HARDY WINE CO
A project in the SA Within Berri Barmera. Development of waste water effluent treatment system, new storm water retention basin & alterations to existing basin. Click for more details...


is currently at the Construction stage, valued at about $ 200000 it is Includes stone lined & grass bank water channels, flood walls & concrete pipework road drains. Click for more details...


Currently at the Construction stage In Renmark-Paringa is a project estimated to be $ 300000. This project Stages 3-8: miscellaneous works. Click for more details...


Main Tank For Effluent Treatment Plant - Lagoon Replacement - Stage 2 project at Township of, Renmark, SA 5341 in the Public Utilities (Treatment plants, Sewerage reticulation). Main tank. Click for more details...

DEPT OF TRANSPORT - SOUTHERN EXPRESSWAY
Dept Of Transport - Southern Expressway is currently at the Construction stage, valued at about $ 85000 it is Darlington St Water Main contract & Minor Water Works contracts. Remove existing 900 mm dia water pipe, retrench at a lower depth & install 375 mm dia water pipe & minor water works for a 9 km two lane carriageway for one-way reversible traffic. Click for more details...

OLD NOARLUNGA SEWAGE SYSTEM
Public Utilities (Treatment plants, Sewerage reticulation) project In The Noarlunga Council Area of Sewage System - Stage 3 type. Sewage system to replace existing septic tank system currently in use by 465 town residents including: supply & install sewer pipework & associated works. Click for more details...

WANDEARAH CATCHMENT PROJECT
Grey Tce Esmond Rd & pt of Wandearah Rd, Port Pirie, SA 5540 Has Wandearah Catchment Project currently at Construction stage. Install reinforced concrete stormwater pipe of various dia (btwn 300 mm & 2,000 mm dia). Click for more details...

NORTHGATE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Port Adelaide Enfield Council Area of Private ownership. Supply & install sewer pump station. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT SITE
High Salinity Treatment Plant For Former Port Adelaide Sewage Treat Plant - Pt 3 New project In The Salisbury Council Area. Construct high salinity waste water treatment plant adjacent existing Bolivar treatment facilities. Click for more details...

CENTRAL LOCAL GOVERNMENT REGION
Public Utilities (Treatment plants, Sewerage reticulation) project at Various sites within Central Local Government Region of, South Australia, SA 5999 of Septic Tank Effluent Disposal Schemes For Region type of New development. Consultants to examine alternative delivery mechanisms for septic effluent disposal schemes (STEDS) for region. Click for more details...

SAHT - ELIZABETH REGION
., Elizabeth, SA 5112 Has Saht - Elizabeth Region currently at Tenders & Building stage. Sewer renewal to 14 properties in Elizabeth region. Click for more details...

AUSTRALIAN SCIENCE & MATHEMATICS SCHOOL
Currently at the Construction stage In Mitcham is a project estimated to be $ 200000. This project Plumbing services for university additions. Click for more details...

ADELAIDE METROPOLITAN CCTV SURVEY
Currently at the Construction stage In Various is a project estimated to be $ 150000. This project Survey consultants to carry out CCTV survey of 90 km approx x concrete trunk sewer for proposed future maintenance &/or upgrade work. Click for more details...

SA WATER CORPORATION
A project in the SA Within Ridley. Warren trunk main diversion. Click for more details...

CHRISTIES BEACH SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Noarlunga Council Area of State ownership. Supply & install civil & structural works for sewage treatment plant upgrade. Click for more details...

CRAFERS SEWER PUMPING STATION
, Crafers, SA 5152 Has Crafers Sewer Pumping Station currently at Construction stage. Lay 560 m x 150 mm dia pvc gravity sewer & 190 m x 100 mm dia pvc rising main. Click for more details...

PORT VINCENT EFFLUENT TREATMENT DISPOSAL SYSTEM
Pumping Station/Treatment Plant & Irrigation Area project at Lot 4, Hd Ramsey, Marine Pde (Pt Vincent Caravan Park), Port Vincent, SA 5581 In The Council Area Of Yorke Peninsula of Local Govt. Effluent treatment disposal system comprising pumping station, treatment plant & Irrigation area. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT
Hodgson Rd, Bolivar, SA 5110 Has Bolivar Sewage Treatment Plant currently at Construction stage. Electrical works for odour control. Click for more details...

BARCOO OUTLET
Subcontract project of Public Utilities (Treatment plants, Sewerage reticulation) project at Glenelg Sewage Treatment Works, Glenelg, SA 5045. 1.5km underground pipeline to discharge stormwater out to sea. Click for more details...

BARCOO OUTLET
Glenelg Sewage Treatment works, Glenelg, SA 5045 Has Barcoo Outlet currently at Construction stage. 1.5km underground pipeline to discharge stormwater out to sea. Click for more details...

BARCOO OUTLET
Public Utilities (Treatment plants, Sewerage reticulation) project In The Holdfast Bay Council Area of Trade Package - Electrical Control Works type. 1.5 km underground pipeline to discharge stormwater out to sea. Also a component of operations & maintenance for 3 years. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT
Supply & Install project of Public Utilities (Treatment plants, Sewerage reticulation) project at Bolivar Sewage Treatment Plant Hodgson Rd, Bolivar, SA 5110. Supply & install fencing & bird netting for filtration plant. Click for more details...

FIELD STREET EFFLUENT BALANCING STORAGE FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Onkaparinga Council Area of Local Govt ownership. Construct effluent balancing storage facility. This facility intended for collection & short term storage of septic tank effluent collected by McLaren Flat & McLaren Vale septic tank effluent disposal schemes. Effluent stored in facility will subsequently be pumped via adjacent McLaren Vale Pumping Station through McLaren Vale - Willunga Rising Main to Willunga Waste Water treatment plant. Click for more details...

CHRISTIES BEACH SEWAGE TREATMENT PLANT
Currently at the Construction stage In Onkaparinga is a project estimated to be $ 3000000. This project Supply & install mechanical & electrical works for sewage treatment plant upgrade. Click for more details...

BRUKUNGA MINE SITE
Supplementary Treatement Plant For Mine Site project at Watts Rd, Brukunga, SA 5252 in the Public Utilities (Treatment plants, Sewerage reticulation). Design & construct supplementary treatment plant for mine site including: preparation of engineering designs, fabricate & construct supplementary treatment plant consisting of 3 x steel mixing tanks & mixers (nominally 1 x 3.2 m dia x e m & 2 x 3 m dia x 3 m) & associated walkways & platforms. Click for more details...

SA WATER CORPORATION - ENGINEERING/CADASTRAL SURVEYING SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project at Various SA Water Corporation sites within, South Australia, SA 5999 for New. Consultants to provide engineering & cadastral surveying services if & when required. Click for more details...

KINGSTON ON MURRAY SEPTIC TANK EFFLUENT DRAINAGE SCHEME
Sted Scheme project at Cnr Kingston-Loxton Rd & Sturt Hwy (Vol 5755 Fol 570, Secn 313 Hund of Moorook), Kingston-On-Murray, SA 5331 in the Public Utilities (Treatment plants, Sewerage reticulation). Develop septic tank effluent drainage scheme. Works include: PVC & PE gravity & rising main pipes with between 63 mm & 125 mm dia. Click for more details...

PELLARING FLAT LAND BASED LIQUID WASTE DISPOSAL FACILITY
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Secn 170 Purnong Rd (Hund Finniss) Pellaring Flat (5.5 km east of), Mannum, SA 5238. Establish land based liquid waste disposal facility. Click for more details...

PARINGA STEDS UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project at Murtho Rd & Shepherd Dr, Paringa, SA 5340 for New. Upgrade to Murtho Rd & Shepherd Dr STEDS. Click for more details...

ALLENDALE EAST SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project at Within Allendale East, Allendale East, SA 5291 of Treatment Plant For Sewerage Disposal type of New development. Construction of treatment plant for Allendale East Sewerage Scheme. Click for more details...

SA WATER CORPORATION HAPPY VALLEY WATER TREATMENT PLANT CHLORINATOR
A project in the SA Within Onkaparinga. Supply & install trim chlorinator for water treatment plant. Click for more details...

SA WATER CORPORATION VARIOUS SITES - ELECTRONIC SECURITY SYSTEMS
Public Utilities (Treatment plants, Sewerage reticulation) project at Various SA Water Corporation sites within, South Australia, SA 5999 for New. Panel of installation providers &/or maintenance services in full or in part for electronic security systems, electric fences & automatic electric gates. Click for more details...

SA WATER COPORATION - VARIOUS WATER FILTRATION PLANTS
Public Utilities (Treatment plants, Sewerage reticulation) New project at Various sites within, South Australia, SA 5999. This type is Water Filtration Plants (15) with State ownership. Design, construct, manage & commission up to 15 water filtration plants for SA Water Corporation's Country Water Quality Improvement program. Click for more details...

PARINGA WASTEWATER TREATMENT PLANT
Currently at the Construction stage In Renmark-Paringa is a project estimated to be $ 500000. This project Lining of Lagoons and Irrigation Systems associated with Waste Water Treatment Plant. Click for more details...

WALTON ROAD WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 894 Walton Rd fp 173985 & Kapunda-Gawler Rd, Freeling, SA 5372. 1800sq m Waste Water Treatment Plant 40,000sq m of irrigation area both are to be fenced. Three concrete tanks & 24sq m control shed. Two tanks will be above ground & one below. The plant will cater for capacity to 2700 people. Click for more details...

MOUNT BARKER WASTEWATER TREATMENT PLANT UPGRADE CIVIL MECHANICAL & ELECTRICAL WORKS
Mount Barker Wastewater Treatment Plant Upgrade Civil Mechanical & Electrical Works is currently at the Construction stage, valued at about $ 500000 it is Supply, construction, installation & commissioning of pre-treatment (DAF or alternative technology) for the Mount Barker WWTP to treat effluent discharged from the polishing lagoon prior to delivery to the filtration facility. This comprises Part 1 Pre-treatment (prior to filtration) of an Overall WWTP Upgrade. Click for more details...

BEACHPORT COMMUNITY WASTE WATER MANAGEMENT SYSTEMS (CWMS) TREATMENT LAGOONS
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Beachport, SA 5280. This type is Treatment Lagoons with Local Govt ownership. Construction of new Community Waste Water Management System (CWMS) for the township of Beachport - Treatment Lagoon component only excluding the gravity drains, rising mains & pump stations. Click for more details...

SA WATER WASTE WATER TREATMENT PLANT CHRISTIES BEACH
Industrial/Storage/Amenities Buildings (4) project at Marine Dr, Christies Beach, SA 5165 in the Public Utilities (Treatment plants, Sewerage reticulation). Construction of 4 buildings for the purposes of storage, industrial & amenities block. Structural steel, precast concrete, aluminium cladding & roofing. Click for more details...

BIRD IN THE HAND WASTE WATER TREATMENT PLANT UPGRADE
Currently at the Construction stage In Adelaide Hills is a project estimated to be $ 30000000. This project Upgrade of treatment plant servicing the townships of Lobethal, Woodside, Charleston & Inverbrackie. Work to include construction of a new activated sludge treatment plant on the site of the existing plant; commissioning the new plant; a lined & covered treated wastewater storage; infrastructure for reuse of treated wastewater both on & off site; decommissioning & rehabilitation of the existing lagoon system. Click for more details...

BEACHPORT COMMUNITY WASTE WATER MANAGEMENT SYSTEMS (CWMS) GRAVITY DRAINS & RISING MAINS
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Beachport, SA 5280 of Gravity Drains/Rising Mains type of New development. Construction of a new Community Waste Water Management System (CWMS) for the township of Beachport - Collection system component only including gravity drains & rising mains. Excluding pump stations & treatment lagoons. Click for more details...

MOUNT TORRENS TO BIRDWOOD CWMS RISING MAIN
Rising Main New project In The Adelaide Hills Council Area. Supply & installation of 125 dia HDPE rising main from existing CWMS pump station in Oval Road Mt Torrens to the Birdwood WWTP in Muellers Road, Birdwood. The scope of works included under this contract involves the followig: rising main construction along Onkaparinga Valley Road; concrete encased pipe creek crossings; MSCL above ground sleeves across bridge structures; installation of air & scour valves along pipe route; construction of an additional precast emergency effluent storage chamber at the Oval Road pump station site & associated pipe & vent connections; construct rising main inlet into balance tank at Birdwood WWTP site; traffic control & DTEI notification prior to works commencing; commissioning & handover of rising main; provide asset register of installed components; provide As Built Drawings in GIS/Mapinfo Tab files & AutoCAD formats. Click for more details...

CITY OF CHARLES STURT WATER PROOFING THE WEST STAGE 1 - INCORPORATED INTO ID 680730
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of Water Proofing the West Stage 1. To include civil, mechanical & electrical works, landscaping. Click for more details...

RENMARK WASTEWATER STORAGE LAGOON
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of a wastewater storage lagoon. Click for more details...

CROSS KEYS ROAD TRADE WASTE WATER TREATMENT PLANT UPGRADE
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Salisbury Council Area for New development. Upgrade of trade waste water treatment plant at milk processing plant. Click for more details...

FRANKLIN HARBOUR ROADWORKS & INFRASTRUCTURE
Roadworks/Infrastructure project at .Various locations within the Boundaries of Port Gibbon & Cedar Ave, Cowell, SA 5602 in the Public Utilities (Treatment plants, Sewerage reticulation). Preparation of a concept design for sealed roads, kerb & water table, stormwater, sewer & potable water reticulation system for the township of Port Gibbon & also the design of road & associated infrastructure for Cedar Ave in the Township of Cowell. The Port Gibbon Township is situated on the east coast of the Eyre Peninsula approx 20 km southwest of Cowell. The settlement currently consists of 21 developed freehold allotments (mostly coastal shacks) & 25 council owned undeveloped freehold allotments, that are serviced by unsealed sheeted roads. There is a 5 year old EWS Go Treat Wastewater Treatment Plant installed that services the existing shacks that also has the capacity to serve the ultimate development of the town. Council intends to develop the 25 allotments on the western side of the settlement for sale. Engineering surveys of the Port Gibbon Township & Cedar Ave have been undertaken. A 10cm aerial survey with high definition imagery has also been carried out in 2012. The standards for design of infrastructure shall be consistent with Councils Land Development Policy, July 2013. Any deviation from standards therein shall be in consultation with & agreed in writing by Council. This brief for design at Port Gibbon shall be a (2) staged project whereas in Stage 1, the Design Engineer shall: a) Develop concept designs of road infrastructure to service the (approx) 50 allotments (developed & undeveloped) including kerb & water table. b) Assess stormwater flows & provide concept designs (in consultation with Council) for stormwater infrastructure to cater for the developed & undeveloped allotments; c) Prepare concept design sewer collection system & property connections between the undeveloped allotments on Barden St & Hennessy Tce & the WWTP on Ocean Blvd; d) Assess effluent disposal system & (if required) concept design extension to cater for waste water flows undeveloped lots; e) Consult with council on issues arising from concept design. The completion of Stage 1 (Port Gibbon) shall constitute a hold point where Council will consider the concept designs. Following a decision to proceed with Stage 2 the design engineer shall: 1) Prepare engineering drawings for construction of road & associated infrastructure as detailed above (including cut/fill volume calculation); 2) Design a reticulated potable water supply for the allotments adjacent to Barden St & Hennessy Tce to connect to councils existing supply; 3) Prepare & submit applications to Department of Health/EPA for sewer/disposal extensions; 4) Advise council on issues arising during construction. The brief for the design of Cedar Ave, Cowell shall be as follows: Prepare engineering drawings for construction of road, kerb & water table & associated infrastructure in consultation with council. Click for more details...

RIVER GLEN MARINA WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Murray Bridge Council Area of Local Govt ownership. The Council invites Expressions of Interest from Registrants for the provision to Supply, Install & Commission a Packaged Water Treatment Plant at the River Glen Marina. The River Glen Marina water supply scheme was designed & commissioned in 1991 by Fletcher Scott Furphy Consulting Engineers & services 30 residential properties & 109 houseboat berths, of which 30 berths are allocated for permanent occupation. The water supply draws from the Murray River via a suction line, which is pumped to the treatment plant located approximately half way between the river & the main Jervois Rd. Treated water is reticulated through both the housing development & marina via an unmetered connection at each residential property, marina service bollard, berth & also the wharf re-fuelling point. An investigation was carried out by Wallbridge & Gilbert Consulting Engineers in January 2008 for both the Potable Water & Waste Water treatment facilities at River Glen to determine the systems adequacy & develop a recommendation plan to manage both systems for the future. A significant finding made at the time of the investigation was that the Water Treatment Plant would require either a major overall or complete replacement within a 3 to 5 year period. The Rural City of Murray Bridge has provided in this project brief a broad outline of the requirements as part of this REOI. This list provides only a minimum requirement & registrants are encouraged to provide : 1) innovation; 2) an alternative solution for consideration; 3) Supply, install (including all required earthworks) & commissioning (including power connection) a package Water Treatment Plant (WTP) that will meet or exceed all requirements as set out in the Australian Drinking Water guidelines. Make use (if required) of the existing concrete tank located on Council owned land adjacent the Jervois Rd for with raw or treated water storage (refer supplied site plan). 2) Provide an allowance to produce detailed construction plans of the WTP sufficient to obtain Development Approval from Council. 3) Extend the raw water delivery infrastructure from its existing location, up Marina View Rd, adjacent the current WTP, to the proposed location (approx. 100m). Allow for all pavement reinstatement of Marina View Rd. 4) Extend the treated water delivery infrastructure from its existing location, up Marina View Rd, adjacent the current WTP to the proposed location, (approx 100m). Allow for all pavement reinstatement of Marina View Rd, 5) Relocate & make use of the existing delivery pump set located in the existing WTP (specification provided); 6) Provide a proposal including a schedule of rates, monthly (or annual) operation fee structure & any other applicable charges to manage, operate & monitor all aspects of the plant to ensure ongoing compliance with the Australian Drinking Water Guidelines. 7) Assess the suitability of the existing raw water delivery pump to provide the package WTP with sufficient inflow, & provide telemetry, to ensure raw water pump failure is monitored as part of any ongoing operation/maintenance contract. Click for more details...

PENNESHAW WASTE WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Binneys Track, Penneshaw, SA 5222. The Council invites tenders from suitably qualified & experienced Tenderers for the provision of Plant & Labour for construction of Wastewater Treatment Plant at Penneshaw. There are currently in the order of 235 existing houses in the township of Penneshaw, including the Seafront Hotel, Penneshaw Hotel, Backpackers & Youth Hostel & the newly redeveloped Caravan Park. The ultimate development within the township boundary specified by Council is approximately 435 allotments. Currently wastewater treatment from the existing houses is achieved by on-site treatment via septic tanks or aerobic systems & discharge to soakage trenches or irrigation Council proposes constructing a full sewage collection scheme with connections provided to each property within the scheme limits. Sewage will be collected by a combination of gravity drains & rising main & discharged to the treatment plant site, some 3 kilometres south east of the town. Construction of the collection network being full sewer is expected to be completed in stages in order to service fully developed parts of the township initially & expanded as the township develops. Treated wastewater will be stored in the lagoon at the WWTP site. Class B effluent, as outlined in the SA Reclaimed Water Guidelines shall be achieve. Filtration & disinfection is to be undertaken after the lagoons & recycled water will be used for irrigation. The treatment requirement is to achieve a mean value BOD not greater than 20 mg/L & a mean value of suspended solids not greater than 30 mg/L. A median termotolerant coliform (E coli) prior to irrigation shall be not greater than 100/100 mL. Scope of Works: This tender is for the supply & installation of a WWTP & adjacent irrigation system to service the ultimate development level for the Township of Penneshaw, Kangaroo Island. Works Included: The tendered contract is performance based & will provide: a) Power connection; b) Inlet screen (if required by Process Design); c) Extended aeration treatment plant capable of producing Class B treated effluent; d) Gravity discharge of effluent to Storage Lagoon; e) Lagoon water pumps; f) Filtration equipment; g) Disinfection system; h) Irrigation system at the nearby site (including wobbler sprinklers); i) Control equipment housed in a shed; j) All other works required for the completion of the scheme. The treatment plant will be constructed on a hardstand pad adjacent the storage lagoon. The construction works are to start once the lagoon civil works are completed, which is expected to be 12 months away subject to approvals. The Contractor shall coordinate its works with the civil contractor. Click for more details...

MOUNT COMPASS COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. The township of Mt Compass is located approximately 60km south of Adelaide on Victor Harbor Rd. The township consists of approximately 400 houses & a small commercial area. Wastewater is collected by a system of gravity drains, pump stations & rising mains. Wastewater, which includes septic tank effluent & full sewer, is currently discharged to the wastewater treatment plant located at Sand Mine Rd. The existing plant has reached its capacity & a new plant has to be constructed. A storage lagoon to discharge the treated effluent & to balance water for reuse has been recently installed at an old mine site west of the existing treatment plant. Project will deliver a reuse water balance lagoon to buffer additional flows from this expansion. The Principal invites tenders from Tenderers for the provision of the Wastewater Treatment Plant at Mount Compass. The project will deliver the Wastewater Treatment Plant at Mount Compass as part of the Mount Compass Community Wastewater Management System (CWMS). The project includes: 1) Construction of two concrete tanks 10m diameter & 4m deep each; 2) Construction of Control Shed including adjacent veranda & concrete pad; 3) Construction of screen support platform & installation of screen; 4) Supply & Installation of Waste Activated Sludge (WAS) tank (50kL); 5) Supply & Installation of two chlorine contact tanks (50 kL each); 6) Supply & Installation of treated water balance tank (50 kL); 7) Supply & Installation of treated water screen filter; 8) Supply & Installation of chlorine dosing system; 9) Supply & Installation of rainwater tank & rainwater reuse system; 10) Supply & Installation of all process pipework including valves, actuators, fittings, supports & flush systems; 11) Supply & Installation of all pumping & process equipment; 12) Supply & Installation of all specified instrumentation; 13) Supply & Installation of all electrical conduits; 14) Testing & Commissioning; 15) As constructed drawings. The project does not include electrical connection & control system. These items will be delivered by the Principal. The following list indicates the main elements of the Works sufficient to ensure that the Tenderer is aware of the scope of the Tender. It does not detail duties, actions or items of supply on minor works which are self evident or inherent to the satisfactory completion of the scheme as described within the tender documents. Preliminaries: These include - a) The transportation of all personnel, plant & materials to & from the site & the provision of temporary site accommodation; b) The provision of all personnel, facilities & amenities for the administration of the works of the scheme including temporary connections to Telstra/NBN, ETSA & SA Water; c) All setting out of the works, including locating services, survey for identifying boundary locations, connection points & temporary bench marks etc; d) Provision of office facilities for the Superintendents Representative for the duration of the works; e) Provision for quality control & assurance, environmental controls & traffic management; f) Provision for all site security; g) Obtaining all licenses & payment of fees where required for conduct of the Works & compliance with all regulations relating to the Works; h) Compaction testing of trench backfill; & i) Other preliminaries as required by the Tenderer as outlined in the tender schedule. Click for more details...

NORMANVILLE COMMUNITY WASTE MANAGEMENT SCHEME PUMP COMMUNICATIONS UPGRADE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Various locations within the boundaries of the District Council of, Yankalilla, SA 5203. The Principal invites tenders for the provision of Normanville Community Waste Scheme (CWMS) Pump Station Communications Upgrade (the Services). The District Council of Yankalilla has resolved to upgrade the communication systems integrated with the Normanville Community Waste Management Scheme (CWMS). The works will vary from site to site & include but not be limited to: 1) Upgrade of infrastructure; & 2) Upgrade of electrical components. The Normanville Community Waste Management Scheme (CWMS) utilises a combination of gravity drains & rising mains to collect & to transport effluent to Normanville Waste Water Treatment Plant (WWTP) located at Hay Flat Road. The CWMS services approximately 2000 connections within the Normanville & Yankalilla area is currently operated by the District Council of Yankalilla staff. The gravity network drainage system services the majority of allotments which then feed into 13 pump stations operated by Council & 3 privately operated pump stations. The majority of these pump stations are for Septic Tanks Effluent Disposal Scheme (STEDS). The Links Lady Bay stations are however, full sewer. The Normanville gravity drain network has been installed in the last 20 years. The pump stations allow for the transportation of effluent & sewage to the Hay Flat Road WWTP. The majority of the pump stations within the scheme feed into pump station No 3 (PS3) along Jetty Road, & then directly transfers effluent to the WWTP, with the exception of Links Lady Bay, which utilises a dedicated rising main to transport effluent to the WWTP. The system currently communicates via a telemetry system, which utilises Telstra 2G network. At the end of 2016 the 2G network will be switched off, resulting in Council?s current communications ceasing to function. Council has resolved to undertake an upgrade of the communication devices in order to maintain communications. 2 test sites have been established within the Normanville network to gauge the type of communication upgrade Council wishes to proceed in obtaining. The sites are Henry Court & Carrickalinga Sands. These sites have been used as the basis for the future upgrade. We have also identified additional works which will see greater control, efficiency & monitoring capabilities. This includes but not limited to the use of additional sensors & mechanical equipment. These pump stations have been assessed by Council & the scope of works required for each station was generated based upon this assessment. Scope of the Project 12 pump stations have been identified as requiring upgrade works. Each of the pump stations require different levels of works. The work is to include an initial start up site inspection on each pump station to identify any issues with the work proposed & finalise the extent of the work. The Contractor shall take legal possession of each site individually during the course of works being undertaken, & will assume all responsibility for the safety on the site while works are in progress. In particular, the Contractor shall: a) Restrict the works in progress to enable each pump station to remain operational during the upgrade with outages being minimized in order to prevent spills.Works to be completed by the stipulated finish time (7am-7pm) each day so that pump stations are not left exposed overnight. b) Emergency measures are in place to ensure no spillage occurs at the station whilst the station is worked on. c) Special Consideration will need to be given to pump station 3. This station has been identified as the critical point in the network. Arrangements may need to be made to manage the incoming flows from the network. Works will need to take place during a period where flows are estimated to be at their lowest. Alternative arrangement may Click for more details...

PETERBOROUGH COMMUNITY WASTE WATER MANAGEMENT SYSTEM
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Various locations within the boundaries of the District Council of, Peterborough, SA 5422. The Principal is seeking to appoint a Preferred Tenderer in advance of negotiating a final Contract Sum for the proposed construction of an 1162 connection Community Wastewater Management System for the town of Peterborough in the mid north of South Australia. Click for more details...