State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tunnels, Subways Projects


WEST KEIRA & WOLLONGONG CENTRE SHOPPING CENTRE
Shopping Centre - 6 Storey Addition project In The Wollongong Council Area. Demolition of the existing structures on the West Kiera site. Construction of a new 6 level retail centre on West Keira St comprising 80 speciality shops, Coles supermarket, fresh food precinct, 600 seat food court, outdoor eating area & more than 650 car spaces. The shopping centre will be interconnected by a tunnel & bridge under/over Keira St to the existing Wollongong Central shopping centre. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
Civil Engineering (Tunnels, Subways) project at Btwn Northern Suburbs Railway & Narrows Bridge, Perth, WA 6000 of Road Infrastructure - Consultancy Services For Package F type of New development. Tenders were invited from suitably qualified & experienced consultants for provision of road infrastructure specialist technical support services during implementation of New MetroRail City Project under Contract 27/03. Primary function of specialist technical advisers will be to independently review & advise on aspects of road infrastructure designs for Contract 27/03 on an as & when required basis (Contract 27/03 is Package F works). Click for more details...

PORT OF ESPERANCE ACCESS CORRIDOR
Access Corridor - Design & Construction Addition project In The Esperance Council Area. It is proposed to upgrade freight access corridor to Port of Esperance comprising of: realignment of Harbour Rd with a bridge over the railway line to the southern side of the track, also realignment of the railway lines to the northern side of Harbour Rd, improvements to the pedestrian & cycle access across the freight transport corridor, replacement of 2 level crossings at Watson St & The Esplanade with bridges from Twilight Beach Rd to The Esplanade & Harbour Rd to Johns St, preparatory works for the future upgrading of Harbour Rd to 4 lanes & a dualing of the railway lines. Noise walls will be built & the final road surface sealed with asphalt to reduce traffic noise. Click for more details...

MARTHA COVE - STAGE 1
New project of Civil Engineering (Tunnels, Subways) project at Marina Dve & Dromana Pde, Safety Beach, VIC 3936. Stage 1 - Earthworks, tunnel and seaway of waterfront development on 94 ha. Click for more details...

PENRITH MEGA BASE HOMEBASE
Civil Engineering (Tunnels, Subways) project at Mulgoa Rd cnr Wolesley St, Jamisontown, NSW 2750 for New. External roadworks, including construction of tunnel beneath Mulgoa Rd. Click for more details...

PARRAMATTA RAIL LINK
Currently at the Planning stage In Parramatta is a project estimated to be $ 100000000. This project Provision of contract management services for the Epping to Chatswood section of the project. This section will include tunnels from Epping to the North Shore Line corridor north of Chatswood station, rail systems including permanent way, signalling, traction electrical system & other rail services, 5 underground stations & associated minor works. Click for more details...

CENTRAL PERTH RAILWAY LAND REDEVELOPMENT
New project of Civil Engineering (Tunnels, Subways) project at Railway line btwn Horseshoe Bridge & Mitchell Fwy, btwn Perth &, Northbridge, WA 6003. Works comprise preliminary design & costing to +/-10% accuracy of lowering of railway tracks between Mitchell Fwy & Perth Central Station. Design is to be based on Option 2 contained in report entitled "Railway Lowering Concepts - Mitchell Freeway to Perth Central Station" by Kellogg Brown & Root Pty Ltd, dated 17 February 2003. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

NEW METRORAIL PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 432000. This project Provision of expert technical advice to City Project team during design review phase. Click for more details...

LEWISHAM TRUCK TUNNEL
Tunnel/Roadworks project at from M4 & Parramatta Rd to Princes Hwy, St Peters, NSW 2044 In The Council Area Of Marrickville of State. Proposed 2 lane 13 kilometre dual truck road including a tunnel under Sydenham Road Marrickville joining Parramatta Road & M4 at Lewisham with Princes Hwy at St Peters with exit & entry ramps at Parramatta Rd & Princes Hwy, two exhaust stacks. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Tunnels, Subways) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

LANE COVE TUNNEL
Tunnel/Road Link project at M2 to Gore Hill Freeway, Lane Cove, NSW 2066 in the Civil Engineering (Tunnels, Subways). 6 lane twin tunnel under Epping Rd to link The Gore Hill Freeway with proposed extended M2 North West Transport Corridor, new north-facing ramps from Falcon St. Click for more details...

AUSTRALIAN INLAND RAIL EXPRESSWAY
Civil Engineering (Tunnels, Subways) project In The Various Council Area of Freight Rail Expressway type. The Australian Inland Expressway is expected to be in three sections from Victoria through NSW and on to Brisbane. Dual standard gauge 4500 km railway line. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

MELBOURNE TO SYDNEY RAIL INFRASTUCTURE UPGRADE
New project of Civil Engineering (Tunnels, Subways) project at Melbourne to Sydney, ., VIC 3999. Package 1 to consist of 220 km of new track which will loop near & follow existing track, extensive sleeper replacement & track geometry improvement. Greenfields refurbishment. Around 60% of work in Victoria & large amount of work on metropolitan route. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standard gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

UPPER BLUE MOUNTAINS SEWERAGE SYSTEM
Sewerage System project at Various, Blackheath, NSW 2785 in the Civil Engineering (Tunnels, Subways). Sewerage system comprising upgrade & augmentation of Mount Victoria sewerage treatment plant, new treatment plant at Blackheath, new pumping station at Medlow Bath, rising main from Medlow Bath to the Blackheath gravity sewer connection. Extension of the Sewage Transfer Tunnel between Mount Victoria & Katoomba. Click for more details...

SPRINGVALE ROAD/RAIL SEPARATION PROJECT
Civil Engineering (Tunnels, Subways) project In The Whitehorse Council Area of State ownership. To eliminate the railway crossing at Springvale Road near Whitehorse Road intersection, a rail underpass will be constructed with the railway line to be lowered up to six meters on the western side of Springvale Road and the road to bridge over the railway line. A new railway station will be built on the west side of Springvale Road, replacing the existing Nunawading Station on the east side of Springvale Road. The station will be constructed as a continuous island platform with tracks either side. There will be space for a future third track. The platform will link to stairs and lifts on either side of Springvale Road, at the side of the current level crossing. Upgraded customer facilities will include bicycle storage, taxi rank and new drop-off and parking area at street level. The new station entry and ticket sales will be at street level and stairs and a lift will descend to the platform. Click for more details...

NORTH-SOUTH BYPASS TUNNEL (NSBT)
J/V - Private & Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. 6.8 km. To include 4.7 kms of tunnels with road connections to South East Freeway, Ipswich Rd, Inner City Bypass & Lutwyche Rd. Click for more details...

EASTERN FREEWAY EXTENSION/TUNNEL SECTION/PARK ROAD TO DEEP CREEK ROAD
Eastern Freeway Extension/Tunnel Section/Park Road To Deep Creek Road is currently at the Planning stage, valued at about $ 200000000 it is Park Road to Deep Creek Road section of the Eastern Freeway Extension. This contract will include the detailed design, construction, operation and maintenance of twin road tunnels approximately 1.5km long. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Railway - Package A - Design & Construction Managerial Services project at Btwn Perth (Narrows Bridge) & Mandurah, ., WA 6999 In The Council Area Of Various of State. Provision of design & construction managerial services for design & construction of Package A (70 km railworks). Click for more details...

FREMANTLE PRISON
Tunnels - Access Works project at East Workshops, Fothergill St, Fremantle, WA 6160 in the Civil Engineering (Tunnels, Subways). Works comprise conservation of existing masonry wall to pump house, including removal of brick infill panels from walls, paint removal, repointing of walls & rebuilding quoining, replacement of failed joinery, fabrication & installation of system of access ramps & ladders to access tunnels complex & such other work as shown on the drawings or included in specification. Contract length: 10 weeks. Click for more details...

CANBERRA TRANSITWAY
Civil Engineering (Tunnels, Subways) project at College St, Barry Dr & Belconnen Way to CBD,, Canberra City, ACT 2601 for New. Proposed construction of a 6.9 kilometre, 7 metre wide bus only transitway from Belconnen to Canberra City, works include a tunnel through Bruce & O'Connor Ridge. Click for more details...

RYDE TOWN CENTRE - TOP RYDE CIVIC PRECINCT
Plaza/Walkways/Bridge project at Devlin St, Ryde, NSW 2112 In The Council Area Of Ryde of Local Govt. Proposed upgrade & additions to the Ryde town centre, work to include a plaza over Devlin Street linking the Civic Centre with the Top Ryde Shopping Centre, pedestrian links & footbridges, road tunnel, civic open space. Click for more details...

SYDNEY TO BRISBANE MAIN NORTH LINE
various locations on the main north line, Sydney, NSW 2000 Has Sydney To Brisbane Main North Line currently at Construction stage. Major upgrading of the main rail line from Sydney to Brisbane, earthworks, track upgrade, new & upgrade of rail bridges, upgrade of signal system. Click for more details...

PACIFIC HIGHWAY UPGRADE - TINTENBAR TO EWINGSDALE
Civil Engineering (Tunnels, Subways) New project at Pacific Hwy from Tintenbar to, Ewingsdale, NSW 2481. This type is Roadworks with State ownership. Proposed upgrade of approximately 17 km, starting at Ross Lane in Tintenbar & extending north to the existing Ewingsdale interchange, near the settlement of Ewingsdale. At Ross Lane, the proposed upgrade would connect to the north end of the proposed Ballina bypass. The proposed upgrade includes: Four-lane divided carriageways (2 lanes each way), with a wide median allowing for the future addition of a third lane in each direction. Connection to the northern end of the Ballina bypass at the proposed Ross Lane interchange. A new northbound on-ramp & a new southbound off-ramp would be provided. The remainder of this interchange will be constructed as part of the Ballina bypass project. Upgrading of the existing Ewingsdale interchange to provide full access between the modified local and regional road network & the highway. A half interchange at Ivy Lane. North-facing ramps would provide access between the local road network and the proposed upgraded highway to the north. A half interchange at Bangalow. South-facing ramps would provide access between the local road network, including to Bangalow and Lismore & the proposed upgrade to the south. This arrangement would replicate the arrangement with the existing Bangalow bypass which also has south-facing ramps only. Six twin bridges & 4 underpasses allowing roads and creeks to pass underneath the proposed upgrade. These would include twin bridges above Byron Creek and the existing Casino-Murwillumbah railway on the north side of Byron Creek. Two bridges carrying local roads over the proposed upgrade, one for Broken Head Road and one about 500 m north of Lawlers Lane providing access to several properties east of the upgrade. Protection screens would be provided on both bridges. The existing highway would be retained as a continuous road for local and regional traffic. Twin parallel tunnels under St Helena ridge (one tunnel for each carriageway). The tunnels would each be about 340 m long & about 45 m below St Helena Road. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Tunnels, Subways) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

NORTH WEST RAIL LINK
Consultancy For Geotechnical Investigation New project In The The Hills Shire Council Area. This tender is for the preliminary geotechnical & contamination site investigation for the North West Rail Link route from Epping Station to the proposed stabling facilty at Rouse Hill. Click for more details...

NORTH WEST RAIL LINK
A project in the NSW Within The Hills Shire. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

EELUP ROUNDABOUT - FLYOVER & UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Bunbury Council Area of State ownership. Stage 1 includes the construction of a slip lane. The overall proposal includes removal of existing roundabout & construction of flyover from Robertson Dr to Koombana Dr that would then allow traffic from Australind Bypass to travel straight through onto Sandridge Rd. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

M5 CORRIDOR EXPANSION - M5 SOUTH WEST MOTORWAY WIDENING
Civil Engineering (Tunnels, Subways) project at M5, ., NSW 2999 for New. Proposal to widen around 20 kilometres of the M5 South West Motorway between King Georges Rd, Beverley Hills & Camden Valley Way, Casula. The project would include: Additional lanes on the M5 South West Motorway for the majority of its length, the additional lanes would be provided by pavement widening, asphalt overlays and new line marking. An operations management control system on and in the vicinity of the M5 South West Motorway, to include a new control building at Hammondville and variable message signs on the motorway and surrounding arterial roads. Bridge widening, by placing new infill decking in the central median between existing bridges over Queen St & Nuwarra Rd. Noise attenuation measures at various locations along the M5 South West Motorway between King Georges Rd & Camden Valley Way. The project also includes associated or ancillary works, activities, uses, structures or facilities for the purposes of the project, including (but not limited to) any of the following: Construction & associated construction site compounds. Drainage works and drainage modifications. Landscaping. Environmental management and pollution control. The project does not include preliminary works associated with the desig Click for more details...

SYDNEY OPERA HOUSE - VEHICLE ACCESS & PEDESTRIAN SAFETY
Civil Engineering (Tunnels, Subways) project at Lots 4 & 5 Bennelong Point (DP77588 & DP87933), Circular Quay, NSW 2000 of Vehicle Access & Pedestrian Safety type of New development. Vehicle Access & Pedestrian safety project. Construction of an underground tunnel will be built from the bottom of Macquarie St to a new underground loading dock. Remediation of the existing forecourt & road. Other works to improve public safety, security & vehicle access, address occupational health & safety risks & operational & maintenance efficiencies Click for more details...

SYDNEY OPERA HOUSE VEHICLE AND PEDESTRIAN SAFETY PROJECT
Civil Engineering (Tunnels, Subways) project In The Sydney Council Area of State ownership. Construction of an underground loading dock to be located below the Sydney Opera House building & forecourt. Alterations to existing lifts & stairs & construction of new lift services & underground corridors to link the new underground loading dock with the performance areas and back-of-house facilities of the Sydney Opera House. Construction of a new opening on the southern side of the forecourt to create a new vehicle access ramp providing service vehicle access from the existing Macquarie St roundabout down to the new underground loading dock. Removal of recessed vehicle access path flanked by kerbs across the Forecourt, & replacement with a surface level with surrounding paving in same material as existing. Removal of existing guardhouse & construction of new smaller guardhouse. Improvements to forecourt lighting. Removal of existing planter boxes on the southern side of the forecourt. Reconfiguration of the grille to the existing carpark air intake shaft against the Tarpeian wall. Modifications to roof of pedestrian tunnel to existing adjoining carpark where it opens onto the lower concourse level. Relocation of various below ground site services. Relocation of existing at grade forecourt loading facilities to the new underground loading dock facility. Click for more details...

ST GEORGE'S CATHEDRAL HERITAGE PRECINCT - OLD TREASURY BUILDINGS REDEVELOPMENT
Office Tower - 35 Storey project at 54-58 Barrack St, bnd by St George's Tce & Catheral Av, Perth, WA 6001 in the Civil Engineering (Tunnels, Subways). St George's Cathedral Heritage Precinct project to comprise of the construction of a new multi-storey office tower which will accommodate a long term lease from State Government departments. This project will be connected by an undergound vehicle tunnel running under Cathedral Lane to the basements levels of the new office building. The car park will continue to be accessed from Pier St & also from a new ramp descending to the car park from Cathedral Av. Click for more details...

PRINCE OF WALES HOSPITAL - COMPREHENSIVE CANCER CARE AND BLOOD DISORDER CENTRE
Civil Engineering (Tunnels, Subways) project at 61 High St, Randwick, NSW 2031 for New. Stage 1 Development of a Comprehensive Cancer Care and Blood Disorder Centre comprising demolition of an existing at grade carpark; bulk excavation works; construction of a staff access tunnel to connect the new treatment area to the existing Building 3 (Radiotherapy Department) lift and hospital; an open fire stair at the north east corner of the site; and underground treatment area at underground level 1 containing 4 radiotherapy bunkers. The Stage 1 works will be constructed in the north-east quadrant of the POWH site, on an existing carpark and forecourt area to the east of Building 3, between the Superintendent?s Cottage and the Edmund Blacket Building. Once the above works are completed and commissioned, the existing facility can be decommissioned and demolished to allow the commencement of the Stage 2 works which will complete the construction of the new 9 level CCCBDC. Click for more details...

SCOTCH COLLEGE - MIDDLE SCHOOL REDEVELOPMENT & PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project for Addition development. Redevelopment of the Middle School includes the demolition of 5 existing buildings including 3 classrooms, administration & canteen facility & the construction of a 2 storey Middle School building to comprise learning areas, administration & staff facilities. The development includes the construction of a new library with gallery, a new art building with a canteen below, partial demolition & redevelopment of the existing library to allow for new multi-purpose learning areas, pipes room & sports store. Construction of landscaped recreation area will also be included, as well as the construction of a pedestrian underpass located beneath the existing at-grade pedestrian crossing on Shenton Rd. The existing 17 bay car park is proposed to be reduced to accommodate 11 car parking bays. The development also includes the removal of power poles & installation of underground services. Plans have been modified to include a lift and elevator shaft to provide access to the underpass for disabled and wheelchair users. Click for more details...

WYNYARD WALK
State ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Provide direct, level safe accessible pedestrian route between Barangaroo & Wynyard precinct transport hub which is integrated with the existing road & footpath networks. A new multi-storey building (above & below ground) forming the western entrance to Wynyard Station (from Clarence St) to provide direct access to the station concourse. A new 3.5 metre high & 9 metres wide (internal dimensions) pedestrian tunnel, approximately 110 metres long, providing a grade separated link from the western entrance structure to Wynyard Station Concourse under Clarence, Margaret & Kent Sts to Napoleon Node (bounded by Sussex St, Westpac Plaza, Kent & Napoleon St). Structural works to facilitate transfer of building loads around the envelope of the proposed tunnel which may involve the use of prefabricated steel beams, supporting columns & temporary jacking frames. A paved public pedestrian plaza at the Napoleon Node. which will connect the Wynyard Walk tunnel & bridge components. A pedestrian bridge link over Sussex St providing a grade separated connection between Sussex St & Napoleon Node. The bridge will provide a 6 metre width & 5.5 metre vertical clearance to Sussex St. Vertical transportation (lifts, escalators & stairs). Click for more details...

PORT OF ESPERANCE ACCESS CORRIDOR
Civil Engineering (Tunnels, Subways) project In The Esperance Council Area of Access Corridor - Consultancy Svcs type. Consultancy svcs required for Specialist Technical Support to comprise of reviewing all aspects of design & report on compliance with the Scope of Works & Technical Criteria (SWTC) for the Esperance Port Access Corridor from approximately Mungan St to the Esperance Port being a distance of about 1.8km. Click for more details...

NORTH WEST RAIL LINK - TUNNEL & STATION CIVIL WORKS
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of Tunnel/Civil Works type. The Tunnel & Station Civil Works Package comprises twin running tunnels each of approximately 6 metres internal diameter & each approximately 15.5 km in length between the Epping Station stub tunnels & Bella Vista station. The running tunnels being constructed predominantly by tunnel boring machine (TBM) plus lengths of tunnel constructed by roadheader. Cross passages between the running tunnels. Mined caverns, niches and openings for rail crossovers & equipment. Excavations for the Cherrybrook, Castle Hill, Hills Centre, Norwest & Bella Vista stations. Permanent concrete lining in all tunnels, caverns, cross passages & underground openings which must allow for all future fixings for track bed & rail services. Safe, secure personnel access/egress into all underground spaces including all necessary temporary support services & site facilities & removal of all temporary work & site facilities not otherwise required for handover to subsequent contractors Click for more details...

WYNYARD WALK
Wynyard Walk is currently at the Planning stage, valued at about $ 10000000 it is Construction of WYnyard Walk. The role of Technical Advisor providing technical support for the delivery of the Main Works contract for the Wynyard Walk project. This role involves - Design management; Procurement support; Construction compliance management; testing & commissioning support & operational readiness support Click for more details...

MARION PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project at 35 Crozier Tce (Seaford Rail Corridor), Marion, SA 5043 of Pedestrian Underpass type of New development. Construction of underpass, two pedestrian access ramps & associated works including CCTV, lighting to replace existing pedestrian overpass. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Civil Engineering (Tunnels, Subways) project at ., Brisbane, QLD 4000 of Consultancy For Financial/Commercial & Economic Advisory Services type of New development. Consultancy for commercial & financial economic advisory services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. Consultancy for cost estimating, risk & project scheduling advisory services for the Brisbane Underground Bus & Train Project. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Airport Rail/Tunnel Link - Structural Manager Consultancy Svcs project at Along Midland Line, Bayswater Station, Tonkin Hwy, Airport West Station to Forrestfield Rail Yards, High Wycombe area, ., WA 6999 In The Council Area Of Various of State. Structural engineer sought to fulfil the role of PTA Major Projects Unit - Structural Manager for the Forrestfield - Airport Link project during the development, procurement & delivery phases of the project. The Structural Manager is required to have significant planning, design & documentation experience with cut & cover bored tunnels structures in the ground & groundwater conditions. Under direction of the Major Projects Executive Director or delegated authority, advice & activities will be conducted under this contract. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 500000. This project Transaction Advisory Consultancy svcs sought to assist with the Forrestfield - Perth Link project's transaction phase & potentially for the provision of continued svcs during the project's delivery phase. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Forrestfield - Perth Airport Rail/Tunnel Link Project is currently at the Early Planning stage, valued at about $ 733000 it is Commissioning Advisory Consultancy svcs to be provided during the development, procurement & delivery stages of the Forrestfield - Airport Link (FAL) project & is required to have significant experience in commissioning of major public transport system infrastructure in an operation electrified railway environment, to assist engineering discipline managers by providing them with detailed commissioning input into the SWTC & reference designs, highlighting design & specification improvements that will enhance the infrastructure commissioning, integration & handover to PTA. Click for more details...

ASPHALT MAINTENANCE WORKS
Roadworks - Bituminous Surfacing New project In The Various Council Area. The Principal invites tenders for the provision of minor asphalt maintenance works on various roads across South Australia. Work will consist of the planing of defected, marked on road pavement of varying size patches & reinstating with asphalt (AC10) of varying depths. In some areas with high levels of heavy vehicle movement, AC10 modified asphalt shall be placed as directed by the Superintendent. The tender shall consist of both Defined & Provisional Works. Upon completion of work at each location, the Tenderer shall : a) sweep the area to remove any loose debris, & b) consult with the Superintendents Representative regarding aftercare signage requirements. Supply of Materials: All materials shall be supplied by the Tenderer. Click for more details...

LAMBS VALLEY RD CULVERT
Lambs Valley Rd Culvert is currently at the Construction stage, valued at about $ 200000 it is Rectification of an existing culvert, mainly comprising of embankment and approach refurbishment works. Repair and refurbishment of the existing embankment with large heavy duty rock protection along the downstream face of the existing embankment. Large rock stabilisation of the downstream embankment, rip rap protection of the upstream face around the barrier poles, repair existing road surface to match existing and reinstatement of the guardrail and line marking. Click for more details...

PERTH CITY LINK TUNNEL SCREED REPAIR WORKS
Perth City Link Tunnel Screed Repair Works is currently at the Construction stage, valued at about $ 50000 it is Works to include rectification works for the tunnels concrete protection screen associated with tunnels 5/6 of the Perth City Link Rail Alliance contract. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect