State

Categories

Sub Categories

Click Here to Find Current Projects

List of Transmission lines/towers, switching yards, transformers, substations, cabling Projects


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

REDBANK II POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Kurri Kurri to Redbank II site near Bulga mine complex,, Singleton, NSW 2330 of Transmission Lines - Construction & Upgrading type of New development. 132 kv transmission line from Redbank 2 power plant site (near Bulga Coal Mine) to an existing 132kV transmission line on the Putty Rd (5km); uprating of existing 132kVtransmission line from the existing Redbank 1 power plant to Kurri Kurri substation and replacement of an existing overhead earth wire from Kurri Kurri to the VAW aluminium smelter. Click for more details...

GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

MINDARIE MINERAL SANDS PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Karoonda Council Area of Power Supply type. Electricity requirements have increased from 5.5 to 7.5 million units. Mains supply will be supplied via the Pyap 66kv substation. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo currently at Construction stage. The main infrastructure requirements at the mine site include a High Voltage power supply. 66 kv transmission line. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

TELFER GOLD OPERATIONS
Addition project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Site operations via, Telfer, WA 6762. Airfield lighting required for new sealed airstrip extending over 200 m with a width of 30 m. Overall project includes a small terminal & a new refuelling facility. Click for more details...

PREMIER COAL OPERATIONS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Collie Council Area of Private ownership. Switchgear, transformers, above & below ground cabling & associated electrical services required for 132 kV - 22 kV substation. Project to be commissioned in January 1996. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 66 KV SWITCHGEAR/EQUIPMENT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Near, Newman, WA 6753 for New. 66 kV Switchgear and Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 33 KV SWITCHGEAR
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Near, Newman, WA 6753. 33 Kv Switchgear. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - TRANSPORTABLE SWITCHROOMS/415V MCCS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The East Pilbara Council Area of Transportable Switchrooms/415v Mccs type. Transportable Switchrooms and 415V MCCs Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - VVVF LV
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Port Hedland Council Area of Variable Voltage Variable Frequency System/ Low Voltage type. Variable Voltage Variable Frequency System - Low Voltage Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREAC/PORT - FIELD ETHERNET SWITCHES
Iron Ore Rapid Growth 3 Project - Areac/Port - Field Ethernet Switches is currently at the Construction stage, valued at about $ 1000000 it is Field Ethernet Switches. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - POLE TRANSFORMERS
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Finucane Island, WA 6721. Pole Transformers Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - 132 & 33 KV SWITCHGEAR
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at On, Finucane Island, WA 6721. This type is 132 & 33 Kv Switchgear - Supply with Private ownership. 132 & 33 kV Switchgear. Click for more details...

MINDARIE MINERAL SANDS PROJECT - TRANSMISSION LINE CONTRACT
Mindarie Mineral Sands Project - Transmission Line Contract is currently at the Construction stage, valued at about $ 1000000 it is A 57 Km long 66,000 volt Transmission line. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

BATCHELOR SUBSTATION PROJECT - 22 KV ALUMINIUM XLPE CABLES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Batchelor Substation to Mine Site via, Batchelor, NT 0845. This type is 22kv Cable - Supply & Deliver with Private ownership. Supply and delivery of 500 cubic metres of 22 kV Aluminium XLPE Cable. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - POWERLINE EXTENSION
A project in the NSW Within Broken Hill. The construction of the 10 km powerline extension will be one package. Click for more details...

MOUNT PLEASANT COAL PROJECT - HIGH VOLTAGE POWER LINES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at 3km West of, Muswellbrook, NSW 2333. This type is Power Lines with Private ownership. For the provision of high voltage power lines for the mine site. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - HIGH VOLTAGE ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Switchyard/Substation/Transmission Lines type of New development. Construction of a 132KV high voltage switchyard & associated transmission lines. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

PILBARA ELECTRICAL INFRASTRUCTURE REPLACEMENT PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Tom Price, Paraburdoo & Channar Mines via, Dampier, WA 6713 for New. Major upgrades to electrical & control systems infrastructure at Rio Tinto Pilbara mines including Tom Price, Paraburdoo & Channar. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - 33KV POWERLINE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The East Pilbara Council Area of Distribution Overhead Powerline - 33kv type. A contract for the design, supply & construction of a 33kV distribution overhead line. Part of the Yandi Sustaining Project involving upgrades of lines from the existing 220kV switchyard & new sections of powerlines. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - POWER/PIPELINE/CABLE RELOCATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Power/Pipeline/Cable - Relocation type. For the provision of power, pipeline & cable relocation. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect