State

Categories

Sub Categories

Click Here to Find Current Projects

List of Treatment plants, Sewerage reticulation Projects in NSW


TAMWORTH COUNCIL AREAS SEWER MAINS
Sewer Mains - Rehabilitation Renovations, Refurbishments etc. project In The Tamworth Council Area. The works include the design, supply & installation of liners in the following sewer mains within Tamworth City: length approx 150mm dia 2000 metres; 225mm dia 200 metres. Click for more details...

INTEGRAL ENERGY
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Not Yet Determined Council Area for New development. Provision of an Oil Treatment Plant. Click for more details...

ORIENT POINT/ST GEORGES BASIN & BERRARA SEWER
Sewer - Rehabilitation project at various within Shoalhaven Council areas, ., NSW 2999 in the Public Utilities (Treatment plants, Sewerage reticulation). Sewer rehabilitation work comprises: cleaning & removing all foreign matters & roots from sewer mains & provide visual inspection of the internal condition of sewer mains using CCTV prior to commencement of works. Excavate sewer dead ends to receive liner. Install, connect & cure suitable liners to 150 & 225mm dia existing sewer mains as designated. Remote, cutting of existing services, re-establish all manholes affected by installation procedure & seal around outside of liner at all manholes & junctions. Supply of CCTV inspection of completed sewer mains & record of junction location & rectification of all above ground areas. Click for more details...

JERVIS BAY TERRITORY SEWERAGE TREATMENT PLANT
various within, Jervis Bay, NSW 2540 Has Jervis Bay Territory Sewerage Treatment Plant currently at Tenders & Building stage. JBTA 2004-001 the contract is for the operation of the existing sewerage system at Jervis Bay. This system includes pump stations, reticulation & the sewage treatment plant. The contractor will be responsible for all routine maintenance of the infrastructure, supply of materials including power, water & chemicals & ensuring that performance standards are maintained. Click for more details...

YARRANGOBILLY CAVES SEWERAGE SCHEME
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Snowy Mountain Hwy, Yarrangobilly Caves, NSW 2720. Design, development & construction of sewage collection & treatment facilities. Click for more details...

TRANSGRID
A project in the NSW Within Blacktown. Construction of new mixed use office building. The scope of works includes: construction of a new open carpark for 70 cars adjacent to the existing carpark; demolition of existing amenities building and construction of new mixed use building, including associated site preparation works by excluding workstations and loose furniture; Provision of and or augmentation of external site services associated with the new works such as electrical, hydraulic, fire services, security and communication services and in particular provision of new electrical supply to the building and provision of new sewerage treatment plant; demolition of existing workshop building adjacent to Oil Treatment shed, including associated works to Oil Treatment shed and construction of paved hardstand area in the space released; refurbishment of an existing building wing (System Ops Wing); landscaping, fencing, external works and completion; temporary works in connection with the above and commissioning and provision of 'As-Constructed' documentation Click for more details...

WAUCHOPE SEWAGE AUGMENTATION
Electrical Works project at Wauchope Sewage Treatment Works, Wauchope, NSW 2446 in the Public Utilities (Treatment plants, Sewerage reticulation). Design, manufacture, supply & installation of electrical works. Click for more details...

FORMER ALLIED FEEDS SITE
Public Utilities (Treatment plants, Sewerage reticulation) New project at 42 Walker St, Rhodes, NSW 2138. This type is Roadworks/Utilities with Private ownership. Construction of roads, footpaths, provision of water, sewer, electricity, gas, telecommunications, street lighting, stormwater drainage, installation of sedimentation & erosion control. Click for more details...

MOSS VALE SEWER RETICULATION
Renovations, Refurbishments etc. project of Public Utilities (Treatment plants, Sewerage reticulation) project at various within, Moss Vale, NSW 2577. Rehabilitation of approx 470 metres of sewermain using 160mm PN 8 & 6.3 medium density polyethylene & reconnection of house services, using trenchless pipebursting technologies. Click for more details...

