List of Tunnels, Subways Projects


NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Civil Engineering (Tunnels, Subways) project at Btwn Perth (Narrows Bridge) & Mandurah, ., WA 6999 for Addition. Package A works (70 km railworks) include earthworks & structures that will form part of South West Metropolitan Railway between Perth (Narrows Bridge) & Mandurah. Works to include civil works, drainage, trackworks, overhead traction wiring system & bulk earthworks to stations at Thomsons Lake, Thomas Rd, Leda, Rockingham, Waikiki & Mandurah. Contract includes delivery of double rail line & traction power, signalling & communications systems, earthworks, drainage, fencing & design & construction of 15 road, rail & pedestrian bridges & underpasses between Glen Iris & Mandurah. As part of project, RailLink will establish temporary construction depot in Rockingham (where rail will be welded into long lengths ahead of track & sleeper laying), construction of railcar storage & internal cleaning depot at Mandurah & electrical substations at Jandakot & Karnup to convert 132 Kv supply to 25 Kv power required to operate trains. Click for more details...

MARTHA COVE - STAGE 1
New project of Civil Engineering (Tunnels, Subways) project at Marina Dve & Dromana Pde, Safety Beach, VIC 3936. Stage 1 - Earthworks, tunnel and seaway of waterfront development on 94 ha. Click for more details...

PENRITH MEGA BASE HOMEBASE
Civil Engineering (Tunnels, Subways) project at Mulgoa Rd cnr Wolesley St, Jamisontown, NSW 2750 for New. External roadworks, including construction of tunnel beneath Mulgoa Rd. Click for more details...

PARRAMATTA RAIL LINK
Currently at the Planning stage In Parramatta is a project estimated to be $ 100000000. This project Provision of contract management services for the Epping to Chatswood section of the project. This section will include tunnels from Epping to the North Shore Line corridor north of Chatswood station, rail systems including permanent way, signalling, traction electrical system & other rail services, 5 underground stations & associated minor works. Click for more details...

SOUTH COAST RAIL CORRIDOR
Civil Engineering (Tunnels, Subways) project for Addition development. Proposed upgrade of rail link from Wollongong to Sydney with a 14 kilometre bypass tunnel between Thirroul & Waterfall. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

GERALDTON SOUTHERN TRANSPORT CORRIDOR
State ownership Civil Engineering (Tunnels, Subways) project In The City Of Greater Geraldton Council Area for New development. Stage 1 works to comprise construction of new single railway line from Narngulu Industrial Area to Geraldton Port, approximately 4.9 km of highway from North West Coastal Hwy into Port precinct, four road bridges & two rail tunnels. Contract also incorporates modifications within Port precinct that will accommodate concurrent unloading of long grain trains & ore trains. Click for more details...

EASTWOOD RAILWAY STATION
Eastwood Railway Station is currently at the Construction stage, valued at about $ 4000000 it is Upgrading of railway station including provision of easy access facilities, installation of lifts, toilets, improved security, widening of subway. Click for more details...

PERTH PUBLIC TRANSPORT HUB PROJECT - NORTHSIDE RAIL LINK
Civil Engineering (Tunnels, Subways) project at Fremantle Rail lines above existing Joondalup line & Wellington St Bus Station, Northbridge, WA 6003 for New. The development will begin with closure & demolition of the William St footbridge. It is anticipated that in January 2012 the project will commence with sinking the Fremantle rail line from Perth station to Lake St. Undergrounding of the Wellington St Bus Station will likely commence in June 2014. The development will also include the construction of a new 'island' train platform & may also comprise creating important connection points between the city centre & Northbridge. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Tunnels, Subways) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

AUSTRALIAN INLAND RAIL EXPRESSWAY
Civil Engineering (Tunnels, Subways) project In The Various Council Area of Freight Rail Expressway type. The Australian Inland Expressway is expected to be in three sections from Victoria through NSW and on to Brisbane. Dual standard gauge 4500 km railway line. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

MELBOURNE TO SYDNEY RAIL INFRASTUCTURE UPGRADE
New project of Civil Engineering (Tunnels, Subways) project at Melbourne to Sydney, ., VIC 3999. Package 1 to consist of 220 km of new track which will loop near & follow existing track, extensive sleeper replacement & track geometry improvement. Greenfields refurbishment. Around 60% of work in Victoria & large amount of work on metropolitan route. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standard gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

CROSS CITY TUNNEL
Civil Engineering (Tunnels, Subways) New project at Connecting Western & Eastern Distibutors, Sydney, NSW 2000. This type is Tunnels (2) with State ownership. Eastbound & Westbound tunnels to connect the Western Distributor with the Eastern Distributor & on to beyond the King Cross tunnel, 2 klms in length from Darling Harbour to past the Kings Cross Tunnel. One tunnel will travel under Bathurst St & the second tunnel will travel under Park St. Click for more details...

PARRAMATTA RAIL LINK
Civil Engineering (Tunnels, Subways) project In The Willoughby Council Area of Rail Link - Overall type. Proposed rail link Parramatta to Chatswood via Macquarie Shopping Centre and Macquarie University, 28 km link to carry 12 trains per hour on a dual line the bulk of which is to be underground. 9 new stations &/or new platforms at existing stations, including new underground stations at Delhi Road, Macquarie Park & Macquarie University, upgrade of existing stations at Chatswood & Epping. Extension of line from Parramatta to Westmead. Click for more details...

STEVENSONS ROAD LANDFILL
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Casey Council Area for New development. Construction of a new stormwater drainage system at the capped Stevensons Road Landfill including clearance of dead trees, topsoiling, trimming, seeding and grassing of part of the site. Click for more details...

SPRINGVALE ROAD/RAIL SEPARATION PROJECT
Civil Engineering (Tunnels, Subways) project In The Whitehorse Council Area of State ownership. To eliminate the railway crossing at Springvale Road near Whitehorse Road intersection, a rail underpass will be constructed with the railway line to be lowered up to six meters on the western side of Springvale Road and the road to bridge over the railway line. A new railway station will be built on the west side of Springvale Road, replacing the existing Nunawading Station on the east side of Springvale Road. The station will be constructed as a continuous island platform with tracks either side. There will be space for a future third track. The platform will link to stairs and lifts on either side of Springvale Road, at the side of the current level crossing. Upgraded customer facilities will include bicycle storage, taxi rank and new drop-off and parking area at street level. The new station entry and ticket sales will be at street level and stairs and a lift will descend to the platform. Click for more details...

EASTERN FREEWAY EXTENSION/TUNNEL SECTION/PARK ROAD TO DEEP CREEK ROAD
Eastern Freeway Extension/Tunnel Section/Park Road To Deep Creek Road is currently at the Planning stage, valued at about $ 200000000 it is Park Road to Deep Creek Road section of the Eastern Freeway Extension. This contract will include the detailed design, construction, operation and maintenance of twin road tunnels approximately 1.5km long. Click for more details...

SNOWY MOUNTAINS HYDRO ELECTRIC AUTHORITY
Civil Engineering (Tunnels, Subways) project at ., Blue Mountains, NSW 2780 for New. Civil Engineering Consultants for Maintenance of Water Conveyance tunnels consists of: 1. Carry out detailed design work associated with the tunnel maintenance. 2. Review project & contract implementation strategies & contractual arrangements. 3. Prepare specifications & assist with preparation of Tender Documents for the required work scope. 4. Assist with Tender evaluations. 5. Provide experienced site officers to monitor contractor compliance & provide site supervision for the duration of the site works. Click for more details...

FREMANTLE PRISON
Civil Engineering (Tunnels, Subways) project at Tunnels complex below East Workshops, Fothergill St, Fremantle, WA 6160 for Renovations, Refurbishments etc.. Works comprise excavation of shaft S2, light scaling of tunnels, excavation of limestone plinth, treatment of walls & ceiling of tunnels, disbursal of silt & such other work as shown on drawings or included in specification. Date of Practical Completion: Prior to 30 November 2004. Click for more details...

RYDE TOWN CENTRE - TOP RYDE CIVIC PRECINCT
Plaza/Walkways/Bridge project at Devlin St, Ryde, NSW 2112 In The Council Area Of Ryde of Local Govt. Proposed upgrade & additions to the Ryde town centre, work to include a plaza over Devlin Street linking the Civic Centre with the Top Ryde Shopping Centre, pedestrian links & footbridges, road tunnel, civic open space. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Tunnels, Subways). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

CITY WEST CABLE TUNNEL
City West Cable Tunnel is currently at the Construction stage, valued at about $ 50000000 it is The proposal involves the construction of an electricity transmission cable tunnel to link the Haymarket bulk supply point in Thomas St, Ultimo, to the new City North substation at the corner of Sussex & Erskine Sts, Sydney; construction of an interface with City Central substation; installation of 5 x electricity transmission feeders to transmit electricity to the City North substation; construction of a permanent tunnel adit (entrance) and ventilation intake at the eastern end of Mary Anne St. The ventilation exhaust works would be integrated with the City North substation building. The proposed delivery model for the tunnel project will essentially be a construct only contract, with the exception of the TBM lining which will be design & construct. All other works are designed to a 100% design stage by EnergyAustrala. Click for more details...

PUBLIC TRANSPORT AUTHORITY - BOULDER SUBWAY
Civil Engineering (Tunnels, Subways) project at East end of Burt St, Boulder, WA 6432 of Subway - Refurbishment type of New development. Works comprise refurbishment to Boulder Subway. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Tunnels, Subways) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

PATERSON ROAD - CULVERT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Murray Council Area for New development. Installation of culvert & associated works on Paterson Rd. Culvert to replace existing bridge structure. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5A(2) EXPANSION
Civil Engineering (Tunnels, Subways) project for New development. Construction of additionals loops that will lay alongside the existing pipeline. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

CONCERT HALL PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Perth Council Area of Pedestrian Underpass - Removal type. Works to comprise removal of northern end of Concert Hall pedestrian underpass. Click for more details...

LEGACY WAY NORTHERN LINK TUNNEL (TOOWONG TO KELVIN GROVE)
Civil Engineering (Tunnels, Subways) project for New development. 5 km tunnel (toll road) linking Western Freeway at Toowong with Inner City By-pass at Kelvin Grove, running under Toowong, Auchenflower, Paddington, Red Hill, Spring Hill & Kelvin Grove. Design,construction, operation, maintenance and operations for up to 20 years. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

RAINE SQUARE UNDERPASS
Underpass project at Btwn Raine Sq & William St, Perth, WA 6000 In The Council Area Of Perth of Private. To include the construction of a pedestrian tunnel connecting the lower level of the Raine Square & the concourse level of the Perth (William St) railway station. Works expected to be done in 3 stages. Stage 1 works (July - August 2009), approx 6.5 weeks comprising of Step 1. The eastern two thirds of William St to be closed to enable installation of sheet piles on all four sides of the site area as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 2. Soil within stage 1 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & then the stage 1 roof slab & horizontal piers to the outer wall of the railway station will be constructed. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 2 works (August - September 2009), approx 4.5 weeks. Step 3. comprising of western third of William St to be closed to enable installation of sheet piles on all three sides of the site area, as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 4. Soil within stage 2 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & sheet pile wall will be removed about roof level. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 3 works (February - March 2010) 7 weeks. Step 5. Comprising of soil to be excavated from underneath the roof slab, & a ground floor slab & footings for the walls will be constructed. Step 6. Comprising permanent retaining walls will be constructed on the inside of the sheet piling. Step 7. Comprising of temporary sheet piles will be removed to connect the tunnel with the railway station concourse & Raine Square basement, remaining soil will be excavated & retaining walls built back to the existing structures. Step 8. Comprising floor slab will be constructed between the retaining walls & existing structures. Existing D-wall will be demolished & a new lintel beam constructed for support. Close up access hole in tunnel roof slab. Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - NORTH STRATHFIELD
Rail Tracks/Tunnel/Stations project at ., North Strathfield, NSW 2137 In The Council Area Of Canada Bay of State. Overall project comprises: Construction of the North Strathfield rail underpass. Scope of work includes: new track to connect to the existing relief goods loop at North Strathfield. 2.4 km of new track & upgrade of 850m of existing track. A shallow driven tunnel (under operational tracks). Construction of a new aerial concourse, platform works, stairs, lifts, offices & amenities at Concord West Railway Station. Relocation of an existing RailCorp depot at North Strathfield Station. Associated civil & structural works. Provision of new rail systems, including overhead wire, high voltage, low voltage, communications & signalling. Utility relocations/protection Click for more details...

LIFEHOUSE AT RPA - CHRIS O'BRIEN CANCER CENTRE
Private ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Relocation of part of the existing sub ground tunnel & associated services. Excavation, perimeter shoring and erection of retaining walls and construction hoardings. The bulk excavation will facilitate the future construction of 3 basement levels. Click for more details...

RAINE SQUARE REDEVELOPMENT
Pedestrian Tunnel project at 300 Murray St, from Raine Sq to new railway station concourse, Perth, WA 6000 in the Civil Engineering (Tunnels, Subways). Works to comprise construction of a pedestrian tunnel from Raine Sq to new railway station concourse with retail areas. Click for more details...

HEATHCOTE ENGADINE & PEPPERMINT GROVE TUNNELS
Currently at the Construction stage In Sutherland is a project estimated to be $ 915000. This project Rehabilitation of the Heathcote Engadine & Peppermint Grove tunnels. Scope of Work ? common to both sites - includes but is not necessarily limited to: Site establishment; reinstatement of access tracks if required to provide safe vehicle access; provision of all confined spaces measures including access, ventilation and odour control (if necessary) to facilitate the internal rehabilitation; removal of any silt, fretted rock & debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; coordination with Sydney Water, any other relevant authorities & the adjoining property owners to arrange access & manage pedestrian movements necessary to implement the rehabilitation & site restoration. Scope of Work ? Heathcote-Engadine Carrier which includes but is not necessarily limited to: Erection of scaffold over Scouts Creek to minimise potential impacts on the creek and to provide safe access for personnel & equipment from the site establishment area to the manhole; coordination with Sydney Water in regard to flow management strategies and wet weather requirements; set-up of a flow management regime to /or internal bypass to deal with incoming flows from the rising main of SP0275 & SP0589; removal of root ingress 9 m downstream of manhole; internal patch repairs of areas with severe deterioration of the 19m of unreinforced concrete lining of the sewer starting from and including the upstream manhole, this includes cleaning & surface preparation of internal concrete & brick surfaces, reinstatement in areas of degradation as required in readiness for application of protective coating system; removal & replacement of cast iron 2 part watertight access covers and cast in frame & removal & replacement of all step irons in upstream manhole. Scope of Work ? Peppermint Grove Carrier which includes but is not necessarily limited to: localised patch repairs with mesh & shotcrete over seam for a total of approximately 18m at CH149-CH161 & CH590-CH596; repairs with mesh & shotcrete to the walls only for approximately 102m at CH172-CH274; localised patch repairs with mesh & shotcrete to roof only for approximately 3m at CH492-CH495; full perimeter repairs with mesh & shotcrete for approximately 63m at CH527-CH590 & possible construction of a temporary 300mm service shaft in Cutler Rd to assist with completion of the shotcrete work. Click for more details...

ST GEORGE'S CATHEDRAL HERITAGE PRECINCT - OLD TREASURY BUILDINGS REDEVELOPMENT
Office Tower - 35 Storey project at 54-58 Barrack St, bnd by St George's Tce & Catheral Av, Perth, WA 6001 in the Civil Engineering (Tunnels, Subways). St George's Cathedral Heritage Precinct project to comprise of the construction of a new multi-storey office tower which will accommodate a long term lease from State Government departments. This project will be connected by an undergound vehicle tunnel running under Cathedral Lane to the basements levels of the new office building. The car park will continue to be accessed from Pier St & also from a new ramp descending to the car park from Cathedral Av. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of State ownership. This tender is develop cost plans, estimates for project options & pricing schedules for the North West Rail Link. The project will provide 23km of new rail infrastructure from Epping to Rouse Hill Click for more details...

WYNYARD WALK
State ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Provide direct, level safe accessible pedestrian route between Barangaroo & Wynyard precinct transport hub which is integrated with the existing road & footpath networks. A new multi-storey building (above & below ground) forming the western entrance to Wynyard Station (from Clarence St) to provide direct access to the station concourse. A new 3.5 metre high & 9 metres wide (internal dimensions) pedestrian tunnel, approximately 110 metres long, providing a grade separated link from the western entrance structure to Wynyard Station Concourse under Clarence, Margaret & Kent Sts to Napoleon Node (bounded by Sussex St, Westpac Plaza, Kent & Napoleon St). Structural works to facilitate transfer of building loads around the envelope of the proposed tunnel which may involve the use of prefabricated steel beams, supporting columns & temporary jacking frames. A paved public pedestrian plaza at the Napoleon Node. which will connect the Wynyard Walk tunnel & bridge components. A pedestrian bridge link over Sussex St providing a grade separated connection between Sussex St & Napoleon Node. The bridge will provide a 6 metre width & 5.5 metre vertical clearance to Sussex St. Vertical transportation (lifts, escalators & stairs). Click for more details...

PORT OF ESPERANCE ACCESS CORRIDOR
Civil Engineering (Tunnels, Subways) project In The Esperance Council Area of Access Corridor - Consultancy Svcs type. Consultancy svcs required for Specialist Technical Support to comprise of reviewing all aspects of design & report on compliance with the Scope of Works & Technical Criteria (SWTC) for the Esperance Port Access Corridor from approximately Mungan St to the Esperance Port being a distance of about 1.8km. Click for more details...

WYNYARD WALK
Wynyard Walk is currently at the Planning stage, valued at about $ 10000000 it is Construction of WYnyard Walk. The role of Technical Advisor providing technical support for the delivery of the Main Works contract for the Wynyard Walk project. This role involves - Design management; Procurement support; Construction compliance management; testing & commissioning support & operational readiness support Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Design, Environmental Impact & Demand Modeling Services New project In The Brisbane City Council Area. Consultancy for engineering design, environmental impact statement & transport demand modelling services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Civil Engineering (Tunnels, Subways) project at ., Brisbane, QLD 4000 of Consultancy For Financial/Commercial & Economic Advisory Services type of New development. Consultancy for commercial & financial economic advisory services for the underground bus & train project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
New project of Civil Engineering (Tunnels, Subways) project at ., Brisbane, QLD 4000. Consultancy for land use planning, urban design & property development services for the Brisbane Underground Bus & Train Project. Click for more details...

ARNCLIFFE PEDESTRIAN LINK
Pedestrian Tunnel New project In The Rockdale Council Area. Construction of a pedestrian tunnel under the T4 Eastern Suburbs & Illawarra railway line. The pedestrian tunnel would be constructed through the existing railway line embankment. It would be approximately 35m in length, 3.7m high & 4.3m wide. Connection of the new underpass to the existing footpath network, modification of kerb lines. Modification of landscaping on the eastern & western portals Click for more details...

FEEDER 90Y BEACONSFIELD BSP TO BELMORE PARK BSP
Civil Engineering (Tunnels, Subways) project for New development. Circuit design, manufacture, supply, installation & jointing of 132 kV XLPE cables & ancillary equipment. Scope of work generally involves: installation of a new 132 kV cable circuit between Beaconsfield Bulk Supply Point (BSP) & Belmore Park Zone Substation (ZS); the circuit will be known as Feeder 90Y. Included in the scope of work is the civil, mechanical & electrical design & construction work associated with these circuits, as well as all necessary site investigation along the circuit route to enable the design to be completed. The specified feeder route in the EIA from Belmore Park ZS to Beaconsfield BSP is approximately 5.5km in length & consists of 3 main cable sections. Section 1 - Belmore Park ZS to the shared section of the Metrogrid Tunnel - approximately 800m; this section utilises the City South Cable Tunnel, Haymarket BSP basement and the Metrogrid Tunnel; this section of cable has already been installed as part of a separate project. Section 2 - shared tunnel to Sydney Park tunnel shaft - approximately 3,450m; the second section runs from the shared section of the Metrogrid Tunnel to a proposed joint bay location, on land at the Sydney Park Tunnel shaft via the Metrogrid Cable Tunnel. Section 3 - Sydney Park Tunnel Shaft to Beaconsfield BSP - approximately 1200m; the third section consists of approximately 60m of new trench, one new joint bay & connection into approximately 1000m of spare conduits & joint bays installed as part of a recently constructed project, feeder 9S4 from Sydney Park Tunnel Shaft joint bay to Beaconsfield BSP. Connection to the BSP is via the Burrows Rd Cable Tunnel. Click for more details...

ASPHALT MAINTENANCE WORKS
Roadworks - Bituminous Surfacing New project In The Various Council Area. The Principal invites tenders for the provision of minor asphalt maintenance works on various roads across South Australia. Work will consist of the planing of defected, marked on road pavement of varying size patches & reinstating with asphalt (AC10) of varying depths. In some areas with high levels of heavy vehicle movement, AC10 modified asphalt shall be placed as directed by the Superintendent. The tender shall consist of both Defined & Provisional Works. Upon completion of work at each location, the Tenderer shall : a) sweep the area to remove any loose debris, & b) consult with the Superintendents Representative regarding aftercare signage requirements. Supply of Materials: All materials shall be supplied by the Tenderer. Click for more details...

CROSS RIVER RAIL - ENGINEERING DESIGN
A project in the QLD Within Brisbane City. Engineering Design & Impact Assessment for the Preliminary Evaluation phase of the Cross River Rail Project. The Preliminary Evaluation will include project option analysis & preliminary analysis to identify project options for further detailed analysis of a preferred solution during the Business Case phase. The scope of services required under this engagement will include engineering design, rail civil & systems, underground structures, design & delivery risk, client-side procurement phase support, impact assessment, environmental impact, architectural & urban design, pedestrian modeling & micro-simulation/intersection modeling. Click for more details...

RHYNDASTON RAIL TUNNEL
Currently at the Construction stage In Southern Midlands is a project estimated to be $ 845000. This project Construction of rehabilitation of air ventilation chimneys at the Rhyndaston Rail Tunnel in Southern Tasmania. Works to include controlled excavation & replacement of existing brick stack with concrete pipes. Click for more details...