List of Transmission lines/towers, switching yards, transformers, substations, cabling Projects in NSW


REDBANK II POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Kurri Kurri to Redbank II site near Bulga mine complex,, Singleton, NSW 2330 of Transmission Lines - Construction & Upgrading type of New development. 132 kv transmission line from Redbank 2 power plant site (near Bulga Coal Mine) to an existing 132kV transmission line on the Putty Rd (5km); uprating of existing 132kVtransmission line from the existing Redbank 1 power plant to Kurri Kurri substation and replacement of an existing overhead earth wire from Kurri Kurri to the VAW aluminium smelter. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo currently at Construction stage. The main infrastructure requirements at the mine site include a High Voltage power supply. 66 kv transmission line. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - POWERLINE EXTENSION
A project in the NSW Within Broken Hill. The construction of the 10 km powerline extension will be one package. Click for more details...

MOUNT PLEASANT COAL PROJECT - HIGH VOLTAGE POWER LINES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at 3km West of, Muswellbrook, NSW 2333. This type is Power Lines with Private ownership. For the provision of high voltage power lines for the mine site. Click for more details...

WILGA PARK COALBED METHANE GAS POWER STATION - UPGRADE GAS POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 7 km west of, Narrabri West, NSW 2390 of Gas Power Station - Upgrade type of New development. The upgrade of the coalbed methane gas power station from 12MW to 40MW. Up to 12, 3 MW gas engine driven generators, subject to gas availability will be installed, with the first underway & expected to be commissioned in June 2009. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - HIGH VOLTAGE ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Switchyard/Substation/Transmission Lines type of New development. Construction of a 132KV high voltage switchyard & associated transmission lines. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

SPRINGVALE COAL OPERATIONS DEWATERING BORE NO 8
Bore Holes/Pumps/Transformers/Switchroom/Tracks/Pipelines New project In The Lithgow Council Area. A project to install an additional 30ML/day dewatering bore (no 8) in a fenced compound. To include construction of 4 dewatering boreholes, each with a submersible pump. A high voltage switchroom & 2 x 11-3.3kV transformers. Installation of a buried water transfer pipeline along with 11kV cables. Upgrade of an access track. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect