List of Treatment plants, Sewerage reticulation Projects in NSW


SEWAGE TREATMENT PLANTS (30) - maintenance
Public Utilities (Treatment plants, Sewerage reticulation) project at various sites, ., NSW 2999 for Renovations, Refurbishments etc.. 2 packages of work involving 10 coastal & 20 inland plants. Services include cleaning of equipment, tanks, lagoons etc. Contract is for 3 years, with 2 + 2 extension option. Click for more details...

BUNDANOON SEWERAGE AUGMENTATION
Bundanoon Sewerage Augmentation is currently at the Early Planning stage, valued at about $ 3000000 it is Proposed upgrading of the Bundanoon sewerage system including a new aeration tank, chemical phosphorous removal facilities, tertiary filtration & ultraviolet light disinfection. Provision of an effluent storage & pipeline to allow reuse of approximately 40% of the effluent volume estimated to be produced in 2031. Release of the excess higher quality effluent into Reedy Creek. Click for more details...

EDEN & TURA BEACH SEWAGE TREATMENT WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project at Eden & Tura Beach, Bega, NSW 2550 of Inlet Works Screening type of New development. Construction & installation of inlet works screening. Click for more details...

SOUTHERN EFFLUENT PIPELINE
Pipeline New project In The Port Macquarie-Hastings Council Area. proposed development of an effluent disposal pipeline. Click for more details...

MATHOURA SEWERAGE TREATMENT PONDS
Lot 2 Picnic Point Rd (DP33539), Mathoura, NSW 2710 Has Mathoura Sewerage Treatment Ponds currently at Planning stage. Proposed construction of sewerage treatment ponds, security fencing. Click for more details...

YARRANGOBILLY CAVES SEWERAGE SCHEME
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Snowy Mountain Hwy, Yarrangobilly Caves, NSW 2720. Design, development & construction of sewage collection & treatment facilities. Click for more details...

ILLAWARRA WATER QUALITY PROJECT
Water Treatment Plant project at Reddalls Rd, Kembla Grange, NSW 2526 in the Public Utilities (Treatment plants, Sewerage reticulation). Water treatment plant, associated tunnels, pipelines & pumping station. Supply Illawarra area with fully filtered water & Port Kembla industrial area with unfiltered water. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) project In The Port Macquarie-Hastings Council Area of Local Govt ownership. Proposed grease trap and aqueous waste recycling facility, depot facilities, roadworks/intersection at junction of Oxley Highway & Kingfisher Rd. Click for more details...

NORTH/WEST & SOUTH/EAST AREA SEWER/STORMWATER INSPECTION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of Sewer/Stormwater Conduits Inspection type. The CCTV inspection of sewer & stormwater conduits in SWC's North/West & South/East areas of operation for a two year period with option to extend a further 3 years. Click for more details...

JAMBEROO SEWERAGE SCHEME
Sewerage System project at Northern Illawarra Towns &, Jamberoo, NSW 2533 In The Council Area Of Kiama of Local Govt. Construction of sewerage system by way of connection to the Bombo sewerage system. Click for more details...

MULGOA WALLACIA & SILVERDALE SEWERAGE FACILITY
Sewerage Treatment Plants/Pipelines project at Mulgoa, Wallacia & Silverdale, Wallacia, NSW 2745 In The Council Area Of Liverpool of Local Govt. Provision of reticulated sewerage system including pumping stations mainly below ground, new sewerage treatment plant off Nortond Rd, transfer pipelines, a treatment waste water reuse facility. Click for more details...

GOVERNOR PHILLIP TOWER
Public Utilities (Treatment plants, Sewerage reticulation) New project at 44-56 Young St bnd by Phillip Bent & Bridge Sts, Sydney, NSW 2000. This type is Bulk Earthworks with Private ownership. Bulk earthworks for the two staged commercial development. Click for more details...

COFFS HARBOUR SEWERAGE - DEEP SEA RELEASE
Sewerage Services - Upgrade - Overall project at Mullaway Arrawarra, Woolgoolga, NSW 2456 in the Public Utilities (Treatment plants, Sewerage reticulation). Overall project will be to provide sewerage reticulation to Arrawarra, Arrawarra Headland & Mullaway, expand Woolgoolga treatment plant, upgrade existing sewage treatment facilities to serve Coffs Harbour & Sawtell, construct 41 klm. long transfer pipeline from Arrawarra to Sawtell & storage reservoir near Woolgoolga, construct a 1.5 klm long deep sea release outside the Solitary Islands Marine Park for the discharge of treated wastewater of surplus reclaimed water, close the existing 3 shoreline outlets. Click for more details...

GRIFFITH SEWERAGE TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at ., Yenda, NSW 2681. Supply & installation of an inert covering material to contain odourous & corrosive gases at the inlet work at the head of the Griffith Sewerage Treatment Plant. Supply of all plant/equipment, materials & consumables to carry out the contract. Re cover & seal inlet works with an inert product approved by Griffith Council. Surface preparation of the inlet work to accept the covers. Supply & install covers, supply & install sealant to seal cover to inlet works. Internal environment of Inlet works are to be able to create a negative pressure on covers are sealed to inlet works. Supply 1 off 600 x 600 hinged hatch cover, supply 2 off 500mm wide hinged panels over rising/gravity mains. Supply all labour & materials to complete the works. Clean up & remove all debris from the site Click for more details...

KANGAROO VALLEY SEWERAGE SCHEME
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Shoalhaven Council Area for New development. Construction of a pressure sewer system, treatment facility, reclaimed water storage & associated works to serve Kangaroo Valley. Click for more details...

BATEAU BAY SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Sewage Treagment Plant, Bateau Bay, NSW 2261 for Addition. Upgrade of sewerage pump stations at Killarney Vale, enclosure of existing sediment tanks at Bateau Bay. Click for more details...

TAMWORTH COUNCIL SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project at within Tamworth City, Tamworth, NSW 2340 for New. Insitu Lining of Sewer Mains: The works include the Design, Supply & installation of Liners in the following sewer mains within Tamworth City:- Size: 150 mm diameter - Approximate length: 4,850 m, Size: 225 mm diameter - Approximate length: 285 m, Size: 300 mm diameter - Approximate length: 650 m, Size: 450 mm diameter - Approximate length: 1,145 m. Click for more details...

MITTAGONG SEWERAGE SCHEME
Currently at the Tenders & Building stage In Wingecarribee is a project estimated to be $ 400000. This project Construction of 6 KM of pressurised sewerage system. Construction of minor pump station at Welby.. Click for more details...

CESSNOCK SEWERAGE TREATMENT PLANT
A project in the NSW Within Cessnock. The establishment of a tertiary treatment plant & associated equipment to remove algal cells, other suspended solids, soluble phosphorus & faecal coliforms from the effluent discharged from the existing maturation ponds. Tertiary treatment will enable the plant to comply with suspended solids, algal cell, faecal coliform & phosphorus requirements. The work required under the contract includes: completion of detailed design (as the Contract nominates some equipment & designs); construction; testing, commissioning & process proving; provison of work as executed information, operation & maintenance manuals, & operator training. Design & construction is required for the following: pond pumping station. Pipework & headwalls to enable recirculation of final pond effluent to pond one. 12 ML/day tertiary flotation plant (DAF, IAF or DAF/IAF Hybrid), including polymer dosing system. Dosing pumps & pipework to allow transfer of chemical from the existing chemical dosing facility to the tertiary flotation plant. Approx 455m of sludge return pipeline, sludge lances & sludge storage tank. UV disinfection cell. Effluent quality sampling & flow monitoring infrastructure for EPA licence data collection. building/enclosure. Approx 325m of DN200 reclaimed water pipeline including a 10kL storage tank & duty pump. Approx 525m extension of DN80 watermain & installation of RPZD & flowmeter. Electrical works including conduits & electrical pits. Associated process instrumentation & control equipment including PLC/SCADA control. Site runoff & sediment control. Construction only of the following is required: 2 reinforced concrete causeways between maturation ponds. Approx 240m of pond wall rehabilitation (Type 1: Reno Mattress or Type 2: Rip Rap). Approx 1820 sq m of access road for the tertiary treatment plant. Click for more details...

ALBURY CITY COUNCIL AREAS SEWER MAINS
A project in the NSW Within Albury. Lump sum contract for the rehabilitation of existing sewer mains. Click for more details...

CENTRAL COAST DESALINATION PLANT
Wilfred Barrett Dr, Noraville, NSW 2263 Has Central Coast Desalination Plant currently at Planning stage. Preparation of Environmental Impact Assessment & Development Application for a major water desalination plant to produce 20 megalitres of fresh water per day. Click for more details...

DE BORTOLI WINERY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Griffith Council Area of Private ownership. The proposal is for the construction & operation of infrastructure to facilitate the expansion of grape crush & wine production at the existing De Bortoli winery to accommodate an annual crush volume of 150,000 tonnes of fruit. The proposal includes a new high speed bottling line; additional grape crushers; upgrade of the wastewater treatment system and effluent re-use; additional warehouses for packaging & processing; additional wine storage facilities (tank farms); upgrade of cellar door sales and visitor facilities; refurbishment of administration and bottling facilities; and upgrade of roads, parking & intersections, including Bortoli Rd and Burley Griffin Way. Click for more details...

LAKES BEACH DESALINATION PLANT PROJECT NOW INCLUDED IN PROJECT ID 665577
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Wyong Council Area for New development. Proposed construction of a mobile desalination plant to produce between 1 to 3 megalitres of water per day. Click for more details...

SUNNYBRAND CHICKENS WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Byron Council Area of Water Treatment Plant type. Secondary waste water treatment plant at abattoir. Click for more details...

NORTH GEORGES RIVER SUBMAIN SEWER
North Georges River Submain Sewer is currently at the Construction stage, valued at about $ 5000000 it is Internal rehabilitation of approximately 7.35km of large trunk sewer at 12 sites including surface preparation, internal protective coating, silt removal & new access chambers. The work is to be divided into 4 sections: Milestone 1 ? Box section of about 1.8km from Site 1 in Arncliffe to Site 6 in Riverwood at the following locations:- Site 1 from MH33A at Brennans Road, Arncliffe to MH39 at Eve Street Merging Chamber, Arncliffe (about 0.48km); Site 2 from MH24 at Catherine Street, Rockdale to Subway Road, Rockdale (about 0.23km); Site 3 from MH11A to MH13 at River Road, Oatley (about 0.23km); Site 4 from MH10 to MH11 near Acacia Street, Oatley (about 0.09km); Site 5 from MH6 at Roberts Avenue, Mortdale to MH9A at Fairway Avenue, Mortdale (about 0.28km) & Site 6 from MH1 at Salt Pan Creek Aqueduct, Riverwood to MH4A at Johnston Street, Riverwood (about 0.49km). Milestone 2 ? Box section of about 1.75km from Site 7 to Site 8 both in Padstow at the following locations: Site 7 from MH45A near Adelaide Road to Salt Pan Creek Aqueduct, Padstow (about 0.56km) & Site 8 from MH39 at Mackenzie Road, Padstow to Alice Street, Padstow (about 1.19km); Milestone 3 ? 2x1.8m diameter pipe section of about 0.2km at Site 9 at Salt Pan Creek Aqueduct, Padstow & Milestone 4 ? 2.5m diameter pipe section over 3 sites of about 3.6km from Condell Park to Lansdowne at the following locations: Site 10 from MH36 at Edgar St, Condell Park to 220m upstream of MH34 within easement on Leighton property at Edgar Street, Condell Park (about 420m); Site 11 from MH28 at Allingham Street, Condell Park to MH26 at Birch St, Condell Park (about 220m) & Site 12 from MH24 at Balmoral Crescent, Georges Hall to MH9A at Edith Street, Lansdowne (about 2960m). Scope of work common to all four Milestones 1 to 4 involves:-Preparation of documentation including Quality Plan, Inspection & Test Plan, Construction Program, Pre-construction Property Survey, Environmental Management Plan, Incident Management Plan, Safety Management Plan and Traffic Management Plan; Development of Communication Procedures and its implementation, in respect of communication with local residents, government authorities and Sydney Water; Implementation of Environmental Safeguards; Site Establishment; Provision of all confined spaces measures including access, ventilation and flow monitoring necessary to facilitate the internal rehabilitation; Construction of new access shafts or modification of existing manholes to improve access and provide ventilation to the sewer; Setup, operation and maintenance of odour control units supplied by Principal; Removal of any silt and debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; Cleaning and surface preparation of internal concrete surfaces of the sewer and lower areas of manhole chambers; Internal repairs as shown on the Contract Drawings and detailed in the specification; Management and control of infiltration through the roof and walls of the sewer during the repair work; Application of a protective coating system on the internal surfaces of the sewer access chambers and at penetrations for new access shafts; Replacement of step irons and platforms at the bottom of access chambers; Coordination with Sydney Water, the local authorities and the adjoining property owners to implement the rehabilitation; Site restoration and permanent restoration of disturbed areas & Disestablishment of site. Click for more details...

PERISHER SEWAGE TREATMENT PLANT
Sludge Dewatering New project In The Snowy River Council Area. Sludge Dewatering at Perisher Sewage Treatment Plant with a 2 year contract with an optional one year extension Click for more details...

WINGECARRIBEE SHIRE COUNCIL WATER & SEWER MAIN REHABILITATION
A project in the NSW Within Wingecarribee. Rehabilitation of various water & sewer main infrastructure throughout the Wingecarribee Shire Council area. The tender is divided into 3 schedules. Schedule 1 - Water main rehabilitation - trenchless - 2580 metres, various sizes. Schedule 2 - Sewer Main rehabilitation - trenchless (pipe bursting) 940 metres, 150mm DN. Schedule 3 - Sewer main rehabilitation - trenchless (relining) 1040 metres, 150mm. Click for more details...

AUSTRALIAN EQUINE & LIVESTOCK EVENTS CENTRE (AELEC)
Currently at the Construction stage In Tamworth is a project estimated to be $ 100000. This project Construction of a water recycling plant. The works include the supply of all materials, plant, equipment & labour required for the construction of a colorbond clad shed of minimum clear floor area of 45 sqm to house a water treatment plant/pump station. The water recycling plant will consist of a priming tank, pumpset, filter, UV disinfection system, pressure accumulator tanks & associated pipework & electrical equipment. Click for more details...

DENILIQUIN SHIRE COUNCIL SEWER SYSTEM
A project in the NSW Within Deniliquin. Schedule of rates contract for the rehalibition of the gravity sewer system. The priority area for rehabilitation is either side of and through the CBD area. This comprises approximately 914m of 375mm dia pipe and 706m of 300mm dia pipe with nominally 10 digups ranging in depth from 5 to 7 metres. There will also be some other isolated sections external from this area Click for more details...

EDGEWORTH WASTEWATER TREATMENT WORKS
Aeration System - Upgrade project at off Garth St, Edgeworth, NSW 2285 in the Public Utilities (Treatment plants, Sewerage reticulation). Design, supply, installation & commissioning of an upgrade of the aeration system. This Contract is divided into two Separable Portions as follows: Separable Portion 1: Design development, supply, installation and commissioning of diffusers and associated pipework modifications: The development of the design of the aeration system (blowers, pipework, valves and diffusers) to provide the specified aeration performance. Running a design review workshop to present the outcomes from the design development to the Principal. Develop a P&ID for the aeration system & present it at a workshop. Developing a detailed program of works that minimises the time that the Principal will have an aeration tank out of service and in general reduces impact on the wastewater treatment process and operation of the wastewater treatment plant. Supply & install new air lines & diffuser membranes to provide both an increase in aeration capacity as well as staging the aeration input longitudinal along each tank into 3 aeration zones. Separable Portion 2: Supply, installation & commissioning new and/or modifying existing aeration blowers and associated works: Supply, install & commission new &/or modifying existing aeration blowers to provide increased air flow capacity. Supply, install & commission flowmeters and control valves on the main air line to each aeration tank. Modifications to electrical switchboards required to operate the revised blower arrangement. Any additional electrical & communication wiring required. Modifications to the PLC control system, site SCADA system and Head Office SCADA system to reflect the operation of the new aeration system. Preparation and submission of operations and maintenance manual which includes work-as-constructed information. Click for more details...

PLOUGHMANS CREEK STORMWATER HARVESTING
Public Utilities (Treatment plants, Sewerage reticulation) project In The Orange Council Area of Stormwater Harvesting type. Construct a stormwater harvesting ccheme on Ploughmans Creek in Orange. The Harvesting Scheme will involve re-using stormwater captured from urban run-off, treating and re-using as a potable water supply. Works under this Contract will include the construction of pipelines required to transfer harvested stormwater from the west side of Orange and connect to the holding pond. Click for more details...

BATEMANS BAY SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at George Bass Dr, Surf Beach, NSW 2536 for New. Construction of a stormwater detention pond, UV system, filter systems & reuse infrastructure Click for more details...

GUNNEDAH & LIVERPOOL PLAINS SHIRE COUNCILS SEWER PIPELINES
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for New development. Rehabilitation of sewer main pipelines for Gunnedah Shire Council & Liverpool Plains Shire Click for more details...

KITCHENER & ELLALONG PUBLIC SCHOOLS
Kitchener & Ellalong Public Schools is currently at the Construction stage, valued at about $ 225000 it is Connection of 2 schools to the respective town sewerage systems. Click for more details...

WATERVIEW WASTEWATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at 79 Laboratory Lne, Splitters Creek, NSW 2640. This type is Bio Solids Hopper with Local Govt ownership. Construction of a truck loading hopper for bio solids adjacent to the belt press shed at the Waterview Wastewater Treatment Plant. Click for more details...

FITZPATRICK INDUSTRIAL ESTATE
Fitzpatrick Industrial Estate is currently at the Construction stage, valued at about $ 384000 it is Construction of a bioretention & detention basin to be located on the eastern boundary of the Fitzpatrick Industrial Estate Click for more details...

HORNSBY AQUATIC CENTRE
Public Utilities (Treatment plants, Sewerage reticulation) New project at 203 (Lot 703) Pacific Hwy (DP1157797), Hornsby, NSW 2077. This type is Pool Reticulation/Water Treatment Works with Local Govt ownership. Provision of all pool filtration & water treatment works (PWT) with all its associated pool reticulation/piping systems for the swimming pools & other aquatic features at the proposed new Hornsby Aquatic Centre. For further information please call Council's Project Manager Major Buildings, Mr Raymond Huzij on 02 9847 6902 Click for more details...

HUNTER WATER GRAVITY SEWER MAINS
Public Utilities (Treatment plants, Sewerage reticulation) project at various locations in Lake Macquarie, Maitland, Cessnock, Port Stephens, Dungog, Singleton &, Newcastle, NSW 2300 for New. Rehabilitation of gravity sewer mains by the installation of lining systems to restore structural integrity, prevent infiltration or exfiltration, eliminate root ingress and/or restore the hydraulic capacity of the sewermain. The gravity sewer mains to be rehabilitated will be up to a maximum nominal diameter of 450mm. Scope of wokr includes: design, supply & installation of structural lining systems for the full length between Access Chambers. Lining systems used locally to patch an isolated defect. Junction sealing. Access Chamber rehabilitation. Associated civil works. Restoration of disturbed surfaces. Click for more details...

COCKLE BAY TOWNS SEWERAGE PROJECT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Gosford Council Area of Local Govt ownership. Cockle Bay towns sewerage scheme for approximately 300 properties in Empire Bay, Bensville & Kincumber South. Sewerage scheme will consist of pressure sewer, gravity sewer & a sewerage pumping station Click for more details...

GOSFORD CITY COUNCIL HIGH VOLTAGE ASSETS
Currently at the Construction stage In Gosford is a project estimated to be $ 11591000. This project Replacement of its high voltage assets at Kincumber & Woy Woy sewerage treatment plants & Mooney Mooney & Mangrove Creek water pump stations. Click for more details...

WALLAGA LAKE KOORI VILLAGE
Public Utilities (Treatment plants, Sewerage reticulation) project at Koori Village, Bermagui, NSW 2546 of Sewerage Scheme type of New development. Construction of a pressure sewerage scheme. Scope of works may include: a low pressure sewerage transport system incorporating 8 pressure sewer units located throughout the village to collect sewage from multiple houses. Rising main connection to Bermagui sewerage system for treatment at the Bermagui STP. Decommissioning of the existing septic tanks. Click for more details...

MANGOPLAH WASTE WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at ., Mangoplah, NSW 2652. Construction of a waste water treatment plant Click for more details...

MENINDEE WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Menindee, NSW 2879. This type is Water Treatment Plant - Dosing System with State ownership. Design, supply & construction of a potassium permanganate & ACH chemical dosing system Click for more details...

NUNDLE WATER TREATMENT PLANT
Water Treatment Plant project at Hall St, Nundle, NSW 2340 In The Council Area Of Tamworth of Local Govt. Upgrade of the Nundle Water Treatment Plant Click for more details...

CBD LANEWAYS
A project in the NSW Within Sydney. Hosking Pl & Penfold Ln improvements project. Scope of work includes: install new high quality, slip resistant paving. New kerb & gutter, repairs to existing kerb & gutter, relocation of existing trachyte. Raising the carriageway threshold of Hosking Pl to the existing footpath levels. Raising pedestrian crossing/driveway threshold of Hosking Pl at Pitt St. Installation of upgraded public domain lighting & special in-ground lighting. Installation of interpretive inlays into paving matrix. Upgrade of existing stormwater Click for more details...

MAITLAND 14 WASTE WATER PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Maitland Council Area of Waste Water Pumping Station type. Upgrade to the Maitland 14 Waste Water pumping station. Scope of work includes but is not limited to: construction of new wet well. Supply & installation of 2 submersible pumps. Supply & installation of electrical switchboards, VSDs & elevated switchroom. Supply of HV electrical infrastructure including power supply upgrade. Supply of LV electrical infrastructure. Carry out cut in to existing system. PLC/SCADA supply, installation & programming. Earthworks & landscaping. Remediation works of existing wet well including installation of new pump pedestals. Remediation of finished landform Click for more details...

MUSWELLBROOK WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Skellatar Stock Route, off Denman Rd, Muswellbrook, NSW 2333 for New. Upgrade of clarifier of the Water Treatment Plant Click for more details...

TWEED SHIRE COUNCIL SEWER MAINS REHABILITATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Tweed Council Area of Sewer Mains - Rehabilitation type. Structural rehabilitation of 150-225mm (totaling approximately 6.4km of mains) gravity sewer mains in various locations within the Tweed Shire. Click for more details...

WOY WOY SEWAGE TREATMENT PLANT
Sewage Treatment Plant - Repairs New project In The Gosford Council Area. Repairs to clarifiers. Replacement of aerator baffle. Scope of work includes supply & delivery of all materials, plant, equipment & labour required for the construction, installation, testing & commissioning of the works. Associated works & incidental sundry components necessary for the complete execution of the works & for the proper operation of the installation. Click for more details...

ARMIDALE SEWAGE TREATMENT FACILITY PIVOT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) New project at 631 Cafferies Rd, Armidale, NSW 2350. This type is Pivot Upgrade with Local Govt ownership. Supply and install new pivot control panels, new tower alignment linkage systems and tower box assemblies. Supply and install control valves and panel power supply. Supply and install auto remote start generators. Supply and install remote pivot management. Supply and install new pump control equipment to remotely start and shut off the supply pumps and shut the pumps automatically if the pivots shut down. Supply and install VSD on the electric pump including new control panel if required. Supply and install automatic brushing filters for both pumps. Supply and install self cleaning suction screen for electric pump. Click for more details...