List of Tunnels, Subways Projects in NSW


WEST KEIRA & WOLLONGONG CENTRE SHOPPING CENTRE
Shopping Centre - 6 Storey Addition project In The Wollongong Council Area. Demolition of the existing structures on the West Kiera site. Construction of a new 6 level retail centre on West Keira St comprising 80 speciality shops, Coles supermarket, fresh food precinct, 600 seat food court, outdoor eating area & more than 650 car spaces. The shopping centre will be interconnected by a tunnel & bridge under/over Keira St to the existing Wollongong Central shopping centre. Click for more details...

PENRITH MEGA BASE HOMEBASE
Civil Engineering (Tunnels, Subways) project at Mulgoa Rd cnr Wolesley St, Jamisontown, NSW 2750 for New. External roadworks, including construction of tunnel beneath Mulgoa Rd. Click for more details...

PARRAMATTA RAIL LINK
Currently at the Planning stage In Parramatta is a project estimated to be $ 100000000. This project Provision of contract management services for the Epping to Chatswood section of the project. This section will include tunnels from Epping to the North Shore Line corridor north of Chatswood station, rail systems including permanent way, signalling, traction electrical system & other rail services, 5 underground stations & associated minor works. Click for more details...

SPA 517 PHILLIP BAY
State ownership Civil Engineering (Tunnels, Subways) project In The Various Council Area for New development. Construction of 585 m long micro-tunnel, lining with 600 mm internal diameter pipe in sand & rock from SPS517 at Phillip Bay Maroubra to La Perouse - Yarra Bay sewer carrier including grouting & connection to sewer. Click for more details...

SOUTH COAST RAIL CORRIDOR
Civil Engineering (Tunnels, Subways) project for Addition development. Proposed upgrade of rail link from Wollongong to Sydney with a 14 kilometre bypass tunnel between Thirroul & Waterfall. Click for more details...

F6 CORRIDOR
A project in the NSW Within Various. F6 corridor to run from St Peters to Loftus via Tempe, Kyeemagh, Banksia, Rockdale, Brighton Le Sands, Kogarah, Monterey, Ramsgate, Sans Souci, Sandringham, Taren Point, Miranda, Gymea & Kirrawee. Click for more details...

EASTWOOD RAILWAY STATION
Eastwood Railway Station is currently at the Construction stage, valued at about $ 4000000 it is Upgrading of railway station including provision of easy access facilities, installation of lifts, toilets, improved security, widening of subway. Click for more details...

LEWISHAM TRUCK TUNNEL
Tunnel/Roadworks project at from M4 & Parramatta Rd to Princes Hwy, St Peters, NSW 2044 In The Council Area Of Marrickville of State. Proposed 2 lane 13 kilometre dual truck road including a tunnel under Sydenham Road Marrickville joining Parramatta Road & M4 at Lewisham with Princes Hwy at St Peters with exit & entry ramps at Parramatta Rd & Princes Hwy, two exhaust stacks. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Tunnels, Subways) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

LANE COVE TUNNEL
Tunnel/Road Link project at M2 to Gore Hill Freeway, Lane Cove, NSW 2066 in the Civil Engineering (Tunnels, Subways). 6 lane twin tunnel under Epping Rd to link The Gore Hill Freeway with proposed extended M2 North West Transport Corridor, new north-facing ramps from Falcon St. Click for more details...

AUSTRALIAN INLAND RAIL EXPRESSWAY
Civil Engineering (Tunnels, Subways) project In The Various Council Area of Freight Rail Expressway type. The Australian Inland Expressway is expected to be in three sections from Victoria through NSW and on to Brisbane. Dual standard gauge 4500 km railway line. Click for more details...

TRANSGRID/ENERGY AUSTRALIA CABLE
Sydney Park to Haymarket Substation, Sydney, NSW 2000 Has Transgrid/Energy Australia Cable currently at Construction stage. Construction of tunnel, 3.8 km x 3.4 m dia to carry 330 kv underground cable. Click for more details...

CROSS CITY TUNNEL
Civil Engineering (Tunnels, Subways) New project at Connecting Western & Eastern Distibutors, Sydney, NSW 2000. This type is Tunnels (2) with State ownership. Eastbound & Westbound tunnels to connect the Western Distributor with the Eastern Distributor & on to beyond the King Cross tunnel, 2 klms in length from Darling Harbour to past the Kings Cross Tunnel. One tunnel will travel under Bathurst St & the second tunnel will travel under Park St. Click for more details...

PARRAMATTA RAIL LINK
Civil Engineering (Tunnels, Subways) project In The Willoughby Council Area of Rail Link - Overall type. Proposed rail link Parramatta to Chatswood via Macquarie Shopping Centre and Macquarie University, 28 km link to carry 12 trains per hour on a dual line the bulk of which is to be underground. 9 new stations &/or new platforms at existing stations, including new underground stations at Delhi Road, Macquarie Park & Macquarie University, upgrade of existing stations at Chatswood & Epping. Extension of line from Parramatta to Westmead. Click for more details...

UPPER BLUE MOUNTAINS SEWERAGE SYSTEM
Sewerage System project at Various, Blackheath, NSW 2785 in the Civil Engineering (Tunnels, Subways). Sewerage system comprising upgrade & augmentation of Mount Victoria sewerage treatment plant, new treatment plant at Blackheath, new pumping station at Medlow Bath, rising main from Medlow Bath to the Blackheath gravity sewer connection. Extension of the Sewage Transfer Tunnel between Mount Victoria & Katoomba. Click for more details...

SNOWY MOUNTAINS HYDRO ELECTRIC AUTHORITY
Civil Engineering (Tunnels, Subways) project at ., Blue Mountains, NSW 2780 for New. Civil Engineering Consultants for Maintenance of Water Conveyance tunnels consists of: 1. Carry out detailed design work associated with the tunnel maintenance. 2. Review project & contract implementation strategies & contractual arrangements. 3. Prepare specifications & assist with preparation of Tender Documents for the required work scope. 4. Assist with Tender evaluations. 5. Provide experienced site officers to monitor contractor compliance & provide site supervision for the duration of the site works. Click for more details...

RYDE TOWN CENTRE - TOP RYDE CIVIC PRECINCT
Plaza/Walkways/Bridge project at Devlin St, Ryde, NSW 2112 In The Council Area Of Ryde of Local Govt. Proposed upgrade & additions to the Ryde town centre, work to include a plaza over Devlin Street linking the Civic Centre with the Top Ryde Shopping Centre, pedestrian links & footbridges, road tunnel, civic open space. Click for more details...

SYDNEY TO BRISBANE MAIN NORTH LINE
various locations on the main north line, Sydney, NSW 2000 Has Sydney To Brisbane Main North Line currently at Construction stage. Major upgrading of the main rail line from Sydney to Brisbane, earthworks, track upgrade, new & upgrade of rail bridges, upgrade of signal system. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Tunnels, Subways). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

PACIFIC HIGHWAY UPGRADE - TINTENBAR TO EWINGSDALE
Civil Engineering (Tunnels, Subways) New project at Pacific Hwy from Tintenbar to, Ewingsdale, NSW 2481. This type is Roadworks with State ownership. Proposed upgrade of approximately 17 km, starting at Ross Lane in Tintenbar & extending north to the existing Ewingsdale interchange, near the settlement of Ewingsdale. At Ross Lane, the proposed upgrade would connect to the north end of the proposed Ballina bypass. The proposed upgrade includes: Four-lane divided carriageways (2 lanes each way), with a wide median allowing for the future addition of a third lane in each direction. Connection to the northern end of the Ballina bypass at the proposed Ross Lane interchange. A new northbound on-ramp & a new southbound off-ramp would be provided. The remainder of this interchange will be constructed as part of the Ballina bypass project. Upgrading of the existing Ewingsdale interchange to provide full access between the modified local and regional road network & the highway. A half interchange at Ivy Lane. North-facing ramps would provide access between the local road network and the proposed upgraded highway to the north. A half interchange at Bangalow. South-facing ramps would provide access between the local road network, including to Bangalow and Lismore & the proposed upgrade to the south. This arrangement would replicate the arrangement with the existing Bangalow bypass which also has south-facing ramps only. Six twin bridges & 4 underpasses allowing roads and creeks to pass underneath the proposed upgrade. These would include twin bridges above Byron Creek and the existing Casino-Murwillumbah railway on the north side of Byron Creek. Two bridges carrying local roads over the proposed upgrade, one for Broken Head Road and one about 500 m north of Lawlers Lane providing access to several properties east of the upgrade. Protection screens would be provided on both bridges. The existing highway would be retained as a continuous road for local and regional traffic. Twin parallel tunnels under St Helena ridge (one tunnel for each carriageway). The tunnels would each be about 340 m long & about 45 m below St Helena Road. Click for more details...

CITY WEST CABLE TUNNEL
City West Cable Tunnel is currently at the Construction stage, valued at about $ 50000000 it is The proposal involves the construction of an electricity transmission cable tunnel to link the Haymarket bulk supply point in Thomas St, Ultimo, to the new City North substation at the corner of Sussex & Erskine Sts, Sydney; construction of an interface with City Central substation; installation of 5 x electricity transmission feeders to transmit electricity to the City North substation; construction of a permanent tunnel adit (entrance) and ventilation intake at the eastern end of Mary Anne St. The ventilation exhaust works would be integrated with the City North substation building. The proposed delivery model for the tunnel project will essentially be a construct only contract, with the exception of the TBM lining which will be design & construct. All other works are designed to a 100% design stage by EnergyAustrala. Click for more details...

BOTANY BAY CABLE PROJECT
Cable Project New project In The Sutherland Council Area. Construction and Operation of a dual 132kV cable from the Bunnerong Substation to the Kurnell Substation using a combination of trenching, horizontal directional drilling and submarine techniques which comprises the following: Bunnerong to La Perouse: The installation of approximately 3.15km of trenched cable which follows Military Road, Bunnerong Road and Anzac Parade towards La Perouse. National Park at La Perouse: Horizontal directional drilling within the bedrock under the National Park, so as not to disturb the area and emerge in the seabed of Botany Bay. Crossing of Botany Bay: Construction of a submarine cable approximately 2.6km long buried to a depth of between 1.5-3 metres. Silver Beach to Kurnell: Construction of approximately 1.5km of trenched cable emerging at Silver Beach situated outside (but next to) Botany Bay National Park at Kurnell, along Prince Charles Parade, Silver Beach Road and Captain Cook Drive to Kurnell STS. Upgrade of existing and construction of new buildings/infrastructure at both Bunnerong and Kurnell substations. Click for more details...

NORTH WEST RAIL LINK
Consultancy For Geotechnical Investigation New project In The The Hills Shire Council Area. This tender is for the preliminary geotechnical & contamination site investigation for the North West Rail Link route from Epping Station to the proposed stabling facilty at Rouse Hill. Click for more details...

NORTH WEST RAIL LINK
A project in the NSW Within The Hills Shire. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

SYDNEY CITYGRID PROJECT STAGES 2D & 2E
Civil Engineering (Tunnels, Subways) project In The Sydney Council Area of Tunnel type. Stage 2D - Construction of City East Cable Tunnel between Riley St STSS & City North Zone substation with connections to the proposed City East & existing Dalley Street Zone substations, & a potential services control room adjacent to the Riley St STSS. Stage 2E - Extension of the City South Cable tunnel from Wade Pl to Riley St, Surry Hills. Click for more details...

SOUTH WEST RAIL LINK
Consultancy For Professional Services Contractors project at from Leppington to, Glenfield, NSW 2167 In The Council Area Of Campbelltown of State. The SWRL involves the design, construction, commissioning & operations of the following key components: Grade-separated flyovers over the Main South Lines to north & south of Glenfield Station & reconfiguration of Glenfield Station. These works are collectively referred to as Glenfield Junction.; A new 13km twin track railway from Glenfield to Rossmore; 2 new railway stations & associated facilities at Edmondson Park & Leppington; A train stabling facility at Rossmore to the west of the new Leppington Station & new carpark at Glenfield. Click for more details...

M5 CORRIDOR EXPANSION - M5 SOUTH WEST MOTORWAY WIDENING
Civil Engineering (Tunnels, Subways) project at M5, ., NSW 2999 for New. Proposal to widen around 20 kilometres of the M5 South West Motorway between King Georges Rd, Beverley Hills & Camden Valley Way, Casula. The project would include: Additional lanes on the M5 South West Motorway for the majority of its length, the additional lanes would be provided by pavement widening, asphalt overlays and new line marking. An operations management control system on and in the vicinity of the M5 South West Motorway, to include a new control building at Hammondville and variable message signs on the motorway and surrounding arterial roads. Bridge widening, by placing new infill decking in the central median between existing bridges over Queen St & Nuwarra Rd. Noise attenuation measures at various locations along the M5 South West Motorway between King Georges Rd & Camden Valley Way. The project also includes associated or ancillary works, activities, uses, structures or facilities for the purposes of the project, including (but not limited to) any of the following: Construction & associated construction site compounds. Drainage works and drainage modifications. Landscaping. Environmental management and pollution control. The project does not include preliminary works associated with the desig Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - NORTH STRATHFIELD
Rail Tracks/Tunnel/Stations project at ., North Strathfield, NSW 2137 In The Council Area Of Canada Bay of State. Overall project comprises: Construction of the North Strathfield rail underpass. Scope of work includes: new track to connect to the existing relief goods loop at North Strathfield. 2.4 km of new track & upgrade of 850m of existing track. A shallow driven tunnel (under operational tracks). Construction of a new aerial concourse, platform works, stairs, lifts, offices & amenities at Concord West Railway Station. Relocation of an existing RailCorp depot at North Strathfield Station. Associated civil & structural works. Provision of new rail systems, including overhead wire, high voltage, low voltage, communications & signalling. Utility relocations/protection Click for more details...

LIFEHOUSE AT RPA - CHRIS O'BRIEN CANCER CENTRE
Private ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Relocation of part of the existing sub ground tunnel & associated services. Excavation, perimeter shoring and erection of retaining walls and construction hoardings. The bulk excavation will facilitate the future construction of 3 basement levels. Click for more details...

SYDNEY OPERA HOUSE - VEHICLE ACCESS & PEDESTRIAN SAFETY
Civil Engineering (Tunnels, Subways) project at Lots 4 & 5 Bennelong Point (DP77588 & DP87933), Circular Quay, NSW 2000 of Vehicle Access & Pedestrian Safety type of New development. Vehicle Access & Pedestrian safety project. Construction of an underground tunnel will be built from the bottom of Macquarie St to a new underground loading dock. Remediation of the existing forecourt & road. Other works to improve public safety, security & vehicle access, address occupational health & safety risks & operational & maintenance efficiencies Click for more details...

SYDNEY OPERA HOUSE VEHICLE AND PEDESTRIAN SAFETY PROJECT
Civil Engineering (Tunnels, Subways) project In The Sydney Council Area of State ownership. Construction of an underground loading dock to be located below the Sydney Opera House building & forecourt. Alterations to existing lifts & stairs & construction of new lift services & underground corridors to link the new underground loading dock with the performance areas and back-of-house facilities of the Sydney Opera House. Construction of a new opening on the southern side of the forecourt to create a new vehicle access ramp providing service vehicle access from the existing Macquarie St roundabout down to the new underground loading dock. Removal of recessed vehicle access path flanked by kerbs across the Forecourt, & replacement with a surface level with surrounding paving in same material as existing. Removal of existing guardhouse & construction of new smaller guardhouse. Improvements to forecourt lighting. Removal of existing planter boxes on the southern side of the forecourt. Reconfiguration of the grille to the existing carpark air intake shaft against the Tarpeian wall. Modifications to roof of pedestrian tunnel to existing adjoining carpark where it opens onto the lower concourse level. Relocation of various below ground site services. Relocation of existing at grade forecourt loading facilities to the new underground loading dock facility. Click for more details...

HEATHCOTE ENGADINE & PEPPERMINT GROVE TUNNELS
Currently at the Construction stage In Sutherland is a project estimated to be $ 915000. This project Rehabilitation of the Heathcote Engadine & Peppermint Grove tunnels. Scope of Work ? common to both sites - includes but is not necessarily limited to: Site establishment; reinstatement of access tracks if required to provide safe vehicle access; provision of all confined spaces measures including access, ventilation and odour control (if necessary) to facilitate the internal rehabilitation; removal of any silt, fretted rock & debris generated from internal surface preparation and cleaning as well as any existing silt within the area of work; coordination with Sydney Water, any other relevant authorities & the adjoining property owners to arrange access & manage pedestrian movements necessary to implement the rehabilitation & site restoration. Scope of Work ? Heathcote-Engadine Carrier which includes but is not necessarily limited to: Erection of scaffold over Scouts Creek to minimise potential impacts on the creek and to provide safe access for personnel & equipment from the site establishment area to the manhole; coordination with Sydney Water in regard to flow management strategies and wet weather requirements; set-up of a flow management regime to /or internal bypass to deal with incoming flows from the rising main of SP0275 & SP0589; removal of root ingress 9 m downstream of manhole; internal patch repairs of areas with severe deterioration of the 19m of unreinforced concrete lining of the sewer starting from and including the upstream manhole, this includes cleaning & surface preparation of internal concrete & brick surfaces, reinstatement in areas of degradation as required in readiness for application of protective coating system; removal & replacement of cast iron 2 part watertight access covers and cast in frame & removal & replacement of all step irons in upstream manhole. Scope of Work ? Peppermint Grove Carrier which includes but is not necessarily limited to: localised patch repairs with mesh & shotcrete over seam for a total of approximately 18m at CH149-CH161 & CH590-CH596; repairs with mesh & shotcrete to the walls only for approximately 102m at CH172-CH274; localised patch repairs with mesh & shotcrete to roof only for approximately 3m at CH492-CH495; full perimeter repairs with mesh & shotcrete for approximately 63m at CH527-CH590 & possible construction of a temporary 300mm service shaft in Cutler Rd to assist with completion of the shotcrete work. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of State ownership. This tender is develop cost plans, estimates for project options & pricing schedules for the North West Rail Link. The project will provide 23km of new rail infrastructure from Epping to Rouse Hill Click for more details...

PRINCE OF WALES HOSPITAL - COMPREHENSIVE CANCER CARE AND BLOOD DISORDER CENTRE
Civil Engineering (Tunnels, Subways) project at 61 High St, Randwick, NSW 2031 for New. Stage 1 Development of a Comprehensive Cancer Care and Blood Disorder Centre comprising demolition of an existing at grade carpark; bulk excavation works; construction of a staff access tunnel to connect the new treatment area to the existing Building 3 (Radiotherapy Department) lift and hospital; an open fire stair at the north east corner of the site; and underground treatment area at underground level 1 containing 4 radiotherapy bunkers. The Stage 1 works will be constructed in the north-east quadrant of the POWH site, on an existing carpark and forecourt area to the east of Building 3, between the Superintendent?s Cottage and the Edmund Blacket Building. Once the above works are completed and commissioned, the existing facility can be decommissioned and demolished to allow the commencement of the Stage 2 works which will complete the construction of the new 9 level CCCBDC. Click for more details...

WYNYARD WALK
State ownership Civil Engineering (Tunnels, Subways) project In The Sydney Council Area for New development. Provide direct, level safe accessible pedestrian route between Barangaroo & Wynyard precinct transport hub which is integrated with the existing road & footpath networks. A new multi-storey building (above & below ground) forming the western entrance to Wynyard Station (from Clarence St) to provide direct access to the station concourse. A new 3.5 metre high & 9 metres wide (internal dimensions) pedestrian tunnel, approximately 110 metres long, providing a grade separated link from the western entrance structure to Wynyard Station Concourse under Clarence, Margaret & Kent Sts to Napoleon Node (bounded by Sussex St, Westpac Plaza, Kent & Napoleon St). Structural works to facilitate transfer of building loads around the envelope of the proposed tunnel which may involve the use of prefabricated steel beams, supporting columns & temporary jacking frames. A paved public pedestrian plaza at the Napoleon Node. which will connect the Wynyard Walk tunnel & bridge components. A pedestrian bridge link over Sussex St providing a grade separated connection between Sussex St & Napoleon Node. The bridge will provide a 6 metre width & 5.5 metre vertical clearance to Sussex St. Vertical transportation (lifts, escalators & stairs). Click for more details...

NORTH WEST RAIL LINK - TUNNEL & STATION CIVIL WORKS
Civil Engineering (Tunnels, Subways) project In The The Hills Shire Council Area of Tunnel/Civil Works type. The Tunnel & Station Civil Works Package comprises twin running tunnels each of approximately 6 metres internal diameter & each approximately 15.5 km in length between the Epping Station stub tunnels & Bella Vista station. The running tunnels being constructed predominantly by tunnel boring machine (TBM) plus lengths of tunnel constructed by roadheader. Cross passages between the running tunnels. Mined caverns, niches and openings for rail crossovers & equipment. Excavations for the Cherrybrook, Castle Hill, Hills Centre, Norwest & Bella Vista stations. Permanent concrete lining in all tunnels, caverns, cross passages & underground openings which must allow for all future fixings for track bed & rail services. Safe, secure personnel access/egress into all underground spaces including all necessary temporary support services & site facilities & removal of all temporary work & site facilities not otherwise required for handover to subsequent contractors Click for more details...

WYNYARD WALK
Wynyard Walk is currently at the Planning stage, valued at about $ 10000000 it is Construction of WYnyard Walk. The role of Technical Advisor providing technical support for the delivery of the Main Works contract for the Wynyard Walk project. This role involves - Design management; Procurement support; Construction compliance management; testing & commissioning support & operational readiness support Click for more details...

MALDON TO DOMBARTON RAIL LINK
Maldon To Dombarton Rail Link is currently at the Planning stage, valued at about $ 255000 it is Professional Services Contractor to estimate the costs of constructing the line. This will involve estimating the cost of constructing items already fully designed, items for which only scoping level estimates will be available, as well as updating the estimates as the design is developed. Professional Services Contractors are therefore being sought to provide cost estimating services for the duration of the TfNSW works. Click for more details...

MALDON TO DOMBARTON RAIL LINK- CONSULTANCY
Civil Engineering (Tunnels, Subways) project at Dombarton to, Maldon, NSW 2571 for New. Professional Services Contractor to provide surveying services for property definition and further engineering design. The required services include: property boundary survey, preparation of deposited plans, aerial, topographic detail survey, underground utility service locating & establishment of a project survey control network Click for more details...

ARNCLIFFE PEDESTRIAN LINK
Pedestrian Tunnel New project In The Rockdale Council Area. Construction of a pedestrian tunnel under the T4 Eastern Suburbs & Illawarra railway line. The pedestrian tunnel would be constructed through the existing railway line embankment. It would be approximately 35m in length, 3.7m high & 4.3m wide. Connection of the new underpass to the existing footpath network, modification of kerb lines. Modification of landscaping on the eastern & western portals Click for more details...

FEEDER 90Y BEACONSFIELD BSP TO BELMORE PARK BSP
Civil Engineering (Tunnels, Subways) project for New development. Circuit design, manufacture, supply, installation & jointing of 132 kV XLPE cables & ancillary equipment. Scope of work generally involves: installation of a new 132 kV cable circuit between Beaconsfield Bulk Supply Point (BSP) & Belmore Park Zone Substation (ZS); the circuit will be known as Feeder 90Y. Included in the scope of work is the civil, mechanical & electrical design & construction work associated with these circuits, as well as all necessary site investigation along the circuit route to enable the design to be completed. The specified feeder route in the EIA from Belmore Park ZS to Beaconsfield BSP is approximately 5.5km in length & consists of 3 main cable sections. Section 1 - Belmore Park ZS to the shared section of the Metrogrid Tunnel - approximately 800m; this section utilises the City South Cable Tunnel, Haymarket BSP basement and the Metrogrid Tunnel; this section of cable has already been installed as part of a separate project. Section 2 - shared tunnel to Sydney Park tunnel shaft - approximately 3,450m; the second section runs from the shared section of the Metrogrid Tunnel to a proposed joint bay location, on land at the Sydney Park Tunnel shaft via the Metrogrid Cable Tunnel. Section 3 - Sydney Park Tunnel Shaft to Beaconsfield BSP - approximately 1200m; the third section consists of approximately 60m of new trench, one new joint bay & connection into approximately 1000m of spare conduits & joint bays installed as part of a recently constructed project, feeder 9S4 from Sydney Park Tunnel Shaft joint bay to Beaconsfield BSP. Connection to the BSP is via the Burrows Rd Cable Tunnel. Click for more details...

LAMBS VALLEY RD CULVERT
Lambs Valley Rd Culvert is currently at the Construction stage, valued at about $ 200000 it is Rectification of an existing culvert, mainly comprising of embankment and approach refurbishment works. Repair and refurbishment of the existing embankment with large heavy duty rock protection along the downstream face of the existing embankment. Large rock stabilisation of the downstream embankment, rip rap protection of the upstream face around the barrier poles, repair existing road surface to match existing and reinstatement of the guardrail and line marking. Click for more details...