MITTAGONG SEWERAGE
A project in the NSW Within Wingecarribee. Design & construct of new pump station & rising main for irrigation of golf course. Click for more details...


Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The North Sydney Council Area for New development. Construction of approx 85 m of 1,050 mm, 20 m of 900 mm, 18 m of 600 mm & 17 m of 450 mm dia reinforced concrete pipeline & associated works. Click for more details...

CAMDEN HAVEN RIVER SEWAGE PUMPOUT FACILITY
Camden Haven & Mill St, Laurieton, NSW 2443 Has Camden Haven River Sewage Pumpout Facility currently at Construction stage. Construction of sewage pumpout system for boats including a slop hopper, associated equipment & a rising main pipeline to an existing manhole at Laurieton Fishermans Co-Operative Wharf. Click for more details...

CULLARIN GUNNING HUME HWY BYPASS
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Hume Hwy 20 3 km to 32 575 km South of, Goulburn, NSW 2580. 12 km of earthworks, drainage & associated works. Click for more details...

BATHURST SEWAGE TREATMENT PLANT AUGMENTATION - STAGE 2A & 2B
Currently at the Construction stage In Bathurst is a project estimated to be $ 15026000. This project Upgrade of inlet works bypass line, abandonment of trickling filter plant, conversion of EAT tanks to intermittent bio-P removal tanks (conversion of EAT 1 has been completed), new primary flow divider, 2 new intermittent bio-P removal of 15,000 EP capacity each, aerated WAS holding tank (700 cu m), catch ponds including lining, chemical dosing facilities as a backup, UV disinfection unit, soil bed & oxygen injection works for odour & septicity control, pipework, new screening facility. Click for more details...

WHITTON SEWERAGE
Sewerage New project In The Leeton Council Area. Reticulation system, conventional or modified gravity. Transfer system, comprising 1.2 km main, transfer pumping station. Click for more details...

WASTE TRANSFER STATION
Currently at the Construction stage In Port Stephens is a project estimated to be $ 1600000. This project Erection of a waste transfer station for acceptance of solid waste, recyclables, building & demolition waste , white goods, green waste. Click for more details...

GOROKAN C8 RISING MAIN
Rising Main New project In The Wyong Council Area. Construction of remedial works including a barometric loop at Charmhaven STW complete with a valve pit & energy dissipation pit, & an air release valve installation at CH492 in Chelmsford Rd, Charmhaven. Click for more details...

SOUTH WEST ROCKS WATER SUPPLY
Public Utilities (Treatment plants, Sewerage reticulation) project at Spencerville Industrial Area, South West Rocks, NSW 2431 of Water Filtration System type of Addition development. Design & construct a membrane filtration water treatment plant. Click for more details...

MARDI DAM
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 1 Old Maitland Rd (DP 2111747), Mardi, NSW 2259. The Gosford Wyong Councils' Water Authority has identified the need to increase its capacity to deliver water from the Mardi Water Treatment Plant to its water distribution system. It is proposed to affect this increase in capacity by upgrading a number of components of its existing headwork system, including; (a) Spillway bridge, roadworks and Spillway; (b) New Transfer System from Mardi Dam to Mardi Water Treatment Plant: Including a new Inlet Tower, inlet channel, raw water pipeline, transfer pump station and associated works & (c) New High Lift Pump Station: Involving a new Pump Station at Mardi Water Treatment Plant to deliver treated water to the Gosford & Wyong Systems. Also includes High Voltage Power Ring Main and other associated works. (d) Mardi to Mangrove pump station. (e) Tuggerah diversion pipeline. Click for more details...

PERISHER RANGE SEWERAGE AUGMENTATION
., Perisher Valley, NSW 2624 Has Perisher Range Sewerage Augmentation currently at Construction stage. Construction of sludge storage facility at Perisher Sewage Treatment Plant. Click for more details...

SINGLETON COUNCIL AREA SEWERS
Public Utilities (Treatment plants, Sewerage reticulation) project for Renovations, Refurbishments etc. development. Deep sewer repairs & rehabilitation services in the Singleton residential area for a period of 5 years with an option to extend for a period of 2 years. Click for more details...

MILTON SEWERAGE EXTENSION
Addition project of Public Utilities (Treatment plants, Sewerage reticulation) project at Corks Lane and Valley View Close, Milton, NSW 2538. Construction of new sewerage pumping station, extension of existing sewer rising main & extension of gravity sewer, upgrade of stormwater storage at SPS site. Click for more details...

NARRANDERA SHIRE COUNCIL AREA SEWERS
Narrandera Shire Council Area Sewers is currently at the Tenders & Building stage, valued at about $ 100000 it is Supply & installation of 8 sewer vent shafts. Click for more details...

BEGA VALLEY SEWERAGE TREATMENT PLANTS
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at for Cobargo, Kalaru &, Candelo, NSW 2550. Proposed installation of sewerage treatment works to service new low-pressure sewerage systems in the villages of Cobargo, Kalura & Candelo. Click for more details...

BEGA MERIMBULA EDEN & BERMAGUI SEWER MAINS
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at within Bega Merimbula Eden &, Bermagui, NSW 2546. This type is Sewer Mains - Rehabilitation with Local Govt ownership. In-situ relining & pipe bursting of approx 3km sewer main in Bega, Merimbula, Eden & Bermagui. Click for more details...

BOWRAL & MITTAGONG SEWER MAIN
Public Utilities (Treatment plants, Sewerage reticulation) project at various within Bowral &, Mittagong, NSW 2575 for Renovations, Refurbishments etc.. Trenchless rehabilitation of sewer mains in Bowral & Mittagong. The work will consist of the trenchless rehabilitation of approx 2063 metres of 150mm vitreous clay & concrete sewer mains & the rehabilitation of 68 house service connections in Bowral & Mittagong. Click for more details...

RANDWICK CITY COUNCIL
Public Utilities (Treatment plants, Sewerage reticulation) project for Supply & Install development. Supply & installation of gross pollutant traps within Randwick LGA for a period of 5 years. Click for more details...

SYDNEY WATER - SEWER & STORMWATER FACILITIES
Public Utilities (Treatment plants, Sewerage reticulation) project at various within NSW, ., NSW 2999 for Renovations, Refurbishments etc.. The removal of silt & other debris from sewer & stormwater facilities as necessary to maintain the sewerage & stormwater systems at their maximum capacity. Click for more details...

WINGECARRIBEE SHIRE COUNCIL WATER & SEWER MAIN REHABILITATION
within the Wingercarribee Shire region, Bowral, NSW 2576 Has Wingecarribee Shire Council Water & Sewer Main Rehabilitation currently at Construction stage. Rehabilitation of various water & sewer main infrastructure throughout the Shire. The tender is divided into 4 schedules: Schedule 1 - water main rehabilitation - trenchless:2120 meters, various sizes, Schedule 2 - Water main rehabilitation - Open trench (relocation) 588 meters, 100mm, Schedule 3 - Sewer main rehabilitation - Trenchless (pipe bursting) 2004 meters, 150mm & Schedule 4 - Sewer main rehabilitation - Trenchless (relining) 690 meters, 150mm Click for more details...

SYDNEY SEAWATER DESALINATION PLANT
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Sutherland Council Area for New development. Design packages for a 500ML/day reverse osmosis desalination plant & ancillary work consisting of tunnels, ocean intakes & outlets, inlet screens & seawater pumping station, pre-treatment & potabilisation treatment, architectural, drinking water delivery pumping station & marine & land pipes. Works will include landscaping & rehabilitation of the site. The scope of work includes: placement of 60,000 cubic metres of concrete; installation of 9,000 tonnes of reinforcing steel; fabrication & construciton of 3,000 tonnes of structural steel; supply & installation of more than 3,000 mechanical items; 150,000 cubic metres of earthworks; construction of more than 16kms of pipework; supply & installation of 200 pumps & installation of more than 480kms of electrical cables & 94 kms of data cables Click for more details...

GOSFORD CITY COUNCIL
Consultancy For Engineering - Water/Sewerage New project In The Gosford Council Area. Professional engineering consultants experienced in the water industry to assist Council's Water & Sewerage Directorate in the project delivery of water & sewerage capital works over the next 2 years. Click for more details...

PERISHER SEWAGE TREATMENT PLANT
Sludge Dewatering project at within Perisher, Perisher Valley, NSW 2624 In The Council Area Of Snowy River of State. Annual sludge dewatering contract. Click for more details...

BAYSWATER POWER STATION
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Muswellbrook Council Area for New development. Upgrade of the Bayswater Power station Wastewater Treatment Plant. The upgrade will increase the salt removal capacity of the existing plant resulting in water conservation & greater efficiency & capacity in power generation. The upgrade consists of the following components: upgrade of the existing lime softening plant and installation of new dosing systems; installation of new plant associated with the existing brine concentrator units; and upgrade of the waste brine disposal system. Click for more details...

CASELLA WINES
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 2 Whitton Stock Route, Yenda, NSW 2681. Construction of a new effluent treatment plant & reuse area. The development will also include the following components, a covered anaerobic lagoon, a sequencing batch reactor, storage lagoons, sludge dewatering, plumps, electrolyte dosing & pivot irrigators. Click for more details...

BUDGEWOI BEACH DESALINATION PLANT PROJECT NOW INCLUDED IN PROJECT ID 665577
A project in the NSW Within Wyong. Proposed construction of a mobile desalination plant to produce between 1 to 3 megalitres of water per day. Click for more details...

EUROBODALLA SHIRE WATER TRANSFER SYSTEM DOUBLE ENTRY REFER TO ID 554456
Public Utilities (Treatment plants, Sewerage reticulation) project at from Moruya River to Deep Creek Dam, Moruya, NSW 2537 for New. Construction of anew water transfer pipeline - 600ns- from Moruya river to Deep Creek Dam capable of transferring 36ML/day Click for more details...

NORTH GEORGES RIVER SUBMAIN SEWER
North Georges River Submain Sewer is currently at the Construction stage, valued at about $ 5000000 it is Internal rehabilitation of approximately 7.35km of large trunk sewer at 12 sites including surface preparation, internal protective coating, silt removal & new access chambers. The work is to be divided into 4 sections: Milestone 1 ? Box section of about 1.8km from Site 1 in Arncliffe to Site 6 in Riverwood at the following locations:- Site 1 from MH33A at Brennans Road, Arncliffe to MH39 at Eve Street Merging Chamber, Arncliffe (about 0.48km); Site 2 from MH24 at Catherine Street, Rockdale to Subway Road, Rockdale (about 0.23km); Site 3 from MH11A to MH13 at River Road, Oatley (about 0.23km); Site 4 from MH10 to MH11 near Acacia Street, Oatley (about 0.09km); Site 5 from MH6 at Roberts Avenue, Mortdale to MH9A at Fairway Avenue, Mortdale (about 0.28km) & Site 6 from MH1 at Salt Pan Creek Aqueduct, Riverwood to MH4A at Johnston Street, Riverwood (about 0.49km). Milestone 2 ? Box section of about 1.75km from Site 7 to Site 8 both in Padstow at the following locations: Site 7 from MH45A near Adelaide Road to Salt Pan Creek Aqueduct, Padstow (about 0.56km) & Site 8 from MH39 at Mackenzie Road, Padstow to Alice Street, Padstow (about 1.19km); Milestone 3 ? 2x1.8m diameter pipe section of about 0.2km at Site 9 at Salt Pan Creek Aqueduct, Padstow & Milestone 4 ? 2.5m diameter pipe section over 3 sites of about 3.6km from Condell Park to Lansdowne at the following locations: Site 10 from MH36 at Edgar St, Condell Park to 220m upstream of MH34 within easement on Leighton property at Edgar Street, Condell Park (about 420m); Site 11 from MH28 at Allingham Street, Condell Park to MH26 at Birch St, Condell Park (about 220m) & Site 12 from MH24 at Balmoral Crescent, Georges Hall to MH9A at Edith Street, Lansdowne (about 2960m). Scope of work common to all four Milestones 1 to 4 involves:-Preparation of documentation including Quality Plan, Inspection & Test Plan, Construction Program, Pre-construction Property Survey, Environmental Management Plan, Incident Management Plan, Safety Management Plan and Traffic Management Plan; Development of Communication Procedures and its implementation, in respect of communication with local residents, government authorities and Sydney Water; Implementation of Environmental Safeguards; Site Establishment; Provision of all confined spaces measures including access, ventilation and flow monitoring necessary to facilitate the internal rehabilitation; Construction of new access shafts or modification of existing manholes to improve access and provide ventilation to the sewer; Setup, operation and maintenance of odour control units supplied by Principal; Removal of any silt and debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; Cleaning and surface preparation of internal concrete surfaces of the sewer and lower areas of manhole chambers; Internal repairs as shown on the Contract Drawings and detailed in the specification; Management and control of infiltration through the roof and walls of the sewer during the repair work; Application of a protective coating system on the internal surfaces of the sewer access chambers and at penetrations for new access shafts; Replacement of step irons and platforms at the bottom of access chambers; Coordination with Sydney Water, the local authorities and the adjoining property owners to implement the rehabilitation; Site restoration and permanent restoration of disturbed areas & Disestablishment of site. Click for more details...

GUNNEDAH & LIVERPOOL PLAINS SHIRE COUNCILS SEWER PIPELINES
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for New development. Rehabilitation of sewer main pipelines for Gunnedah Shire Council & Liverpool Plains Shire Click for more details...

ELAMBRA ESTATE - STAGE 7
Electrical/Sewer Main Works New project In The Kiama Council Area. Installation of electrical reticulation & street lights & relocation of existing substation. Construction of water & sewer main extension. The scope of work involves the construction of approximately 1000 m of urban road with 1075 lin meter of sewer mains & 1170 lin metre of water mains & associated structural components. Click for more details...

THE GREEN SQUARE TOWN CENTRE WATER REUSE PROJECT
Green Square, Zetland, NSW 2017 Has The Green Square Town Centre Water Reuse Project currently at Construction stage. Stage 1 consists of the design, construct & commission of infrastructure & includes works as follows: source water supply take-off & collection; pre-treatment & delivery of source water for processing; treatment of source water & delivery to storage; storage tanks, as required, to mitigate risk at various stages of the scheme; water quality, flow monitoring & response systems; delivery & service reticulation to GSTC & provision of appropriate system redundancies. Stage 2 consists of the provision of operate, maintain & administer services Click for more details...

SYDNEY WATERCARRIER & SUBMAINS WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Marrickville Council Area of Sewer Mains - Rehabilitation type. Scope of work involves: internally rehabilitate the Main Western Carrier (MWC) along selected sections including 3 special structures & internally rehabilitate the Eastern Branch Submain (EBS) along selected sections. Click for more details...

HUNTER WATER GRAVITY SEWER MAINS
Public Utilities (Treatment plants, Sewerage reticulation) project at various locations in Lake Macquarie, Maitland, Cessnock, Port Stephens, Dungog, Singleton &, Newcastle, NSW 2300 for New. Rehabilitation of gravity sewer mains by the installation of lining systems to restore structural integrity, prevent infiltration or exfiltration, eliminate root ingress and/or restore the hydraulic capacity of the sewermain. The gravity sewer mains to be rehabilitated will be up to a maximum nominal diameter of 450mm. Scope of wokr includes: design, supply & installation of structural lining systems for the full length between Access Chambers. Lining systems used locally to patch an isolated defect. Junction sealing. Access Chamber rehabilitation. Associated civil works. Restoration of disturbed surfaces. Click for more details...

WILLOUGHBY CITY COUNCIL STORMWATER WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project at various locations in the Willoughby City Council area, Chatswood, NSW 2057 for New. Stormwter rehabilitaiton, relining & repairs. Works to occur over a 4 year period. Click for more details...

ORAN PARK STORMWATER FACILITIES
A project in the NSW Within Camden. Construction of stormwater facilities with landscaping & open space Click for more details...

PARKES WATER TREATMENT PLANT
A project in the NSW Within Parkes. Construction of a water treatment plant. The Water Treatment Plant will utilise a coagulation, clarification & filtration process and include chemical storage and dosing systems, clarifiers, three gravity filters, sludge and wastewater handling systems and plant buildings. A new 2.7ML clear water tank will also be constructed next to the new water treatment plant. The exact location of the clear water tank will be decided during the detailed design stage. A separate 2.7ML (High Level Reservoir) reservoir located at a higher location north-east of the new water treatment plant may also be built to supply water to high level areas. Three sludge lagoons will be built on site to handle the sludge generated at the WTP. The backwash wastewater will be recycled through the WTP process. Click for more details...

ASTROLABE PARK
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Cook Av, Daceyville, NSW 2032. Scope of work broadly involves: detailed design and construction of twin 2100mm diameter concrete pipes, special outlet configuration to the wetlands & other minor works. Detailed design & construction of two gross pollutant traps. Demolition & removal of existing gross pollutant traps. Cap & sand/cement filling of the existing box culverts. Detailed geotechnical investigations, detailed design and construction of in stream wetland berms, earthworks & wetland planting. Site restoration including Golf Course restoration & reconstruction of existing Council access road. Ancillary Golf Course landscape & access works and site restoration. Decommissioning of failed & redundant box culverts, outlet structures & GPTs Click for more details...

NORTH WEST GROWTH CENTRE STORMWATER - PACKAGE E
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Blacktown Council Area for New development. Riverstone & Alex Avenue 2014-15 Package E. The stormwater management infrastructure to be delivered will generally include: detention basins; rain gardens/bio-retention systems; gross pollutant traps; open vegetated channels & riparian corridors; culvert crossings; piped trunk drainage systems. The stormwater management design will need to be coordinated with adjoining road, open space reserve and urban development designs. Click for more details...

KINCUMBER SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Design, fabrication, supply, installation & testing of civil & mechanical plant for the Internal Reuse Plant at Kincumber Sewage Treatment Plant Click for more details...

BOGGABILLA TO TOOMELAH WATER SUPPLY TRANSFER SYSTEM
Water Supply Transfer System project at Toomelah to, Boggabilla, NSW 2409 in the Public Utilities (Treatment plants, Sewerage reticulation). Construction & commissioning of the Boggabilla to Toomelah Water Supply Transfer System. Scope of work includes: construction of approximately 1.8 km of DN200 new supply main from the river intake to the Boggabilla water treatment plant. Construction of a new 2 x 11 kW (1 duty & 1 standby) transfer pump station at the Boggabilla water tank compound to supply water from Boggabilla to Toomelah. Construction of a new 2 x 11 kW (1 duty & 1 standby) transfer pump station at Toomelah to supply water from Toomelah to Boggabilla. Construction of approximately 15.3 km of DN100 new transfer main from the Boggabilla water tank compound to the Toomelah tank compound. Commissioning of both transfer pump stations & 1.8 km of DN200 new supply main from the river intake to the Boggabilla water treatment plant (WTP) as well as the 15.3 km of DN100 new transfer main from the Boggabilla water tank compound to the Toomelah tank compound. Click for more details...

MOULAMEIN WATER TREATMENT PLANT
Water Treatment Plant - Upgrade New project In The Wakool Council Area. Conversion of the Moulamein water treatment plant (WTP) to a pentair membrane based system. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect