List of Tankage, Silos Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

KOGAN CREEK POWER PROJECT - TANKS/VESSELS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Western Downs Regional Council Area of Tanks/Vessels type. 1 Clean Drains Tank 12 m³ (carbon steel), - 1 Clean Drains Flash Tank 6m³ (carbon steel), - 1 Volume Expansion Tank 5m³ (carbon steel), - 1 Potable Water Tank 20m³, stainless steel or GRP, - 1 Vacuum Drains Tank 14m³ (carbon steel). Click for more details...

BROWNS OXIDE PROJECT - PROCESSING PLANT/ LEACHING FACILITIES
Processing Plant/Leaching Facilities project at South East of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Tankage, Silos). The plant will treat 1.3 million tonnes per year. All major items of equipment for the plant have been acquired including grinding and classification circuit, Cawse solvent extraction, electrowinning plant, thickners and tanks have also been acquired. Other equipment is being custom designed and fabricated offsite. Detailed engineering design works of the plant are in progress. Finalisation of processing plant flowsheet and confirmatory metallurgical testwork are also in progress. Testwork has already shown that the valuable copper, cobalt and nickel minerals are dissolved in acid. Once the metals are in the solution, the liquor is separated from the leached solids which are then washed and sent to the tailings storage facility. Testwork is confirming solvent extraction design criteria for concentrating metals in solution ahead of copper electrowinning of high purity cathode product. The facility will comprise a solvent extraction plant, electrowiring plant, tankage and product filtering equipment. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - TANK FOR WASHPLANT FIRE PROTECTION
A project in the QLD Within Isaac Regional. 600,000 litre tank. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MANPOWER & LABOUR
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Manpower & Labour currently at Construction stage. For the provision of manpower & labour. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PERLITE - INSULATION
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of loose fill perlite insulation for use in non evacuated low temperature & cryogenic vessels. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - RESILIENT BLANKET
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of a resilient blanket. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO EN 10025-2
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cs Plates To En 10025-2 is currently at the Construction stage, valued at about $ 750000 it is For the provision of CS plates to EN 10025. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FLOATING ROOF SEALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Floating Roof Seals currently at Construction stage. For the provision of floating roof seals. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - J-CHANNEL GASKET, WHITE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - J-Channel Gasket, White currently at Construction stage. For the provision of (70 Nitrile 30 Vinyl) J-channel gaskets. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - Y TYPE & WITCHES HAT SS STRAINERS
Ss Strainers - Y Type/Witches Hat project at On, Barrow Island, WA 6712 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of Y type & witches hat SS strainers. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MUELLER COUPLINGS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of Mueller couplings. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PRESSURE RELIEF VALVES
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of pressure relief valves. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - POWER DISTRIBUTION BOARDS
Power Distribution Boards project at on, Barrow Island, WA 6712 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of power distribution boards (230A to 630A). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE TANKS - ELECTRICAL CABLE GLANDS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Electrical Cable Glands type. For the provision of M20 electrical cable glands. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - VARIOUS ELECTRICAL ITEMS
A project in the WA Within Ashburton. For the provision of various electrical items to provide lighting & power. Click for more details...

LAMBOO/NICOLSONS GOLD JOINT VENTURE PROJECT - MILL REFURBISHMENT & UPGRADE
Mill - Refurbishment/Upgrade project at NW of Great Northern Hwy & from 40km W/SW of, Halls Creek, WA 6770 in the Mining - Primary And Secondary Processing (Tankage, Silos). Replacement of the retaining wall on the ROM pad. Replacement of the cone crusher. Modification to the single deck screen & installation of new second deck. New feeder belt & modified feed arrangement for the fine ore bin. New cyanide bagging system & dosing pump. Installation of new leach tankage for the 200 000 tpa upgrade. Modification of tank agitators & gearboxes to suit the upgraded leach circuit. New decant water return system. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - LUMINARIES - (MR-16520)
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Luminaries type of New development. For the provision of luminaries. Cooper Crouse Hinds LA, LB, LC, LD type lights "Full Shielded". Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BOTTOM SUMP
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Bottom Sump with Private ownership. For the provision of a bottom sump. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULK PIPE SUPPORTS
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the provision of bulk pipe supports. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - DRAWOFF SUMP
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Drawoff Sump is currently at the Construction stage, valued at about $ 150000 it is For the provision of a drawoff sump. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EARTHING LUG
Currently at the Construction stage In Ashburton is a project estimated to be $ 50000. This project For the provision of an earthing lug. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FABRICATE DRAWOFF ASSY
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Fabricate Drawoff Assy currently at Construction stage. For the fabrication & supply of a drawoff assembly. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ROOF PLATE PIECE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Roof Plate Piece with Private ownership. For the provision of roof plate piece details. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL NOZZLE REINFORCING
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Shell Nozzle Reinforcing type. For the provision of shell nozzle reinforcing. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS & CS PIPE & PIPE MATERIALS
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Ss/Cs Pipe/Materials type of New development. For the provision of SS & CS pipe & pipe materials. To include: pipe, flanges, fittings, gaskets & fasteners. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - VORTEX BREAKER
Currently at the Construction stage In Ashburton is a project estimated to be $ 200000. This project For the provision of a vortex breaker. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Primary And Secondary Processing (Tankage, Silos) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - DISCONNECT SWITCHES (MR-16537)
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Disconnect Switches with Private ownership. For the provision of Stahl disconnect switches or equivalent. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ELECTRICAL POWER CABLE (MR-16120)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of electrical power cable. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENT INSTALLATION MATERIAL (MR-17100)
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of instrument installation material. To include a Camera Stand package & a number of Single Instrument Stand packages. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS CABLE LABLES & FERRULES (MR-17100)
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of SS cable lables & ferrules heat shrinkable tubes. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - CONCRETE EQUIPMENT
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of concrete equipment. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - FORMWORK SYSTEMS
Formwork Systems New project In The Ashburton Council Area. For the provision of formwork systems. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CRYOGENIC MANUAL VALVES
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Cryogenic Manual Valves type. For the provision of cryogenic manual valves. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBREGLASS FOR BOTTOM & NOZZLES
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Vicinity of, Onslow, WA 6710. This type is Fibreglass For Bottom/Nozzles with Private ownership. For the provision of fiberglass for bottom and nozzles. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBERGLASS FOR SUSPENDED DECK
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of fiberglass for the suspended deck. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - GAUGE & DIFFERENTIAL PRESSURE TRANSMITTER
Gauge/Differential Pressure Transmitter project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of the gauge and differential pressure transmitter. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - INSTRUMENT CABLES
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of instrument cables. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ROOF DRAIN SYSTEM
Roof Drain System project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of a roof drainage system. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ROOF SEAL
Roof Seal New project In The Ashburton Council Area. For the provision of a roof seal. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - STAINLESS STEEL HEATING CONDUITS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of stainless steel heating conduits. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - TEMPERATURE PROBE
A project in the WA Within Ashburton. For the provision of a temperature probe. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - WATER CHILLER
Water Chiller New project In The Ashburton Council Area. For the provision of 8 series process water chiller (29 kW). Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...