List of Tailings, Dams, Water supply dams Projects


KWINANA ALUMINA REFINERY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area of Runoff Water Storage Pond type. Total storage capacity of 2.5GL of which 0.5GL is available for emergency mud storage. Final impounded surface 21 hectares approx. The main purpose is to store high quality process water. The pond will also be available for excessive rainfall runoff and emergency mud storage. Liner will be clay in conjunction with a geosynthetic membrane. Clay to be excavated and trucked from Alcoa's clay reserves at Wellard/Baldivis. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Approx 200 km east of, Daly Waters, NT 0852 Has Merlin Diamond Project - Stage 1 currently at Construction stage. First ore is likely to be available from the pits during November 1998. Work on the tailings dam is expected to be completed within 10-11 weeks of commencement. Click for more details...

JUNDEE - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approximately 40 km east southeast of, Wiluna, WA 6646 for New. Mineral resource currently estimated at 13mt grading 2.4gpt gold including a proven & probable reserve of 6.9mt at 2.4gpt gold. Bulk mining methods are expected to be used with an estimated strip ratio of 10:1. Oxide ore continues to a depth of 60m & ore is anticipated to be free digging to 30m. Transitional material extends between 60m & 80m for this area where 4 initial pits are planned. These deposits are expected to form one large pit as mining progresses (1.8 km x 500m to a depth of 100m). Surveys, tailings dam/plant & waste dumps sterilisation drilling undertaken. Contract extending over 3 years expected to involve 45 million bank cu m of material. Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

PARABURDOO IRON ORE OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Ashburton Council Area of Private ownership. To raise the tailings dam wall. Click for more details...

LAVERTON GOLD OPERATIONS
Tailings Dam - Expansion Addition project In The Laverton Council Area. General earthworks & civils required to increase tailings area from 20 hectares to 65 hectares. Associated works such as piping & pumps included in this tender. Click for more details...

NIFTY COPPER OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 200 km southeast of, Marble Bar, WA 6760 for Addition. Contract to involve site preparation, embankments, liner plus associated pumps & piping. Click for more details...

PEAK HILL GOLD MINE
, Peak Hill, NSW 2869 Has Peak Hill Gold Mine currently at Construction stage. Open cut mine. Also includes pre-stripping, preparation of heap leach pad, preparatory site works and mining contract. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

CRACOW GOLD PROJECT - RESOURCE
Operating Mine New project In The Banana Shire Council Area. Resource estimate is 3.6 Mt @ 10 gpt with reserves being 780,000 tonnes @ 12 gpt. Gold production for December Quarter 2006 was 29,000,000 tonnes @ 9.7 g/t for 8,400 ounces of Au. Development expenditure of $23 million for 2006/2007 includes a decline access to the sovereign shoot and towards the Empire and Sterling zones of mineralisation; decline development of the lower portion of Crown shoot and the lifting of the tailings storage facility. The recently discovered Kilkenny structure is located on the western side of this zone. Recent exploration at Cracow has been focused on drilling of Kilkenny, in addition to drilling on the Sovereign, Roses Pride and Empire shoots. Drilling of the Kilkenny structure defined two steeply plunging shoots of epithermal gold mineralisation. Gold is hosted within a lode structure similar to the Crown and Sovereign shoots. At June 2008, Newcrest calculated an Inferred Resource for Kilkenny (based on a cut off grade of 2.3 g/t gold) of 0.9 Mt at 7.1 g/t for 200,000 ounces. Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

GOLF/TOLLIS - GOLD
A project in the NT Within Katherine Town. An indicated resource of 8.76mt grading 0.85gpt gold has now been estimated (oxide, transition & primary ores) for this area. These deposits are being considered as future feed for the heap leach circuit at the Company's Mt Todd plant. Additional zone of mineralisation also undergoing evaluation & is included in current pit optimisation studies (Golf & Tollis). It is envisaged the Golf pit will provide waste for a new tailings dam to be constructed nearby. Click for more details...

KOGAN CREEK POWER STATION PROJECT - GROUNDWATER SUPPLY
Lagoon Gully Groundwater Supply project at South of, Brigalow, QLD 4412 In The Council Area Of Western Downs Regional of Private. Design and Construct of 26,060m of DN250 DICL Pipe including pipe fittings like Surge tanks 2No Scour valves 15 No and Air valves 22 No. 2 No 45KW pumps & motor (20L/s and 150m head), 2 No 110KW pumps & motor (50L/s and 150m head) and 2 No relift pumps & motor (58L/s and 150m head). 2ML Balancing Storage ( concrete). SCADA control System. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - MINING/CRUSHING
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. The revised mine plan now incorporates the previous stage one and stage two. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES - FIMISTON GOLD OPNS TAILINGS
Consultancy On Tailings Storage Facility Performance & Proposed Height Increase project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. The Fimiston 1 review report concluded that the proposal is technically feasible, subject to additional studies of seepage interception and embankment design. Some environmental damage from seepage (tree stress/loss) has been identified. Some design modifications and a more targeted groundwater management plan are likely to be required. Click for more details...

COYOTE GOLD PROJECT - DAMS/ROADS/AIRSTRIP
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. Construction of the airstrip has commenced and civil works for the plant, roads and dams will commence shortly. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

PRINCESS CREEK TAILINGS DAM - MOUNT LYELL
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Lyell Council Area for New development. The dam is a zoned earth/rock fill embankment, with current height of 42 metres. The planned lift is 5 metres, requiring excavation, movement and placement of approximately 230,000 cubic metres of clay and rock. Other components include excavation of a spillway, embankment and spillway foundation works, construction of roads, installation of decant structure and rehabilitation of exhausted borrow pits. Click for more details...

POITREL COAL MINE PROJECT - SEDIMENT DAMS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Isaac Regional Council Area for New development. The proposal includes a water management system, including sediment dams. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

ST IVES GOLD OPERATIONS - HEAP LEACH FACILITY STAGE 3 EXPANSION
Currently at the Construction stage In Coolgardie is a project estimated to be $ 8589000. This project Work comprises clearing the site, earthworks, pipeworks, Geomembrane and geofabrics liners for the heap leach facility. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Containment walls, processing plant, roads & pipes. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

ARGYLE DIAMOND OPERATIONS - UNDERGROUND INFRASTRUCTURE CONTRACT
110 Km South South West of, Kununurra, WA 6743 Has Argyle Diamond Operations - Underground Infrastructure Contract currently at Construction stage. Work comprises 30 kilometres of underground development work with all the associated infrastructure needed for a block cave mine. More specifically the contractor will construct two underground crusher chambers, undertake vertical development and do initial cave draw production. As part of the underground expansion the existing tailings dam will be expanded. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE DAMS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mackay Regional Council Area of Site Dams - Construction type. To construct two dams. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

SAVAGE RIVER MAGNETITE OPERATIONS - SOUTH DEPOSIT TAILINGS STORAGE FACILITY
Currently at the Construction stage In Waratah-Wynyard is a project estimated to be $ 28000000. This project Construction of a new Tailings Storage Facility (TSF) in Main Creek south of the existing tailings dam as part of the proposed extension of workings to the South Deposit. To comprise a downstream rock filter face formed from alkaline rock to provide neutralisation of any overflow to Main Creek. Upstream a permanent water reservoir used to store tailings from the Savage River mining operation under water, neutralise historic tailings seepage (B Dump, Old Tailings Dam) & store hydroxide sludges formed by the neutralisation reactions & which will eventually be capped. Click for more details...

GOLDEN GROVE GOLD COPPER & BASE METALS OPERATIONS- TAILINGS DAM
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 50km south of, Yalgoo, WA 6635 of Tailings Dam type of New development. Proposed construction of an additional tailings dam to store more than 15 years worth of tailings. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR OPERATIONS - TAILINGS DISPOSAL PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at West of, Woods Point, VIC 3723 of Structural Steel - For Paste Backfill Plant type of New development. Supply of structural steel for a paste backfill plant to allow for the disposal underground of tailings from the Gravity Mill plant. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

DELFECTOR COPPER GOLD PROJECT - PROCESSING PLANT
Processing Plant New project In The City Of Greater Geraldon - Mullewa Council Area. New processing plant to comprise three stage crushing & screening, ball mill, gravity circuit, elution circuit & gold room & flotation circuit. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

SOLOMON IRON ORE PROJECT TAILINGS STORAGE FACILITY CONTRACT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at East of, Cue, WA 6640 for New. For the provision of a Tailings Storage Facility Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

MATILDA GOLD MINE TAILINGS DAM
Currently at the Construction stage In Wiluna is a project estimated to be $ 100000000. This project Construction of tailings dam at Matilda Gold Mine. Click for more details...

DALGARANGA GOLD OPERATIONS RECOMMENCEMENT - TAILINGS STORAGE FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. For the provision of a 3.5m embankment rise of the existing 800m x 800m tailings storage facility. Click for more details...