State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tankage, Silos Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Tankage, Silos). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - TANK FOR WASHPLANT FIRE PROTECTION
A project in the QLD Within Isaac Regional. 600,000 litre tank. Click for more details...

BODDINGTON GOLD MINE EXPANSION - SEWAGE TREATMENT PLANT
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Boddington Council Area of Sewage Treatment Plant type. Sewage Treatment Plant will comprise an Aeration tank, Sludge Storage tank, Chlorination tank, Chlorine Dosing System and associated pipe and pumps. Production capacity will be 65 cubic metres per day. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS PIPES FOR PUMP TUBES
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of stainless steel pipes for pump tubes. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS GRATINGS & HANDRAILS
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the provision of CS gratings & handrails. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO EN 10025-2
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cs Plates To En 10025-2 is currently at the Construction stage, valued at about $ 750000 it is For the provision of CS plates to EN 10025. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO A36 & AS3678 250
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of 250 CS plates MTO to A36 & AS3678. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - J-CHANNEL GASKET, WHITE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - J-Channel Gasket, White currently at Construction stage. For the provision of (70 Nitrile 30 Vinyl) J-channel gaskets. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - Y TYPE & WITCHES HAT SS STRAINERS
Ss Strainers - Y Type/Witches Hat project at On, Barrow Island, WA 6712 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of Y type & witches hat SS strainers. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MUELLER COUPLINGS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of Mueller couplings. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - POWER DISTRIBUTION BOARDS
Power Distribution Boards project at on, Barrow Island, WA 6712 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of power distribution boards (230A to 630A). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULL WHEEL GANTRY WALKWAY
Bull Wheel Gantry Walkway project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of a bull wheel gantry walkway. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MATERIALS FOR INSTRUMENT MOUNTING & SUPPORTS (REV 1)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of materials for instrument mounting supports. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - VARIOUS ELECTRICAL ITEMS
A project in the WA Within Ashburton. For the provision of various electrical items to provide lighting & power. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - LUMINARIES - (MR-16520)
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Luminaries type of New development. For the provision of luminaries. Cooper Crouse Hinds LA, LB, LC, LD type lights "Full Shielded". Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BOTTOM PLATES
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of bottom plates. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - DRAWOFF SUMP
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Drawoff Sump is currently at the Construction stage, valued at about $ 150000 it is For the provision of a drawoff sump. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EARTHING LUG
Currently at the Construction stage In Ashburton is a project estimated to be $ 50000. This project For the provision of an earthing lug. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FABRICATE SHELL & ROOF NOZZLE MANWAYS
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the fabrication of shell roof nozzle manways. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ROOF PLATE PIECE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Roof Plate Piece with Private ownership. For the provision of roof plate piece details. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL MANHOLE REINFORCING
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Shell Manhole Reinforcing type of New development. For the provision of shell manhole reinforcing. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - VORTEX BREAKER
Currently at the Construction stage In Ashburton is a project estimated to be $ 200000. This project For the provision of a vortex breaker. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Primary And Secondary Processing (Tankage, Silos) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - DISCONNECT SWITCHES (MR-16537)
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Disconnect Switches with Private ownership. For the provision of Stahl disconnect switches or equivalent. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - GENERATOR HIRE
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the provision of generator hire (several large units required). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - HOSE STORAGE CABINETS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Hose Storage Cabinets type. For the provision of hose storage cabinets. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENT INSTALLATION MATERIAL (MR-17100)
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of instrument installation material. To include a Camera Stand package & a number of Single Instrument Stand packages. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - COMPRESSOR HIRE
Currently at the Construction stage In Ashburton is a project estimated to be $ 100000. This project For the provision of compressor hire. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EQUIPMENT/PLANT HIRE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Equipment/Plant Hire currently at Construction stage. For the provision of 6 T forklift hire. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - CONCRETE EQUIPMENT
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of concrete equipment. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - FORMWORK SYSTEMS
Formwork Systems New project In The Ashburton Council Area. For the provision of formwork systems. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COUPLERS
Couplers project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of couplers. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBREGLASS FOR BOTTOM & NOZZLES
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Vicinity of, Onslow, WA 6710. This type is Fibreglass For Bottom/Nozzles with Private ownership. For the provision of fiberglass for bottom and nozzles. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBERGLASS FOR SUSPENDED DECK
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of fiberglass for the suspended deck. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - PRESSURE GAUGES
Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Pressure Gauges is currently at the Construction stage, valued at about $ 250000 it is For the provision of pressure gauges. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ROOF DRAIN SYSTEM
Roof Drain System project at Vicinity of, Onslow, WA 6710 in the Mining - Primary And Secondary Processing (Tankage, Silos). For the provision of a roof drainage system. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - SLAB HEATING SYSTEM
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of a slab heating system. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - STAINLESS STEEL HEATING CONDUITS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of stainless steel heating conduits. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - TEMPERATURE PROBE
A project in the WA Within Ashburton. For the provision of a temperature probe. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - WEAVE GLASS
A project in the WA Within Ashburton. For the provision of weave glass. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - WATER CHILLER
Water Chiller New project In The Ashburton Council Area. For the provision of 8 series process water chiller (29 kW). Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect