State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tunnels, Subways Projects


NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
Civil Engineering (Tunnels, Subways) project at Btwn Northern Suburbs Railway & Narrows Bridge, Perth, WA 6000 of Road Infrastructure - Consultancy Services For Package F type of New development. Tenders were invited from suitably qualified & experienced consultants for provision of road infrastructure specialist technical support services during implementation of New MetroRail City Project under Contract 27/03. Primary function of specialist technical advisers will be to independently review & advise on aspects of road infrastructure designs for Contract 27/03 on an as & when required basis (Contract 27/03 is Package F works). Click for more details...

PARRAMATTA RAIL LINK
Currently at the Planning stage In Parramatta is a project estimated to be $ 100000000. This project Provision of contract management services for the Epping to Chatswood section of the project. This section will include tunnels from Epping to the North Shore Line corridor north of Chatswood station, rail systems including permanent way, signalling, traction electrical system & other rail services, 5 underground stations & associated minor works. Click for more details...

SOUTH COAST RAIL CORRIDOR
Civil Engineering (Tunnels, Subways) project for Addition development. Proposed upgrade of rail link from Wollongong to Sydney with a 14 kilometre bypass tunnel between Thirroul & Waterfall. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

ROE HIGHWAY
Civil Engineering (Tunnels, Subways) project In The Various Council Area of Roadworks - Stage 6 - Design & Construction type. Stage 6 to be built as 4.5 km lane dual carriageway controlled access highway constructed to freeway standards & to run from Nicholson Rd to South St. To be constructed initially as four lanes, with provision for expansion to allow for third lane in both directions - this will be constructed at later stage. Project will include construction of interchange at Willeri Dr & connections to South St. Bridge will be constructed over Willeri Dr, with on/off ramp connections to Roe Hwy, principal shared path along north side linking into local networks & pedestrian underpass will be constructed under Willeri Dr. Project also includes significant traffic improvements on Willeri Dr/Collins Rd & Willeri Dr/Bannister Rd intersections. Click for more details...

GERALDTON SOUTHERN TRANSPORT CORRIDOR
State ownership Civil Engineering (Tunnels, Subways) project In The City Of Greater Geraldton Council Area for New development. Stage 1 works to comprise construction of new single railway line from Narngulu Industrial Area to Geraldton Port, approximately 4.9 km of highway from North West Coastal Hwy into Port precinct, four road bridges & two rail tunnels. Contract also incorporates modifications within Port precinct that will accommodate concurrent unloading of long grain trains & ore trains. Click for more details...

NEW METRORAIL PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 432000. This project Provision of expert technical advice to City Project team during design review phase. Click for more details...

EASTWOOD RAILWAY STATION
Eastwood Railway Station is currently at the Construction stage, valued at about $ 4000000 it is Upgrading of railway station including provision of easy access facilities, installation of lifts, toilets, improved security, widening of subway. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Tunnels, Subways) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

LANE COVE TUNNEL
Tunnel/Road Link project at M2 to Gore Hill Freeway, Lane Cove, NSW 2066 in the Civil Engineering (Tunnels, Subways). 6 lane twin tunnel under Epping Rd to link The Gore Hill Freeway with proposed extended M2 North West Transport Corridor, new north-facing ramps from Falcon St. Click for more details...

MELBOURNE TO SYDNEY RAIL INFRASTUCTURE UPGRADE
New project of Civil Engineering (Tunnels, Subways) project at Melbourne to Sydney, ., VIC 3999. Package 1 to consist of 220 km of new track which will loop near & follow existing track, extensive sleeper replacement & track geometry improvement. Greenfields refurbishment. Around 60% of work in Victoria & large amount of work on metropolitan route. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standard gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

EASTERN FREEWAY EXTENSION/TUNNEL SECTION/PARK ROAD TO DEEP CREEK ROAD
Eastern Freeway Extension/Tunnel Section/Park Road To Deep Creek Road is currently at the Planning stage, valued at about $ 200000000 it is Park Road to Deep Creek Road section of the Eastern Freeway Extension. This contract will include the detailed design, construction, operation and maintenance of twin road tunnels approximately 1.5km long. Click for more details...

FREMANTLE PRISON
Civil Engineering (Tunnels, Subways) project at Tunnels complex below East Workshops, Fothergill St, Fremantle, WA 6160 for Renovations, Refurbishments etc.. Works comprise excavation of shaft S2, light scaling of tunnels, excavation of limestone plinth, treatment of walls & ceiling of tunnels, disbursal of silt & such other work as shown on drawings or included in specification. Date of Practical Completion: Prior to 30 November 2004. Click for more details...

CANBERRA MONORAIL SYSTEM
Civil Engineering (Tunnels, Subways) project at linking town centres, Canberra, ACT 2600 of High Speen Monorail type of New development. Proposed construction of a monorail transport system linking Civic to the ACT town centres of Tuggeranong, Woden, Belconnen & Gungahlin, undergrounding of Northbourne Avenue, construction of road bridges, construction of a civic plaza below City Hill. Click for more details...

KARRAKATTA TRAFFIC UNDERPASS (ADERDARE ROAD UNDERPASS)
Currently at the Construction stage In Nedlands is a project estimated to be $ 6300000. This project Works to comprise of design & construction of road underpass under rail & PSP bridge at Stubbs Terrace site (south of Aberdare Rd & Karrakatta Subway) & all connections. PTA's Rail Maintenance contractor will remove railway & relay railway in dedicated shutdown period to facilitate underpass construction below rail. Click for more details...

SYDNEY TO BRISBANE MAIN NORTH LINE
various locations on the main north line, Sydney, NSW 2000 Has Sydney To Brisbane Main North Line currently at Construction stage. Major upgrading of the main rail line from Sydney to Brisbane, earthworks, track upgrade, new & upgrade of rail bridges, upgrade of signal system. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Tunnels, Subways). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

AIRPORT LINK TUNNEL & NORTHERN BUSWAY (WINDSOR TO KEDRON)
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. Airport Link is a mainly underground toll road proposed to connect Brisbane's northern arterials of Gympie Road and Stafford Road at Kedron, and Sandgate Road and the East-West Arterial at Clayfield to the Inner City Bypass and North-South Bypass Tunnel at Bowen Hills. Airport Link to include 6.7 km dual tunnels, Northern Busway to include 3km 2 lane busway including 1.5 km between Windsor & Kedron, busway stations at Lutwyche & Kedron & Airport Dr flyover include 750 m flyover to link East-West Arterial Rd to Airport Dr, replacemrnt of roundabout with signalised intersection & upgrade of the East-West Arterial to 3 lanes each way. Click for more details...

PACIFIC HIGHWAY UPGRADE - TINTENBAR TO EWINGSDALE
Civil Engineering (Tunnels, Subways) New project at Pacific Hwy from Tintenbar to, Ewingsdale, NSW 2481. This type is Roadworks with State ownership. Proposed upgrade of approximately 17 km, starting at Ross Lane in Tintenbar & extending north to the existing Ewingsdale interchange, near the settlement of Ewingsdale. At Ross Lane, the proposed upgrade would connect to the north end of the proposed Ballina bypass. The proposed upgrade includes: Four-lane divided carriageways (2 lanes each way), with a wide median allowing for the future addition of a third lane in each direction. Connection to the northern end of the Ballina bypass at the proposed Ross Lane interchange. A new northbound on-ramp & a new southbound off-ramp would be provided. The remainder of this interchange will be constructed as part of the Ballina bypass project. Upgrading of the existing Ewingsdale interchange to provide full access between the modified local and regional road network & the highway. A half interchange at Ivy Lane. North-facing ramps would provide access between the local road network and the proposed upgraded highway to the north. A half interchange at Bangalow. South-facing ramps would provide access between the local road network, including to Bangalow and Lismore & the proposed upgrade to the south. This arrangement would replicate the arrangement with the existing Bangalow bypass which also has south-facing ramps only. Six twin bridges & 4 underpasses allowing roads and creeks to pass underneath the proposed upgrade. These would include twin bridges above Byron Creek and the existing Casino-Murwillumbah railway on the north side of Byron Creek. Two bridges carrying local roads over the proposed upgrade, one for Broken Head Road and one about 500 m north of Lawlers Lane providing access to several properties east of the upgrade. Protection screens would be provided on both bridges. The existing highway would be retained as a continuous road for local and regional traffic. Twin parallel tunnels under St Helena ridge (one tunnel for each carriageway). The tunnels would each be about 340 m long & about 45 m below St Helena Road. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

EELUP ROUNDABOUT - FLYOVER & UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Bunbury Council Area of State ownership. Stage 1 includes the construction of a slip lane. The overall proposal includes removal of existing roundabout & construction of flyover from Robertson Dr to Koombana Dr that would then allow traffic from Australind Bypass to travel straight through onto Sandridge Rd. Click for more details...

LEGACY WAY NORTHERN LINK TUNNEL (TOOWONG TO KELVIN GROVE)
Civil Engineering (Tunnels, Subways) project for New development. 5 km tunnel (toll road) linking Western Freeway at Toowong with Inner City By-pass at Kelvin Grove, running under Toowong, Auchenflower, Paddington, Red Hill, Spring Hill & Kelvin Grove. Design,construction, operation, maintenance and operations for up to 20 years. Click for more details...

STIRLING HIGHWAY NEAR FORREST STREET UNDERPASS OR OVERPASS
Underpass/Overpass New project In The Fremantle Council Area. Proposed construction of overpass or underpass details not determined. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

SOUTH WEST RAIL LINK
Consultancy For Professional Services Contractors project at from Leppington to, Glenfield, NSW 2167 In The Council Area Of Campbelltown of State. The SWRL involves the design, construction, commissioning & operations of the following key components: Grade-separated flyovers over the Main South Lines to north & south of Glenfield Station & reconfiguration of Glenfield Station. These works are collectively referred to as Glenfield Junction.; A new 13km twin track railway from Glenfield to Rossmore; 2 new railway stations & associated facilities at Edmondson Park & Leppington; A train stabling facility at Rossmore to the west of the new Leppington Station & new carpark at Glenfield. Click for more details...

RAINE SQUARE UNDERPASS
Underpass project at Btwn Raine Sq & William St, Perth, WA 6000 In The Council Area Of Perth of Private. To include the construction of a pedestrian tunnel connecting the lower level of the Raine Square & the concourse level of the Perth (William St) railway station. Works expected to be done in 3 stages. Stage 1 works (July - August 2009), approx 6.5 weeks comprising of Step 1. The eastern two thirds of William St to be closed to enable installation of sheet piles on all four sides of the site area as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 2. Soil within stage 1 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & then the stage 1 roof slab & horizontal piers to the outer wall of the railway station will be constructed. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 2 works (August - September 2009), approx 4.5 weeks. Step 3. comprising of western third of William St to be closed to enable installation of sheet piles on all three sides of the site area, as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 4. Soil within stage 2 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & sheet pile wall will be removed about roof level. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 3 works (February - March 2010) 7 weeks. Step 5. Comprising of soil to be excavated from underneath the roof slab, & a ground floor slab & footings for the walls will be constructed. Step 6. Comprising permanent retaining walls will be constructed on the inside of the sheet piling. Step 7. Comprising of temporary sheet piles will be removed to connect the tunnel with the railway station concourse & Raine Square basement, remaining soil will be excavated & retaining walls built back to the existing structures. Step 8. Comprising floor slab will be constructed between the retaining walls & existing structures. Existing D-wall will be demolished & a new lintel beam constructed for support. Close up access hole in tunnel roof slab. Click for more details...

LIFEHOUSE AT RPA - CHRIS O'BRIEN CANCER CENTRE
Private ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Relocation of part of the existing sub ground tunnel & associated services. Excavation, perimeter shoring and erection of retaining walls and construction hoardings. The bulk excavation will facilitate the future construction of 3 basement levels. Click for more details...

HEATHCOTE ENGADINE & PEPPERMINT GROVE TUNNELS
Currently at the Construction stage In Sutherland is a project estimated to be $ 915000. This project Rehabilitation of the Heathcote Engadine & Peppermint Grove tunnels. Scope of Work ? common to both sites - includes but is not necessarily limited to: Site establishment; reinstatement of access tracks if required to provide safe vehicle access; provision of all confined spaces measures including access, ventilation and odour control (if necessary) to facilitate the internal rehabilitation; removal of any silt, fretted rock & debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; coordination with Sydney Water, any other relevant authorities & the adjoining property owners to arrange access & manage pedestrian movements necessary to implement the rehabilitation & site restoration. Scope of Work ? Heathcote-Engadine Carrier which includes but is not necessarily limited to: Erection of scaffold over Scouts Creek to minimise potential impacts on the creek and to provide safe access for personnel & equipment from the site establishment area to the manhole; coordination with Sydney Water in regard to flow management strategies and wet weather requirements; set-up of a flow management regime to /or internal bypass to deal with incoming flows from the rising main of SP0275 & SP0589; removal of root ingress 9 m downstream of manhole; internal patch repairs of areas with severe deterioration of the 19m of unreinforced concrete lining of the sewer starting from and including the upstream manhole, this includes cleaning & surface preparation of internal concrete & brick surfaces, reinstatement in areas of degradation as required in readiness for application of protective coating system; removal & replacement of cast iron 2 part watertight access covers and cast in frame & removal & replacement of all step irons in upstream manhole. Scope of Work ? Peppermint Grove Carrier which includes but is not necessarily limited to: localised patch repairs with mesh & shotcrete over seam for a total of approximately 18m at CH149-CH161 & CH590-CH596; repairs with mesh & shotcrete to the walls only for approximately 102m at CH172-CH274; localised patch repairs with mesh & shotcrete to roof only for approximately 3m at CH492-CH495; full perimeter repairs with mesh & shotcrete for approximately 63m at CH527-CH590 & possible construction of a temporary 300mm service shaft in Cutler Rd to assist with completion of the shotcrete work. Click for more details...

ST GEORGE'S CATHEDRAL HERITAGE PRECINCT - OLD TREASURY BUILDINGS REDEVELOPMENT
Office Tower - 35 Storey project at 54-58 Barrack St, bnd by St George's Tce & Catheral Av, Perth, WA 6001 in the Civil Engineering (Tunnels, Subways). St George's Cathedral Heritage Precinct project to comprise of the construction of a new multi-storey office tower which will accommodate a long term lease from State Government departments. This project will be connected by an undergound vehicle tunnel running under Cathedral Lane to the basements levels of the new office building. The car park will continue to be accessed from Pier St & also from a new ramp descending to the car park from Cathedral Av. Click for more details...

THE LINK (PERTH CITY RAIL LINK PROJECT)
Currently at the Planning stage In Perth is a project estimated to be $ 2500000. This project Tenders are being invited for a surveying consultant with experience working within an operating electrified environment, to undertake a survey for future development to the PTA rail reserve from the eastern face of the Lord Street overpass to the City West Station platform, including area of track from existing Joondalup tunnel through to the Roe Street tunnel. The survey is to collate information on the track, components, overhead wiring, signalling, cable pits, bridges, station building & extent of the platforms. The work must be undertaken by a Licensed Surveyor accredited under the Licensed Surveyors Act 1909 & must hold a practicing certificate. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of State ownership. This tender is develop cost plans, estimates for project options & pricing schedules for the North West Rail Link. The project will provide 23km of new rail infrastructure from Epping to Rouse Hill Click for more details...

WYNYARD WALK
State ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Provide direct, level safe accessible pedestrian route between Barangaroo & Wynyard precinct transport hub which is integrated with the existing road & footpath networks. A new multi-storey building (above & below ground) forming the western entrance to Wynyard Station (from Clarence St) to provide direct access to the station concourse. A new 3.5 metre high & 9 metres wide (internal dimensions) pedestrian tunnel, approximately 110 metres long, providing a grade separated link from the western entrance structure to Wynyard Station Concourse under Clarence, Margaret & Kent Sts to Napoleon Node (bounded by Sussex St, Westpac Plaza, Kent & Napoleon St). Structural works to facilitate transfer of building loads around the envelope of the proposed tunnel which may involve the use of prefabricated steel beams, supporting columns & temporary jacking frames. A paved public pedestrian plaza at the Napoleon Node. which will connect the Wynyard Walk tunnel & bridge components. A pedestrian bridge link over Sussex St providing a grade separated connection between Sussex St & Napoleon Node. The bridge will provide a 6 metre width & 5.5 metre vertical clearance to Sussex St. Vertical transportation (lifts, escalators & stairs). Click for more details...

MALDON TO DOMBARTON RAIL LINK
Maldon To Dombarton Rail Link is currently at the Planning stage, valued at about $ 255000 it is Professional Services Contractor to estimate the costs of constructing the line. This will involve estimating the cost of constructing items already fully designed, items for which only scoping level estimates will be available, as well as updating the estimates as the design is developed. Professional Services Contractors are therefore being sought to provide cost estimating services for the duration of the TfNSW works. Click for more details...

MALDON TO DOMBARTON RAIL LINK- CONSULTANCY
Civil Engineering (Tunnels, Subways) project at Dombarton to, Maldon, NSW 2571 for New. Professional Services Contractor to provide surveying services for property definition and further engineering design. The required services include: property boundary survey, preparation of deposited plans, aerial, topographic detail survey, underground utility service locating & establishment of a project survey control network Click for more details...

MILES SEWERAGE NETWORKS UPGRADE (WORK PACKAGE 1)
New project of Civil Engineering (Tunnels, Subways) project at ., Miles, QLD 4415. Construction of Miles Sewerage Network Upgrade Work Package 1. Works to include tunnelling Warrego Highway, Leichhardt Highway & Eastern Line Railways at Miles. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Design, Environmental Impact & Demand Modeling Services New project In The Brisbane City Council Area. Consultancy for engineering design, environmental impact statement & transport demand modelling services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Civil Engineering (Tunnels, Subways) project at ., Brisbane, QLD 4000 of Consultancy For Financial/Commercial & Economic Advisory Services type of New development. Consultancy for commercial & financial economic advisory services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Bus Planning & Operations Services New project In The Brisbane City Council Area. Consultancy for bus planning & operations services for the Brisbane Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. Consultancy for cost estimating, risk & project scheduling advisory services for the Brisbane Underground Bus & Train Project. Click for more details...

ROWSLEY CROSSING LOOP
Crossing Loop project at Fisken St, Atkinson St, Rowsley-Station Rd, Ballan, VIC 3342 in the Civil Engineering (Tunnels, Subways). Construction of a new 1 km loop at Rowsley (between Bacchus Marsh & Ballan). The loop will be built near Rowsley-Station Road & will increase the reliability of V/Line passenger & freight trains between Ballarat & Melbourne. Works include; turnouts, 1km of loop, service relocation, earthworks & associated signalling. Construction of the new Rowsley Crossing Loop will reduce the distance between existing crossing loops on the Ballarat line, at Parwan & Bank Box, providing further flexibility for trains to pass each other between these points. The project will also deliver an upgrade of the existing flashing lights rail crossing at Rowsley Station Road to boom barriers, providing a higher level of rail crossing protection for road users. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 500000. This project Transaction Advisory Consultancy svcs sought to assist with the Forrestfield - Perth Link project's transaction phase & potentially for the provision of continued svcs during the project's delivery phase. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Civil Engineering (Tunnels, Subways) project at Along Midland Line, Bayswater Station, Tonkin Hwy, Airport West Station, to Forrestfield Rail, ., WA 6999 for New. Stations Reference Design & Technical Specification consultancy svcs for the Forrestfield - Airport Rail/Tunnel Link project. The consultant is to be suitably skilled & experienced in Architectural, Structural & Building Svcs to continue with the conceptual work done so far & develop further to a reference Design for the 3 stations & above ground building infrastructure being the tunnel portals & emergency egress shafts, to a sufficient level. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Forrestfield - Perth Airport Rail/Tunnel Link Project is currently at the Early Planning stage, valued at about $ 733000 it is Commissioning Advisory Consultancy svcs to be provided during the development, procurement & delivery stages of the Forrestfield - Airport Link (FAL) project & is required to have significant experience in commissioning of major public transport system infrastructure in an operation electrified railway environment, to assist engineering discipline managers by providing them with detailed commissioning input into the SWTC & reference designs, highlighting design & specification improvements that will enhance the infrastructure commissioning, integration & handover to PTA. Click for more details...

ARNCLIFFE PEDESTRIAN LINK
Pedestrian Tunnel New project In The Rockdale Council Area. Construction of a pedestrian tunnel under the T4 Eastern Suburbs & Illawarra railway line. The pedestrian tunnel would be constructed through the existing railway line embankment. It would be approximately 35m in length, 3.7m high & 4.3m wide. Connection of the new underpass to the existing footpath network, modification of kerb lines. Modification of landscaping on the eastern & western portals Click for more details...

BRIDGE INN ROAD TUNNEL CONSTRUCTION
Bridge Inn Road Tunnel Construction is currently at the Construction stage, valued at about $ 3000000 it is Civil works for tunnel construction. Click for more details...

ASPHALT MAINTENANCE WORKS
Roadworks - Bituminous Surfacing New project In The Various Council Area. The Principal invites tenders for the provision of minor asphalt maintenance works on various roads across South Australia. Work will consist of the planing of defected, marked on road pavement of varying size patches & reinstating with asphalt (AC10) of varying depths. In some areas with high levels of heavy vehicle movement, AC10 modified asphalt shall be placed as directed by the Superintendent. The tender shall consist of both Defined & Provisional Works. Upon completion of work at each location, the Tenderer shall : a) sweep the area to remove any loose debris, & b) consult with the Superintendents Representative regarding aftercare signage requirements. Supply of Materials: All materials shall be supplied by the Tenderer. Click for more details...

BROADBENT GRAIN TUNNEL
Civil Engineering (Tunnels, Subways) project at Ballarat Western Link Rd, Ballarat, VIC 3350 for New. Construction of grain tunnel & silo bases for the Broadbent Grain Handling Facility. Works include programming, concrete, piling, precast concrete, reinforcement. Click for more details...

CROSS RIVER RAIL - ENGINEERING DESIGN
A project in the QLD Within Brisbane City. Engineering Design & Impact Assessment for the Preliminary Evaluation phase of the Cross River Rail Project. The Preliminary Evaluation will include project option analysis & preliminary analysis to identify project options for further detailed analysis of a preferred solution during the Business Case phase. The scope of services required under this engagement will include engineering design, rail civil & systems, underground structures, design & delivery risk, client-side procurement phase support, impact assessment, environmental impact, architectural & urban design, pedestrian modeling & micro-simulation/intersection modeling. Click for more details...

RHYNDASTON RAIL TUNNEL
Currently at the Construction stage In Southern Midlands is a project estimated to be $ 845000. This project Construction of rehabilitation of air ventilation chimneys at the Rhyndaston Rail Tunnel in Southern Tasmania. Works to include controlled excavation & replacement of existing brick stack with concrete pipes. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect