BEGA & EDEN SEWER MAINS
Bega &, Eden, NSW 2551 Has Bega & Eden Sewer Mains currently at Construction stage. The works comprise the in-situ relining of approx 1,940m sewer mains & pipe bursting of approx 600m of sewer mains in Bega & Eden. Click for more details...

SEWAGE TREATMENT PLANTS (30) - maintenance
Public Utilities (Treatment plants, Sewerage reticulation) project at various sites, ., NSW 2999 for Renovations, Refurbishments etc.. 2 packages of work involving 10 coastal & 20 inland plants. Services include cleaning of equipment, tanks, lagoons etc. Contract is for 3 years, with 2 + 2 extension option. Click for more details...

TARALGA SEWERAGE SCHEME
Lots 200, 245, 248 & Part Lot 194 DP750017, Taralga township, Taralga, NSW 2580 Has Taralga Sewerage Scheme currently at Construction stage. Proposed sewerage rising main alignment & sewage treatment works. Works under this contract include the supply & construction of approximately 12km of sewer main & 184 maintenance shafts, sewerage pumping station & 270m rising main, construction of 1.2ML storm flow storage pond & 16ML effluent storage dam Click for more details...

TRANSGRID
A project in the NSW Within Blacktown. Construction of new mixed use office building. The scope of works includes: construction of a new open carpark for 70 cars adjacent to the existing carpark; demolition of existing amenities building and construction of new mixed use building, including associated site preparation works by excluding workstations and loose furniture; Provision of and or augmentation of external site services associated with the new works such as electrical, hydraulic, fire services, security and communication services and in particular provision of new electrical supply to the building and provision of new sewerage treatment plant; demolition of existing workshop building adjacent to Oil Treatment shed, including associated works to Oil Treatment shed and construction of paved hardstand area in the space released; refurbishment of an existing building wing (System Ops Wing); landscaping, fencing, external works and completion; temporary works in connection with the above and commissioning and provision of 'As-Constructed' documentation Click for more details...

WARRINGAH COUNCIL
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at various within Warringah Council areas, Warringah Mall, NSW 2100. Investigation, public consultation, design, project management of a range of services to assist in the development, coordination & implementation of a works program. Projects include storm water drainage facilities; traffic & parking; parks, sports fields & reserves & streetscape improvement. Click for more details...

DALGETY WATER PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Dalgety, NSW 2628 of Water Treatment Plant type of New development. Provision of a water treatment plant at the Dalgety Water Pumping Station which is to provide treated water up to 350kl/day to NHMRC requirements. Existing facilities consist of a well, pumps & chlorination plant. Click for more details...

ARNOTTS BISCUIT FACTORY
Public Utilities (Treatment plants, Sewerage reticulation) project at Cnr Huntingwood Dr & Horsley Rd, Huntingwood, NSW 2148 of Factory/Offices/Treatment Plant type of New development. Proposal involves the relocation of all biscuit production facilities currently located at Homebush. Construction of new factory,offices,carparking,extension to warehouse docks & wastewater treatment plant Click for more details...


Currently at the Tenders & Building stage In Greater Taree is a project estimated to be $ 100000. This project Work consists of various minor main extensions &/or replacements for a variety of pipe diameters identified during 1995. Lengths may vary from 0 to 500 m for 150 mm dia up to 375 mm dia. Pipe material may consist of DI, VC or UPVC. Contract period from 1 January 1997 to 30 June 1998. Click for more details...

NORTH/WEST & SOUTH/EAST AREA SEWER/STORMWATER INSPECTION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of Sewer/Stormwater Conduits Inspection type. The CCTV inspection of sewer & stormwater conduits in SWC's North/West & South/East areas of operation for a two year period with option to extend a further 3 years. Click for more details...


Wastewater Treatment Plants - Minor Works Renovations, Refurbishments etc. project In The Greater Taree Council Area. Minor works at Council's Wastewater Treatment Plants (WWPT'S) from 1 July 1998 to 30 June 2000 including: Part A - remove dried sludge & sand filter layer, clean, prepare asphaltic surface & place 25 mm layer of filter sand to Council's WWTP sludge drying beds. Part B - transport wet biosolids from Taree to Dawson WWTP. Part C - slash grassed areas at Dawson, Taree & Old Bar WWTP's. Part D - transport dewatered biosolids to stockpile. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) New project at Midcoast Water area, NSW 2998. This type is Sewer Mains with Local Govt ownership. Construction of sewer reticulation mains. The works consists of various minor main extensions &/or replacements for a variety of pipe diameters identified during period. Lengths may vary from (zero) 0 to 500 m for 150 mm dia up to 375 mm dio. Pipe material may consist of DI, VC or uPVC. Click for more details...

NORTHERN SHOALHAVEN WATER SUPPLY AUGMENTATION
Public Utilities (Treatment plants, Sewerage reticulation) project, Bamarang, NSW 2540 for New. Water treatment plant augmentation from 60 ML/D to 75 ML/D. Design development & construction of lime dosing system, CO2 dosing, minor civil works & associated mechanical, electrical & telemetry work & pipework. Click for more details...

BOOTAWA WATER TREATMENT PLANT - CONTRACT 2
Public Utilities (Treatment plants, Sewerage reticulation) project In The Greater Taree Council Area of State ownership. Bootawa treatment plant upgrade to increase the plants capacity to 60 m/day is being procured under 3 separate contacts . This Expressions of Interest relates to Contract 2, which includes works such as design of building reservoirs, pipework, pump upgrades associated with the plant Click for more details...

MILLTHORPE SEWERAGE SCHEME
Sewerage Scheme project at Millthorpe, Blayney, NSW 2799 In The Council Area Of Blayney of Local Govt. Construction of augmentation to Blayney Sewerage Treatment Plant & pumping station at Millthorpe. Click for more details...

PERISHER RANGE SEWERAGE AUGMENTATION
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Perisher Valley, NSW 2624 of Catch/Balance Pond type of New development. Work includes: concrete lined pond on site of existing pond; roadworks; inlet/outlet structures & pipework, pumping station including building, mechanical & electrical equipment & associated works. Click for more details...

RECYCLING TRANSFER STATION
A project in the NSW Within Fairfield. Proposed establishment of a road materials recycling transfer station Click for more details...

COLLEX WASTE WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Parramatta Council Area of Factory - Altns & Addns type. Expansion of existing liquid treatment plant. Click for more details...

CONJOLA LAKE REGIONAL SEWERAGE SCHEME
200 km south of (Conjola Lake Area), Lake Conjola, NSW 2539 Has Conjola Lake Regional Sewerage Scheme currently at Construction stage. Construction of a wastewater collection & transportation system. Click for more details...

SOUTH WEST ROCKS WATER SUPPLY
Public Utilities (Treatment plants, Sewerage reticulation) project at Spencerville Industrial Area, South West Rocks, NSW 2431 of Water Filtration System type of Addition development. Design & construct a membrane filtration water treatment plant. Click for more details...

PICTON HIGH SCHOOL
Sewer - Renewal project at Lot 2 Remembrance Driveway (DP520158), Tahmoor, NSW 2573 in the Public Utilities (Treatment plants, Sewerage reticulation). Sewer renewal. Click for more details...

CHITTAWAY POINT SEWER MAIN
A project in the NSW Within Wyong. Construction of gravity sewer main, pump station & rising main. Click for more details...

MILTON SEWERAGE EXTENSION
Addition project of Public Utilities (Treatment plants, Sewerage reticulation) project at Corks Lane and Valley View Close, Milton, NSW 2538. Construction of new sewerage pumping station, extension of existing sewer rising main & extension of gravity sewer, upgrade of stormwater storage at SPS site. Click for more details...

SOUTHERN & WESTERN SUBURBS OCEAN OUTFALL SYSTEM (SWSOOS)
A project in the NSW Within Various. Design, supply, install & commission 6 chemical dosing units for SWS005 System at SPS 41, SPS 64, SPS 91, SPS 323, SPS 384 & SPS 969. The work includes: preparation of pre-construction property survey report. Preparation of quality plan, inspection & test plan, construction program, environmental management plan, safety management plan & traffic management plan. Establishment of site, site clearning, excavation, works on access roads, demolition or coring into brickwork/concrete for penetration, concrete works, electrical works, mechanical/chemical dosing unit & IICATS, disestablishment of site & site restoration. The contract period for the work is 30 weeks. Click for more details...

NARRANDERA SHIRE COUNCIL AREA SEWERS
Narrandera Shire Council Area Sewers is currently at the Tenders & Building stage, valued at about $ 100000 it is Supply & installation of 8 sewer vent shafts. Click for more details...

BOWRAL & MITTAGONG SEWER MAIN
Public Utilities (Treatment plants, Sewerage reticulation) project at various within Bowral &, Mittagong, NSW 2575 for Renovations, Refurbishments etc.. Trenchless rehabilitation of sewer mains in Bowral & Mittagong. The work will consist of the trenchless rehabilitation of approx 2063 metres of 150mm vitreous clay & concrete sewer mains & the rehabilitation of 68 house service connections in Bowral & Mittagong. Click for more details...

HUNTER WATER CORPORATION'S WASTEWATER TREATMENT WORKS
various, ., NSW 2999 Has Hunter Water Corporation's Wastewater Treatment Works currently at Tenders & Building stage. Grounds maintenance at HWC's WWTW for a 3 year period. Click for more details...

WOOLLAMIA INDUSTRIAL ESTATE
Public Utilities (Treatment plants, Sewerage reticulation) project at Woollamia Industrial Estate, Woollamia, NSW 2540 for New. Construction of a wet well sewer pumping station & 270 metres of rising main. Click for more details...

BRUNGLE SEWAGE TREATMENT PLANT
Sewage Treatment Plant/ Effluent Transfer Station project at ., Brungle, NSW 2722 In The Council Area Of Tumut of State. Design, construction, testing & commissioning of Brungle Sewerage Treatment plant & effluent transfer system. The plant nominal capacity shall be 167 EP (Biological & Hydraulic). Initial loading is anticipated to be 158 EP. Suitable sewage treatment processes are to be considered & proposed. The processes may include continuous or intermittent activated sludge process or enhanced treatment/polishing systems such as submerged membrane bioreactors or variations therof. Effuent discharge pipeline, directionally drilled or equivalent under Nimbo Creek to the Tumut River, require outlet structure at the Tumut river Click for more details...

WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 17 Hindman St (DP788589), Port Macquarie, NSW 2444. Proposed construction of a reclaimed water treatment plant & associated facilities. The 2 storey building will be consist of concrete block, fibre cement sheeting & colourbond roofing. Parking, landscaping & fencing. Click for more details...

GOSFORD CITY COUNCIL WATER & SEWER
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at within Gosford City Council area, Gosford, NSW 2250. Construction of water & sewer reticulation mains in Gosford & its surrounding areas. Click for more details...

SHOALHAVEN SEWER RAHABILITATION WORKS DOUBLE ENTRY REFER TO PROJECT ID 941019
Currently at the Tenders & Building stage In Shoalhaven is a project estimated to be $ 1200000. This project The work comprises, rehabilitation report prior to commencement of works. Excavate sewer dead ends or lampholes to receive liner. Excavate, repair or replace broken/collapsed pipes & house service junction to receive liner. Install, connect & cure suitable liners for full & patch lining g to existing sewer mains as designated. Remove cutting of liner to re-instate existing services, re-instate all manholes affected by installation procedure & seal around outside of liner at all manholes & house service junctions. Supply of CCTV inspections of completed sewer mains & record of junction location in a MPEG-1 format directly recorded to a USB hard drive (USB hard drive to be supplied by contractor) linked to WinCan Version 7.5 or above through a Microsoft access project file & hard copy rehabilitation report & rectification of all above ground areas. Click for more details...

DORA CREEK WASTEWATER TREATMENT PLANT (WWTW)
Marconi Rd, Morisset, NSW 2264 Has Dora Creek Wastewater Treatment Plant (Wwtw) currently at Construction stage. Dora Creek WWTW - construction of new inlet works, new septage receival facilities, new soil bed filter, new switch room; 2 new 26.5m diameter secondary clarifiers; modification of the existing aeration tanks; new pump stations; all associated mechanical & electrical equipment; new access roads; demolition & removal of various buildings/structures; site rehabilitation & landscaping & design/development & construction of screenings & grit handling systems Click for more details...

AUSTRALIAN EQUINE & LIVESTOCK EVENTS CENTRE (AELEC)
Currently at the Construction stage In Tamworth is a project estimated to be $ 100000. This project Construction of a water recycling plant. The works include the supply of all materials, plant, equipment & labour required for the construction of a colorbond clad shed of minimum clear floor area of 45 sqm to house a water treatment plant/pump station. The water recycling plant will consist of a priming tank, pumpset, filter, UV disinfection system, pressure accumulator tanks & associated pipework & electrical equipment. Click for more details...

DUNGOG CLEAR WATER TANK
Treatment Plant - Tank project at off Short St, Dungog, NSW 2420 In The Council Area Of Dungog of State. Construction is required for the following:Clear Water Tank/s (Options for 1 x 30ML CWT or 2 x 15ML CWTs will be considered. For clarity only the 1 x 30ML option is referred to in this specification). Pipelines including all associated valving. Approximately 380m of pipework and fittings from the existing clear water tank (CWT1) inlet pipeline connection to the new CWT (CWT2), (DN1200 Straight pipe lengths shall be Principal Supplied). Approximately 210m of pipework & fittings from the new reservoir to the CTGM connection, (DN1200 Straight pipe lengths shall be Principal Supplied). Approximately 160m of common overflow/scour pipework from CWT2 to the existing plant overflow pipework system. Approximately 38m of overflow pipework from the WTP delay tank to the stormwater pit. Access Roads. Modifications to existing chemical dosing systems. All associated Electrical & PLC works. All associated earthworks. All associated civil works. Other works required under this contract include but not limited to:Testing, pre-commissioning & commissioning; preparation of O&M manuals, and work as executed (WAE) information; Provision of training to HWC/HWA operators and maintenance staff & site restoration. Click for more details...

JOE WHITE MALTINGS WATER TREATMENT PLANT
Water Treatment Plant project at 15-17 Gunnedah Rd, Taminda, NSW 2340 In The Council Area Of Tamworth of Private. Construction of a new advanced water treatment plant for Joe White Maltings Click for more details...

SHOALHAVEN HEADS SEWERAGE SCHEME
Shoalhaven Heads Sewerage Scheme is currently at the Construction stage, valued at about $ 1500000 it is The works comprise provision of construction management services for upgrading the existing Shoalhaven Heads Wastewater Treatment Plant, including contract administration, site surveillance & technical support services Click for more details...

WAGGA WAGGA WATER TREATMENT PLANT
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Wagga Wagga Council Area for New development. Replacement of the existing water treatment plant. Design development, construction & commissioning of the new 55 ML/d (net) Wagga Wagga Water Treatment Plant comprising: river water intake pumping station. Coagulant, lime, carbon dioxide, & polymer dosing systems. Coagulation, flocculation and clarifications systems (three possible options). Inclined plate settlers. Actiflo & reactivator clarifiers. Dual media gravity filtration & backwash system. Washwater handling & mechanical sludge dewatering. Gaseous chlorine disinfection system. Clear water tank. Clear water pumps. All associated civil, mechanical, pipework & electrical equipment. Control & monitoring systems for a fully automatic plant operation. Testing, demonstration & commissioning of the plant. Click for more details...

MASSEY PARK STORMWATER
Public Utilities (Treatment plants, Sewerage reticulation) project In The Canada Bay Council Area of Stormwater Pipes - Rehabilitaton type. Rehabilitate 850 metres x 1350?1500 mm diameter corrugated steel stormwater pipes at Massey Park. Relining of 5 x 300mm to 900 mm stormwater pipes at various locations. Click for more details...

BOURKE WATER SUPPLY
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Bourke, NSW 2840 for New. Construction of a Bore Water Transfer System from Walkdens Bores to the Bourke Water Treatment Plant (WTP). Scope of work includes: Walkdens Bores headwork, cooling system, bore water storage tank, pump/electrical/chlorine building, high lift pumps, chlorine dosing system, connections to Bourke WTP including installation of valves on existing bore water rising main. Click for more details...

JOHN MORONY CORRECTIONAL CENTRE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Penrith Council Area of State ownership. Upgrade of sewer treatment plant, gas & stormwater Click for more details...

CBD LANEWAYS
A project in the NSW Within Sydney. Hosking Pl & Penfold Ln improvements project. Scope of work includes: install new high quality, slip resistant paving. New kerb & gutter, repairs to existing kerb & gutter, relocation of existing trachyte. Raising the carriageway threshold of Hosking Pl to the existing footpath levels. Raising pedestrian crossing/driveway threshold of Hosking Pl at Pitt St. Installation of upgraded public domain lighting & special in-ground lighting. Installation of interpretive inlays into paving matrix. Upgrade of existing stormwater Click for more details...

MAITLAND 14 WASTE WATER PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Maitland Council Area of Waste Water Pumping Station type. Upgrade to the Maitland 14 Waste Water pumping station. Scope of work includes but is not limited to: construction of new wet well. Supply & installation of 2 submersible pumps. Supply & installation of electrical switchboards, VSDs & elevated switchroom. Supply of HV electrical infrastructure including power supply upgrade. Supply of LV electrical infrastructure. Carry out cut in to existing system. PLC/SCADA supply, installation & programming. Earthworks & landscaping. Remediation works of existing wet well including installation of new pump pedestals. Remediation of finished landform Click for more details...

PALERANG COUNCIL PHOTOVOLTAIC SYSTEMS
Photovoltaic Systems project at Various locations in Palerang Council, Bungendore, NSW 2621 In The Council Area Of Palerang of Local Govt. Design, supply, install & commission photovoltaic systems at 9 council sites. Locations include: Bungendore Sewage Treatment Works; Bungendore Council Office Building; Bungendore Community Centre; Currandooley Water Treatment Plant; Braidwood Sewage Treatment Works; Braidwood Water Treatment Plant; Captains Flat Water Treatment Plant; Captains Flat Sewage Treatment Works; Bungendore Clear Water Pumping Station. Click for more details...

CANIABA ST SEWER PUMP STATION
A project in the NSW Within Lismore. Design & construction of new sewer pump station & rising main to cater for duty flow of 24L/s at 36m head. Click for more details...

URBAN WATER MAINS
Public Utilities (Treatment plants, Sewerage reticulation) New project at Webb & Lorking St, Parkes, NSW 2870. This type is Water Main - Augmentation with Local Govt ownership. Design, development & construction of the Urban Water Mains Augmentation (UWMA). Scope of work comprises the construction of new raw water & treated water pipework between existing augmentation points within the Parkes reticulation & both the existing and new water treatment plans (WTP). The augmentation points are located throughout Parkes town. The new WTP is located near the cnr Webb St & Lorking St. Click for more details...

GUNNEDAH WASTE FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Gunnedah, NSW 2380 for New. Construction of leachate & surface water controls & ancillary works at the Gunnedah Waste Management Facility. Click for more details...

WOY WOY SEWAGE TREATMENT PLANT
Sewage Treatment Plant - Repairs New project In The Gosford Council Area. Repairs to clarifiers. Replacement of aerator baffle. Scope of work includes supply & delivery of all materials, plant, equipment & labour required for the construction, installation, testing & commissioning of the works. Associated works & incidental sundry components necessary for the complete execution of the works & for the proper operation of the installation. Click for more details...

BOGGABILLA TO TOOMELAH WATER SUPPLY TRANSFER SYSTEM
Water Supply Transfer System project at Toomelah to, Boggabilla, NSW 2409 in the Public Utilities (Treatment plants, Sewerage reticulation). Construction & commissioning of the Boggabilla to Toomelah Water Supply Transfer System. Scope of work includes: construction of approximately 1.8 km of DN200 new supply main from the river intake to the Boggabilla water treatment plant. Construction of a new 2 x 11 kW (1 duty & 1 standby) transfer pump station at the Boggabilla water tank compound to supply water from Boggabilla to Toomelah. Construction of a new 2 x 11 kW (1 duty & 1 standby) transfer pump station at Toomelah to supply water from Toomelah to Boggabilla. Construction of approximately 15.3 km of DN100 new transfer main from the Boggabilla water tank compound to the Toomelah tank compound. Commissioning of both transfer pump stations & 1.8 km of DN200 new supply main from the river intake to the Boggabilla water treatment plant (WTP) as well as the 15.3 km of DN100 new transfer main from the Boggabilla water tank compound to the Toomelah tank compound. Click for more details...

DUBBO SEWERS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Rehabilitation of various sewers located within Dubbo Regional Council. The specifications of sewers involved are: 40 sewer mains that are 150mm in diameter, totalling 1916m in length. 3 sewer mains that are 225mm in diameter, totalling 172m in length. 1 sewer main that is 375mm in diameter, totalling 13m in length. Click for more details...

MOSS VALE SEWERAGE TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Kennedy Cl, Moss Vale, NSW 2577. Replacement of step screening equipment & construction of trench at Moss Vale Sewerage Treatment Plant. Click for more details...