State

Categories

Sub Categories

Click Here to Find Current Projects

List of Treatment plants, Sewerage reticulation Projects in Western Australia


HENDERSON LANDFILL SITE - LEACHATE TREATMENT PLANT & CELL CAPPING
Public Utilities (Treatment plants, Sewerage reticulation) project In The Cockburn Council Area of Leachate Treatment Plant/Cell Capping - Consultancy Services type. Provision of consultancy services for upgrading or provision of new leachate treatment plant facility, impermeable cover over Cell 3, Stage 1 of Cell 4 & construction of Cell 5. Click for more details...

WOODMAN POINT WASTEWATER TREATMENT PLANT
A project in the WA Within Cockburn. Supply & delivery of odour control equipment for Woodman Point Wastewater Treatment Plant tanker receival facility. Click for more details...

WATER CORPORATION - STRATEGIC ALLIANCE FOR OPERATION & MAINTENANCE SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of Water Operation & Maintenance Services - Strategic Alliance type. Strategic alliance contracts for provision of operations & maintenance services for Perth Metropolitan Area. Two separate alliances have been formed, one for Perth Region South & one for Perth Region North. Scope of services includes management of service company for delivery of operations & all maintenance services for water reticulation systems, wastewater conveyance systems & drainage systems. Perth Metropolitan Region currently services population of 1.7 million. Click for more details...

SUBIACO WASTEWATER TREATMENT PLANT ODOUR CONTROL
Lemnos St, Shenton Park, WA 6008 Has Subiaco Wastewater Treatment Plant Odour Control currently at Planning stage. Removal of existing biological scrubber, relocation of services, excavation & construction of two concrete shell tanks & associated channels. Click for more details...

KULIN WASTEWATER SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Sewerage Reticulation Area Kulin 1A, within Shire of, Kulin, WA 6365. This type is Gravity Sewers/Pumping Station/Pressure Main/Wastewater Treatment Plant with State ownership. Construction of gravity sewers, pumping station, pressure main & wastewater treatment plant for Sewerage Reticulation Area Kulin 1A. Pumping station to be located at intersection of High St & Johnston St; pressure main to run from pump station parallel with Johnston St & Kulin - Lake Grace Rd to wastewater treatment ponds off West Rd. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Approximately 0.6 ha of 1.00 mm HDPE membrane for the lining of septage lagoons at the proposed septage treatment works. Click for more details...

ESPERANCE PRESSURE MAIN, PUMP STATION, STORAGE TANK & INFILTRATION PONDS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of pressure main (of over 5 km in length) which will run from existing on Goldfields Rd, via Daw Dr & Wylie Bay Rd to existing wastewater treatment plant no. 2, temporary storage tank & pumping station at corner of Goldfields Rd & Daw Dr & three infiltration ponds at wastewater treatment plant no. 2. Click for more details...

DROUGHT RELIEF STRATEGY - SAMSON BROOK PIPEHEAD DAM
Public Utilities (Treatment plants, Sewerage reticulation) project at Approximately 7 km downstream of existing Samson Dam, Waroona, WA 6215 of Pipehead Dam - Main Contract type of New development. Construction of pipehead dam approximately 7 km below existing Samson Dam, which will store about 300 megalitres of water & replace an existing structure at same site that currently supplies Waroona townsite. Dam would have 15 - 25 m high wall & dosing plant is also to be constructed. Water would be connected to Stirling Trunk Main via 11.5 km of 900 mm pipe. Click for more details...

RUTHERFORD'S REWARD - GOLD
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at 8 km south of, Westonia, WA 6423. Work involves 100,000 cu m volume to a depth of 6 m. Minimal haulage required as heap leach facility to be located on site. Items (eg liner) to be purchased piecemeal. It is envisaged earthworks tender will be awarded on an hourly basis. Mining of the 230,000 t deposit grading 1.0 gpt gold to be carried out over 2-3 years with about 134,000 t being mined in first year. A dam (2,000 cu m) and a pad (for process ploant) will be constructed on site. Miscellaneous work will involve sumps, bores, cyanide storage area, a 12 kw generator (diesel) and accommodation. Abadoe (formerly Tanjung Resources) to earn 66% interest in project. Final metallurgical/engineering studies indicate a 65% recovery (within 90 days). Click for more details...

GOOSEBERRY HILL BRANCH SEWER (HAVENVALE SUBDIVISION)
Public Utilities (Treatment plants, Sewerage reticulation) project at Yirrdah Crt via Maida Vale Rd to Poison Gully/Creek, Gooseberry Hill, WA 6076 for New. Works comprise construction of approximately 330 m of 450 diameter gravity sewer for Havenvale Subdivision. Contract length: 10 weeks. Click for more details...

LANCELIN SEWERAGE PROJECT
Deep Sewerage System project at Within northern portion of townsite of, Lancelin, WA 6044 In The Council Area Of Gingin of J/V - Private & Govt. Works comprise construction of gravity & vacuum sewerage system for northern portion of Lancelin townsite. Click for more details...

WATER CORPORATION - COPPER ALLOY GATE, SWING CHECK & BALL VALVES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of Copper Alloy Gate, Swing Check & Ball Valves - Supply type. Works comprise supply & delivery of copper alloy gate, swing check & ball valves for three-year period. Click for more details...

DALYELLUP WATER SUPPLY SCHEME
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Pt lot 305 Minninup Rd Dalyellup area of, Capel, WA 6271. Water treatment plant, bore, water collection tank, pump station & transfer mains. Click for more details...

SONS OF GWALIA GOLD OPERATIONS
A project in the WA Within Leonora. Work to also include instrumentation associated with wet plant relocation. Click for more details...

THOMSONS LAKE
East & West of Kwinana Fwy, Jandakot, WA 6164 Has Thomsons Lake currently at Construction stage. Deep wet sewers. Click for more details...

ROCKINGHAM SENIOR HIGH SCHOOL
A project in the WA Within Rockingham. Construction of single level special purpose classroom building, new covered walkways & various pedestrian access facilities. Also includes is connection of school's drainage system to Minister's deep sewer. Click for more details...

PICCADILLY STREET SEWER MAIN
Public Utilities (Treatment plants, Sewerage reticulation) project at Piccadilly St, Kalgoorlie, WA 6430 of Sewer Main - Extn type of Addition development. Works include supply of materials & construction of approx 395 lineal metres of 150 mm dia sewer mains & 675 lineal metres of 225 mm dia sewer mains as en extension of City's sewerage reticulation system. Click for more details...

FALCON INFILL SEWERAGE PROGRAMME - FALCON 3A
Falcon Infill Sewerage Programme - Falcon 3a is currently at the Construction stage, valued at about $ 2000000 it is Works to comprise construction of gravity sewers, pumping stations, pressure mains & vacuum sewers for Reticulation Area Falcon 3A with provision for further infill work. Click for more details...

PERTH REGION RETICULATION SEWER REFURBISHMENT
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area for Renovations, Refurbishments etc. development. Works were to include, but not be limited to, design & construction of following: Part 1 - Perth South rehabilitation sewers - rehabilitation, but cured-in-place lining, of approximately 1,209 m of 150 mm diameter vitrified clay pipe & 179 m of 230 mm diameter vitrified clay pipe as shown on drawings; reconnection of incoming sewer lines at existing access chambers &/or property connections along sewer; installation of new covers & frames; Part 2 - Perth North rehabilitation sewers - rehabilitation, by cured-in-place lining, of approximately 1,426 m of 150 mm diameter vitrified clay pipe as shown on drawings; reconnection of incoming sewer lines at existing access chambers &/or property connections along sewer; installation of new covers & frames. Click for more details...

BLACKSTONE COMMUNITY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Ngaanyatjarraku Council Area of State ownership. Works comprise major construction of roadworks, stormwater drainage, water supply & sewerage construction. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY - STAGE 2 - PHASE 2
Currently at the Construction stage In Wanneroo is a project estimated to be $ 400000. This project Construction of stage 2 phase 2 west earthworks at Tamala Park Waste Disposal Facility, includes excavation of material to create the airspace for the next phase of landfilling operations. Contract duration may take up to 9 months. Click for more details...

BIDYADANGA POLICE STATION - MULTI FUNCTION FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at Bidyadanga Community, 170 km south of, Broome, WA 6725. This type is Power/Water & Waste Water Service - Upgrade with State ownership. Works to comprise of construction of power, water & sewerage for Bidyadanga Multi-Function Police Station Facility. Click for more details...

TOWN OF VICTORIA PARK - AQUALIFE POOL & SURROUNDS RETICULATION
Town Of Victoria Park - Aqualife Pool & Surrounds Reticulation is currently at the Construction stage, valued at about $ 50000 it is Works to comprise of supply & installation of automatic reticulation system to Aqualife Pool & surrounding site. Click for more details...

SHIRE OF HARVEY - DRAINAGE WORKS
Drainage - Upgrade project at Candeloro Pl & Herbert Rd, Harvey, WA 6220 in the Public Utilities (Treatment plants, Sewerage reticulation). Work to comprise of drainage works upgrade at Candeloro Pl & Herbert Rd, Harvey. Click for more details...

AUSTRALIAN MARINE COMPLEX - COMMON USER FACILITY
A project in the WA Within Cockburn. To remove existing rocks/soil to sea bed in area of works, to install approximately 285m of sheet pile wharf, complete with a sheet pile, anchor walls and tie rods, install new mooring bollards and wharf fixture, excavate yard and lay new concrete pavement, modify existing site drainage, reinstate yard damaged by new works, to install new hydraulic services eg, sewerage, wash down water, stormwater, potable water, fire water, salt water cooling and fuel. To install new electrical services including new substation, switchboards, cables, lighting, metering and control systems for pumps, installation of new cathodic protection system to wharf and for the provision of assorted access platforms. Click for more details...

BEACHHAVEN DRIVE WASTEWATER PUMPING STATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Wanneroo Council Area of Type 10 Wasterwater Pumping Station - Supply & Installation type. To supply & install Type 10 Wastewater Pumping Station & connection to existing pressure main. Works include mechanical fittings, connection & electrical components for pumping station. Click for more details...

FARMANER PARKWAY WASTEWATER PUMPING STATION
A project in the WA Within Swan. Supply & installation of Type 40 Wastewater Pumping Station & approx 830 m of DN150 PVC pressure main. Works include mechanical fittings, connections & electrical components for pump station. Click for more details...

GERADLTON NORTH WASTEWATER TREATMENT PLANT POND DUPLICATION
Pond Duplication project at 10 km north of Geraldton Townsite, Geraldton, WA 6530 in the Public Utilities (Treatment plants, Sewerage reticulation). Works shall include, but not be limited to: excavation & construction of primary pond, secondary pond, & two infiltration ponds; trimming batters of proposed pond & provides backfil; lay 1.5 mm HDPE linder on pond embankment section; installation of 2 DN300 PVC pipes to connect primary pond to secondary pond & secondary ponds to 2 infiltration ponds for Geraldton North Wastewater Treatment Plant Expansion; construction & equiping of Flow Measurine FLume on connection between secondary pond to 2 infiltration ponds; construction of access gravel road around pond preimeters; construction of mountable kerbing along perimeter of ponds; construction of reinforced concrete sewer spillway for dump trucks; clearing & construction gravel track & unloading bay for dump truck to access sewer spillway; loose stone pitching with A14 Geofabric underlay, on batter slope between existing treatment ponds & proposed treatment ponds. Click for more details...

BERTRAM - BELGRAVIA CENTRAL STAGE 2 - LANDSCAPE & IRRIGATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Kwinana Council Area of State ownership. Works to comprise earthworks, retaining walls, drainage, sewerage, water supply & underground power for 68 lot residential subdivision. Click for more details...

TAMBELLUP PRIMARY SCHOOL
Public Utilities (Treatment plants, Sewerage reticulation) project at Taylor St, Tambellup, WA 6320 of School - Sewer Connection type of Renovations, Refurbishments etc. development. Works to comprise upgrade to sewer connection. Click for more details...

KARNET PRISON FARM
Public Utilities (Treatment plants, Sewerage reticulation) project at Kingsbury Dr, Serpentine, WA 6125 of Sewerage Pond Mbr System - Upgrade type of Renovations, Refurbishments etc. development. Works to comprise improvements to MBR System at sewerage pond Karnet Prison Farm. Click for more details...

MUNDARING WATER TREATMENT PLANT PUBLIC PRIVATE PARTNERSHIP (PPP)
Public Utilities (Treatment plants, Sewerage reticulation) project at DEC depot site, off Mundaring Weir Rd, Mundaring Weir, WA 6073 of Water Treatment Plant - Design/Construct/Commission/Operate type of New development. Works to comprise design, construction, commissioning, operation, maintenance, asset replacement & financing of Mundaring Weir Water Treatment Plant, pump station C & pipelines to cater for future services within the Mundaring Town Centre for a period of up to 35 years. Click for more details...

MCGREGOR STREET OVAL & KEVIN SCOTT OVAL GROUNDWATER BORES
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at McGregor St Oval & Kevin Scott Oval, Port Hedland, WA 6721. A tender is called for the design, construction & installation of 2 groundwater bores at McGregor St Oval & Kevin Scott Oval. Click for more details...

STOKES INLET CAMP GROUND & DAY USE AREA TOILETS
Public Utilities (Treatment plants, Sewerage reticulation) project at Stokes Inlet Campsite, Stokes National Park, 538 km east of Perth, Munglinup, WA 6450 for New. Tenders are invited for the construction of 3 new toilet buildings including the installation of 3 Goughs Plastic's Hybrid sewerage systems at Stokes Inlet Campsite, as per specifications & drawings provided by DEC (WC32.6 & WC32.7) & Gough Plastics (2 @ twin - 50 DP & 1 triple 25 DP). Click for more details...

PARDELUP PRISON FARM WORK CAMP
Sewage Treatment Plant - Upgrade project at Muir Hwy, Mount Barker, WA 6324 In The Council Area Of Plantagenet of State. Works to include the upgrade of the sewage treament plant at Pardelup prison farm & work camp. Click for more details...

NEWMAN COMMUNITY COLLOCATION CENTRE
A project in the WA Within East Pilbara. Works to comprise roadworks, drainage, water reticulation, sewer reticulation, electrical reticulation & street lighting for the Newman Community Collocation Centre. Click for more details...

HAY PARK TEE-BALL GROUNDS RETICULATION UPGRADE
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Bunbury Council Area for Renovations, Refurbishments etc. development. The City of Bunbury invites quotations from suitably qualified & experienced companies for the design, installation & commissioning of a commercial reticulation system to the Tee Ball Grounds in Hay Park. Click for more details...

EATON PRIMARY SCHOOL SEWER CONVERSION
Public Utilities (Treatment plants, Sewerage reticulation) project at 35 Diadem St, Eaton, WA 6232 for New. Works to comprise of sewer converson at Eaton Primary School. Click for more details...

WATER CORPORATION SUBIACO MAIN SEWER STAGE C
Public Utilities (Treatment plants, Sewerage reticulation) project In The Subiaco Council Area of Main Sewer - Refurbishment type. Works to comprise refurbishment of Subiaco Main Sewer Stage 3 from Selby St Shenton Park to the Subiaco Wastewater Treatment Plant to ensure the integrity of the sewer system. Click for more details...

EFFLUENT RETICULATION SYSTEM - KALGOORLIE NO 2 HOLDING POND
Holding Pond - Sealing Works project at Piccadilly St, Kalgoorlie, WA 6430 in the Public Utilities (Treatment plants, Sewerage reticulation). Works to comprise seal of dam with polyurethane liner. Works may include earthworks. Click for more details...

CROESUS STREET LANEWAY SEWER UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Kalgoorlie-Boulder Council Area of Local Govt ownership. Works to comprise of a sewer upgrade. Click for more details...

LENNOX RESERVE IRRIGATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Lennox Res, Secret Harbour, WA 6173 of Irrigation - Supply & Install type of New development. Works to include supply & installation of irrigation at the Lennox Reserve. Click for more details...

CANNING ROAD SEWER EXTENSION
Public Utilities (Treatment plants, Sewerage reticulation) project at Canning Rd, Kalamunda, WA 6076 for Addition. Works to include extension of the existing sewer on Canning Road. Click for more details...

CITY OF GERALDTON INFILL SEWERAGE SG3 STAGE 1
Public Utilities (Treatment plants, Sewerage reticulation) project In The City Of Greater Geraldton Council Area of State ownership. Works to include construction of below ground sewers approx 150 mm in diameter. LocationS of the works are at: Archer, Abraham & Assen Sts, Newton Rd, Broadfield Cl, Hepburn St, Ruth St & Solomon Cir, Amos Pl. Click for more details...

BULLFINCH STREET, NORLAND WAY, HAMILTON & RESERVE ROADS SEWER WORKS
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at 16A & 16B Bullfinch St, 12A, 12B, 24A & 24B Norland Wy, 122A & 122B Hamilton Rd, 10a & 18A Reserve Rd, Spearwood, WA 6163. This type is Sewer Works - Conversion with State ownership. Works to include sewer conversions to 10 residential properties within the suburb of Spearwood. Click for more details...

YILLIMINNING ROAD NARROGIN WASTEWATER TREATMENT PLANT - TREATMENT WETLAND
Public Utilities (Treatment plants, Sewerage reticulation) project at Adjacent to the existing WWTP, Lot 2001 Yilliminning Rd, Narrogin, WA 6312 for New. Registration of Interest invited from contractors for the design & construction of a densly planted treatment wetland. The project will involve the surplus treated wastewater flowing by gravity to an adjacent 2ha densley planted shallow treatment wetland. Click for more details...

ROTTNEST ISLAND - WASTE WATER TREATMENT PLANT WORKS - PACKAGE 1
Waste Water Treatment Plant - Upgrade - Design & Construct project at Located on the north east cnr of, Rottnest Island, WA 6161 in the Public Utilities (Treatment plants, Sewerage reticulation). Works to include the design & construction for the upgrade & conversion of the existing waste water treatment plant (WWTP) from a Cyclic Activated Sludge System (CASS) technology to a Membrane Bio Reactor System (MBR). This process involves a staged implementation due to the need that the existing system continues to operate during the winter off-peak season. Package 1 to include: the design, procurement & construction of a new Flow Balance Tank (FBT) & the new Recycled Water Storage Tank (RWST); design, procurement, construction, integration & commissioning of the new waste activated sludge dewatering system & the emergency storage system including the plant sump wet well & design, procurement & installation of the RWP piping culverts & major underground piping. Click for more details...

DENMARK WATER TREATMENT PLANT WORKS
Denmark Water Treatment Plant Works is currently at the Construction stage, valued at about $ 2000000 it is Works to include the installation of a new 3.4 km pipeline to be constructed between the Denmark River Dam & Quickup Dam, a 700m extension to the existing pipeline & reverse osmosis desalination units at the Denmark Water Treatment Plant. Click for more details...

SOUTH HEDLAND LANDFILL
Wastewater Treatment Plant project at South Hedland Landfill, end of North Circular Rd, South Hedland, WA 6722 In The Council Area Of Port Hedland of Local Govt. Works to include the construction of the wastewater treatment plant for the South Hedland Landfill. Click for more details...

BEATON PARK ALL ABILITIES PLAY SPACE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Beaton Park, Dalkeith, WA 6009. Supply & Installation of a package sewer pump station at Beaton Park, Dalkeith for the All Abilities Play Space Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect