on site. Ore will be processed in a onsite process plant and tailing will be stored in a onsite tailings dam. The in-ground oxide resource estimate for the Batchelor region projects has an estimated value at over 1 billion dollars. Measured resource is 18 million tonnes, indicated is 27 million tonnes and inferred is 37 million tonnes. Metals in the ground are lead at 1,865,000 tonnes, copper 622,000 tonnes, cobalt at 98,000 tonnes and nickel at 90,000 tonnes. There are also significant exploration prospects at Mount Fitch and Mount Burton. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

RADIO HILL NICKEL OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at South of, Karratha, WA 6714 of Nickel/Copper Sulphide Process Plant & Associated Infrastructure type of New development. To include relocation and refurbishment of secondhand ball mill. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) Addition project at Lot 100 Postans Rd, Hope Valley, WA 6165. This type is Mechanical/Electrical Installation For Residue Disposal Expansion with Private ownership. This major mechanical/electrical package includes installation of piping for the tailings dam expansion. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area for Subcontract development. This electrical subcontract package includes electrical services for the infrastructure of the tailings work. Click for more details...

ARDLETHAN TIN OPERATIONS - ERECTION/INSTALLATION PACKAGES
Erection/Installation Packages New project In The Coolamon Council Area. Packages include mechanical, structural, piping and electrical work for the processing area. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES - FIMISTON GOLD OPNS TAILINGS
Consultancy On Tailings Storage Facility Performance & Proposed Height Increase project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. The Fimiston 1 review report concluded that the proposal is technically feasible, subject to additional studies of seepage interception and embankment design. Some environmental damage from seepage (tree stress/loss) has been identified. Some design modifications and a more targeted groundwater management plan are likely to be required. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

GOOYELLA/RIVERSIDE COAL OPERATIONS
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at approx 30 km north of, Moranbah, QLD 4744. The design of the Tailings Dam Raisings is for Goonyella. Click for more details...

POITREL COAL MINE PROJECT - SEDIMENT DAMS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Isaac Regional Council Area for New development. The proposal includes a water management system, including sediment dams. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

NORTHPARKES MINES - TAILINGS DAM EARTHWORKS
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Bogin Road Via, Parkes, NSW 2870. Project will involve the excavation, movement and placing of an estimated 600,000 cubic metres of clay and rock. Earthworks involving the raising the height of an existing tailings storage facility. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

ANGAS ZINC PROJECT - DOUBLE LINING FOR TAILINGS STORAGE FACILITY
A project in the SA Within Alexandrina. The double lining is for a 540,000 bcm sized Tailings Storage Facility. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - STORM WATER RETENTION POND
Storm Water Retention Pond project at Near, Grassy, TAS 7256 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). For the provision of storm water retention pond. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Containment walls, processing plant, roads & pipes. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE DAMS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mackay Regional Council Area of Site Dams - Construction type. To construct two dams. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - INFILTRATION BASIN
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 28 km east of, Ouyen, VIC 3490. This type is Infiltration Basin with Private ownership. For the provision of an infiltration basin to filter storm water runoff. Click for more details...

PEKO MAGNETITE PROJECT - TAILINGS POND
Currently at the Early Planning stage In Barkly Shire is a project estimated to be $ 1000000. This project For the provision of a temporary tailings pond. Click for more details...

SAVAGE RIVER MAGNETITE OPERATIONS - SOUTH DEPOSIT TAILINGS STORAGE FACILITY
Currently at the Construction stage In Waratah-Wynyard is a project estimated to be $ 28000000. This project Construction of a new Tailings Storage Facility (TSF) in Main Creek south of the existing tailings dam as part of the proposed extension of workings to the South Deposit. To comprise a downstream rock filter face formed from alkaline rock to provide neutralisation of any overflow to Main Creek. Upstream a permanent water reservoir used to store tailings from the Savage River mining operation under water, neutralise historic tailings seepage (B Dump, Old Tailings Dam) & store hydroxide sludges formed by the neutralisation reactions & which will eventually be capped. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

GOLDEN GROVE GOLD COPPER & BASE METALS OPERATIONS- TAILINGS DAM
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 50km south of, Yalgoo, WA 6635 of Tailings Dam type of New development. Proposed construction of an additional tailings dam to store more than 15 years worth of tailings. Click for more details...

SAINT IVES GOLD OPERATIONS EXPANSION - LAKE LEFROY
Operating Mine - Expansion project at 20km southeast of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. An open cut & underground mining operation based on June 2009 gold reserves of 5.6 million ounces contained in 30 million tonnes (Mt) of resources. A project to extend the Life-of-Mine (LOM) to 2014 by mining 778ha of saline Lake Lefroy & 22ha of riparian zone at the Pistol Club & Neptune localities. Continued use of central infrastructure including administration & engineering facilities, a 4.8Mtpa mill/CIP processing plant & a 2.3Mtpa heap leach processing plant with 3 associated 5.5Mt leach pads. New expansion infrastructure expected to include a fourth heap leach pad & a fourth tailings dam. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR OPERATIONS - TAILINGS DISPOSAL PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at West of, Woods Point, VIC 3723 of Structural Steel - For Paste Backfill Plant type of New development. Supply of structural steel for a paste backfill plant to allow for the disposal underground of tailings from the Gravity Mill plant. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

MAULES CREEK COAL PROJECT - MINE INDUSTRIAL AREA
Maules Creek Coal Project - Mine Industrial Area is currently at the Construction stage, valued at about $ 75000000 it is Surface facilities at the Mine Infrastructure Area to include workshops, heavy & light vehicle refuelling & washing facilities as well as tyre jacking slabs. Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

SOLOMON IRON ORE PROJECT TAILINGS STORAGE FACILITY CONTRACT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at East of, Cue, WA 6640 for New. For the provision of a Tailings Storage Facility Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DAM C INFRASTRUCTURE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Weipa Shire Council Area of Private ownership. For the provision of Dam C Infrastructure including: Clear & grub of the dam & spillway footprint including the impoundment area. Construction of a slurry wall cut off trench. Construction of the dam wall. Spillway construction including a fish-way. Construction of a decant tower & pipework including a riparian release system. Construction of an infrastructure corridor. Click for more details...