List of Treatment plants, Sewerage reticulation Projects in South Australia


SA WATER CORPORATION
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for New development. Provision of fencing works excluding electric fencing for various SA Water sites including sites operated by United Water. Click for more details...

SA WATER CORPORATION
Electronic Security Installations For Various Sites project at Various sites in, South Australia, SA 5999 in the Public Utilities (Treatment plants, Sewerage reticulation). Installation of electronic security including closed circuit televisin for various SA Water sites including sites operated by United Water. Click for more details...


State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Far North Council Area for New development. Repairs, upgrading, replacement of sanitary drainage, septic tanks & soakage trenches. Click for more details...


Currently at the Construction stage In Goyder is a project estimated to be $ 75000. This project Planning, hydrological, engineering & architectural study & programming of future possible work & maintenance of Burra Creek. Click for more details...

MULTI FUNCTION POLIS - NEW HAVEN VILLAGE
Waste Water Treatment For Residential Subdivision/Development project at Buckberry Crt cnr Victoria Rd (On LeFevre Peninsula), Osborne, SA 5017 In The Council Area Of Port Adelaide Enfield of J/V - Private & Govt. Provision of a localised waste water treatment system to include sewage, internal road run-off & access roof run-off. Treated water will be required to be recycled. Click for more details...


Currently at the Construction stage In Renmark-Paringa is a project estimated to be $ 300000. This project Stages 3-8: miscellaneous works. Click for more details...

SA HOUSING TRUST
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. 65 sewer connections. Click for more details...

OLD NOARLUNGA SEWAGE SYSTEM
Public Utilities (Treatment plants, Sewerage reticulation) project In The Noarlunga Council Area of Sewage System - Stage 3 type. Sewage system to replace existing septic tank system currently in use by 465 town residents including: supply & install sewer pipework & associated works. Click for more details...

SA WATER CORPORATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Colville Rd, Aldinga, SA 5173 for Subcontract. Construct treatment plant, associated equipment & water storage lagoons to use recycled water from plant. Scheme will initially serve population of up to 5,000 people. Works include: 1 x holding lagoon, 3 x evaporation lagoons, pump station, oxidation ditch, clarifier, filtration units & associated equipment. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at Township of, Kapunda, SA 5373. This type is Sted Reticulation Work with Local Govt ownership. Upgrade existing pump station, install new pump station, 120 m approx x 100 mm dia pvc gravity main, 500 m approx x 65 mm dia pvc rubber jointed rising main & bitumen reinstatement. New system to connect with existing gravity main system. Relocate 30 - 40 x existing gravity main line. Click for more details...

SAHT - ELIZABETH REGION
., Elizabeth, SA 5112 Has Saht - Elizabeth Region currently at Tenders & Building stage. Sewer renewal to 14 properties in Elizabeth region. Click for more details...

AUSTRALIAN SCIENCE & MATHEMATICS SCHOOL
Currently at the Construction stage In Mitcham is a project estimated to be $ 200000. This project Plumbing services for university additions. Click for more details...

WHYALLA TREATMENT PLANT
Currently at the Construction stage In Whyalla is a project estimated to be $ 7200000. This project Civil, structural & ancillary works for treatment plant. Click for more details...

ADELAIDE METROPOLITAN CCTV SURVEY
Currently at the Construction stage In Various is a project estimated to be $ 150000. This project Survey consultants to carry out CCTV survey of 90 km approx x concrete trunk sewer for proposed future maintenance &/or upgrade work. Click for more details...

WHYALLA TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Racecourse Rd (Secn 285 Hund Randell Vol 752 Fol 639), Whyalla, SA 5600. Mechanical, electrical & ancillary works for treatment plant. Click for more details...

FORMER PORT ADELAIDE SEWAGE TREATMENT PLANT
Renovations, Refurbishments etc. project of Public Utilities (Treatment plants, Sewerage reticulation) project at Frederick Rd West Lakes via pipeline to Bolivar Sewage Treatment Plant Hodgson Rd Bolivar, ., SA 5999. Abandon existing treatment plant at Port Adelaide. Construct relift pump station in former Port Adelaide site, pipeline between Port Adelaide & Bolivar. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) project In The Lameroo Council Area of Local Govt ownership. Desludging of 60 approx x septic tanks in township of Lameroo & 45 approx x septic tanks in township of Pinnaroo. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT SITE
Public Utilities (Treatment plants, Sewerage reticulation) project at Bolivar Sewage Treatment Plant site Hodgson Rd, Bolivar, SA 5110 of Uv Disinfection For Former Pt Adel Sewage Treat Plant - Pt 3 type of Supply & Install development. Supply & install UV disinfection for high salinity waste water treatment plant. Click for more details...

CRAFERS SEWER PUMPING STATION
, Crafers, SA 5152 Has Crafers Sewer Pumping Station currently at Construction stage. Lay 560 m x 150 mm dia pvc gravity sewer & 190 m x 100 mm dia pvc rising main. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Hodgson Rd, Bolivar, SA 5110 for Renovations, Refurbishments etc.. Civil works for odour control. Click for more details...

NETLEY POLICE PATROL STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Netley Commercial Park, Marion Rd, Netley, SA 5037 for New. Demolition of 5 major & 4 smaller buildings, diversion of existing site services & general removal of all site features to provide clear & level site for new major police facility after works. Works also include - provision of chain wire security fence to perimeter of new site. Services to be diverted include fire sprinkler mains to new fire pump house, telephone, water & electrical. Click for more details...

BARCOO OUTLET
Glenelg Sewage Treatment works, Glenelg, SA 5045 Has Barcoo Outlet currently at Construction stage. 1.5km underground pipeline to discharge stormwater out to sea. Click for more details...

FIELD STREET EFFLUENT BALANCING STORAGE FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Onkaparinga Council Area of Local Govt ownership. Construct effluent balancing storage facility. This facility intended for collection & short term storage of septic tank effluent collected by McLaren Flat & McLaren Vale septic tank effluent disposal schemes. Effluent stored in facility will subsequently be pumped via adjacent McLaren Vale Pumping Station through McLaren Vale - Willunga Rising Main to Willunga Waste Water treatment plant. Click for more details...

CHRISTIES BEACH SEWAGE TREATMENT PLANT
Currently at the Construction stage In Onkaparinga is a project estimated to be $ 3000000. This project Supply & install mechanical & electrical works for sewage treatment plant upgrade. Click for more details...

VARIOUS SA WATER CORPORATION SITES
Various Construction Works For Sa Water Sites project at Various sites within, South Australia, SA 5999 In The Council Area Of Various of State. Panel of construction contractors for provision of construction works including: civil, pipelay, structural, mechanical, electrical, instrumentation & control. Click for more details...

WELSH PLACE & UPPER THAMMES STREET
Public Utilities (Treatment plants, Sewerage reticulation) project at Welsh Pl & Upper Thammes St, Burra, SA 5417 of Steds - Extn type of Addition development. Extensions to STED system for two roads. Click for more details...

CHRISTIES BEACH WASTEWATER TREATMENT PLANT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project at Gilbert St, Christies Beach, SA 5165 for New. Upgrade of Christies Beach Wastewater Treatment Plant including decommissioning & rehabilitation of Noarlunga Downs sludge lagoons. Overall work includes: design, supply, commission &/or installation of membrane plant. Click for more details...

MOUNT BARKER WASTEWATER TREATMENT PLANT - VARIOUS WORKS
Public Utilities (Treatment plants, Sewerage reticulation) New project at Lot 3 Springs Rd (adj Laratinga Wetlands), Mount Barker, SA 5251. This type is Civil/Mechanical/Electrical/Pipework For Wastewater Treatment Plant - Upgrade with Local Govt ownership. Supply, construction, installation & commissioning of civil, mechanical, pipework & electrical works for Mount Barker wastewater treatment plant upgrade. Click for more details...

LIGHT REGIONAL COUNCIL - CAPITAL WORKS PROGRAM 2006/2007
Light Regional Council - Capital Works Program 2006/2007 is currently at the Planning stage, valued at about $ 5000000 it is Engineering design consultant for preparation of detailed designs for Council's 2006/2007 capital works program. Program includes: roads, footpath, stormwater drainage, STEDS & waste water treatment plant construction. Click for more details...

HOSKIN ROAD EFFLUENT TREATMENT LAGOONS & STORAGE DAMS
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Berri Barmera Council Area for New development. Construct effluent treatmenty lagoons & storage dams. Click for more details...

SA WATER CORPORATION - ADELAIDE WATER TREATMENT PLANTS PARTICLE COUNTERS
Particle Counters - Install New project In The Adelaide Council Area. Install particle counters at Adelaide water treatment plants. Click for more details...

SA WATER - ADELAIDE DESALINATION PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Chrysler Rd, Port Stanvac, SA 5160. Project includes 50 GL/annum desalination plant designed to be capable of being upgraded if required to a capacity of 100 GL/annum, reverse osmosis technology, seawater intake & outlet conduits to draw raw seawater into the facility & return approved waste streams to Gulf St Vincent, & associated marine structures. Plant to comprise of 4 main treatment plant buildings comprising nominal footprints of 5600 sqm, 5700 sqm, 5600 sqm & 9000 sqm. Construction of auxiliary buildings housing chemical storage areas, centrifuge control rooms, administration building &/or separate visitor centre. Numerous water storage & sludge balancing & thickening tanks. A nominal 10,000 sqm substation & a nominal 150 to 300 sqm main electrical switchgear building. Treated water storage tank with a footprint of approx 10,200 sqm or more (which may be designed to be underground). Hardstand loading & unloading areas. Buried services & drainage infrastructure throughout the plant site. Electrical systems including power transformers, overhead &/or underground power lines, cabling & switchgear. Site access, internal access roads & parking areas. Open areas for landscape screening & security fencing. Intake/outfall pipelines &&/or tunnel/s/s) associated marine intake/outfall structures, pumping station & associated access & building & electrical works. Future augmentation to allow for a 100 GL per year facility would comprise of additional 3 or 4 buildings for extra treatment plant & storage of similar size to original main buildings, additional pumps & process equipment, additional electrical power transformers & cabling & additional pumps for the transfer pipeline. Click for more details...

WALTON ROAD WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 894 Walton Rd fp 173985 & Kapunda-Gawler Rd, Freeling, SA 5372. 1800sq m Waste Water Treatment Plant 40,000sq m of irrigation area both are to be fenced. Three concrete tanks & 24sq m control shed. Two tanks will be above ground & one below. The plant will cater for capacity to 2700 people. Click for more details...

MICHELMORE ROAD & GREENWAYS ROAD WASTE WATER TREATMENT PLANT
Michelmore Road & Greenways Road Waste Water Treatment Plant is currently at the Construction stage, valued at about $ 1008000 it is 120 megalitre waste water treatment plant with associated concrete tanks, booster pipeline, buffer landscaping & 2.1 m high fencing. Click for more details...

MOUNT BARKER WASTEWATER TREATMENT PLANT UPGRADE CIVIL MECHANICAL & ELECTRICAL WORKS
Mount Barker Wastewater Treatment Plant Upgrade Civil Mechanical & Electrical Works is currently at the Construction stage, valued at about $ 500000 it is Supply, construction, installation & commissioning of pre-treatment (DAF or alternative technology) for the Mount Barker WWTP to treat effluent discharged from the polishing lagoon prior to delivery to the filtration facility. This comprises Part 1 Pre-treatment (prior to filtration) of an Overall WWTP Upgrade. Click for more details...

OUTER METROPOLITAN ADELAIDE WATER & WASTE WATER EXTENSIONS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Schedule of rates contract for contract term of two years with one year extension option. Area 1 - Balaclava, Roseworthy, Nuriootpa. Area 2 - Mannum, Murray Bridge. Area 3 - Woodside & Port Elliott. Click for more details...

BEACHPORT COMMUNITY WASTE WATER MANAGEMENT SYSTEMS (CWMS) TREATMENT LAGOONS
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Beachport, SA 5280. This type is Treatment Lagoons with Local Govt ownership. Construction of new Community Waste Water Management System (CWMS) for the township of Beachport - Treatment Lagoon component only excluding the gravity drains, rising mains & pump stations. Click for more details...

SA WATER WASTE WATER TREATMENT PLANT CHRISTIES BEACH
Industrial/Storage/Amenities Buildings (4) project at Marine Dr, Christies Beach, SA 5165 in the Public Utilities (Treatment plants, Sewerage reticulation). Construction of 4 buildings for the purposes of storage, industrial & amenities block. Structural steel, precast concrete, aluminium cladding & roofing. Click for more details...

PINKY FLAT GROSS POLLUTANT TRAP
Public Utilities (Treatment plants, Sewerage reticulation) project at Montefiore Rd Pinky Flat (Tardanya Womma Park 26), North Adelaide, SA 5006 for New. Installation of a gross pollutant trap along a 900 mm reinforced concrete pipe (RCP) within Pinky Flat. The catchment area encompasses the portion of Montefiore Rd north of War Memorial Drive. Click for more details...

CITY OF CHARLES STURT WATER PROOFING THE WEST STAGE 1 - INCORPORATED INTO ID 680730
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of Water Proofing the West Stage 1. To include civil, mechanical & electrical works, landscaping. Click for more details...

RENMARK STORAGE LAGOON LINING
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Renmark, SA 5341 of Lining For Wastewater Storage Lagoon type of New development. Supply of a lining for a storage lagoon at the Wasterwater Treatment Facility. Click for more details...

THE BAROSSA COUNCIL STOCKWELL WASTEWATER TREATMENT PLANT - STAGE 1
Wastewater Treatment Plant New project In The Barossa Council Area. Construction of a Wastewater Treatment Plant (WWTP), storage Lagoon & associated plant to service the Township of Stockwell & future flows from northern Nuriootpa. Click for more details...

CROSS KEYS ROAD TRADE WASTE WATER TREATMENT PLANT UPGRADE
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Salisbury Council Area for New development. Upgrade of trade waste water treatment plant at milk processing plant. Click for more details...

TONSLEY PARK REDEVELOPMENT CIVIL ENGINEERING CONSULTANCY
Consultancy For Civil Engineering Design New project In The Marion Council Area. Engineering design for all civil construction including site remediation & minor demolition; road & footpath reconstruction & new road & footpath construction; stormwater management including Water Sensitive Urban Design works; new & replacement sewer drainage; potable & non-potable water supply & headworks; common service trench including tri-generation fluid reticulation network & pit & pipe for communications services & electrical works including electrical networks & the undergrounding of existing cables. Click for more details...

ANGASTON WINERY CELLAR DOOR & OFFICES
Winery/Cellar Door/Offices project at 55 (Lot 111) Long Gully Rd, Angaston, SA 5353 in the Public Utilities (Treatment plants, Sewerage reticulation). Proposed development of winery to process 500 tonnes of grapes per year. To include L shaped building to house winery, cellar door, sales offices, fruit receival area, gallery. Rainwater tanks & waste water treatment plant. Associated parking & landscaping. Click for more details...

MUELLERS ROAD CWMS RISING MAIN PROJECT
Public Utilities (Treatment plants, Sewerage reticulation) project at Muellers Rd, Birdwood, SA 5234 for New. The overall purpose of the project is to convey treated wastewater from the Birdwood WWTP located on Muellers Road, Birdwood to a privately owned storage dam approximately 1.8km to the west of the WWTP at 10L/s. Wastewater is currently drawn from the WWTP tertiary lagoon via a lagoon lift pump (Ebara) to the treatment system at the Oval Plant Shed at 5L/s. The system currently comprises liquid aluminium sulphate injection, hydro-cyclone, screen and media filtering, chlorine (sodium hypochlorite) dosing and ultra-violet disinfection. Treated wastewater is then pumped (at 5L/s) to an oval for irrigation located north-west of the WWTP via a rising main transfer pump (Ebara) also housed within the shed. Treated wastewater to the Oval is conveyed through an existing rising main (PE DN90) for approximately 600m along Muellers Road from the shed before steering north across a private paddock at 112 Muellers Road to the oval site. Treated wastewater from the new system is to be conveyed through this existing main up to this location, where a new mPVC DN100 transfer main will need to be constructed to carry the wastewater to the private dam. Actuated controls are therefore required at the shed to control the delivery along this section of the common main. Along the way to the dam the new transfer main will need to be bored under Winery Creek, enter a private property within a bounded easement where it needs to be bored again under the same creek and an existing SA Watereasement (above-ground water main), before ending at the top embankment of the dam with a blank flange. The scope of works includes, but is not limited to the following: construction of approximately 1.2km DN100 mPVC (Series 2) CL12 (lilac) treated effluent transfer main; boring of main under a creek at two locations; supply and installation of various control valves; pressure/compaction testing and flushing. Click for more details...

COWELL COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Waste Water Treatment Plant New project In The Franklin Harbor Council Area. The township of Cowell is located on the Lincoln Highway on the eastern coast of Eyre Peninsula, between Port Augusta & Port Lincoln. It is a community based around farming, fishing & aquaculture, with most premises being residential, some commercial properties along Main St & several oyster processing sheds. There is also a hospital, a school, two hotels & a caravan park. The estimated flow of wastewater likely to be generated in Cowell is 267 kL per day, or an equivalent of 1,570 EP at 170 L/p/day. A new wastewater treatment plant is required to treat this wastewater flow. The plant shall be expandable to meet a potential future wastewater flow of 430 kL/day. Using the former nomenclature for reclaimed water quality, 100% of expected inflow to the treatment plant will be processed to 'Class B' reclaimed water standard, suitable for irrigating the town oval and three other irrigation sites & supplying a standpipe. Click for more details...

FRANKLIN HARBOUR ROADWORKS & INFRASTRUCTURE
Roadworks/Infrastructure project at .Various locations within the Boundaries of Port Gibbon & Cedar Ave, Cowell, SA 5602 in the Public Utilities (Treatment plants, Sewerage reticulation). Preparation of a concept design for sealed roads, kerb & water table, stormwater, sewer & potable water reticulation system for the township of Port Gibbon & also the design of road & associated infrastructure for Cedar Ave in the Township of Cowell. The Port Gibbon Township is situated on the east coast of the Eyre Peninsula approx 20 km southwest of Cowell. The settlement currently consists of 21 developed freehold allotments (mostly coastal shacks) & 25 council owned undeveloped freehold allotments, that are serviced by unsealed sheeted roads. There is a 5 year old EWS Go Treat Wastewater Treatment Plant installed that services the existing shacks that also has the capacity to serve the ultimate development of the town. Council intends to develop the 25 allotments on the western side of the settlement for sale. Engineering surveys of the Port Gibbon Township & Cedar Ave have been undertaken. A 10cm aerial survey with high definition imagery has also been carried out in 2012. The standards for design of infrastructure shall be consistent with Councils Land Development Policy, July 2013. Any deviation from standards therein shall be in consultation with & agreed in writing by Council. This brief for design at Port Gibbon shall be a (2) staged project whereas in Stage 1, the Design Engineer shall: a) Develop concept designs of road infrastructure to service the (approx) 50 allotments (developed & undeveloped) including kerb & water table. b) Assess stormwater flows & provide concept designs (in consultation with Council) for stormwater infrastructure to cater for the developed & undeveloped allotments; c) Prepare concept design sewer collection system & property connections between the undeveloped allotments on Barden St & Hennessy Tce & the WWTP on Ocean Blvd; d) Assess effluent disposal system & (if required) concept design extension to cater for waste water flows undeveloped lots; e) Consult with council on issues arising from concept design. The completion of Stage 1 (Port Gibbon) shall constitute a hold point where Council will consider the concept designs. Following a decision to proceed with Stage 2 the design engineer shall: 1) Prepare engineering drawings for construction of road & associated infrastructure as detailed above (including cut/fill volume calculation); 2) Design a reticulated potable water supply for the allotments adjacent to Barden St & Hennessy Tce to connect to councils existing supply; 3) Prepare & submit applications to Department of Health/EPA for sewer/disposal extensions; 4) Advise council on issues arising during construction. The brief for the design of Cedar Ave, Cowell shall be as follows: Prepare engineering drawings for construction of road, kerb & water table & associated infrastructure in consultation with council. Click for more details...

MANOR CRESCENT CWMS GRAVITY MAIN UPGRADE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Manor Cr, Mount Barker, SA 5251. The Principal invites tenders for the provision of the supply & installation of the gravity main & associated works. The services are to be installed by directional drilling & the Tenderers are to base their price on drilling in clay. Background - Manor Cr CWMS gravity main runs from Kavanagh St to Hill St, Mt Barker, predominately through private property in rear yards with a short section within a Council Reserve. The pipe line: 1) Contains a mixture of PVC, VC & steel; 2) Is cracked & distorted in a number of locations; 3) Is badly corroded in the steel sections; 4) Contains misaligned joints; & 5) Has tree root penetration in a number of locations. The Principal is proposing to replace the existing main with a DN180 HDPE pipe using directional boring. Conventional excavation (open trenching) may be used in road reserves or the Council Reserve off Manor Cr. The section of main to be replaced accepts effluent from 60 properties but is being sized to cater for raw sewage. The existing main within private property is not contained within registered easements however it is protected by statutory easement under the Water Industry Act 2012 as the Principal is a licensed water industry entity. Property owners along the route have been advised that Council is investigating the replacement of the main. Scope of Works: The works broadly include the following: a) Letter box advice to residents (25) along the route; b) Supply & install 426m of DN180 PN12.5 HDPE pipe; c) Install 3 manhole covers; d) Install 5 maintenance shafts; e) Locate 11 existing septic tank connection points at the old main; f) Locate 5 existing side 100mm mains connection points at the old main; g) Connect existing septic tank connections & side mains to the new main; h) Undertake testing on the pipeline; i) Removal all existing MH & FP covers & lids & close off with a sealed cap below ground level; j) Reinstate areas disturbed by the works to match the surrounding area; k) Provide As Constructed Drawings to Council; & l) Make payment for the CITB levy. Click for more details...

CROMWELL ROAD ODOUR CONTROL SYSTEMS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Port Adelaide Enfield Council Area of Private ownership. Upgrade to odour emission control systems & 2 existing mould cooling shed building axial fans. Installation of extraction fan of 25m high dispersion stack to the existing foundry use. Click for more details...