State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tunnels, Subways Projects


WEST KEIRA & WOLLONGONG CENTRE SHOPPING CENTRE
Shopping Centre - 6 Storey Addition project In The Wollongong Council Area. Demolition of the existing structures on the West Kiera site. Construction of a new 6 level retail centre on West Keira St comprising 80 speciality shops, Coles supermarket, fresh food precinct, 600 seat food court, outdoor eating area & more than 650 car spaces. The shopping centre will be interconnected by a tunnel & bridge under/over Keira St to the existing Wollongong Central shopping centre. Click for more details...

WESTCONNEX M4 EAST - PARRAMATTA TO HABERFIELD
Civil Engineering (Tunnels, Subways) project In The Various Council Area of State ownership. Widening of the existing M4 Motorway. The M4 East will join the M4 Widening at Homebush Bay Drive & Underwood Rd at Homebush. Construction of 2 x 5.5km x 3 lane tunnels extending from west of Underwood Rd Homebush to near Alt St at Haberfield. Provide interchanges at Concord Rd at North Strathfield/Concord, Wattle St (City West Link) at Haberfield & at Parramatta Rd at Ashfield/Haberfield Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
Civil Engineering (Tunnels, Subways) project at Btwn Northern Suburbs Railway & Narrows Bridge, Perth, WA 6000 of Road Infrastructure - Consultancy Services For Package F type of New development. Tenders were invited from suitably qualified & experienced consultants for provision of road infrastructure specialist technical support services during implementation of New MetroRail City Project under Contract 27/03. Primary function of specialist technical advisers will be to independently review & advise on aspects of road infrastructure designs for Contract 27/03 on an as & when required basis (Contract 27/03 is Package F works). Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

GERALDTON SOUTHERN TRANSPORT CORRIDOR
State ownership Civil Engineering (Tunnels, Subways) project In The City Of Greater Geraldton Council Area for New development. Stage 1 works to comprise construction of new single railway line from Narngulu Industrial Area to Geraldton Port, approximately 4.9 km of highway from North West Coastal Hwy into Port precinct, four road bridges & two rail tunnels. Contract also incorporates modifications within Port precinct that will accommodate concurrent unloading of long grain trains & ore trains. Click for more details...

PERTH PUBLIC TRANSPORT HUB PROJECT - NORTHSIDE RAIL LINK
Civil Engineering (Tunnels, Subways) project at Fremantle Rail lines above existing Joondalup line & Wellington St Bus Station, Northbridge, WA 6003 for New. The development will begin with closure & demolition of the William St footbridge. It is anticipated that in January 2012 the project will commence with sinking the Fremantle rail line from Perth station to Lake St. Undergrounding of the Wellington St Bus Station will likely commence in June 2014. The development will also include the construction of a new 'island' train platform & may also comprise creating important connection points between the city centre & Northbridge. Click for more details...

MOUNT LAWLEY SUBWAY
Subway - Scaffolding, Preparation & Painting Renovations, Refurbishments etc. project In The Vincent Council Area. Works comprise provision of scaffolding, preparation & painting of Mount Lawley Subway. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Tunnels, Subways) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

LANE COVE TUNNEL
Tunnel/Road Link project at M2 to Gore Hill Freeway, Lane Cove, NSW 2066 in the Civil Engineering (Tunnels, Subways). 6 lane twin tunnel under Epping Rd to link The Gore Hill Freeway with proposed extended M2 North West Transport Corridor, new north-facing ramps from Falcon St. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

MELBOURNE TO SYDNEY RAIL INFRASTUCTURE UPGRADE
New project of Civil Engineering (Tunnels, Subways) project at Melbourne to Sydney, ., VIC 3999. Package 1 to consist of 220 km of new track which will loop near & follow existing track, extensive sleeper replacement & track geometry improvement. Greenfields refurbishment. Around 60% of work in Victoria & large amount of work on metropolitan route. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standard gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

TONKIN HIGHWAY
Tonkin Highway is currently at the Construction stage, valued at about $ 105000000 it is Construction of four-lane dual carriageway extension of Tonkin Hwy from Mills Rd West (Martin) to Thomas Rd (Byford) at freeway standards. Approximately 32 km in length. Project to include shared path along eastern side of Tonkin Hwy from Albany Hwy in Gosnells to South Western Hwy, Mundijong, & underpasses & overpasses at Corfield Street extension, Armadale Rd & Bishop Rd. Crossing facility will also be provided in vicinity of Manning Av in Martin, however it has not yet been determined whether this will be an underpass or overpass. Click for more details...

SPRINGVALE ROAD/RAIL SEPARATION PROJECT
Civil Engineering (Tunnels, Subways) project In The Whitehorse Council Area of State ownership. To eliminate the railway crossing at Springvale Road near Whitehorse Road intersection, a rail underpass will be constructed with the railway line to be lowered up to six meters on the western side of Springvale Road and the road to bridge over the railway line. A new railway station will be built on the west side of Springvale Road, replacing the existing Nunawading Station on the east side of Springvale Road. The station will be constructed as a continuous island platform with tracks either side. There will be space for a future third track. The platform will link to stairs and lifts on either side of Springvale Road, at the side of the current level crossing. Upgraded customer facilities will include bicycle storage, taxi rank and new drop-off and parking area at street level. The new station entry and ticket sales will be at street level and stairs and a lift will descend to the platform. Click for more details...

NORTH-SOUTH BYPASS TUNNEL (NSBT)
J/V - Private & Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. 6.8 km. To include 4.7 kms of tunnels with road connections to South East Freeway, Ipswich Rd, Inner City Bypass & Lutwyche Rd. Click for more details...

EASTERN FREEWAY EXTENSION/TUNNEL SECTION/PARK ROAD TO DEEP CREEK ROAD
Eastern Freeway Extension/Tunnel Section/Park Road To Deep Creek Road is currently at the Planning stage, valued at about $ 200000000 it is Park Road to Deep Creek Road section of the Eastern Freeway Extension. This contract will include the detailed design, construction, operation and maintenance of twin road tunnels approximately 1.5km long. Click for more details...

QUEEN ELIZABETH HOSPITAL
Civil Engineering (Tunnels, Subways) Addition project at Woodville Rd, Woodville South, SA 5011. This type is Enabling Works/Services Relocation/Demolition For Hospital - Redevelopment with State ownership. Work includes diversion of stormwater, sewer, domestic & fire water, steam & condensate, natural gas, high & low voltage electrical & communications inground services in staged program. Nurses Education annex of CDRC building will be demolished with services decommissioned & made safe. Services including air conditioning, refrigeration systems, domestic hot, cold & fire water, electrical & communications between Nurses Education & CDRC buildings will be diverted. New air conditioning & domestic hot water systems will be installed in CDRC building. Structural strengthening of services tunnel from boiler house under roadway to Maternity building & structural works to CDRC demolition facade are also required. Click for more details...

RYDE TOWN CENTRE - TOP RYDE CIVIC PRECINCT
Plaza/Walkways/Bridge project at Devlin St, Ryde, NSW 2112 In The Council Area Of Ryde of Local Govt. Proposed upgrade & additions to the Ryde town centre, work to include a plaza over Devlin Street linking the Civic Centre with the Top Ryde Shopping Centre, pedestrian links & footbridges, road tunnel, civic open space. Click for more details...

PACIFIC HIGHWAY UPGRADE - TINTENBAR TO EWINGSDALE
Civil Engineering (Tunnels, Subways) New project at Pacific Hwy from Tintenbar to, Ewingsdale, NSW 2481. This type is Roadworks with State ownership. Proposed upgrade of approximately 17 km, starting at Ross Lane in Tintenbar & extending north to the existing Ewingsdale interchange, near the settlement of Ewingsdale. At Ross Lane, the proposed upgrade would connect to the north end of the proposed Ballina bypass. The proposed upgrade includes: Four-lane divided carriageways (2 lanes each way), with a wide median allowing for the future addition of a third lane in each direction. Connection to the northern end of the Ballina bypass at the proposed Ross Lane interchange. A new northbound on-ramp & a new southbound off-ramp would be provided. The remainder of this interchange will be constructed as part of the Ballina bypass project. Upgrading of the existing Ewingsdale interchange to provide full access between the modified local and regional road network & the highway. A half interchange at Ivy Lane. North-facing ramps would provide access between the local road network and the proposed upgraded highway to the north. A half interchange at Bangalow. South-facing ramps would provide access between the local road network, including to Bangalow and Lismore & the proposed upgrade to the south. This arrangement would replicate the arrangement with the existing Bangalow bypass which also has south-facing ramps only. Six twin bridges & 4 underpasses allowing roads and creeks to pass underneath the proposed upgrade. These would include twin bridges above Byron Creek and the existing Casino-Murwillumbah railway on the north side of Byron Creek. Two bridges carrying local roads over the proposed upgrade, one for Broken Head Road and one about 500 m north of Lawlers Lane providing access to several properties east of the upgrade. Protection screens would be provided on both bridges. The existing highway would be retained as a continuous road for local and regional traffic. Twin parallel tunnels under St Helena ridge (one tunnel for each carriageway). The tunnels would each be about 340 m long & about 45 m below St Helena Road. Click for more details...

CITY WEST CABLE TUNNEL
City West Cable Tunnel is currently at the Construction stage, valued at about $ 50000000 it is The proposal involves the construction of an electricity transmission cable tunnel to link the Haymarket bulk supply point in Thomas St, Ultimo, to the new City North substation at the corner of Sussex & Erskine Sts, Sydney; construction of an interface with City Central substation; installation of 5 x electricity transmission feeders to transmit electricity to the City North substation; construction of a permanent tunnel adit (entrance) and ventilation intake at the eastern end of Mary Anne St. The ventilation exhaust works would be integrated with the City North substation building. The proposed delivery model for the tunnel project will essentially be a construct only contract, with the exception of the TBM lining which will be design & construct. All other works are designed to a 100% design stage by EnergyAustrala. Click for more details...

PUBLIC TRANSPORT AUTHORITY - BOULDER SUBWAY
Civil Engineering (Tunnels, Subways) project at East end of Burt St, Boulder, WA 6432 of Subway - Refurbishment type of New development. Works comprise refurbishment to Boulder Subway. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Tunnels, Subways) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5A(2) EXPANSION
Civil Engineering (Tunnels, Subways) project for New development. Construction of additionals loops that will lay alongside the existing pipeline. Click for more details...

NORTH WEST RAIL LINK
Consultancy For Geotechnical Investigation New project In The The Hills Shire Council Area. This tender is for the preliminary geotechnical & contamination site investigation for the North West Rail Link route from Epping Station to the proposed stabling facilty at Rouse Hill. Click for more details...

CONCERT HALL PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Perth Council Area of Pedestrian Underpass - Removal type. Works to comprise removal of northern end of Concert Hall pedestrian underpass. Click for more details...

EELUP ROUNDABOUT - FLYOVER & UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Bunbury Council Area of State ownership. Stage 1 includes the construction of a slip lane. The overall proposal includes removal of existing roundabout & construction of flyover from Robertson Dr to Koombana Dr that would then allow traffic from Australind Bypass to travel straight through onto Sandridge Rd. Click for more details...

STIRLING HIGHWAY NEAR FORREST STREET UNDERPASS OR OVERPASS
Underpass/Overpass New project In The Fremantle Council Area. Proposed construction of overpass or underpass details not determined. Click for more details...

SYDNEY CITYGRID PROJECT STAGES 2D & 2E
Civil Engineering (Tunnels, Subways) project In The Sydney Council Area of Tunnel type. Stage 2D - Construction of City East Cable Tunnel between Riley St STSS & City North Zone substation with connections to the proposed City East & existing Dalley Street Zone substations, & a potential services control room adjacent to the Riley St STSS. Stage 2E - Extension of the City South Cable tunnel from Wade Pl to Riley St, Surry Hills. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

SOUTH WEST RAIL LINK
Consultancy For Professional Services Contractors project at from Leppington to, Glenfield, NSW 2167 In The Council Area Of Campbelltown of State. The SWRL involves the design, construction, commissioning & operations of the following key components: Grade-separated flyovers over the Main South Lines to north & south of Glenfield Station & reconfiguration of Glenfield Station. These works are collectively referred to as Glenfield Junction.; A new 13km twin track railway from Glenfield to Rossmore; 2 new railway stations & associated facilities at Edmondson Park & Leppington; A train stabling facility at Rossmore to the west of the new Leppington Station & new carpark at Glenfield. Click for more details...

KWINANA BULK TERMINAL - CONVEYOR ECO3
Civil Engineering (Tunnels, Subways) project at Lot 120 Kwinana Beach Rd, Kwinana Beach, WA 6167 of Conveyor - Design & Reconstruction type of New development. Works to comprise design & reconstruction of a conveyor system & tunnel that were previously damaged by fire at Kwinana Bulk Terminal load out facility. Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - NORTH STRATHFIELD
Rail Tracks/Tunnel/Stations project at ., North Strathfield, NSW 2137 In The Council Area Of Canada Bay of State. Overall project comprises: Construction of the North Strathfield rail underpass. Scope of work includes: new track to connect to the existing relief goods loop at North Strathfield. 2.4 km of new track & upgrade of 850m of existing track. A shallow driven tunnel (under operational tracks). Construction of a new aerial concourse, platform works, stairs, lifts, offices & amenities at Concord West Railway Station. Relocation of an existing RailCorp depot at North Strathfield Station. Associated civil & structural works. Provision of new rail systems, including overhead wire, high voltage, low voltage, communications & signalling. Utility relocations/protection Click for more details...

SYDNEY OPERA HOUSE - VEHICLE ACCESS & PEDESTRIAN SAFETY
Civil Engineering (Tunnels, Subways) project at Lots 4 & 5 Bennelong Point (DP77588 & DP87933), Circular Quay, NSW 2000 of Vehicle Access & Pedestrian Safety type of New development. Vehicle Access & Pedestrian safety project. Construction of an underground tunnel will be built from the bottom of Macquarie St to a new underground loading dock. Remediation of the existing forecourt & road. Other works to improve public safety, security & vehicle access, address occupational health & safety risks & operational & maintenance efficiencies Click for more details...

SYDNEY OPERA HOUSE VEHICLE AND PEDESTRIAN SAFETY PROJECT
Civil Engineering (Tunnels, Subways) project In The Sydney Council Area of State ownership. Construction of an underground loading dock to be located below the Sydney Opera House building & forecourt. Alterations to existing lifts & stairs & construction of new lift services & underground corridors to link the new underground loading dock with the performance areas and back-of-house facilities of the Sydney Opera House. Construction of a new opening on the southern side of the forecourt to create a new vehicle access ramp providing service vehicle access from the existing Macquarie St roundabout down to the new underground loading dock. Removal of recessed vehicle access path flanked by kerbs across the Forecourt, & replacement with a surface level with surrounding paving in same material as existing. Removal of existing guardhouse & construction of new smaller guardhouse. Improvements to forecourt lighting. Removal of existing planter boxes on the southern side of the forecourt. Reconfiguration of the grille to the existing carpark air intake shaft against the Tarpeian wall. Modifications to roof of pedestrian tunnel to existing adjoining carpark where it opens onto the lower concourse level. Relocation of various below ground site services. Relocation of existing at grade forecourt loading facilities to the new underground loading dock facility. Click for more details...

ST GEORGE'S CATHEDRAL HERITAGE PRECINCT - OLD TREASURY BUILDINGS REDEVELOPMENT
Office Tower - 35 Storey project at 54-58 Barrack St, bnd by St George's Tce & Catheral Av, Perth, WA 6001 in the Civil Engineering (Tunnels, Subways). St George's Cathedral Heritage Precinct project to comprise of the construction of a new multi-storey office tower which will accommodate a long term lease from State Government departments. This project will be connected by an undergound vehicle tunnel running under Cathedral Lane to the basements levels of the new office building. The car park will continue to be accessed from Pier St & also from a new ramp descending to the car park from Cathedral Av. Click for more details...

THE LINK (PERTH CITY RAIL LINK PROJECT)
Currently at the Planning stage In Perth is a project estimated to be $ 2500000. This project Tenders are being invited for a surveying consultant with experience working within an operating electrified environment, to undertake a survey for future development to the PTA rail reserve from the eastern face of the Lord Street overpass to the City West Station platform, including area of track from existing Joondalup tunnel through to the Roe Street tunnel. The survey is to collate information on the track, components, overhead wiring, signalling, cable pits, bridges, station building & extent of the platforms. The work must be undertaken by a Licensed Surveyor accredited under the Licensed Surveyors Act 1909 & must hold a practicing certificate. Click for more details...

PRINCE OF WALES HOSPITAL - COMPREHENSIVE CANCER CARE AND BLOOD DISORDER CENTRE
Civil Engineering (Tunnels, Subways) project at 61 High St, Randwick, NSW 2031 for New. Stage 1 Development of a Comprehensive Cancer Care and Blood Disorder Centre comprising demolition of an existing at grade carpark; bulk excavation works; construction of a staff access tunnel to connect the new treatment area to the existing Building 3 (Radiotherapy Department) lift and hospital; an open fire stair at the north east corner of the site; and underground treatment area at underground level 1 containing 4 radiotherapy bunkers. The Stage 1 works will be constructed in the north-east quadrant of the POWH site, on an existing carpark and forecourt area to the east of Building 3, between the Superintendent?s Cottage and the Edmund Blacket Building. Once the above works are completed and commissioned, the existing facility can be decommissioned and demolished to allow the commencement of the Stage 2 works which will complete the construction of the new 9 level CCCBDC. Click for more details...

NORTH WEST RAIL LINK - TUNNEL & STATION CIVIL WORKS
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of Tunnel/Civil Works type. The Tunnel & Station Civil Works Package comprises twin running tunnels each of approximately 6 metres internal diameter & each approximately 15.5 km in length between the Epping Station stub tunnels & Bella Vista station. The running tunnels being constructed predominantly by tunnel boring machine (TBM) plus lengths of tunnel constructed by roadheader. Cross passages between the running tunnels. Mined caverns, niches and openings for rail crossovers & equipment. Excavations for the Cherrybrook, Castle Hill, Hills Centre, Norwest & Bella Vista stations. Permanent concrete lining in all tunnels, caverns, cross passages & underground openings which must allow for all future fixings for track bed & rail services. Safe, secure personnel access/egress into all underground spaces including all necessary temporary support services & site facilities & removal of all temporary work & site facilities not otherwise required for handover to subsequent contractors Click for more details...

WYNYARD WALK
Wynyard Walk is currently at the Planning stage, valued at about $ 10000000 it is Construction of WYnyard Walk. The role of Technical Advisor providing technical support for the delivery of the Main Works contract for the Wynyard Walk project. This role involves - Design management; Procurement support; Construction compliance management; testing & commissioning support & operational readiness support Click for more details...

MALDON TO DOMBARTON RAIL LINK
Maldon To Dombarton Rail Link is currently at the Planning stage, valued at about $ 255000 it is Professional Services Contractor to estimate the costs of constructing the line. This will involve estimating the cost of constructing items already fully designed, items for which only scoping level estimates will be available, as well as updating the estimates as the design is developed. Professional Services Contractors are therefore being sought to provide cost estimating services for the duration of the TfNSW works. Click for more details...

MALDON TO DOMBARTON RAIL LINK- CONSULTANCY
Civil Engineering (Tunnels, Subways) project at Dombarton to, Maldon, NSW 2571 for New. Professional Services Contractor to provide surveying services for property definition and further engineering design. The required services include: property boundary survey, preparation of deposited plans, aerial, topographic detail survey, underground utility service locating & establishment of a project survey control network Click for more details...

MARION PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project at 35 Crozier Tce (Seaford Rail Corridor), Marion, SA 5043 of Pedestrian Underpass type of New development. Construction of underpass, two pedestrian access ramps & associated works including CCTV, lighting to replace existing pedestrian overpass. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Design, Environmental Impact & Demand Modeling Services New project In The Brisbane City Council Area. Consultancy for engineering design, environmental impact statement & transport demand modelling services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area of Consultancy For Rail Operation Assessment Services type. Consultancy for rail operational assessment services for the Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Bus Planning & Operations Services New project In The Brisbane City Council Area. Consultancy for bus planning & operations services for the Brisbane Underground Bus & Train Project. Click for more details...

ROWSLEY CROSSING LOOP
Crossing Loop project at Fisken St, Atkinson St, Rowsley-Station Rd, Ballan, VIC 3342 in the Civil Engineering (Tunnels, Subways). Construction of a new 1 km loop at Rowsley (between Bacchus Marsh & Ballan). The loop will be built near Rowsley-Station Road & will increase the reliability of V/Line passenger & freight trains between Ballarat & Melbourne. Works include; turnouts, 1km of loop, service relocation, earthworks & associated signalling. Construction of the new Rowsley Crossing Loop will reduce the distance between existing crossing loops on the Ballarat line, at Parwan & Bank Box, providing further flexibility for trains to pass each other between these points. The project will also deliver an upgrade of the existing flashing lights rail crossing at Rowsley Station Road to boom barriers, providing a higher level of rail crossing protection for road users. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Airport Rail/Tunnel Link - Structural Manager Consultancy Svcs project at Along Midland Line, Bayswater Station, Tonkin Hwy, Airport West Station to Forrestfield Rail Yards, High Wycombe area, ., WA 6999 In The Council Area Of Various of State. Structural engineer sought to fulfil the role of PTA Major Projects Unit - Structural Manager for the Forrestfield - Airport Link project during the development, procurement & delivery phases of the project. The Structural Manager is required to have significant planning, design & documentation experience with cut & cover bored tunnels structures in the ground & groundwater conditions. Under direction of the Major Projects Executive Director or delegated authority, advice & activities will be conducted under this contract. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Civil Engineering (Tunnels, Subways) project In The Various Council Area of State ownership. Consultancy Services sought for a Station & Buildings Manager for the Forrestfield-Airport Link (FAL) project who will be responsible for managing the overall design development, delivery & commissioning into service of the 3 stations proposed being: Airport West Station, Consolidated Airport Station & Forrestfield Station. Consultancy svcs will also include a similar service for the design, delivery & commissioning of any ad-hoc buildings required on the project such as the tunnel evacuation shaft enclosures. This position is to be filled by an individual possessing relevant professional & technical background in project management, architecture and/or building construction & will be required to provide all of the following svcs: during the construction stage of the project, PTA may exercise an option to procure other personnel through this contract to provide superintendent's representative svcs to support the FAL stations delivery team. Click for more details...

BRIDGE INN ROAD TUNNEL CONSTRUCTION
Bridge Inn Road Tunnel Construction is currently at the Construction stage, valued at about $ 3000000 it is Civil works for tunnel construction. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Construction stage In Various is a project estimated to be $ 236000. This project Tunnel Boring Machine Advisor consultancy services sought for the development, procurement & delivery stages of the Forrestfield - Airport Link (FAL) project who is required to have strong experience with design, manufacture, operation & maintenance of Slurry, Earth Pressure Balance (EPB) & Dual mode tunnel boring machines (TBMs), with extensive experience in local & international bore tunnelling projects, mainly in soft ground conditions such as the ground & groundwater conditions similar to Perth Coastal Plain. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect