List of Tailings, Dams, Water supply dams Projects in WA


RAVENSTHORPE NICKEL PROJECT - TAILINGS STORAGE FACILITY
50 km north of, Hopetoun, WA 6348 Has Ravensthorpe Nickel Project - Tailings Storage Facility currently at Construction stage. Development will comprise a Tailings Storage Facility (TSF) to store a maximum of 87.81 Mt over a 25 year life. It is proposed that 3.51 Mtpa will be stored in the TSF. The TSF will comprise 3 cells of 180-190 Hectares each. The TSF will be using thickened tailings. This will reduce seepage induced groundwater impacts. This will be achieved by limiting the formation of a water pond on the tailings surface by thickening the tailings slurry prior to discharge, maximising evaporation from TSF and maximising transfer of liquid from the TSF to the evaporation pond. The evaporation ponds will be a maximum height of 2.9 metres and store annually 1.58 Mtpa. A permanent spillway will also be constructed. Click for more details...

SALLY MALAY NICKEL PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. To include open pit and dams construction. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area of Runoff Water Storage Pond type. Total storage capacity of 2.5GL of which 0.5GL is available for emergency mud storage. Final impounded surface 21 hectares approx. The main purpose is to store high quality process water. The pond will also be available for excessive rainfall runoff and emergency mud storage. Liner will be clay in conjunction with a geosynthetic membrane. Clay to be excavated and trucked from Alcoa's clay reserves at Wellard/Baldivis. Click for more details...

BARNICOAT - GOLD
A project in the WA Within Laverton. A 7.5 km pipeline from the borefield to the treatment plant. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

JUNDEE - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approximately 40 km east southeast of, Wiluna, WA 6646 for New. Mineral resource currently estimated at 13mt grading 2.4gpt gold including a proven & probable reserve of 6.9mt at 2.4gpt gold. Bulk mining methods are expected to be used with an estimated strip ratio of 10:1. Oxide ore continues to a depth of 60m & ore is anticipated to be free digging to 30m. Transitional material extends between 60m & 80m for this area where 4 initial pits are planned. These deposits are expected to form one large pit as mining progresses (1.8 km x 500m to a depth of 100m). Surveys, tailings dam/plant & waste dumps sterilisation drilling undertaken. Contract extending over 3 years expected to involve 45 million bank cu m of material. Click for more details...

ARGYLE DIAMOND OPERATIONS
Road/Pipework & Tailings Dam project at Mine site via, Argyle, WA 6239 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Construction of a gravel road of about 4.2 km in length is required. Contract to include laying of approximately 6 km of polyethylane pipe some of which is to lie parallel to the new road. Project now incorporates some tailings dam foundations, general earthworks & embankments. Click for more details...

NIMARY - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

THREE MILE - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) Addition project at Approximately 5 km east of, Coolgardie, WA 6429. This type is Operations - Tailings Dam with Private ownership. Approximately 135,000 cu m expansion of existing facility required. Contract to include site preparation & embankments. Award anticipated early September 1995. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 8 km east of, Collie, WA 6225 of Bulk Earthworks type of New development. Contract involves placement of waste dump & stockpile areas plus site levelling for new mine. Earthworks also required for rail line & site access roads. ((Tracklaying to be carried out by Westrail.)) Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

PARABURDOO IRON ORE OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Ashburton Council Area of Private ownership. To raise the tailings dam wall. Click for more details...

PLUTONIC GOLD OPERATIONS - RESOURCE
Operating Mine project at 180 km North east of, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. The Plutonic gold operation comprises both open pit and underground operations. There is also a CIL plant which operates sulphide and oxide circuits on site for the processing of ore. The mine can produce between 1.3 Mtpa to 1.8 Mtpa. In 2005, 251,000 ounces of gold were produced. Ore reserves are 14 Mt @ 5.2 gpt Au. Development work proposed includes increased mining at the Freshwater mine, in pit Tailing storage facilities at the Callp and Pirana pits. Work at the Freshwater mine is entitled the Trout Mining Project. Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

LAVERTON GOLD OPERATIONS
Tailings Dam - Expansion Addition project In The Laverton Council Area. General earthworks & civils required to increase tailings area from 20 hectares to 65 hectares. Associated works such as piping & pumps included in this tender. Click for more details...

NIFTY COPPER OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 200 km southeast of, Marble Bar, WA 6760 for Addition. Contract to involve site preparation, embankments, liner plus associated pumps & piping. Click for more details...

RADIO HILL NICKEL OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at South of, Karratha, WA 6714 of Nickel/Copper Sulphide Process Plant & Associated Infrastructure type of New development. To include relocation and refurbishment of secondhand ball mill. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) Addition project at Lot 100 Postans Rd, Hope Valley, WA 6165. This type is Mechanical/Electrical Installation For Residue Disposal Expansion with Private ownership. This major mechanical/electrical package includes installation of piping for the tailings dam expansion. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area for Subcontract development. This electrical subcontract package includes electrical services for the infrastructure of the tailings work. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES - FIMISTON GOLD OPNS TAILINGS
Consultancy On Tailings Storage Facility Performance & Proposed Height Increase project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. The Fimiston 1 review report concluded that the proposal is technically feasible, subject to additional studies of seepage interception and embankment design. Some environmental damage from seepage (tree stress/loss) has been identified. Some design modifications and a more targeted groundwater management plan are likely to be required. Click for more details...

COYOTE GOLD PROJECT - DAMS/ROADS/AIRSTRIP
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. Construction of the airstrip has commenced and civil works for the plant, roads and dams will commence shortly. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

WINDIMURRA VANDIUM OPERATION - PROCESSING PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 80 Km East South East of, Mount Magnet, WA 6638 for New. New equipment has been purchased for the plant and a tender has closed for a SAG Mill. The present plant infrastructure at the site is a 126m Rotary Gas Fired Kiln and cooler, Plant earthworks and Concrete, Crusher Area structure and ROM pad, Grinding Area Concrete and Footings, Beneficiation area including Rare Earth Magnetic Separators, Leach Vats, Leaching Area Concrete, Fusion Area, Fusion furnace, Flaking Wheel, Hot pan Conveyor, Packaging Plant, Process design and engineering, Tailings Dam, Road Works, Bore fields, Communication services, Building and Workshop equipment and Accommodation Village. The plant infrastructure, design and processing operations have been studied and improvements have been recommended. The design will look at power station configuration, upgrade of the material handling in parts of the plant which were found to be production bottlenecks. Click for more details...

ST IVES GOLD OPERATIONS - HEAP LEACH FACILITY STAGE 3 EXPANSION
Currently at the Construction stage In Coolgardie is a project estimated to be $ 8589000. This project Work comprises clearing the site, earthworks, pipeworks, Geomembrane and geofabrics liners for the heap leach facility. Click for more details...

COSMOS NICKEL PROJECT - TAILINGS STORAGE EXPANSION
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Leonora Council Area of Tailings Storage Expansion type. An expansion of the tailings storage facilities 1 & 2. The expansion will be used for ore processed by the expanding operations at Tapinos and Prospero. Click for more details...

ARGYLE DIAMOND OPERATIONS - UNDERGROUND INFRASTRUCTURE CONTRACT
110 Km South South West of, Kununurra, WA 6743 Has Argyle Diamond Operations - Underground Infrastructure Contract currently at Construction stage. Work comprises 30 kilometres of underground development work with all the associated infrastructure needed for a block cave mine. More specifically the contractor will construct two underground crusher chambers, undertake vertical development and do initial cave draw production. As part of the underground expansion the existing tailings dam will be expanded. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

GOLDEN GROVE GOLD COPPER & BASE METALS OPERATIONS- TAILINGS DAM
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 50km south of, Yalgoo, WA 6635 of Tailings Dam type of New development. Proposed construction of an additional tailings dam to store more than 15 years worth of tailings. Click for more details...

SAINT IVES GOLD OPERATIONS EXPANSION - LAKE LEFROY
Operating Mine - Expansion project at 20km southeast of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. An open cut & underground mining operation based on June 2009 gold reserves of 5.6 million ounces contained in 30 million tonnes (Mt) of resources. A project to extend the Life-of-Mine (LOM) to 2014 by mining 778ha of saline Lake Lefroy & 22ha of riparian zone at the Pistol Club & Neptune localities. Continued use of central infrastructure including administration & engineering facilities, a 4.8Mtpa mill/CIP processing plant & a 2.3Mtpa heap leach processing plant with 3 associated 5.5Mt leach pads. New expansion infrastructure expected to include a fourth heap leach pad & a fourth tailings dam. Click for more details...

DELFECTOR COPPER GOLD PROJECT - PROCESSING PLANT
Processing Plant New project In The City Of Greater Geraldon - Mullewa Council Area. New processing plant to comprise three stage crushing & screening, ball mill, gravity circuit, elution circuit & gold room & flotation circuit. Click for more details...

SOLOMON IRON ORE PROJECT TAILINGS STORAGE FACILITY CONTRACT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at East of, Cue, WA 6640 for New. For the provision of a Tailings Storage Facility Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

MATILDA GOLD MINE TAILINGS DAM
Currently at the Construction stage In Wiluna is a project estimated to be $ 100000000. This project Construction of tailings dam at Matilda Gold Mine. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - TAILINGS DAM
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Port Hedland Council Area of Private ownership. For the provision of a tailings dam. Click for more details...

ELLENDALE DIAMOND MINE - TAILINGS STORAGE FACILITY - EROSION REMEDIATION
Erosion Remediation project at Via, Derby, WA 6728 In The Council Area Of Derby-W Kimberley of State. Works to include remediation works on the walls of the main Ellendale Tailings Storage Facility to ensure the facility remains safe & stable. Works will primarily involve placing rock material in areas where significant scour & erosion occurs. Click for more details...

DALGARANGA GOLD OPERATIONS RECOMMENCEMENT - TAILINGS STORAGE FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. For the provision of a 3.5m embankment rise of the existing 800m x 800m tailings storage facility. Click for more details...