State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tunnels, Subways Projects


WEST KEIRA & WOLLONGONG CENTRE SHOPPING CENTRE
Shopping Centre - 6 Storey Addition project In The Wollongong Council Area. Demolition of the existing structures on the West Kiera site. Construction of a new 6 level retail centre on West Keira St comprising 80 speciality shops, Coles supermarket, fresh food precinct, 600 seat food court, outdoor eating area & more than 650 car spaces. The shopping centre will be interconnected by a tunnel & bridge under/over Keira St to the existing Wollongong Central shopping centre. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Civil Engineering (Tunnels, Subways) project at Btwn Perth (Narrows Bridge) & Mandurah, ., WA 6999 for Addition. Package A works (70 km railworks) include earthworks & structures that will form part of South West Metropolitan Railway between Perth (Narrows Bridge) & Mandurah. Works to include civil works, drainage, trackworks, overhead traction wiring system & bulk earthworks to stations at Thomsons Lake, Thomas Rd, Leda, Rockingham, Waikiki & Mandurah. Contract includes delivery of double rail line & traction power, signalling & communications systems, earthworks, drainage, fencing & design & construction of 15 road, rail & pedestrian bridges & underpasses between Glen Iris & Mandurah. As part of project, RailLink will establish temporary construction depot in Rockingham (where rail will be welded into long lengths ahead of track & sleeper laying), construction of railcar storage & internal cleaning depot at Mandurah & electrical substations at Jandakot & Karnup to convert 132 Kv supply to 25 Kv power required to operate trains. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
Civil Engineering (Tunnels, Subways) project at Btwn Northern Suburbs Railway & Narrows Bridge, Perth, WA 6000 of Road Infrastructure - Consultancy Services For Package F type of New development. Tenders were invited from suitably qualified & experienced consultants for provision of road infrastructure specialist technical support services during implementation of New MetroRail City Project under Contract 27/03. Primary function of specialist technical advisers will be to independently review & advise on aspects of road infrastructure designs for Contract 27/03 on an as & when required basis (Contract 27/03 is Package F works). Click for more details...

SOUTH COAST RAIL CORRIDOR
Civil Engineering (Tunnels, Subways) project for Addition development. Proposed upgrade of rail link from Wollongong to Sydney with a 14 kilometre bypass tunnel between Thirroul & Waterfall. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

EASTWOOD RAILWAY STATION
Eastwood Railway Station is currently at the Construction stage, valued at about $ 4000000 it is Upgrading of railway station including provision of easy access facilities, installation of lifts, toilets, improved security, widening of subway. Click for more details...

LEWISHAM TRUCK TUNNEL
Tunnel/Roadworks project at from M4 & Parramatta Rd to Princes Hwy, St Peters, NSW 2044 In The Council Area Of Marrickville of State. Proposed 2 lane 13 kilometre dual truck road including a tunnel under Sydenham Road Marrickville joining Parramatta Road & M4 at Lewisham with Princes Hwy at St Peters with exit & entry ramps at Parramatta Rd & Princes Hwy, two exhaust stacks. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

MELBOURNE TO SYDNEY RAIL INFRASTUCTURE UPGRADE
New project of Civil Engineering (Tunnels, Subways) project at Melbourne to Sydney, ., VIC 3999. Package 1 to consist of 220 km of new track which will loop near & follow existing track, extensive sleeper replacement & track geometry improvement. Greenfields refurbishment. Around 60% of work in Victoria & large amount of work on metropolitan route. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standard gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

QUEEN ELIZABETH HOSPITAL
Civil Engineering (Tunnels, Subways) Addition project at Woodville Rd, Woodville South, SA 5011. This type is Enabling Works/Services Relocation/Demolition For Hospital - Redevelopment with State ownership. Work includes diversion of stormwater, sewer, domestic & fire water, steam & condensate, natural gas, high & low voltage electrical & communications inground services in staged program. Nurses Education annex of CDRC building will be demolished with services decommissioned & made safe. Services including air conditioning, refrigeration systems, domestic hot, cold & fire water, electrical & communications between Nurses Education & CDRC buildings will be diverted. New air conditioning & domestic hot water systems will be installed in CDRC building. Structural strengthening of services tunnel from boiler house under roadway to Maternity building & structural works to CDRC demolition facade are also required. Click for more details...

SNOWY MOUNTAINS HYDRO ELECTRIC AUTHORITY
Civil Engineering (Tunnels, Subways) project at ., Blue Mountains, NSW 2780 for New. Civil Engineering Consultants for Maintenance of Water Conveyance tunnels consists of: 1. Carry out detailed design work associated with the tunnel maintenance. 2. Review project & contract implementation strategies & contractual arrangements. 3. Prepare specifications & assist with preparation of Tender Documents for the required work scope. 4. Assist with Tender evaluations. 5. Provide experienced site officers to monitor contractor compliance & provide site supervision for the duration of the site works. Click for more details...

FREMANTLE PRISON
Civil Engineering (Tunnels, Subways) project at Tunnels complex below East Workshops, Fothergill St, Fremantle, WA 6160 for Renovations, Refurbishments etc.. Works comprise excavation of shaft S2, light scaling of tunnels, excavation of limestone plinth, treatment of walls & ceiling of tunnels, disbursal of silt & such other work as shown on drawings or included in specification. Date of Practical Completion: Prior to 30 November 2004. Click for more details...

DROUGHT RELIEF STRATEGY - PERTH SEAWATER DESALINATION INTEGRATION
Major Thrust Borings For Pipelines (2) project at Beneath four locations at Kwinana to Alcoa Railway, Rockingham Rd, Midland to Kwinana Railway & Kwinana Fwy, ., WA 6999 in the Civil Engineering (Tunnels, Subways). Tenders are planned to be invited for thrust boring works required for Perth Seawater Desalination Project. Perth Desalination Integration Project includes several new pipelines. Two pipelines related to Contract RI-05-11972 are DN1200 from Perth Seawater Desalination Plant (adjacent to Kwinana Power Station) to Thomsons Reservoir & DN1400 from Thomsons Reservoir to proposed new Nicholson Rd Pump Station. This pre-qualification covers four major thrust borings required on sections of these two pipelines & are DN1200 under Kwinana to Alcoa Railway, DN1200 under Rockingham Rd, DN1200 under Midland to Kwinana Railway & DN1400 under Kwinana Fwy. Click for more details...

RYDE TOWN CENTRE - TOP RYDE CIVIC PRECINCT
Plaza/Walkways/Bridge project at Devlin St, Ryde, NSW 2112 In The Council Area Of Ryde of Local Govt. Proposed upgrade & additions to the Ryde town centre, work to include a plaza over Devlin Street linking the Civic Centre with the Top Ryde Shopping Centre, pedestrian links & footbridges, road tunnel, civic open space. Click for more details...

QUEENSLAND RAIL - UNDERTRACK BORES
Undertrack Bore Drilling project at Various sites within Brisbane area, Brisbane, QLD 4000 in the Civil Engineering (Tunnels, Subways). The installation of 100mm dia undertrack bores at approx. 40 stations in the metropolitan area over the next 10 months. Click for more details...

KARRAKATTA TRAFFIC UNDERPASS (ADERDARE ROAD UNDERPASS)
Currently at the Construction stage In Nedlands is a project estimated to be $ 6300000. This project Works to comprise of design & construction of road underpass under rail & PSP bridge at Stubbs Terrace site (south of Aberdare Rd & Karrakatta Subway) & all connections. PTA's Rail Maintenance contractor will remove railway & relay railway in dedicated shutdown period to facilitate underpass construction below rail. Click for more details...

SYDNEY TO BRISBANE MAIN NORTH LINE
various locations on the main north line, Sydney, NSW 2000 Has Sydney To Brisbane Main North Line currently at Construction stage. Major upgrading of the main rail line from Sydney to Brisbane, earthworks, track upgrade, new & upgrade of rail bridges, upgrade of signal system. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Tunnels, Subways). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

PUBLIC TRANSPORT AUTHORITY - BOULDER SUBWAY
Civil Engineering (Tunnels, Subways) project at East end of Burt St, Boulder, WA 6432 of Subway - Refurbishment type of New development. Works comprise refurbishment to Boulder Subway. Click for more details...

PATERSON ROAD - CULVERT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Murray Council Area for New development. Installation of culvert & associated works on Paterson Rd. Culvert to replace existing bridge structure. Click for more details...

NORTH WEST RAIL LINK
A project in the NSW Within The Hills Shire. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

EELUP ROUNDABOUT - FLYOVER & UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Bunbury Council Area of State ownership. Stage 1 includes the construction of a slip lane. The overall proposal includes removal of existing roundabout & construction of flyover from Robertson Dr to Koombana Dr that would then allow traffic from Australind Bypass to travel straight through onto Sandridge Rd. Click for more details...

STIRLING HIGHWAY NEAR FORREST STREET UNDERPASS OR OVERPASS
Underpass/Overpass New project In The Fremantle Council Area. Proposed construction of overpass or underpass details not determined. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

THE O BAHN EXTENSION CITY ACCESS PROJECT
The O Bahn Extension City Access Project is currently at the Construction stage, valued at about $ 160000000 it is REVISED CONCEPT : The State Government has released its revised plans for the O'Bahn City Access Project taking into account the extensive consultation with the community & stakeholders, such as the Adelaide City Council. Changes to the plan include: retaining the existing alignment of Rundle Road; reducing the impact on Rymill Park; extending the tunnel portal 140 metres west, closer to Grenfell Street; reducing the length at which buses travel at street level to 40 metres; removing the barrier between the bus tunnels to reduce the tunnel footprint; & creating an extra 50 car parks on east Terrace and Rundle Road. Under the revised plan the tunnel has been lengthened from about 510 metres to 650 metres, shifting the tunnel portal closer to Grenfell Street & reducing the visual impact. Construction of share use pedestrian-cyclist bridge over the River Torrens. Click for more details...

RAINE SQUARE UNDERPASS
Underpass project at Btwn Raine Sq & William St, Perth, WA 6000 In The Council Area Of Perth of Private. To include the construction of a pedestrian tunnel connecting the lower level of the Raine Square & the concourse level of the Perth (William St) railway station. Works expected to be done in 3 stages. Stage 1 works (July - August 2009), approx 6.5 weeks comprising of Step 1. The eastern two thirds of William St to be closed to enable installation of sheet piles on all four sides of the site area as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 2. Soil within stage 1 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & then the stage 1 roof slab & horizontal piers to the outer wall of the railway station will be constructed. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 2 works (August - September 2009), approx 4.5 weeks. Step 3. comprising of western third of William St to be closed to enable installation of sheet piles on all three sides of the site area, as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 4. Soil within stage 2 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & sheet pile wall will be removed about roof level. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 3 works (February - March 2010) 7 weeks. Step 5. Comprising of soil to be excavated from underneath the roof slab, & a ground floor slab & footings for the walls will be constructed. Step 6. Comprising permanent retaining walls will be constructed on the inside of the sheet piling. Step 7. Comprising of temporary sheet piles will be removed to connect the tunnel with the railway station concourse & Raine Square basement, remaining soil will be excavated & retaining walls built back to the existing structures. Step 8. Comprising floor slab will be constructed between the retaining walls & existing structures. Existing D-wall will be demolished & a new lintel beam constructed for support. Close up access hole in tunnel roof slab. Click for more details...

M5 CORRIDOR EXPANSION - M5 SOUTH WEST MOTORWAY WIDENING
Civil Engineering (Tunnels, Subways) project at M5, ., NSW 2999 for New. Proposal to widen around 20 kilometres of the M5 South West Motorway between King Georges Rd, Beverley Hills & Camden Valley Way, Casula. The project would include: Additional lanes on the M5 South West Motorway for the majority of its length, the additional lanes would be provided by pavement widening, asphalt overlays and new line marking. An operations management control system on and in the vicinity of the M5 South West Motorway, to include a new control building at Hammondville and variable message signs on the motorway and surrounding arterial roads. Bridge widening, by placing new infill decking in the central median between existing bridges over Queen St & Nuwarra Rd. Noise attenuation measures at various locations along the M5 South West Motorway between King Georges Rd & Camden Valley Way. The project also includes associated or ancillary works, activities, uses, structures or facilities for the purposes of the project, including (but not limited to) any of the following: Construction & associated construction site compounds. Drainage works and drainage modifications. Landscaping. Environmental management and pollution control. The project does not include preliminary works associated with the desig Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - NORTH STRATHFIELD
Rail Tracks/Tunnel/Stations project at ., North Strathfield, NSW 2137 In The Council Area Of Canada Bay of State. Overall project comprises: Construction of the North Strathfield rail underpass. Scope of work includes: new track to connect to the existing relief goods loop at North Strathfield. 2.4 km of new track & upgrade of 850m of existing track. A shallow driven tunnel (under operational tracks). Construction of a new aerial concourse, platform works, stairs, lifts, offices & amenities at Concord West Railway Station. Relocation of an existing RailCorp depot at North Strathfield Station. Associated civil & structural works. Provision of new rail systems, including overhead wire, high voltage, low voltage, communications & signalling. Utility relocations/protection Click for more details...

SYDNEY OPERA HOUSE - VEHICLE ACCESS & PEDESTRIAN SAFETY
Civil Engineering (Tunnels, Subways) project at Lots 4 & 5 Bennelong Point (DP77588 & DP87933), Circular Quay, NSW 2000 of Vehicle Access & Pedestrian Safety type of New development. Vehicle Access & Pedestrian safety project. Construction of an underground tunnel will be built from the bottom of Macquarie St to a new underground loading dock. Remediation of the existing forecourt & road. Other works to improve public safety, security & vehicle access, address occupational health & safety risks & operational & maintenance efficiencies Click for more details...

HEATHCOTE ENGADINE & PEPPERMINT GROVE TUNNELS
Currently at the Construction stage In Sutherland is a project estimated to be $ 915000. This project Rehabilitation of the Heathcote Engadine & Peppermint Grove tunnels. Scope of Work ? common to both sites - includes but is not necessarily limited to: Site establishment; reinstatement of access tracks if required to provide safe vehicle access; provision of all confined spaces measures including access, ventilation and odour control (if necessary) to facilitate the internal rehabilitation; removal of any silt, fretted rock & debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; coordination with Sydney Water, any other relevant authorities & the adjoining property owners to arrange access & manage pedestrian movements necessary to implement the rehabilitation & site restoration. Scope of Work ? Heathcote-Engadine Carrier which includes but is not necessarily limited to: Erection of scaffold over Scouts Creek to minimise potential impacts on the creek and to provide safe access for personnel & equipment from the site establishment area to the manhole; coordination with Sydney Water in regard to flow management strategies and wet weather requirements; set-up of a flow management regime to /or internal bypass to deal with incoming flows from the rising main of SP0275 & SP0589; removal of root ingress 9 m downstream of manhole; internal patch repairs of areas with severe deterioration of the 19m of unreinforced concrete lining of the sewer starting from and including the upstream manhole, this includes cleaning & surface preparation of internal concrete & brick surfaces, reinstatement in areas of degradation as required in readiness for application of protective coating system; removal & replacement of cast iron 2 part watertight access covers and cast in frame & removal & replacement of all step irons in upstream manhole. Scope of Work ? Peppermint Grove Carrier which includes but is not necessarily limited to: localised patch repairs with mesh & shotcrete over seam for a total of approximately 18m at CH149-CH161 & CH590-CH596; repairs with mesh & shotcrete to the walls only for approximately 102m at CH172-CH274; localised patch repairs with mesh & shotcrete to roof only for approximately 3m at CH492-CH495; full perimeter repairs with mesh & shotcrete for approximately 63m at CH527-CH590 & possible construction of a temporary 300mm service shaft in Cutler Rd to assist with completion of the shotcrete work. Click for more details...

THE LINK (PERTH CITY RAIL LINK PROJECT)
Currently at the Planning stage In Perth is a project estimated to be $ 2500000. This project Tenders are being invited for a surveying consultant with experience working within an operating electrified environment, to undertake a survey for future development to the PTA rail reserve from the eastern face of the Lord Street overpass to the City West Station platform, including area of track from existing Joondalup tunnel through to the Roe Street tunnel. The survey is to collate information on the track, components, overhead wiring, signalling, cable pits, bridges, station building & extent of the platforms. The work must be undertaken by a Licensed Surveyor accredited under the Licensed Surveyors Act 1909 & must hold a practicing certificate. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of State ownership. This tender is develop cost plans, estimates for project options & pricing schedules for the North West Rail Link. The project will provide 23km of new rail infrastructure from Epping to Rouse Hill Click for more details...

SCOTCH COLLEGE - MIDDLE SCHOOL REDEVELOPMENT & PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project for Addition development. Redevelopment of the Middle School includes the demolition of 5 existing buildings including 3 classrooms, administration & canteen facility & the construction of a 2 storey Middle School building to comprise learning areas, administration & staff facilities. The development includes the construction of a new library with gallery, a new art building with a canteen below, partial demolition & redevelopment of the existing library to allow for new multi-purpose learning areas, pipes room & sports store. Construction of landscaped recreation area will also be included, as well as the construction of a pedestrian underpass located beneath the existing at-grade pedestrian crossing on Shenton Rd. The existing 17 bay car park is proposed to be reduced to accommodate 11 car parking bays. The development also includes the removal of power poles & installation of underground services. Plans have been modified to include a lift and elevator shaft to provide access to the underpass for disabled and wheelchair users. Click for more details...

NORTH WEST RAIL LINK - TUNNEL & STATION CIVIL WORKS
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of Tunnel/Civil Works type. The Tunnel & Station Civil Works Package comprises twin running tunnels each of approximately 6 metres internal diameter & each approximately 15.5 km in length between the Epping Station stub tunnels & Bella Vista station. The running tunnels being constructed predominantly by tunnel boring machine (TBM) plus lengths of tunnel constructed by roadheader. Cross passages between the running tunnels. Mined caverns, niches and openings for rail crossovers & equipment. Excavations for the Cherrybrook, Castle Hill, Hills Centre, Norwest & Bella Vista stations. Permanent concrete lining in all tunnels, caverns, cross passages & underground openings which must allow for all future fixings for track bed & rail services. Safe, secure personnel access/egress into all underground spaces including all necessary temporary support services & site facilities & removal of all temporary work & site facilities not otherwise required for handover to subsequent contractors Click for more details...

MALDON TO DOMBARTON RAIL LINK- CONSULTANCY
Civil Engineering (Tunnels, Subways) project at Dombarton to, Maldon, NSW 2571 for New. Professional Services Contractor to provide surveying services for property definition and further engineering design. The required services include: property boundary survey, preparation of deposited plans, aerial, topographic detail survey, underground utility service locating & establishment of a project survey control network Click for more details...

MILES SEWERAGE NETWORKS UPGRADE (WORK PACKAGE 1)
New project of Civil Engineering (Tunnels, Subways) project at ., Miles, QLD 4415. Construction of Miles Sewerage Network Upgrade Work Package 1. Works to include tunnelling Warrego Highway, Leichhardt Highway & Eastern Line Railways at Miles. Click for more details...

MARION PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project at 35 Crozier Tce (Seaford Rail Corridor), Marion, SA 5043 of Pedestrian Underpass type of New development. Construction of underpass, two pedestrian access ramps & associated works including CCTV, lighting to replace existing pedestrian overpass. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area of Consultancy For Rail Operation Assessment Services type. Consultancy for rail operational assessment services for the Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Bus Planning & Operations Services New project In The Brisbane City Council Area. Consultancy for bus planning & operations services for the Brisbane Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Brisbane City Council Area for New development. Consultancy for cost estimating, risk & project scheduling advisory services for the Brisbane Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
New project of Civil Engineering (Tunnels, Subways) project at ., Brisbane, QLD 4000. Consultancy for land use planning, urban design & property development services for the Brisbane Underground Bus & Train Project. Click for more details...

ROWSLEY CROSSING LOOP
Crossing Loop project at Fisken St, Atkinson St, Rowsley-Station Rd, Ballan, VIC 3342 in the Civil Engineering (Tunnels, Subways). Construction of a new 1 km loop at Rowsley (between Bacchus Marsh & Ballan). The loop will be built near Rowsley-Station Road & will increase the reliability of V/Line passenger & freight trains between Ballarat & Melbourne. Works include; turnouts, 1km of loop, service relocation, earthworks & associated signalling. Construction of the new Rowsley Crossing Loop will reduce the distance between existing crossing loops on the Ballarat line, at Parwan & Bank Box, providing further flexibility for trains to pass each other between these points. The project will also deliver an upgrade of the existing flashing lights rail crossing at Rowsley Station Road to boom barriers, providing a higher level of rail crossing protection for road users. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Airport Rail/Tunnel Link - Consultancy Svcs New project In The Various Council Area. Tunnelling Engineers to provide Tunnel Logistics Advisor Consultancy Svcs for the Forrestfield - Perth Airport Rail/Tunnel Link project during the development, procurement & delivery phases of the project. Sufficient construction experience is required by the Advisor with cut & cover & bored tunnels in the ground & groundwater conditions of the Perth Coastal Plain. Under direction of the Project Director or delegated authority, advice & activities will be conducted under this contract. Click for more details...

ARNCLIFFE PEDESTRIAN LINK
Pedestrian Tunnel New project In The Rockdale Council Area. Construction of a pedestrian tunnel under the T4 Eastern Suburbs & Illawarra railway line. The pedestrian tunnel would be constructed through the existing railway line embankment. It would be approximately 35m in length, 3.7m high & 4.3m wide. Connection of the new underpass to the existing footpath network, modification of kerb lines. Modification of landscaping on the eastern & western portals Click for more details...

BRIDGE INN ROAD TUNNEL CONSTRUCTION
Bridge Inn Road Tunnel Construction is currently at the Construction stage, valued at about $ 3000000 it is Civil works for tunnel construction. Click for more details...

FEEDER 90Y BEACONSFIELD BSP TO BELMORE PARK BSP
Civil Engineering (Tunnels, Subways) project for New development. Circuit design, manufacture, supply, installation & jointing of 132 kV XLPE cables & ancillary equipment. Scope of work generally involves: installation of a new 132 kV cable circuit between Beaconsfield Bulk Supply Point (BSP) & Belmore Park Zone Substation (ZS); the circuit will be known as Feeder 90Y. Included in the scope of work is the civil, mechanical & electrical design & construction work associated with these circuits, as well as all necessary site investigation along the circuit route to enable the design to be completed. The specified feeder route in the EIA from Belmore Park ZS to Beaconsfield BSP is approximately 5.5km in length & consists of 3 main cable sections. Section 1 - Belmore Park ZS to the shared section of the Metrogrid Tunnel - approximately 800m; this section utilises the City South Cable Tunnel, Haymarket BSP basement and the Metrogrid Tunnel; this section of cable has already been installed as part of a separate project. Section 2 - shared tunnel to Sydney Park tunnel shaft - approximately 3,450m; the second section runs from the shared section of the Metrogrid Tunnel to a proposed joint bay location, on land at the Sydney Park Tunnel shaft via the Metrogrid Cable Tunnel. Section 3 - Sydney Park Tunnel Shaft to Beaconsfield BSP - approximately 1200m; the third section consists of approximately 60m of new trench, one new joint bay & connection into approximately 1000m of spare conduits & joint bays installed as part of a recently constructed project, feeder 9S4 from Sydney Park Tunnel Shaft joint bay to Beaconsfield BSP. Connection to the BSP is via the Burrows Rd Cable Tunnel. Click for more details...

ASPHALT MAINTENANCE WORKS
Roadworks - Bituminous Surfacing New project In The Various Council Area. The Principal invites tenders for the provision of minor asphalt maintenance works on various roads across South Australia. Work will consist of the planing of defected, marked on road pavement of varying size patches & reinstating with asphalt (AC10) of varying depths. In some areas with high levels of heavy vehicle movement, AC10 modified asphalt shall be placed as directed by the Superintendent. The tender shall consist of both Defined & Provisional Works. Upon completion of work at each location, the Tenderer shall : a) sweep the area to remove any loose debris, & b) consult with the Superintendents Representative regarding aftercare signage requirements. Supply of Materials: All materials shall be supplied by the Tenderer. Click for more details...

ACTON TUNNEL
Civil Engineering (Tunnels, Subways) New project at Parkes Way between Edinburgh Av & Clunies Ross St, Acton, ACT 2601. This type is Tunnel - Restoration Works with Local Govt ownership. Complete restoration works at Acton Tunnel. Scope of work includes: construction of new ceiling to replace the full length of the damage ceiling plus extension to next grid line and for full width between the existing light bays. Removal of other asbestos containing material within worksite will occur same time. This is expected to include flexible sealant around precast concrete fascia panel and the sprinkler pipework gaskets. Installation of new precast concrete fascia panel & replacement of warning lighting Click for more details...

PERTH CITY LINK TUNNEL SCREED REPAIR WORKS
Perth City Link Tunnel Screed Repair Works is currently at the Construction stage, valued at about $ 50000 it is Works to include rectification works for the tunnels concrete protection screen associated with tunnels 5/6 of the Perth City Link Rail Alliance contract. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect