BALLARAT GOLD PROJECT
A project in the VIC Within Ballarat. Construction of a 300,000tpa plant for a minimum of 80,000oz of gold per year expected to include a gravity circuit & carbon-in-pulp module. Contract to involve all associated services & power distribution. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - INFILTRATION BASIN
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 28 km east of, Ouyen, VIC 3490. This type is Infiltration Basin with Private ownership. For the provision of an infiltration basin to filter storm water runoff. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR OPERATIONS - TAILINGS DISPOSAL PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at West of, Woods Point, VIC 3723 of Structural Steel - For Paste Backfill Plant type of New development. Supply of structural steel for a paste backfill plant to allow for the disposal underground of tailings from the Gravity Mill plant. Click for more details...