State

Categories

Sub Categories

Click Here to Find Current Projects

List of Transmission lines/towers, switching yards, transformers, substations, cabling Projects in QLD


MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

GOONYELLA RIVERSIDE COAL OPERATIONS - EXPANSION PROJECT - 132KV SWITCHING STATION
Off Red Hill Rd 30km north of, Moranbah, QLD 4744 Has Goonyella Riverside Coal Operations - Expansion Project - 132kv Switching Station currently at Construction stage. A project to accommodate the Goonyella Riverside Mine's increase in electrical requirements from 50MW to 93MW by providing access to 132kV transmission capacity. Existing Feeders at the Mornabah-Stony Creek Tee North Goonyella (7122) & Moranbah-Newlands (7155) to loop in & out of the new switchyard atop concrete poles. The switching station to include 2 x 132kV busbars, 8 x 132kV double circuit breaker bays, 2 x 132kV capacitor banks & a 250kVA emergency diesel generator. Civil works expected to include site clearance & levelling, drainage, fencing, installation of cable trench & a site wide earthing mat. Buildings to include 2 demountables for a bay control building (14 x 3.2m) & communications building (7 x 3.2m) as well as a 9 x 9m, slab on ground storage shed with metal walls & roof. Up to 30 construction personnel & a similar number for the following electrical fit-off expected during the 1 year project. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

GROSVENOR COAL PROJECT ELECTRICAL SYSTEMS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project for New development. A contract for the design, engineering, testing & project commissioning of an integrated automation & electrification system to control all processes & power systems. To include a 66kV substation, power & distribution transformers. Modular pre-fabricated switchrooms equipped with medium voltage switchgear & low voltage power control centres & multi-drive variable speed drives. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

CARMICHAEL COAL PROJECT - HV POWER TRANSMISSION LINE
From near COLLINSVILLE to mine site 140km northwest of CLERMONT, ., QLD 4999 Has Carmichael Coal Project - Hv Power Transmission Line currently at Construction stage. Construction of a 240km long high voltage line from Powerlink's Strathmore substation near Collinsville to the proposed Galilee North substation located on the Moray Downs pastoral lease & 3km east of the Carmichael coal mine site. To comprise a 275kV double circuit with an initial capability of 35MW & an eventual capacity of 400-500MW & connected to the Powerlink Queensland Transmission Grid. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at ., Curtis Island, QLD 4680. This type is Distribution Transformer Install/Commissioning with Private ownership. For the provision of Distribution transformer installation & commissioning for the Surat North Upstream QCLNG Project Phase 2. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect