State

Categories

Sub Categories

Click Here to Find Current Projects

List of Topside - modules, platforms Projects


TASSIE SHOAL METHANOL PROJECT - LNG PRODUCTION FACILITY/STORAGE TANKS
Lng Production Facility/Storage Tanks project at Tassie Shoal in the Timor Sea 275 km north of, Darwin Mc, NT 0820 in the Oil & Gas (Topside - modules, platforms). A 2.5 million tonnes per annum LNG production and export facility. Includes construction for two concrete structure each containing conventional nickel steel LNG storage tanks. These structure would provide support for the LNG production module. The facility would be serviced and provisioned out of Darwin. Click for more details...

HARRIET JV - LINDA
Oil & Gas (Topside - modules, platforms) project In The City Of Karratha Council Area of Platform type. The development will include a multi-slot platform to allow development of the Linda Gas/condensate field via two or three wells. The platform is positioned to allow development of the Rose and Lee Gas/condensate fields and other future discoveries in the area. The platform is to be connected to the Campbell pipeline. Processing to be at Varanus Island. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

TASSIE SHOAL METHANOL PROJECT - JETTY/OFFSHORE MOORINGS
Jetty/Offshore Moorings New project In The Darwin City Council Area. Key components of the Tasie Shoal project include a jetty (200 metres long for loading methanol onto export tankers); and two offshore moorings ( one on Tassie Shoal and one beside Tassie Shoal) for use by service boats, tugs and visiting fishing vessels. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Oil & Gas (Topside - modules, platforms) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...

ELANG
Oil & Gas (Topside - modules, platforms) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

BASKER-MANTA OIL & GAS PROJECT - RESOURCE
Resource - Oil & Gas - Offshore New project In The Bass Coast Council Area. Installation associated the EPT comprise the Floating Production Storage and offloading Unit flexible flowline and control umbilical system and shuttle tanker mooring. The ocean patriot will be used for the drilling and expected to start July 2005. The majority of the development drilling will be undertaken in the fourth quarter 2005 when production licences are granted. A Floating Production Storage and Offloading vessel (FPSO) has been secured until January 15 2008. The FPSO has the capacity to handle up to 40,000 barrells of fluid per day and 50MMscf/d of gas. The Crystal Ocean (FPSO) has been obtained under a bareboat charter and manning will be provided by Upstream Petrolem Pty Ltd with assitance from Seatankers Management Co Ltd. The Crystal Ocean is expected to arrive in Melbourne August 2005. A shuttle tanker has been secured for a three year contract from Teekay Shipping and is expected in Bass Strait September 2005. The tanker called the Nordic Yukon is aframax sized, with dynamic positioning capability and a capacity for approx 650,000 bbls. Click for more details...

BLACKTIP GAS PROJECT - PLATFORM
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Private ownership. Offshore unmanned wellhead platform (WHP) in 50 metres of water. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Topside - modules, platforms) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Offshore Facilities - Jacket/Topsides Epic Contract type. The proposed development concept for offshore facilities includes a wellhead platform with five production wells on the Thylacine Reservoir and a subsea manifold and three production wells on the Geographe Reservoir. Click for more details...

WA-286P - CLIFF HEAD - UNMANNED PLATFORM
West of Horseshoe Reef, Perth Basin south of, Geraldton, WA 6531 Has Wa-286p - Cliff Head - Unmanned Platform currently at Planning stage. An unmanned offshore production wellhead platform supporting sIx production wells and two water injection wells, with capability for two additional wells. Steel construction with pile foundations. Click for more details...

KIPPER UNIT JOINT VENTURE GAS PROJECT
Resource - Gas - Offshore New project In The Gippsland Basin Council Area. The Kipper Gas Field is estimated to contain 620billion cubic feet (Bcf) of recoverable gas & 30million barrels (MMbl) of condensate/liquefied petroleum gas (LPG). Initial development includes 2 subsea gas wells along with 4 subsea coolers. Recovered gas to be piped through existing infrastructure via the West Tuna Platform to the onshore Esso & BHP Billiton processing facilities at Longford. Click for more details...

GIPPSLAND BASIN JOINT VENTURE PROJECT - TURRUM
Resource - Oil & Gas - Offshore project at Gippsland Basin Bass Strait, Gippsland Basin, VIC 3999 in the Oil & Gas (Topside - modules, platforms). Full development of the Turrum gas field expected to recover around 1 trillion cubic feet of natural gas and 110 million barrels of oil and gas liquids. Processing to be at the onshore Longford Gippsland Basin Joint Venture Facilities. Production to be enhanced with the late 2010 installation of the new Marlin B platform. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Topside - modules, platforms). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

AC-RL3 - MONTARA OIL & GAS PROJECT
A project in the WA Within Offshore. The Company proposes to develop the oilfields, which are located within Permit Area AC/L7 & 8 in the Australian Commonwealth Territory of Ashmore and Cartier islands, approximately 690 km west of Darwin. Click for more details...

ANGEL GAS PROJECT - RESOURCE
Resource - Gas & Oil project at 130 Km North of Dampier, ., WA 6999 In The Council Area Of Offshore of Private. The project will comprise of the drilling of four wells in 2007, installing a processing platform and exporting the gas and condesate via a new 49 Km pipeline and the existing trunkline to the onshore gas plant near Karratha. Processing platform facilities include accommodation for up to 40 persons; helideck; emergency flare and vent; Produced water treatment and disposal with allowance for potential future volumes; Gas/condensate cooling via air cooled heat exchangers; Gas/condensate seperation and condensate/water seperation; gas dehydration; Gas/condensate metering; Power generation gas turbines (7MW) and 4 installed risers and two additional risers as provision for tie in of future fields. A floating production, storage and offloading vessel. Click for more details...

WOODSIDE GAS OFFSHORE CRANE ENGINEERING/MAINTENANCE CONTRACT
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Crane Engineering/Maintenance Contract type. Work comprises the delivery of specialised offshore crane engineering and maintenance services to gas resources at Goodwyn A and North Rankin A. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Oil & Gas (Topside - modules, platforms) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

VINCENT OILFIELD PROJECT - DISCONNECTABLE TURRET MOORING SYSTEM
A project in the WA Within Offshore. Main items include, an STP Buoy with integrated turret, mooring system, STP Ship system for handling and locking of STP Buoy and Multi-path swivel system. The mooring system will contain the proposed following components. 9 chain sections of 122mm with a total length of 4800m and total weight of 1450 tons. 27 wire sections of 100mm with a total length of 5400m and a total weight of 300 tons. 9 mooring line buoyancy elements (3.0m dia / 5.0m length) with a total weight of 135 tons. 9 fluke anchors with a total weight of 180 tons. 15 concrete clump weights with a total weight of 100 tons. Click for more details...

BLACKTIP GAS PROJECT - JACKET
New project of Oil & Gas (Topside - modules, platforms) project at Bonaparte Basin, ., WA 6999. The four legged jacket will form the sub structure of the well head platform. The jacket will be secured to the seabed by deep or shallow foundations and will be designed to withstand extreme environmental conditions. Click for more details...

WOOLLYBUTT OIL FIELD - WA-25-L - SOUTH LOBE PROJECT
Oil & Gas (Topside - modules, platforms) project at West of Barrow Island, Barrow Sub-Basin, WA 6999 for New. Work comprises the drilling and completion of Woollybutt-4 horizontal development well and Woollybutt-6 appraisal well. There will be modifications to the existing FPSO, new sub-sea christmas trees, flowlines, manifolds and control systems. Resource estimate is 7 million barrels of oil. Click for more details...

NORTH RANKIN REDEVELOPMENT - ESCAPE CRAFT
Oil & Gas (Topside - modules, platforms) New project at 135 Km North of, Dampier Sub-Basin, WA 6999. This type is Escape Craft with Private ownership. M028B. Escape Craft.The design, manufacture, inspection, testing, certification, corrosion protection, painting, identification, documentation, commissioning support, preservation and packing for transport of 60 person freefall lifeboats, SOLAS, with associated launch frames and retrieval devices. Lifeboats shall be proven for freefall from a height of 33 metres. 3 Required Click for more details...

ICHTHYS LNG PROJECT - CENTRAL PROCESSING FACILITY
Processing Facility project at Off Maret Island Via, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of Private. The offshore CPF facilities include process, power generation, utilities & accommodation facilities. Work involves fabrication, installation, mechanical completion, pre-commissioning & commissioning of equipment, piping, electrical, instrumentation & controls, safety system & accommodation facilities. The CPF topside is modularised on a Semi submersible substructure. Semi-sub includes pontoons, columns & deck box with a plan dimension of approximately 96mx96m to support topsides. Topside to comprise modules up to a maximum of 5000 te & packages if appropriate. The living quarters module can be a part of the semi-sub deck box or separate module. Alternative concepts for integrated topsides will be considered. Click for more details...

NORTH RANKIN REDEVELOPMENT PROJECT - GROUT PACKERS & DIAPHRAGM
135km North of, Dampier Sub-Basin, WA 6999 Has North Rankin Redevelopment Project - Grout Packers & Diaphragm currently at Construction stage. The scope includes - the design, documentation, manufacture, testing, identification, painting, preservation and packing of: 40 off Inflatable Packer kits, complete with inflation spuds, spud coupling, protective mat for installation and protective covers, 20 off Flat Wiper assemblies, 4 off Packer Activation Panels, 4 off Primary Packer Inflation system including all connectors, couplings, fittings and tubing, 40 off packer inflation check valves, 32 off Buoyancy Tank Rip-out Diaphragms, complete with cruciform, pulling eye, retaining ring and bolting, 32 off Buoyancy Tank Rip-out Diaphragms, galvanised non-rotating wire rope pull cable assemblies and 2 off Buoyancy Tank Diaphragm pressure test domes. Click for more details...

BASSGAS OPERATIONS - YOLLA MID-LIFE ENHANCEMENT PROJECT STAGE 1
Tasmanian waters 147km off the Victorian coast, Bass Basin, TAS 7999 Has Bassgas Operations - Yolla Mid-Life Enhancement Project Stage 1 currently at Construction stage. A project to maximise gas recovery from the operating Yolla field which provides gas, condensate & LPG through the Lang Lang processing facility. Conversion of the currently unmanned 8000t, 50m x 50m x 120m high Yolla A platform by installation of living quarters along with safety related systems & equipment. Installation also of pumping & compression equipment. Click for more details...

WHEATSONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - HOOKUP & COMMISSIONING
Oil & Gas (Topside - modules, platforms) New project at Wheatstone Gas Field, 85km Northwest of, Barrow Island, WA 6712. This type is Platform Hookup/Commissioning with Private ownership. For the provision of the Wheatstone Platform hookup and commissioning. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - OPERABILITY RELIABILITY & MAINTAINABILITY CONTRACTOR
Wheatstone Development Project - Offshore Platform - Operability Reliability & Maintainability Contractor is currently at the Construction stage, valued at about $ 15000000 it is For a operability, reliability and maintainability contractor. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Topside - modules, platforms) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect