State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tankage, Silos Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 500000. This project CIL tankage. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

KOGAN CREEK POWER PROJECT
Mining - Primary And Secondary Processing (Tankage, Silos) New project at South of, Brigalow, QLD 4412. This type is Feedwater Tank & Deaerator with Private ownership. High & Low Pressure Preheater: 4 Low Pressure Preheaters, 1 Low Pressure Drains Cooler, 2 High Pressure Feedwater Heaters, 1 Deaerator with Feedwater Storage Tank approx 250m3, 3 Plate Type Heat Exchanger (13MW each). Click for more details...

KOGAN CREEK POWER PROJECT - TANKS/VESSELS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Western Downs Regional Council Area of Tanks/Vessels type. 1 Clean Drains Tank 12 m³ (carbon steel), - 1 Clean Drains Flash Tank 6m³ (carbon steel), - 1 Volume Expansion Tank 5m³ (carbon steel), - 1 Potable Water Tank 20m³, stainless steel or GRP, - 1 Vacuum Drains Tank 14m³ (carbon steel). Click for more details...

KWINANA ALUMINA REFINERY
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

JEEBROPILLY COAL TO LIQUIDS PLANT
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ipswich City Council Area for New development. Construction of a proof of concept coal to liquids (CTL) plant at the existing Jeebropilly Coal Mine site. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PERLITE - INSULATION
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of loose fill perlite insulation for use in non evacuated low temperature & cryogenic vessels. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PRESSURE RELIEF VALVES
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of pressure relief valves. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - RESISTANCE TEMPERATURE DETECTORS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of resistance temperature detectors. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE TANKS - ELECTRICAL CABLE GLANDS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Electrical Cable Glands type. For the provision of M20 electrical cable glands. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ROOF COLUMN JACKING LUGS
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of roof column jacking lugs. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULL WHEEL GANTRY WALKWAY
Bull Wheel Gantry Walkway project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of a bull wheel gantry walkway. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ANNULAR STANDS
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the detail, supply, fabrication, testing & prime of Annular Stands. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MATERIALS FOR INSTRUMENT MOUNTING & SUPPORTS (REV 1)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of materials for instrument mounting supports. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - VARIOUS ELECTRICAL ITEMS
A project in the WA Within Ashburton. For the provision of various electrical items to provide lighting & power. Click for more details...

LAMBOO/NICOLSONS GOLD JOINT VENTURE PROJECT - MILL REFURBISHMENT & UPGRADE
Mill - Refurbishment/Upgrade project at NW of Great Northern Hwy & from 40km W/SW of, Halls Creek, WA 6770 in the Mining - Primary And Secondary Processing (Tankage, Silos). Replacement of the retaining wall on the ROM pad. Replacement of the cone crusher. Modification to the single deck screen & installation of new second deck. New feeder belt & modified feed arrangement for the fine ore bin. New cyanide bagging system & dosing pump. Installation of new leach tankage for the 200 000 tpa upgrade. Modification of tank agitators & gearboxes to suit the upgraded leach circuit. New decant water return system. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - LUMINARIES - (MR-16520)
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Luminaries type of New development. For the provision of luminaries. Cooper Crouse Hinds LA, LB, LC, LD type lights "Full Shielded". Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MANUAL VALVES - (MR-15130)
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Manual Valves type. For the provision of manual valves. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BOTTOM PLATES
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of bottom plates. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULK PIPE SUPPORTS
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the provision of bulk pipe supports. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EARTHING LUG
Currently at the Construction stage In Ashburton is a project estimated to be $ 50000. This project For the provision of an earthing lug. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FABRICATE DRAWOFF ASSY
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Fabricate Drawoff Assy currently at Construction stage. For the fabrication & supply of a drawoff assembly. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ROOF PLATE PIECE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Roof Plate Piece with Private ownership. For the provision of roof plate piece details. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL MANHOLE DETAILS
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of shell manhole details. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL MANHOLE REINFORCING
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Shell Manhole Reinforcing type of New development. For the provision of shell manhole reinforcing. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS & CS PIPE & PIPE MATERIALS
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Ss/Cs Pipe/Materials type of New development. For the provision of SS & CS pipe & pipe materials. To include: pipe, flanges, fittings, gaskets & fasteners. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Primary And Secondary Processing (Tankage, Silos) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - DISCONNECT SWITCHES (MR-16537)
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Disconnect Switches with Private ownership. For the provision of Stahl disconnect switches or equivalent. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ELECTRICAL POWER CABLE (MR-16120)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of electrical power cable. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - GROUNDING MATERIAL
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Grounding Material is currently at the Construction stage, valued at about $ 2500000 it is For the provision of grounding material. To include: earth cables, bars, connectors & terminals, tool kit, compression tool & dies). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - HOSE STORAGE CABINETS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Hose Storage Cabinets type. For the provision of hose storage cabinets. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENT INSTALLATION MATERIAL (MR-17100)
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of instrument installation material. To include a Camera Stand package & a number of Single Instrument Stand packages. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - COMPRESSOR HIRE
Currently at the Construction stage In Ashburton is a project estimated to be $ 100000. This project For the provision of compressor hire. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EQUIPMENT/PLANT HIRE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Equipment/Plant Hire currently at Construction stage. For the provision of 6 T forklift hire. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - FORMWORK SYSTEMS
Formwork Systems New project In The Ashburton Council Area. For the provision of formwork systems. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COUPLERS
Couplers project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of couplers. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CRYOGENIC MANUAL VALVES
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Cryogenic Manual Valves type. For the provision of cryogenic manual valves. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBERGLASS FOR SUSPENDED DECK
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of fiberglass for the suspended deck. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - GAUGE & DIFFERENTIAL PRESSURE TRANSMITTER
Gauge/Differential Pressure Transmitter project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of the gauge and differential pressure transmitter. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - INTERNAL PIPING
Internal Piping project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the provision of internal piping. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - PRESSURE GAUGES
Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Pressure Gauges is currently at the Construction stage, valued at about $ 250000 it is For the provision of pressure gauges. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - STAINLESS STEEL HEATING CONDUITS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of stainless steel heating conduits. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - WATER CHILLER
Water Chiller New project In The Ashburton Council Area. For the provision of 8 series process water chiller (29 kW). Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - SITE FACILITIES OPERATIONS & MAINTENANCE - VARIOUS
Site Facilities Operations/Maintenance - Various project at Blaydin Point, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Tankage, Silos). Fuel supply. Fuel tank supply. Site establishment including supply, delivery to site & removae site offices, crib facilities, amenities blocks & workshops. Temporary fencing. Vector/pest control. Plant & equipment supply. Power generation. Storage containers. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect