List of Treatment plants, Sewerage reticulation Projects in WA


HENDERSON LANDFILL SITE - LEACHATE TREATMENT PLANT & CELL CAPPING
Public Utilities (Treatment plants, Sewerage reticulation) project In The Cockburn Council Area of Leachate Treatment Plant/Cell Capping - Consultancy Services type. Provision of consultancy services for upgrading or provision of new leachate treatment plant facility, impermeable cover over Cell 3, Stage 1 of Cell 4 & construction of Cell 5. Click for more details...

BROOME WASTEWATER TREATMENT PLANT
Currently at the Planning stage In Broome is a project estimated to be $ 900000. This project Upgrade capacity of Broome wastewater treatment plant & undertake odour control works. Works to include construction of new primary pond, deepening of existing ponds at site, raising banks of existing ponds, construction of new inlet discharge tower, removal of old discharge tower, miscellaneous associated electrical & mechanical piping works & increasing existing pond banks & depth to maximise storage. Click for more details...

BINNINGUP & MYALUP WATER SUPPLY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Harvey Council Area of Pipeline, Storage Tank, Pumping Station & Chlorination Plant type. It was originally proposed to re-equip existing bores to increase pumping capacity, construct new delivery pipeline from bores to existing treatment plant site, construct new ground level storage tank at existing water treatment plant site, construct new transfer pumping station to transfer water from ground storage tank to existing elevated tank & upgrade existing water treatment facilities, including new chlorination plant. It has now been found that existing groundwater supplies at both Binningup & Myalup are inadequate & it is now planned that pipeline will be constructed to Stirling-Harvey trunk main just north of Harvey & within existing Harvey Diversion Drain Reserve to bring water from Stirling Dam. Pipeline will eliminate requirement for bore or treatment plant works, however storage tank, pumping station & chlorination plant works will still be required. Click for more details...

BIOWISE COMPOSTING FACILITY
A project in the WA Within Kwinana. It is proposed to construct two underground storage tanks for storage of grease trap waste for incorporation into existing BioWise waste composting process. Tanks to have capacity of 16,000 l. Click for more details...

INFILL SEWERAGE PROGRAMME
Civil Works For Construction Of Gravity Sewers New project In The Canning Council Area. Construction of approximately 242 m of 225 mm diameter sewer. Click for more details...

INFILL SEWERAGE PROGRAMME
Public Utilities (Treatment plants, Sewerage reticulation) project for Renovations, Refurbishments etc. development. Capel sewerage extension. Click for more details...


Sewer & Manholes - Construction project at Sewerage Pump Station Lot 1148 Kalgan Dve, Newman, WA 6753 in the Public Utilities (Treatment plants, Sewerage reticulation). Construction of sewer and manholes to Bypass No 3. Click for more details...


Sewer Main - Extns project at Gribble Creek & Keegan St Area, Boulder, WA 6432 in the Public Utilities (Treatment plants, Sewerage reticulation). Supply materials & construct 565 linear m approx x 150 mm dia sewer mains. Click for more details...

RUTHERFORD'S REWARD - GOLD
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at 8 km south of, Westonia, WA 6423. Work involves 100,000 cu m volume to a depth of 6 m. Minimal haulage required as heap leach facility to be located on site. Items (eg liner) to be purchased piecemeal. It is envisaged earthworks tender will be awarded on an hourly basis. Mining of the 230,000 t deposit grading 1.0 gpt gold to be carried out over 2-3 years with about 134,000 t being mined in first year. A dam (2,000 cu m) and a pad (for process ploant) will be constructed on site. Miscellaneous work will involve sumps, bores, cyanide storage area, a 12 kw generator (diesel) and accommodation. Abadoe (formerly Tanjung Resources) to earn 66% interest in project. Final metallurgical/engineering studies indicate a 65% recovery (within 90 days). Click for more details...

BEENYUP WASTEWATER TREATMENT PLANT - STAGE 2 ODOUR CONTROL SYSTEM
Compressor Room - Mechanical Upgrade Renovations, Refurbishments etc. project In The Joondalup Council Area. Work involves installation of six gas compressors & improvements to system pipework. Click for more details...

WATER CORPORATION - COPPER ALLOY GATE, SWING CHECK & BALL VALVES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of Copper Alloy Gate, Swing Check & Ball Valves - Supply type. Works comprise supply & delivery of copper alloy gate, swing check & ball valves for three-year period. Click for more details...

NEERABUP TREATMENT PLANT
Neerabup Treatment Plant is currently at the Construction stage, valued at about $ 10000000 it is Design & construct ground water treatment plant stage 2. Click for more details...

SOUTH BUNBURY GRAVITY SEWERS
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Reticulation Area Bunbury 32G & 42F bnd by Clarke Gibson Halsey Sts & Minninup Rd & Spencer Miller Sts Timperley Goldsmith Rds &, South Bunbury, WA 6230. 1,794 m approx x 150 mm dia gravity sewers & 63 m approx x 150 mm dia trenchless technique totalling 9 km approx. Click for more details...

SHIRE OF AUGUSTA-MARGARET RIVER - WATER SUPPLY IMPROVEMENTS
Shire Of Augusta-Margaret River - Water Supply Improvements is currently at the Construction stage, valued at about $ 587000 it is Works involve construction of pump & headworks on exiting bore, upgrading existing water treatment plant, installing surge protection measures to existing water main & other associated construction works. Click for more details...

MARGARET RIVER WASTEWATER TREATMENT PLANT
Bnd by Bussell Hwy, Thompson, Roger & Long Rds (tracks), Margaret River, WA 6285 Has Margaret River Wastewater Treatment Plant currently at Construction stage. Design, construct, test, commission, operate & maintain wastewater treatment plant. Click for more details...

FRISBY COURT GROUPED DWELLINGS
Public Utilities (Treatment plants, Sewerage reticulation) New project at 17 (lot 5975) Frisby Crt/Pettit Pl, South Hedland, WA 6722. This type is Grouped Dwellings (4)/Water & Sewer Reticulation - Stage 1 with State ownership. Portion A comprises construction of 2 x 3 bedroom & 2 x 2 bedroom single storey steel roof & walls grouped dwellings with 2 parking bays per unit & 1 additional visitor parking bay (Tender 96230/2004). Site area for this project will be 2,033 sq m. Portion B: proposed water & sewer retic at Part Lot 5975 Frisby Crt/Pettit Pl South Hedland (Tender 96241/2004). Works include earthworks, sewer reticulation, water reticulation including excavating, placing & compaction & stabilisation of earthworks, setting out & construction/relocation of sewer, water mains & associated man holes. Click for more details...

AUSTRALIAN MARINE COMPLEX - SEWER DISPOSAL NETWORK (AMC-CUF)
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Cockburn Council Area for Renovations, Refurbishments etc. development. Works involve supply & installation of new sewerage pipework at existing complex. Click for more details...

MARGARET RIVER RECREATION CENTRE - WATER TREATMENT SYSTEM
Wallcliffe Rd, Margaret River, WA 6285 Has Margaret River Recreation Centre - Water Treatment System currently at Construction stage. Works comprise of supply, installation, commissioning & maintenance of water treatment system heat pump replacement. Click for more details...

BURNS BEACH SPS3, HAMERSLEY SPS3 & SPS6 SEWERAGE PUMPING STATION
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for New development. Works comprise of construction of emergency overflow storage culverts at Burns Beach SPS3, Hamersley SPS3 & SPS6 sewerage Pumping Stations. Click for more details...

NAIRN DRIVE SEWERAGE PUMPING STATION & PRESSURE MAIN WORKS
Public Utilities (Treatment plants, Sewerage reticulation) New project at Nairn Dr, Baldivis, WA 6171. This type is Pumping Station & Pressure Main - Construction with Private ownership. Works to comprise of construction of Type 40 Sewerage Pumping Station some 7.5 m deep & approximately 240 m of 150 mm diameter pressure main. Click for more details...

BUSSELTON FLOOD PROTECTION PROJECT
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Works primarily comprises of construction of perimeter earthfill embankments which will form new compensating basin designated CB3. Works shall include outlet culverts & trashrack structures, spillway over embankment, access to compensating basin CB3, including entrances, access ramps & road terminations, perimeter drains, culvert crossing under Vasse Hwy, reconstruction of portions of Sabina Diversion Drain, weir structure, fencing including gates & drainstops, demolition & clearing of buildings & associated farm structure & upgrades of portions of Yoongarillup & Piggott Rds. Click for more details...

BIDYADANGA COMMUNITY - POWER, SEWER, WATER
Currently at the Construction stage In Broome is a project estimated to be $ 419000. This project Comprise construction of new electrical, sewer & water services fo 15 residential lots. Click for more details...

PEELWOOD PARADE WASTEWATER PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Peelwood Pde, Mandurah, WA 6210 of Type 10 Pumping Station/Pressure Main - Supply & Installation type of Supply & Install development. Supply & install Type 10 Wastewater Pumping Station & construction of 192 m long pressure main. Click for more details...

SEWER POND JIGALONG
Jigalong Aboriginal Community, approx 120 km East of, Newman, WA 6753 Has Sewer Pond Jigalong currently at Construction stage. Construction of additional sewer pond. Comprise supply of all materials & construction of 170m long x 97 m wide evaporation pond within vicinity of existing sewage ponds. Click for more details...

END OF TRIP FACILITY - PROSPECTOR
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Perth Council Area for Renovations, Refurbishments etc. development. Convert temporary Prospector train service facilities at East Perth into permanent facilities. Works include water supply to train, sewerage dumping & pumping facilities for railcars, trade wast bunded areas for refuelling, electrical for lighting & power supply & railcar diesel refuelling. Click for more details...

BROOME RECREATION & AQUATIC CENTRE - STAGE 2A
Supply & Install project of Public Utilities (Treatment plants, Sewerage reticulation) project at Cable Beach Rd, Broome, WA 6725. Works to comprise supply & installation of effluent reticulation on playing field 3 for Broome Recreation & Aquatic Centre - stage 2a. Click for more details...

MINDIBUNGU (BILLILUNA) COMMUNITY INFRASTRUCTURE SERVICE EXTENSION
Public Utilities (Treatment plants, Sewerage reticulation) project at Mindibungu (also known as Billiluna) Community, 170 km south of Halls Creek, Off Tanami Rd, via, Halls Creek, WA 6770 of Infrastructure Service - Extension type of New development. Works involve power, water & sewer infrastructure upgrade & regularise for new housing. Construction includes removal of existing sewer main & construction of new gravity sewers & access chambers & other minor works as per drawings & specifications; construction of new water supply reticulation to extend water supply to service new building sites & to include all bends, thrust blocks, valves, hydrants & installation of connection points for new houses; Removal of overhead & install underground power reticulation, supply & installation of street lights, universal maxi pillars & mini pillars as per drawings & specifications. Click for more details...

WINDIDDA COMMUNITY WATER SUPPLY UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) Supply & Install project at Within Windidda Community, Wiluna, WA 6646. This type is Reverse Osmosis Unit & Reticulation Network - Supply & Install with State ownership. Works to involve supply & installation of reverse osmosis unit & reticulation network. Click for more details...

CUE RUBBISH TIP
Public Utilities (Treatment plants, Sewerage reticulation) project In The Cue Council Area of Refuse Site Cell - Construction type. Works to comprise of construction of refuse site cell. Click for more details...

PERRY LAKES/UNDERWOOD AVENUE SEWER
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at From Basketball Stadium, Underwood Av to existing sewer pump station, Perry Lakes, Floreat, WA 6014. This type is Sewer - Extn with State ownership. Works to include construction of a new sewer from the Basketball Stadium in Underwood Av to the existing Perry Lakes sewer pump station. Click for more details...

EFFLUENT RETICULATION SYSTEM - KALGOORLIE NO 2 HOLDING POND
Holding Pond - Sealing Works project at Piccadilly St, Kalgoorlie, WA 6430 in the Public Utilities (Treatment plants, Sewerage reticulation). Works to comprise seal of dam with polyurethane liner. Works may include earthworks. Click for more details...

DAWESVILLE INFILL SEWERAGE PROGRAM - AREA 2B
Public Utilities (Treatment plants, Sewerage reticulation) New project at Bnded by Luill Cr in the north, Dawesville Rd in the east, Durham Cr in the south, & Chapman Rd to the west, Dawesville, WA 6210. This type is Infill Sewerage with State ownership. Works to comprise infill sewerage service for gravity sewers for Reticulation Area Dawesville 2B approx 2,040m x 150mm plus approx 930 x 150mm Trenchless Techniques. Click for more details...

KARRATHA WASTEWATER TREATMENT PLANT NO 1
Karratha Wastewater Treatment Plant No 1 is currently at the Construction stage, valued at about $ 100000000 it is Works to include upgrade of the existing Karratha Wastewater Treatment Plant No 1 to 10ML/day based on advanced pond technology comprising of anaerobic ponds & inlet works & possible downstream treatment for the provision of high quality treated wastewater. Click for more details...

KARRATHA/SOUTH HEDLAND WASTEWATER TREATMENT PLANTS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Tenders are being invited for the design, construction, operate & maintain the Karratha & South Hedland Wastewater Treatment Plants. Click for more details...

CITY OF KALGOORLIE-BOULDER SEWER ACCESS CHAMBER
Public Utilities (Treatment plants, Sewerage reticulation) New project at Various sites within the City of, Kalgoorlie, WA 6430. This type is Sewer Access Chamber - Refurbishment with Local Govt ownership. Works to include the refurbishment of approx 176 access chambers of various depths. Works also comprising of: traffic management, supply of all labour, materials, plant machinery equipment, supervision, provision of temporary sewer bypass as required, construction of concrete footpaths, roadworks to include pavements, kerbing, flush concrete edge beams & verge preparation to open cut areas, clearing, filling stripping & the removal of all rubbish materials on the site. Click for more details...

KARRATHA-TOM PRICE ROAD WASTE TREATMENT FACILITY
Waste Treatment Facility project at Lot 126 Karratha-Tom Price Rd, Roebourne, WA 6718 In The Council Area Of City Of Karratha of Private. May include the construction of a solid to liquid waste facility. Click for more details...

DEPARTMENT OF HOUSING - ANDERSON & MOORE STREET - MAIN SEWER WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 236000. This project Works to include connection of 22 various properties to comprise of: 2 dwellings each on 101 & 105 Anderson St, 1 dwelling on 115 Anderson St & 8 dwellings on 124 Anderson St & one dwelling each on 17, 44, 46 52 & 56 Moore St & 2 dwellings each on 35 & 54 Moore St in Port Hedland to the main sewer line & to include decommissioning of the septic tanks. Click for more details...

BEENYUP ADVANCED WATER RECYCLING PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Ocean Reef Rd, Craigie, WA 6025. Works to include the design, construction, commissioning, performance testing & validation of the Beenyup Advanced Water Recycling Plant (AWRP) located at Craigie which will have the capacity to recharge 14 billion ltrs of water into groundwater supplies which is done through a process of treating wastewater to drinking water standards & after the water is stored, it is removed some time later for further treatment, ready to supply drinking water. Click for more details...

DEPARTMENT OF FINANCE - MECHANICAL SERVICES PANEL - VARIOUS AGENCIES
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for New development. The Department of Finance is seeking consultants for the Mechanical Services Panel - Various Agencies for the provision of comprehensive maintenance svcs to include chillers, building management systems, boilers, oil analysis, power generation equipment, DDC Control systems & water treatment. Click for more details...

BINDI BINDI WASTE WATER TREATMENT POND
Currently at the Construction stage In Ashburton is a project estimated to be $ 690000. This project Works to include the decontamination & decommission of the Bindi Bindi Waste Water Treatment Pond. Click for more details...

ONSLOW PARK TENNIS CLUB
A project in the WA Within Subiaco. Works to include the decommissioning of the existing sewer line, septic tank & leach drain & installation of a new PVC sewer line to connect into the Rosalie Park Pavilion sewer line. Click for more details...

CLEOPATRA & PYLMOUTH ROADS, EURYALUS STREET, ABRAHAM STREET & BROADFIELD CLOSE CIVIL WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project In The City Of Greater Geraldton Council Area of Septic Sewer System - Upgrade & Decommission type. Works to include the upgrading & decommissioning of septic sewer systems at the following locations: 10 & 15 Cleopatra Rd, 5A, 5B & 8 Euryalus St, 5 Plymouth Rd, 4A, 4B, 8, 54, 70 & 74 Abraham St & 17 Broadfield Cl. Works to include all lids to existing tanks, wells & leach drains to be removed from site & disposed of, pump pits if encountered to be removed including the electrics back to the meter box by a licenced electrician. The successful contractor must liaise with tenants to minimise disruption, exposure to hazardous materials & ensure that the tenants ability to enter or exit the property is not comprised. Click for more details...

MOWANJUM COMMUNITY WATER & SEWER SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Derby-W Kimberley Council Area of Water/Sewer - Extensions - Supply/Install/Construct type. Works to include the supply, installation & construction of sewer & water extensions in Mowanjum Community. Click for more details...

YELVERTON NORTH ROAD WINERY LIQUID WASTE TREATMENT FACILITY
Liquid Waste Treatment Facility New project In The Busselton Council Area. Construction of a winery liquid waste treatment facility. The facility will be designed to treat 5,000 kl per year (13.7kl) per day of winery waste & septage (from septic tank pump outs). The site will also compost green waste, cereals & animal manures. Click for more details...

CHRISTMAS ISLAND SEWER & WATER
Currently at the Construction stage In Christmas Island is a project estimated to be $ 1600000. This project Works to include the construction of sewer & water infrastructure & associated works to service four proposed light industrial lots on Quarry Rd Christmas Island. Click for more details...

WELLARD STREET SEWER MAIN CONNECTION
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Civil Works for the construction of New Sewer Main Connection From Newton Street, Spearwood to Operations Centre, 52-54 Wellard Street, Bibra Lake. Scope of works include but are not limited to, Pipework-Supply & Construction of approximately 1,120m DN225 SN8 PVC-U Gravity Pipework, including the supply & installation of all pipe fittings, bends, & marker posts. Access Chambers, Maintenance Shafts & Property Connections (Supply & Installation). Pipe Jacking-Thrust Boring-To align the new sewer inside a DN375 Reinforced Concrete (RC) sleeve underneath the existing freight rail corridor & Stock Road to Brookfield Rail & Main Roads Western Australia (MRWA) requirements respectively, including all temporary works, liaison & associated approvals from relevant stakeholders. Pipe Jacking-Thrust Boring-To align the new sewer inside a DN375 RC sleeve underneath a section of Lot 50 in Howson Way and past the existing Western Power assets in Howson Way (HV power transmission pole and stay wires). Relocation of Any Existing Infrastructure (e.g. soakwells) adversely affected by the works. All Associated Testing, Commissioning & Connections-To the existing access chamber outside the Newton Street WWPS at 18.05 AHD, to enable live operation of the sewer. Reinstatement of lots, road surface & the road reserve to the satisfaction of the Principal & associated lot owners. As-Constructed Drawings & Documentation/Records in accordance with the Water Corporation of WA's requirements (Completion & provision of to the Principal). Click for more details...

CARNARVON COMMUNITY COLLEGE
Carnarvon Community College is currently at the Construction stage, valued at about $ 12715000 it is Construction of additions to Carnarvon Community College. Construction of Sewer Works. Click for more details...

MACAULAY PARK SEWER CONVERSION
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Hamer Rd, Inglewood, WA 6052. Macaulay Park Sewer Conversion for the City of Stirling. Click for more details...

IRWIN WATER TREATMENT PLANT
Irwin Water Treatment Plant is currently at the Construction stage, valued at about $ 100000 it is Works at Irwin Water Treatment Plant include Refurbish louvres, Replace internal vermin screens & Treat corrosion to ring beam of filter room structure. Click for more details...

BEATON PARK ALL ABILITIES PLAY SPACE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Beaton Park, Dalkeith, WA 6009. Supply & Installation of a package sewer pump station at Beaton Park, Dalkeith for the All Abilities Play Space Project. Click for more details...