BEGA & EDEN SEWER MAINS
Bega &, Eden, NSW 2551 Has Bega & Eden Sewer Mains currently at Construction stage. The works comprise the in-situ relining of approx 1,940m sewer mains & pipe bursting of approx 600m of sewer mains in Bega & Eden. Click for more details...

HENDERSON LANDFILL SITE - LEACHATE TREATMENT PLANT & CELL CAPPING
Public Utilities (Treatment plants, Sewerage reticulation) project In The Cockburn Council Area of Leachate Treatment Plant/Cell Capping - Consultancy Services type. Provision of consultancy services for upgrading or provision of new leachate treatment plant facility, impermeable cover over Cell 3, Stage 1 of Cell 4 & construction of Cell 5. Click for more details...

GRANTVILLE SEWERAGE SCHEME
A project in the VIC Within Bass Coast. Approx 4,750 m of 300 mm, 225 mm & 150 mm dia sewers. Click for more details...

.
City of Wyndham, Werribee, VIC 3030 Has . currently at Tenders & Building stage. Construction of approx 400 Lm of 225 mm dia. reticulation sewer. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
Electrical & Control Works For Rokeby Waste Water Treatment Plant project, Rokeby, TAS 7019 in the Public Utilities (Treatment plants, Sewerage reticulation). Supply of materials and construction of electrical and control works. Click for more details...


Currently at the Construction stage In Renmark-Paringa is a project estimated to be $ 300000. This project Stages 3-8: miscellaneous works. Click for more details...

BRIDGETOWN WASTEWATER TREATMENT PLANT
Bridgetown Wastewater Treatment Plant is currently at the Construction stage, valued at about $ 1500000 it is Design, construct, test, commission, operate & maintain wastewater treatment plant. Click for more details...

SOUTHERN EFFLUENT PIPELINE
Pipeline New project In The Port Macquarie-Hastings Council Area. proposed development of an effluent disposal pipeline. Click for more details...

KWINANA WATER RECLAMATION PROJECT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Kwinana Council Area of State ownership. It is proposed to further treat secondary waste water from Woodman Point Wastewater Treatment Plant to quality suitable for use as high grade industrial processing water by industries in Kwinana industrial area (to include Hismelt, Tiwest, CSBP & Edison Mission Energy). Proposal includes construction of reverse osmosis treatment plant on BP's site in Kwinana, together with connecting pipelines to Kwinana industries initially taking around 6 ML/day of industrial wastewater from specified participating industries that presently discharge into Cockburn Sound back into Sepia Depression Ocean Outlet for discharge 4 km offshore. Click for more details...

REDLAND HOSPITAL REDEVELOPMENT
Public Utilities (Treatment plants, Sewerage reticulation) project at Wellington Rd, Cleveland, QLD 4163 of Early Works Package type of New development. 14 week contract period. Click for more details...

NORTH CANBERRA EFFLUENT TREATMENT PLANT
Currently at the Planning stage In Act is a project estimated to be $ 20000000. This project Upgrade of treatment plant in 2 stages, first with capacity 20Ls, & later doubling capacity to 40L/s. Click for more details...

TINGHA SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Guyra Council Area of Sewerage type. Construction of a modified gravity sewerage scheme for the township of Tingha. Click for more details...

LIVINGSTONE SHIRE COUNCIL - YEPPOON SEWERAGE TREATMENT PLANT
Aeration System For Sewerage Treatment Plant New project In The Rockhampton Regional Council Area. Diffused aeration system for proposed sewerage treatment plant. Click for more details...

BATHURST SEWAGE TREATMENT PLANT AUGMENTATION - STAGE 2A & 2B
Currently at the Construction stage In Bathurst is a project estimated to be $ 15026000. This project Upgrade of inlet works bypass line, abandonment of trickling filter plant, conversion of EAT tanks to intermittent bio-P removal tanks (conversion of EAT 1 has been completed), new primary flow divider, 2 new intermittent bio-P removal of 15,000 EP capacity each, aerated WAS holding tank (700 cu m), catch ponds including lining, chemical dosing facilities as a backup, UV disinfection unit, soil bed & oxygen injection works for odour & septicity control, pipework, new screening facility. Click for more details...

PINE CREEK POWER STATION
Currently at the Construction stage In Katherine Town is a project estimated to be $ 56000. This project Day to day operations & maintenance of power station, water & sewer systems. Click for more details...

MISSION BEACH SEWERAGE SCHEME
Currently at the Construction stage In Cassowary Coast Regional is a project estimated to be $ 14000000. This project Sewerage reticulation & collection system (including lift stations, pump stations & rising mains) to the three main catchments: Mission Beach, Wongaling Beach & South Mission Beach. Click for more details...

TANGENTYERE COUNCIL SEWERAGE CONTRACT
A project in the NT Within Alice Springs Town. Construction of gravity sewers at Ilpara, Karnte & Anthepe. Construction of 3 no pump stations & rising mains. Click for more details...

STOCKTON TO SHORTLAND WWTW SEWERAGE TRANSPORTATION SYSTEM
Stockton to Shortland WWTW Sewerage, Shortland, NSW 2307 Has Stockton To Shortland Wwtw Sewerage Transportation System currently at Tenders & Building stage. Sewer odour & corrosion control for a period of 5 years. Click for more details...

BEGA VALLEY SEWERAGE TREATMENT PLANT
Wolumia Village, Bega, NSW 2550 Has Bega Valley Sewerage Treatment Plant currently at Planning stage. Construction of a sewerage treatment plant to service the Wolumia Village, sewerage reticulation system, reuse of treated wastewater to irrigate the Recreation Reserve with surplus water to be piped to an existing water storage facility. Click for more details...

THE EDGE RESIDENTIAL ESTATE - SEWERS & DRAINAGE
Sewerage/Drainage Infrastructure For Subdivision - Part B project at North of Russell Rd, Success, WA 6164 In The Council Area Of Cockburn of Private. Thomsons Lake Branch Sewer sections 2 & 3, South Jandakot Branch Drain Section 1 Success, Part B from end of Part A to Branch Circus. Works comprise connection of work completed under Part A to existing sewerage & drainage infrastructure, Water Corporation proposes to extend major sewer & drainage infrastructure comprising approximately 805 m of 750 mm & 25 m of 1,050 mm diameter main sewer, together with 862 m of 1,200 mm diameter main drain. Click for more details...

TONGALA WASTEWATER MANAGEMENT FACILITY
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Watson Road, Tongala, VIC 3621. Sinclair Knight Merz on behalf of Goulburn Valley Water invite contractors to tender for construction of a 100ML earthen storage, with an external footprint of 195m x 240m, including construction of up to 30,000m3 of earthen embankment, 600mm thick clay liner, inlet/outlet structure, access tracks and on farm works at the RCW Reuse Site, construction of a concrete inlet screening and flow splitting structure at Tongala WMF,and a 520m pipeline including road and G-MW drain crossing connecting the two sites. Click for more details...

SUNBURY WASTEWATER PURIFICATION PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Sunbury, VIC 3429 of Purification Plant - Upgrade "package One" type of New development. Upgrade works at Sunbury Wastewater Purification Plant include construction of two tertiary sedimentation tanks, a relift pump station with 1000 L/s capacity; an additional filter and the design and construction of sludge scrapers and a flocculation unit. Click for more details...

SUBIACO WASTEWATER TREATMENT PLANT
Currently at the Tenders & Building stage In Subiaco is a project estimated to be $ 100000. This project Works to comprise of refurbishment of Subiaco's Wastewater Treatment Plants laboratory. Click for more details...

SHIRE OF BUSSELTON - PEEL TERRACE SEWER WORKS
Peel Tce, Busselton, WA 6280 Has Shire Of Busselton - Peel Terrace Sewer Works currently at Construction stage. Works to comprise of construction of sewer, stormwater drainage & car park at Peel Tce, Busselton. Click for more details...

KALGOORLIE-BOULDER GRAVITY SEWERS
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Various areas within City of, Kalgoorlie, WA 6430. Replacement of approx 1500 lineal metres of sewer main at 4 locations within City of Kalgoorlie-Boulder. Click for more details...

WESTERN SYDNEY RECYCLED WATER INITATIVE - REPLACEMENT FLOWS PROJECT
Consultancy For Contract Management Services project at Lot 1 Links Rd (DP223888, DP31810 & DP803832), St Marys, NSW 2760 in the Public Utilities (Treatment plants, Sewerage reticulation). The Project involves the construction and operation of an Advanced Water Treatment Plant (AWTP) and associated works. Existing tertiary effluent from St Marys, Penrith and Quakers Hill STPs will be transferred to and treated at an AWTP located at St Marys, producing up to 50 million litres per day of highly treated recycled water. The recycled water will be substituted, as replacement flows, for water that is currently released from Warragamba Dam for extraction and river health purposes. Click for more details...

LAWSON VILLAGE TOWN CENTRE
Water/Sewer - Relocation New project In The Blue Mountains Council Area. This tender is for reconstruction/relocation of water & sewer services. The overall project will involve the ultimate demolition of all of the highway frontage shops between Staples Street & New Street, the re-subdivision of the land, the construction of new local public road infrastructure. This work will require all basic services including water, sewer, electrical reticulation & street lighting to be replaced/upgraded Click for more details...

HARTMAN DRIVE SEWER RAISING MAINS
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Wanneroo Council Area for Renovations, Refurbishments etc. development. Relocation/replacement of sewer rising mains. Click for more details...

COOMBABAH WASTEWATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Coombabah, QLD 4216 of Wastewater Treatment Plant - Refurbishment Of Steelwork type of New development. Rehabilitate the internal metal works at existing Clarifier D and existing DAF Tank No 2. Click for more details...

RAAF BASE SALE EAST REDEVELOPMENT
Training Facilities/Air Traffic Control Tower project at RAAF Base, Sale East Raaf, VIC 3852 in the Public Utilities (Treatment plants, Sewerage reticulation). Redevelopment of existing Base facilities including; 180 accommodation units, physical fitness training facilities, air traffic control facilities, services infrastructure upgrades, chapel and community support facility, commercial facilities, security fencing, 25m firing range and passive security works and bore water treatment plant. Click for more details...

MANILLA SEWER MAINS
in, Manilla, NSW 2346 Has Manilla Sewer Mains currently at Tenders & Building stage. Rehabilation of sewer mains in-situ relining. Scope of work includes design, supply & installation of lines for the following sewer mains - 4,200m x 150mm diameter sewers & 1,350m x300mm diameter sewers. Click for more details...

STUBBS TERRACE RETICULATION INSTALLATION STAGE 1
Currently at the Construction stage In Subiaco is a project estimated to be $ 200000. This project Supply & installation of reticulation along Stubbs Tce, Daglish. Stage 1 works include the installation of all mainline & lateral lines associated with valves 11, 12 & 13 as per the specification. Click for more details...

RENMARK STORAGE LAGOON LINING
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Renmark, SA 5341 of Lining For Wastewater Storage Lagoon type of New development. Supply of a lining for a storage lagoon at the Wasterwater Treatment Facility. Click for more details...

WYNDHAM CITY COUNCIL SPORTS RESERVES CIVIL INFRASTRUCTURE WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project at Kookaburra Av, Werribee; off Sneydes Rd, Point Cook & off Ballan Rd, Wyndham Vale, VIC 3024 for New. Civil infrastructure works associated with sports reserves at Glen Orden Primary School (Kookaburra Avenue, Werribee), Innisfail Reserve (off Sneydes Road, Point Cook) and Manor Lakes Reserve (off Ballan Road, Wyndham Vale). Works will include bulk earthworks, construction of utility services, drainage, sewer, sports field construction, irrigation, fencing and associated works. Click for more details...

MOUNT BARKER COMMUNITY COLLEGE - SEWER/RISING MAIN
Woogenellup Rd, Mount Barker, WA 6324 Has Mount Barker Community College - Sewer/Rising Main currently at Construction stage. Works to include the upgrade to the sewer/rising main station comprising of: installation of a new sewer pump/rising main station, adjusting existing sanitary plumbing waste systems, removal & pump out of existing pump stations, septic tanks & leach drains, electrical work associated with new & existing stations. Click for more details...

BUNDABERG WASTERWATER TREATMENT PLANTS
Thebaban &, Gin Gin, QLD 4671 Has Bundaberg Wasterwater Treatment Plants currently at Planning stage. Detailed design for two wasterwater treatment plants. To work in association with contractors & council on associated construction project during its ECI phase of tendering. Click for more details...

HARRINGTON RECYCLED WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Civil works at the recycled water treatment plant.Scope of work includes: civil & structural works comprising demolition, construction, pavement, plumbing/drainage, pipework, equipment installation, painting & signage within the designated work area Click for more details...

TONSLEY PARK REDEVELOPMENT CIVIL ENGINEERING CONSULTANCY
Consultancy For Civil Engineering Design New project In The Marion Council Area. Engineering design for all civil construction including site remediation & minor demolition; road & footpath reconstruction & new road & footpath construction; stormwater management including Water Sensitive Urban Design works; new & replacement sewer drainage; potable & non-potable water supply & headworks; common service trench including tri-generation fluid reticulation network & pit & pipe for communications services & electrical works including electrical networks & the undergrounding of existing cables. Click for more details...

SEWERAGE PROJECTS KINGSTHORPE GOWRIE JUNCTION & WESTBROOK
Public Utilities (Treatment plants, Sewerage reticulation) New project at Kingsthorpe, Gowrie Junction &, Westbrook, QLD 4350. This type is Sewerage Projects with State ownership. Construction of sewerage reticulation for part of the town of Kingsthorpe. Construction of sewerage reticulation for part of the town of Gowrie Junction. Design & construction of sewerage reticulation for part of the town of Westbrook. Click for more details...

EPPING NORTH TANK 2 STAGE 2
Tank Works - Stage 2 project at Bindts Rd, Wollert, VIC 3750 in the Public Utilities (Treatment plants, Sewerage reticulation). Design & construction of the 12 megalitre Epping North potable water tank no. 2. Click for more details...

HORIZON BOULEVARD F179 BRANCH SEWER CONSTRUCTION
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Horizon Bvd, Greenvale, VIC 3059. Construction of 1.5 km, 375 mm dia sewer main & staged subdivision reticulation sewer, located Horizon Boulevard, Aspect Estate, Greenvale. Click for more details...

PALM ISLAND WATER & SEWER TREATMENT PLANTS UPGRADE
Water Treatment & Sewer Treatment Plants - Upgrade project at ., Palm Island, QLD 4816 in the Public Utilities (Treatment plants, Sewerage reticulation). Upgrade of water & sewer infrastructure to increase capacity of water & sewer treatment plants to accommodate the increasing population on Palm Island. Click for more details...

ALICE SPRINGS PLUMBING & HYDRAULIC MAINTENANCE & REPAIRS
Public Utilities (Treatment plants, Sewerage reticulation) project at Located Within, Alice Springs, NT 0870 for New. Repairs & maintenance works to the plumbing & drainage assets of the Northern Territory Government in the Alice Springs Region. To include hydraulic services, hydronic boilers, roof plumbing, sewer & septic waste disposal systems. Electric, gas, solar & hot water systems & associated works. Cyclic maintenance works at Alice Springs Prison, Araluen Arts Centre, Alice Springs Desert Park, Alice Springs Telegraph Station & Cannellan Community Health Centre. Click for more details...

MUSWELLBROOK SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Scope of work includes: Removal of sludge & specified earthworks at Muswellbrook Sewage Treatment Plant sludge pond 1. Click for more details...

SOMERSBY BALANCE TANKS
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Somersby, NSW 2250. This type is Pac Plant with Local Govt ownership. Construction of a Powdered Activated Carbon (PAC) Unloading, storage & dosing system at the Somersby Balancing Tanks site. The PAC system will provide additional pre-treatment upstream of the existing water treatment system at the Somersby Water Treatment Plant. Click for more details...

CRESCENT HEAD & GLADSTONE SEWAGE TREATMENT PLANTS
Inlet Works project at Crescent Head &, Gladstone, NSW 2440 in the Public Utilities (Treatment plants, Sewerage reticulation). Supply, installation, performance testing & commissioning of both the Crescent Head & Gladstone sewage treatment plant inlet works. Scope of work comprises: fine screens, screening press & washing with auto bagging system of screened material & manual bypass screens. Grit removal, grit classification & washing system with auto bagging system of grit material Click for more details...

TOOWOOMBA REGIONAL COUNCIL INSITU SEWER RELINING SYSTEM
Insitu Sewer Relining New project In The Toowoomba Regional Council Area. Supply & installation of an Insitu Sewer Relining System at various locations for Toowoomba Regional Council. Click for more details...

SANDGATE AND LUGGAGE POINT SEWAGE TREATMENT PLANTS
Sewage Treatment Plants New project In The Brisbane City Council Area. Modification & rehabilitation works to STP's. Scope of work includes: Work package A - Sandgate STP; Part A - Inlet works channel concrete wall restoration; repair of the reinforced concrete walls of the grit outlet channel.; Part B - Odour Facility Area Refurbishment; replace the two 15 kW motors that drive the odour control fans; paint all of the odour control piping, the scrubber, the stack and the reactor vessel; paint all of the odour control facility bunds & replace the four manhole covers in the odour control facility delivery area; Part C - Polymer Batching tank replacement; replace the polymer batching tank with a new tank; paint the existing tank baseframe; relocate the switchboard that is currently welded to the Polymer batching tank; install a new low-level non-slip platform adjacent to the polymer transfer pump & install new pipe supports to replace the ones that are currently supported off the tank or tank baseframe. Work package B - Luggage Point STP - Part A: MF Feed & Reverse Flow Systems; new automatic priming system for MF Feed pumps; new MF Feed pipe flushing valve & piping; replace the 2 reflux valves downstream of the MF Reverse flow pumps; Part B: MF & RO skids; install new (free-issued) MF membranes on 3 MF skids; install new (free-issued) RO membranes on two RO skids; install new positioners on the butterfly valve actuators; Part C: Product Water transfer system; product water suction priming System; product water flowmeter; two new Product Water Transfer Pumps (Provisional Item); new surge tank level control valve; Part D: chemical dosing area; replace the 2 hypochlorite dosing pumps for the product water; apply protective coating to all chemical bunds; repair the doors on all of the chemical dosing pump enclosures; Part E: lighting & lightning protection; lighting study & lightning protection study Click for more details...

WAHGUNYAH WATER TREATMENT PLANT
Renovations, Refurbishments etc. project of Public Utilities (Treatment plants, Sewerage reticulation) project at In, Wahgunyah, VIC 3687. Works to include installation of an additional treatment step at the Wahgunyah Water Treatment Plant in the form of floccation/clarification & Dissolve Air Flotation (DAF) to the existing filters. To include design & construction of the floccation & DOF process, extension of the existing building, additional caustic dosing system, modification to raw water supply pipework & existing chemical dosing systems, replacement of existing compressed air station & PLC/SCADA software configuration. Click for more details...

JOHN GILBERT WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Macquarie St, Dubbo, NSW 2830. Electrical upgrade works at John Gilbert Water Treatment plant Click for more details...