List of Treatment plants, Sewerage reticulation Projects in New South Wales


NORTH HEAD SEWAGE TREATMENT PLANT
North Head Sewage Treatment Plant is currently at the Construction stage, valued at about $ 3000000 it is Design, construction & proving of a 2ML/d recycled water plant. Click for more details...

SEWAGE TREATMENT PLANTS (30) - maintenance
Public Utilities (Treatment plants, Sewerage reticulation) project at various sites, ., NSW 2999 for Renovations, Refurbishments etc.. 2 packages of work involving 10 coastal & 20 inland plants. Services include cleaning of equipment, tanks, lagoons etc. Contract is for 3 years, with 2 + 2 extension option. Click for more details...

CORINDI BEACH SEWERAGE SCHEME AUGMENTATION
Corindi Beach Village, Corindi Beach, NSW 2456 Has Corindi Beach Sewerage Scheme Augmentation currently at Early Planning stage. Proposed upgrade of existing sewerage scheme. Click for more details...

ORIENT POINT/ST GEORGES BASIN & BERRARA SEWER
Sewer - Rehabilitation project at various within Shoalhaven Council areas, ., NSW 2999 in the Public Utilities (Treatment plants, Sewerage reticulation). Sewer rehabilitation work comprises: cleaning & removing all foreign matters & roots from sewer mains & provide visual inspection of the internal condition of sewer mains using CCTV prior to commencement of works. Excavate sewer dead ends to receive liner. Install, connect & cure suitable liners to 150 & 225mm dia existing sewer mains as designated. Remote, cutting of existing services, re-establish all manholes affected by installation procedure & seal around outside of liner at all manholes & junctions. Supply of CCTV inspection of completed sewer mains & record of junction location & rectification of all above ground areas. Click for more details...

JERVIS BAY TERRITORY WATER SUPPLY/TREATMENT PLANT
Jervis Bay Territory Water Supply/Treatment Plant is currently at the Tenders & Building stage, valued at about $ 500000 it is JBTA-2004-002 this contract is for the operation of the existing water supply system at Jervis Bay. This system includes intake works, pump stations, reticulation, reservoirs & water treatment plant. The contractor will be responsible for all routine maintenance of the infrastructure, supply of materials including power, water & chemicals & ensuring that performance standards are maintained. Click for more details...

TWEED SHIRE COUNCIL - BRAY PARK WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Bray Park Water Treatment Plant, Bray Park, NSW 2484. Design of a 100 Ml/day low pressure immersed membrane facility & supply of proprietary membrane equipment & other services during the construction phase. Click for more details...

HYDROMET RECYCLING PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at Lot 3 Five Islands Rd (DP259921), Unanderra, NSW 2526. This type is Recycling Plant with Private ownership. Construction of a spent acid purification & recycling process for spent acid & a waste stream from the oil refinery. Click for more details...


Currently at the Tenders & Building stage In Greater Taree is a project estimated to be $ 100000. This project Work consists of various minor main extensions &/or replacements for a variety of pipe diameters identified during 1995. Lengths may vary from 0 to 500 m for 150 mm dia up to 375 mm dia. Pipe material may consist of DI, VC or UPVC. Contract period from 1 January 1997 to 30 June 1998. Click for more details...

TINGHA SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Guyra Council Area of Sewerage type. Construction of a modified gravity sewerage scheme for the township of Tingha. Click for more details...

GOVERNOR PHILLIP TOWER
Public Utilities (Treatment plants, Sewerage reticulation) New project at 44-56 Young St bnd by Phillip Bent & Bridge Sts, Sydney, NSW 2000. This type is Bulk Earthworks with Private ownership. Bulk earthworks for the two staged commercial development. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Installation and testing of up to approx 2066 metres of 160mm dia and 88 metres of 225mm dia sewer mains and associated works by pipe cracking or similar approved methods. Click for more details...

PRIORITY SEWERAGE PROGRAM
Public Utilities (Treatment plants, Sewerage reticulation) New project at various within Sydney Water area, ., NSW 2999. This type is Sewerage with State ownership. Provision of sewerage services to unsewered towns & villages in the greater Sydney metropolitan area. 12 sewerage schemes make up Stage 1 of the Program, 6 of these are already completed, or in the process of being delivered. The remaining six schemes are at various stages in the planning approval process. Click for more details...

MILTON WATER TREATMENT PLANT
Treatment Plant - Stage 2b 1 project, Milton, NSW 2538 In The Council Area Of Shoalhaven of Local Govt. Works include 10.5ml Water Treatment Plant, Pointer Mountain tank & pipeline, Constant flow valves (4), Telemetry & land matters. Click for more details...

CLERGATE RD SEWERAGE
Currently at the Tenders & Building stage In Orange is a project estimated to be $ 440000. This project Proposed sewerage connection to the eastern boundary of the Clergate Road Industrial Area. 1135m x 450 mm dia HPPE "Black Brute" sewer main, incorporating 14 HDPE pipe & access chambers. Click for more details...

RECYCLING TRANSFER STATION
A project in the NSW Within Fairfield. Proposed establishment of a road materials recycling transfer station Click for more details...

BERRIGAN WATER TREATMENT PLANT
Currently at the Construction stage In Berrigan is a project estimated to be $ 1867000. This project Construction of a new water treatment plant Click for more details...

COROWA WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Corowa, NSW 2646 for New. Modification of existing raw water pumping stations, construction of a new 15 ML/day Water Treatment Plant, construction of new raw, cleanwater, rising mains & of a 5ML reservoir. Click for more details...

ILLAWARRA SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Wollongong Council Area of Microtunnel type. Construction of tunnel with associated sewerage work. Click for more details...

KILLARNEY VALE PUMP STATIONS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Wyong Council Area of State ownership. Construction of new pump stations. Click for more details...

PELICAN SHORES
Sewerage Packaging Plant project at Boorga Boorga Rd, Lake Wyangan, NSW 2680 In The Council Area Of Griffith of Private. Proposed installation of sewerage packaging plant on new residential estate. Click for more details...

JOHN GILBERT WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Dubbo Council Area of Aeration Tower - Refurbishment type. Refurbishment of tower. Click for more details...

BATEAU BAY SEWAGE TREATMENT PLANT
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Wyong Council Area for Renovations, Refurbishments etc. development. Design, manufacture, installation & testing of a manual supply changeover chamber & installation of generator for Bateau Bay Sewage Treatment Plant. Click for more details...

HURSTVILLE COUNCIL PERIOD SERVICES
Engineering Materials/Services Supply & Install project In The Various Council Area. Construction of concrete vehicular crossings, kerb, gutter & paving work. Laying paving blocks. licensed builder/plumber/electrician. Planned preventative & breakdown maintenance of mechanical services (airconditioning). Provision of water treatment services (airconditioning). Click for more details...

CESSNOCK SEWERAGE TREATMENT PLANT
A project in the NSW Within Cessnock. The establishment of a tertiary treatment plant & associated equipment to remove algal cells, other suspended solids, soluble phosphorus & faecal coliforms from the effluent discharged from the existing maturation ponds. Tertiary treatment will enable the plant to comply with suspended solids, algal cell, faecal coliform & phosphorus requirements. The work required under the contract includes: completion of detailed design (as the Contract nominates some equipment & designs); construction; testing, commissioning & process proving; provison of work as executed information, operation & maintenance manuals, & operator training. Design & construction is required for the following: pond pumping station. Pipework & headwalls to enable recirculation of final pond effluent to pond one. 12 ML/day tertiary flotation plant (DAF, IAF or DAF/IAF Hybrid), including polymer dosing system. Dosing pumps & pipework to allow transfer of chemical from the existing chemical dosing facility to the tertiary flotation plant. Approx 455m of sludge return pipeline, sludge lances & sludge storage tank. UV disinfection cell. Effluent quality sampling & flow monitoring infrastructure for EPA licence data collection. building/enclosure. Approx 325m of DN200 reclaimed water pipeline including a 10kL storage tank & duty pump. Approx 525m extension of DN80 watermain & installation of RPZD & flowmeter. Electrical works including conduits & electrical pits. Associated process instrumentation & control equipment including PLC/SCADA control. Site runoff & sediment control. Construction only of the following is required: 2 reinforced concrete causeways between maturation ponds. Approx 240m of pond wall rehabilitation (Type 1: Reno Mattress or Type 2: Rip Rap). Approx 1820 sq m of access road for the tertiary treatment plant. Click for more details...

TABOURIE LAKE SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project at from Burrill Lake to, Tabourie Lake, NSW 2539 for New. Scope of works includes construction of a sewer main from Tabourie Lake Village to the sewage pumping station SPS A including Tabourie Lake bridge crossing; construction of the sewage pumping station SPS A including all necessary infrastructure; construction of chemical dosing facilities at the sewage pumping station; construction of deodorisation bed frailties at the sewage pumping station; construciton of pressure/gravity main from sewage pumping station to Burrill Lake; Telemetry; completion of any design not completed; all necessary connection to existing infrastructures; any ancillary work required for a complete operating system; documentation including designs, Environmental Management Plan, Project OHS Management Plan, WAE drawings, QA documentation and Operations and Maintenance Manuals for the works; Provide video records of construction; testing, demonstration and commissioning of works; training of Shoalhaven Water Operators Click for more details...

CABRAMURRA SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Cabramurra Township, Cabramurra, NSW 2630 of Sewage Treatment Plant type of New development. Design & construct a domestic wastewater treatment plant to an overall concept design to achive EPA specified 'sensitive waters' criteria. Click for more details...

ALBURY CITY COUNCIL AREAS SEWER MAINS
A project in the NSW Within Albury. Lump sum contract for the rehabilitation of existing sewer mains. Click for more details...

SOUTHERN & WESTERN SUBURBS OCEAN OUTFALL SYSTEM (SWSOOS)
A project in the NSW Within Various. Design, supply, install & commission 6 chemical dosing units for SWS005 System at SPS 41, SPS 64, SPS 91, SPS 323, SPS 384 & SPS 969. The work includes: preparation of pre-construction property survey report. Preparation of quality plan, inspection & test plan, construction program, environmental management plan, safety management plan & traffic management plan. Establishment of site, site clearning, excavation, works on access roads, demolition or coring into brickwork/concrete for penetration, concrete works, electrical works, mechanical/chemical dosing unit & IICATS, disestablishment of site & site restoration. The contract period for the work is 30 weeks. Click for more details...

SEWERAGE PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Stanwell Park Reserve, Stanwell Tops, NSW 2508 of Pumping Station type of New development. Proposed demolition of existing amenities building & construction of a new building incorporating a sewerage pumping station. Click for more details...

JERSEYVILLE SEWERAGE SCHEME
Sewerage Scheme New project In The Kempsey Council Area. Proposed installation of an E-ONE low-pressure grinder pump system (LPGP). Click for more details...

SEWERAGE MAIN WORKS
Sewerage Main Works is currently at the Tenders & Building stage, valued at about $ 400000 it is Repair/replacement of sewer mains, junctions, branches & inspection shafts. Contract for a 2 year period with option for an additional 2/1 year extensions. Click for more details...

MULI MULI SEWERAGE SCHEME - DOUBLE ENTRY REFER TO PROJECT ID2208534
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of sewerage reticulation system, pumping station, stormwater drainage network & the replacement of a water supply ring main in Muli Muli Community. Work also involves the construction of rising main to the Woodenbong Township. Click for more details...

GOSFORD CITY COUNCIL
Consultancy For Engineering - Water/Sewerage New project In The Gosford Council Area. Professional engineering consultants experienced in the water industry to assist Council's Water & Sewerage Directorate in the project delivery of water & sewerage capital works over the next 2 years. Click for more details...

KELSO WASTE PROCESSING PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at 11 (Lot 6) Whyalla Cct, Bathurst, NSW 2795. This type is Waste Processing Plant with Private ownership. Construction of a waste processing facility that would accept up to 18,000 tonnes per annum of organic waste such as grease trap waste, liquid food waste from restaurants and industrial waste water (such as water form fuel bunds & truck wash-down facilities). Wastes accepted at the site will be separated by storing wastes in settling tanks until oil components float to the top & can be removed. Click for more details...

WESTERN SYDNEY RECYCLED WATER INITATIVE - REPLACEMENT FLOWS PROJECT
Currently at the Construction stage In Penrith is a project estimated to be $ 265000000. This project The Western Sydney Recycled Water Initiative - Replacement Flows Project, involves interconnection of three existing sewage treatment plants and treating the available effluent from these plants via a new advanced water treatment plant to replace the water that is currently released from Warragamba Dam for extraction and river health purposes. The project involves the construction and operation of the following key components: an advanced water treatment plant at St Marys sewage treatment plant; effluent transfer pipelines from Quakers Hill, Penrith and St Marys sewage treatment plants to the advanced water treatment plant; a brine transfer pipeline and pumping station for the transfer of brine from the advanced water treatment plant to a storage pond at Quakers Hill sewage treatment plant. This will connect with a pipeline which will transfer brine from the pond to the Northern Suburbs Ocean Outfall Sewer (NSOOS); balance storage tanks and effluent pumping stations at Penrith, Quakers Hill and St Marys sewage treatment plants; a recycled water pipeline for the transfer of treated recycled water (replacement flow) produced by the advanced water treatment plant to Penrith sewage treatment plant. The replacement flow is proposed to be discharged via the existing effluent outlet into Boundary Creek, which discharges into the Hawkesbury-Nepean River below Penrith Weir. Click for more details...

SOLDIERS BEACH DESALINATION PLANR PROJECT NOW INCLUDED IN PROJECT ID 665577
Public Utilities (Treatment plants, Sewerage reticulation) project In The Wyong Council Area of Desalination Plant type. Proposed construction of a mobile desalination plant to produce between 1 to 3 megalitres of water. Click for more details...

WESTERN BRANCH MAIN SEWER
A project in the NSW Within Marrickville. Scope of work includes internal rehabililtation of a 2.9km long large oviform trunk sewer including surface preparation, internal protective coating & silt removal with construction of new access shafts Click for more details...

MOONEY MOONEY & CHEERO POINT SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project at within Mooney Mooney & Cheero Point, Gosford, NSW 2250 for New. The work includes administration, supervision & auditing of construction contracts, design & tender management, community liaison, management of service providers & co-ordination of works with various authorities. Click for more details...

JEMALONG RETIREMENT VILLAGE
Water & Sewer Supply project at Edward & Bogan Gate Rds, Forbes, NSW 2871 In The Council Area Of Forbes of Local Govt. Extensions to the water & sewerage reticulation system to provide water & sewer services to a new aged care facility proposed for the edge of Forbes Click for more details...

LAWSON VILLAGE TOWN CENTRE
Water/Sewer - Relocation New project In The Blue Mountains Council Area. This tender is for reconstruction/relocation of water & sewer services. The overall project will involve the ultimate demolition of all of the highway frontage shops between Staples Street & New Street, the re-subdivision of the land, the construction of new local public road infrastructure. This work will require all basic services including water, sewer, electrical reticulation & street lighting to be replaced/upgraded Click for more details...

GOSFORD SEWER RETICULATION MAINS
Sewer Reticulation Mains project at various within, Gosford, NSW 2250 In The Council Area Of Gosford of Local Govt. The construction of water & sewer reticulation mains in Gosford and its surrounding areas 2008-2009. Please note that this is a general contract requiring rates only. Actual quantities will be obtained if and when work becomes available Click for more details...

KINCUMBER & WOY WOY SEWAGE TREATMENT PLANTS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Gosford Council Area of Local Govt ownership. Removal & dewatering of accumulated sludge from sludge lagoons at Kincumber & Woy Woy Sewage Treatment Plans for a 1 year period with 2 x 1 year options. Click for more details...

TUGGERAH LAKES ESTUARY CATCHMENT - PROJECT 8
Lowana Ave, Charmhaven, NSW 2263 Has Tuggerah Lakes Estuary Catchment - Project 8 currently at Construction stage. Stormwater Project 8. Undertake the construction of a new gross pollutant trap & wetland adjacent to an exiting stormwater channel in Charmhaven. Click for more details...

EDGEWORTH WASTEWATER TREATMENT WORKS
Aeration System - Upgrade project at off Garth St, Edgeworth, NSW 2285 in the Public Utilities (Treatment plants, Sewerage reticulation). Design, supply, installation & commissioning of an upgrade of the aeration system. This Contract is divided into two Separable Portions as follows: Separable Portion 1: Design development, supply, installation and commissioning of diffusers and associated pipework modifications: The development of the design of the aeration system (blowers, pipework, valves and diffusers) to provide the specified aeration performance. Running a design review workshop to present the outcomes from the design development to the Principal. Develop a P&ID for the aeration system & present it at a workshop. Developing a detailed program of works that minimises the time that the Principal will have an aeration tank out of service and in general reduces impact on the wastewater treatment process and operation of the wastewater treatment plant. Supply & install new air lines & diffuser membranes to provide both an increase in aeration capacity as well as staging the aeration input longitudinal along each tank into 3 aeration zones. Separable Portion 2: Supply, installation & commissioning new and/or modifying existing aeration blowers and associated works: Supply, install & commission new &/or modifying existing aeration blowers to provide increased air flow capacity. Supply, install & commission flowmeters and control valves on the main air line to each aeration tank. Modifications to electrical switchboards required to operate the revised blower arrangement. Any additional electrical & communication wiring required. Modifications to the PLC control system, site SCADA system and Head Office SCADA system to reflect the operation of the new aeration system. Preparation and submission of operations and maintenance manual which includes work-as-constructed information. Click for more details...

BEGA VALLEY SHIRE COUNCIL
Sewer - Rehabilitation project at various locations in the Bega Valley Shire Council area, Bega, NSW 2550 in the Public Utilities (Treatment plants, Sewerage reticulation). Sewer rehabilitation works in the form of sewer pipe bursting. Pipe bursting works involves the inspection, design, manufacture, supply, delivery to site, installation & testing of an acceptable sewer pipe bursting material for the specified sewer mains. The conduits to be rehabilitated are concrete or earthenware or asbestos cement or cast iron mains or Polyvinyl chloride mains. Council's sewer mains vary in sizes between 150mm and 450mm diameter. Click for more details...

ALBURY CITY SOLAR PHOTOVOLTAIC SYSTEMS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Supply & install solar photovoltaic panel systems at 6 Council buildings. those sites are; Library Museum; Albury Airport; Albury Entertainment Centre; Waste Water Treatment Plant; Albury Family Day Care Centre & Mirambeena Community Centre. Click for more details...

NORTH WEST GROWTH CENTRE STORMWATER - PACKAGE H
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Riverstone & Alex Avenue 204-15 Package H. The stormwater management infrastructure to be delivered will generally include: detention basins; rain gardens/bio-retention systems; gross pollutant traps; open vegetated channels & riparian corridors; culvert crossings; piped trunk drainage systems. The stormwater management design will need to be coordinated with adjoining road, open space reserve and urban development designs. Click for more details...

JOHN MORONY CORRECTIONAL CENTRE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Penrith Council Area of State ownership. Upgrade of sewer treatment plant, gas & stormwater Click for more details...

ARMIDALE SEWER HOUSE SERVICE LINE
Public Utilities (Treatment plants, Sewerage reticulation) project at Various locations in, Armidale, NSW 2350 of Sewer - Replacement type of New development. Replacement of 35 sewer house service lines and inspection shafts with 150mm PVC-U SN8 sewer pipe & fittings, at various locations throughout the city of Armidale. Click for more details...

URANA SHIRE SEWER MAINS RELINING
Public Utilities (Treatment plants, Sewerage reticulation) project at Various locations within the municipality of, Urana, NSW 2645 for New. Proposed works to include trenchless sewer mains relining works. Click for more details...