State

Categories

Sub Categories

Click Here to Find Current Projects

List of Tunnels, Subways Projects in WA


NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Civil Engineering (Tunnels, Subways) project at Btwn Perth (Narrows Bridge) & Mandurah, ., WA 6999 for Addition. Package A works (70 km railworks) include earthworks & structures that will form part of South West Metropolitan Railway between Perth (Narrows Bridge) & Mandurah. Works to include civil works, drainage, trackworks, overhead traction wiring system & bulk earthworks to stations at Thomsons Lake, Thomas Rd, Leda, Rockingham, Waikiki & Mandurah. Contract includes delivery of double rail line & traction power, signalling & communications systems, earthworks, drainage, fencing & design & construction of 15 road, rail & pedestrian bridges & underpasses between Glen Iris & Mandurah. As part of project, RailLink will establish temporary construction depot in Rockingham (where rail will be welded into long lengths ahead of track & sleeper laying), construction of railcar storage & internal cleaning depot at Mandurah & electrical substations at Jandakot & Karnup to convert 132 Kv supply to 25 Kv power required to operate trains. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
Civil Engineering (Tunnels, Subways) project at Btwn Northern Suburbs Railway & Narrows Bridge, Perth, WA 6000 of Road Infrastructure - Consultancy Services For Package F type of New development. Tenders were invited from suitably qualified & experienced consultants for provision of road infrastructure specialist technical support services during implementation of New MetroRail City Project under Contract 27/03. Primary function of specialist technical advisers will be to independently review & advise on aspects of road infrastructure designs for Contract 27/03 on an as & when required basis (Contract 27/03 is Package F works). Click for more details...

PORT OF ESPERANCE ACCESS CORRIDOR
Access Corridor - Design & Construction Addition project In The Esperance Council Area. It is proposed to upgrade freight access corridor to Port of Esperance comprising of: realignment of Harbour Rd with a bridge over the railway line to the southern side of the track, also realignment of the railway lines to the northern side of Harbour Rd, improvements to the pedestrian & cycle access across the freight transport corridor, replacement of 2 level crossings at Watson St & The Esplanade with bridges from Twilight Beach Rd to The Esplanade & Harbour Rd to Johns St, preparatory works for the future upgrading of Harbour Rd to 4 lanes & a dualing of the railway lines. Noise walls will be built & the final road surface sealed with asphalt to reduce traffic noise. Click for more details...

CENTRAL PERTH RAILWAY LAND REDEVELOPMENT
New project of Civil Engineering (Tunnels, Subways) project at Railway line btwn Horseshoe Bridge & Mitchell Fwy, btwn Perth &, Northbridge, WA 6003. Works comprise preliminary design & costing to +/-10% accuracy of lowering of railway tracks between Mitchell Fwy & Perth Central Station. Design is to be based on Option 2 contained in report entitled "Railway Lowering Concepts - Mitchell Freeway to Perth Central Station" by Kellogg Brown & Root Pty Ltd, dated 17 February 2003. Click for more details...

MITCHELL FREEWAY EXTENSION (HODGES DRIVE - BURNS BEACH ROAD)
Civil Engineering (Tunnels, Subways) project for Addition development. Mitchell Freeway extension project, Stage 2, involves extension of Freeway for approximately 4.5 km in length, with bridge interchanges at Hodges Dr, Shenton Av & Burns Beach Rd & pedestrian overpass to Winton Rd, bridge over Freeway at Moore Dr & tunnel built south of Moore Dr to assist in relocation of existing passenger railway line (on western side of Freeway) into Freeway median. Also includes construction of principal shared path along eastern side of Freeway to Moore Dr & continuing northwards via proposed road bridge on western side. Click for more details...

ROE HIGHWAY
Civil Engineering (Tunnels, Subways) project In The Various Council Area of Roadworks - Stage 6 - Design & Construction type. Stage 6 to be built as 4.5 km lane dual carriageway controlled access highway constructed to freeway standards & to run from Nicholson Rd to South St. To be constructed initially as four lanes, with provision for expansion to allow for third lane in both directions - this will be constructed at later stage. Project will include construction of interchange at Willeri Dr & connections to South St. Bridge will be constructed over Willeri Dr, with on/off ramp connections to Roe Hwy, principal shared path along north side linking into local networks & pedestrian underpass will be constructed under Willeri Dr. Project also includes significant traffic improvements on Willeri Dr/Collins Rd & Willeri Dr/Bannister Rd intersections. Click for more details...

GERALDTON SOUTHERN TRANSPORT CORRIDOR
State ownership Civil Engineering (Tunnels, Subways) project In The City Of Greater Geraldton Council Area for New development. Stage 1 works to comprise construction of new single railway line from Narngulu Industrial Area to Geraldton Port, approximately 4.9 km of highway from North West Coastal Hwy into Port precinct, four road bridges & two rail tunnels. Contract also incorporates modifications within Port precinct that will accommodate concurrent unloading of long grain trains & ore trains. Click for more details...

NEW METRORAIL PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 432000. This project Provision of expert technical advice to City Project team during design review phase. Click for more details...

PERTH PUBLIC TRANSPORT HUB PROJECT - NORTHSIDE RAIL LINK
Civil Engineering (Tunnels, Subways) project at Fremantle Rail lines above existing Joondalup line & Wellington St Bus Station, Northbridge, WA 6003 for New. The development will begin with closure & demolition of the William St footbridge. It is anticipated that in January 2012 the project will commence with sinking the Fremantle rail line from Perth station to Lake St. Undergrounding of the Wellington St Bus Station will likely commence in June 2014. The development will also include the construction of a new 'island' train platform & may also comprise creating important connection points between the city centre & Northbridge. Click for more details...

MOUNT LAWLEY SUBWAY
Subway - Scaffolding, Preparation & Painting Renovations, Refurbishments etc. project In The Vincent Council Area. Works comprise provision of scaffolding, preparation & painting of Mount Lawley Subway. Click for more details...

NEW METRORAIL PROJECT - TUNNELS, UNDERGROUND STATIONS & CIVIL WORKS
New Metrorail Project - Tunnels, Underground Stations & Civil Works is currently at the Construction stage, valued at about $ 333728000 it is Development of 1.6 km Perth City Rail Tunnel to link direct rail line to Mandurah at Narrows Bridge with northern suburbs rail line. Works to include 600 m of cut & cover & 700 m of twin bored tunnel structures, underground stations at The Esplanade & William St, drainage service relocations, roadworks, pedestrian/cycle links, railway track & overheads, landscaping & associated urban improvement works. Esplanade Station to be located below intersection of Mounts Bay Rd, Esplanade & William St & will include two levels (platform & concourse), walk on & cycle access, integration with Bus Port & CCTV coverage. William St Station will be constructed below commercial city block bound by Murray St Mall, William St & Wellington St. Heritage facades along William St will be retained. New underground platforms will connect with existing Perth Central Station platforms via concourse beneath Horseshoe Bridge. Access to be via escalators, stairs & lifts. Station to comprise two levels (platform & concourse), walk on & cycle access, integration with Wellington St Bus Station & CCTV coverage. Services at both stations are to commence late 2006. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

TONKIN HIGHWAY
Tonkin Highway is currently at the Construction stage, valued at about $ 105000000 it is Construction of four-lane dual carriageway extension of Tonkin Hwy from Mills Rd West (Martin) to Thomas Rd (Byford) at freeway standards. Approximately 32 km in length. Project to include shared path along eastern side of Tonkin Hwy from Albany Hwy in Gosnells to South Western Hwy, Mundijong, & underpasses & overpasses at Corfield Street extension, Armadale Rd & Bishop Rd. Crossing facility will also be provided in vicinity of Manning Av in Martin, however it has not yet been determined whether this will be an underpass or overpass. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Railway - Package A - Design & Construction Managerial Services project at Btwn Perth (Narrows Bridge) & Mandurah, ., WA 6999 In The Council Area Of Various of State. Provision of design & construction managerial services for design & construction of Package A (70 km railworks). Click for more details...

FREMANTLE PRISON
Tunnels - Access Works project at East Workshops, Fothergill St, Fremantle, WA 6160 in the Civil Engineering (Tunnels, Subways). Works comprise conservation of existing masonry wall to pump house, including removal of brick infill panels from walls, paint removal, repointing of walls & rebuilding quoining, replacement of failed joinery, fabrication & installation of system of access ramps & ladders to access tunnels complex & such other work as shown on the drawings or included in specification. Contract length: 10 weeks. Click for more details...

FREMANTLE PRISON
Civil Engineering (Tunnels, Subways) project at Tunnels complex below East Workshops, Fothergill St, Fremantle, WA 6160 for Renovations, Refurbishments etc.. Works comprise excavation of shaft S2, light scaling of tunnels, excavation of limestone plinth, treatment of walls & ceiling of tunnels, disbursal of silt & such other work as shown on drawings or included in specification. Date of Practical Completion: Prior to 30 November 2004. Click for more details...

DROUGHT RELIEF STRATEGY - PERTH SEAWATER DESALINATION INTEGRATION
Major Thrust Borings For Pipelines (2) project at Beneath four locations at Kwinana to Alcoa Railway, Rockingham Rd, Midland to Kwinana Railway & Kwinana Fwy, ., WA 6999 in the Civil Engineering (Tunnels, Subways). Tenders are planned to be invited for thrust boring works required for Perth Seawater Desalination Project. Perth Desalination Integration Project includes several new pipelines. Two pipelines related to Contract RI-05-11972 are DN1200 from Perth Seawater Desalination Plant (adjacent to Kwinana Power Station) to Thomsons Reservoir & DN1400 from Thomsons Reservoir to proposed new Nicholson Rd Pump Station. This pre-qualification covers four major thrust borings required on sections of these two pipelines & are DN1200 under Kwinana to Alcoa Railway, DN1200 under Rockingham Rd, DN1200 under Midland to Kwinana Railway & DN1400 under Kwinana Fwy. Click for more details...

KARRAKATTA TRAFFIC UNDERPASS (ADERDARE ROAD UNDERPASS)
Currently at the Construction stage In Nedlands is a project estimated to be $ 6300000. This project Works to comprise of design & construction of road underpass under rail & PSP bridge at Stubbs Terrace site (south of Aberdare Rd & Karrakatta Subway) & all connections. PTA's Rail Maintenance contractor will remove railway & relay railway in dedicated shutdown period to facilitate underpass construction below rail. Click for more details...

PUBLIC TRANSPORT AUTHORITY - BOULDER SUBWAY
Civil Engineering (Tunnels, Subways) project at East end of Burt St, Boulder, WA 6432 of Subway - Refurbishment type of New development. Works comprise refurbishment to Boulder Subway. Click for more details...

OCEAN OUTLET/OUTFALL - ALKIMOS WASTEWATER TREATMENT SCHEME
New project of Civil Engineering (Tunnels, Subways) project at Connected to Alkimos WWTP, extends 1 km onshore & 3.7 km offshore into Indian Ocean, Alkimos, WA 6033. Works comprise: Construction of 3.7 km ocean outfall with diameter of 1,200 mm & diffuser; construction of temporary pipe fabrication area & launch site; construction of temporary site access track; construction of connection pip to Alkimos Wastewater Treatment Plant (WWTP) approx 1,027 m in length with internal diameter of 2,000 mm to be constructed by tunnelling. Click for more details...

PATERSON ROAD - CULVERT
Local Govt ownership Civil Engineering (Tunnels, Subways) project In The Murray Council Area for New development. Installation of culvert & associated works on Paterson Rd. Culvert to replace existing bridge structure. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5A(2) EXPANSION
Civil Engineering (Tunnels, Subways) project for New development. Construction of additionals loops that will lay alongside the existing pipeline. Click for more details...

CONCERT HALL PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Perth Council Area of Pedestrian Underpass - Removal type. Works to comprise removal of northern end of Concert Hall pedestrian underpass. Click for more details...

EELUP ROUNDABOUT - FLYOVER & UNDERPASS
Civil Engineering (Tunnels, Subways) project In The Bunbury Council Area of State ownership. Stage 1 includes the construction of a slip lane. The overall proposal includes removal of existing roundabout & construction of flyover from Robertson Dr to Koombana Dr that would then allow traffic from Australind Bypass to travel straight through onto Sandridge Rd. Click for more details...

STIRLING HIGHWAY NEAR FORREST STREET UNDERPASS OR OVERPASS
Underpass/Overpass New project In The Fremantle Council Area. Proposed construction of overpass or underpass details not determined. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - STAGE 5B EXPANSION
Natural Gas Pipeline - Expansion project at From Dampier to, Bunbury, WA 6230 In The Council Area Of Bunbury of Private. Stage 5B is likely to involve a further 440km of looping, which, when completed, would result in the Dampier to Bunbury Natural Gas Pipeline system being more than 75% duplicated. Click for more details...

RAINE SQUARE UNDERPASS
Underpass project at Btwn Raine Sq & William St, Perth, WA 6000 In The Council Area Of Perth of Private. To include the construction of a pedestrian tunnel connecting the lower level of the Raine Square & the concourse level of the Perth (William St) railway station. Works expected to be done in 3 stages. Stage 1 works (July - August 2009), approx 6.5 weeks comprising of Step 1. The eastern two thirds of William St to be closed to enable installation of sheet piles on all four sides of the site area as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 2. Soil within stage 1 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & then the stage 1 roof slab & horizontal piers to the outer wall of the railway station will be constructed. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 2 works (August - September 2009), approx 4.5 weeks. Step 3. comprising of western third of William St to be closed to enable installation of sheet piles on all three sides of the site area, as temporary retaining walls. Bored piers will also be constructed & these will form supports for the roof slab. Step 4. Soil within stage 2 piling will be excavated to the depth of the underside of the roof slab, approx 2 metres. Temporary propping of the sheet piling will be installed & sheet pile wall will be removed about roof level. Waterproofing membranes will be installed & soil backfilled over the roof slab, this portion of the road will be reinstated to the City´s specifications. Stage 3 works (February - March 2010) 7 weeks. Step 5. Comprising of soil to be excavated from underneath the roof slab, & a ground floor slab & footings for the walls will be constructed. Step 6. Comprising permanent retaining walls will be constructed on the inside of the sheet piling. Step 7. Comprising of temporary sheet piles will be removed to connect the tunnel with the railway station concourse & Raine Square basement, remaining soil will be excavated & retaining walls built back to the existing structures. Step 8. Comprising floor slab will be constructed between the retaining walls & existing structures. Existing D-wall will be demolished & a new lintel beam constructed for support. Close up access hole in tunnel roof slab. Click for more details...

KWINANA BULK TERMINAL - CONVEYOR ECO3
Civil Engineering (Tunnels, Subways) project at Lot 120 Kwinana Beach Rd, Kwinana Beach, WA 6167 of Conveyor - Design & Reconstruction type of New development. Works to comprise design & reconstruction of a conveyor system & tunnel that were previously damaged by fire at Kwinana Bulk Terminal load out facility. Click for more details...

RAINE SQUARE REDEVELOPMENT
Pedestrian Tunnel project at 300 Murray St, from Raine Sq to new railway station concourse, Perth, WA 6000 in the Civil Engineering (Tunnels, Subways). Works to comprise construction of a pedestrian tunnel from Raine Sq to new railway station concourse with retail areas. Click for more details...

ST GEORGE'S CATHEDRAL HERITAGE PRECINCT - OLD TREASURY BUILDINGS REDEVELOPMENT
Office Tower - 35 Storey project at 54-58 Barrack St, bnd by St George's Tce & Catheral Av, Perth, WA 6001 in the Civil Engineering (Tunnels, Subways). St George's Cathedral Heritage Precinct project to comprise of the construction of a new multi-storey office tower which will accommodate a long term lease from State Government departments. This project will be connected by an undergound vehicle tunnel running under Cathedral Lane to the basements levels of the new office building. The car park will continue to be accessed from Pier St & also from a new ramp descending to the car park from Cathedral Av. Click for more details...

THE LINK (PERTH CITY RAIL LINK PROJECT)
Currently at the Planning stage In Perth is a project estimated to be $ 2500000. This project Tenders are being invited for a surveying consultant with experience working within an operating electrified environment, to undertake a survey for future development to the PTA rail reserve from the eastern face of the Lord Street overpass to the City West Station platform, including area of track from existing Joondalup tunnel through to the Roe Street tunnel. The survey is to collate information on the track, components, overhead wiring, signalling, cable pits, bridges, station building & extent of the platforms. The work must be undertaken by a Licensed Surveyor accredited under the Licensed Surveyors Act 1909 & must hold a practicing certificate. Click for more details...

SCOTCH COLLEGE - MIDDLE SCHOOL REDEVELOPMENT & PEDESTRIAN UNDERPASS
Civil Engineering (Tunnels, Subways) project for Addition development. Redevelopment of the Middle School includes the demolition of 5 existing buildings including 3 classrooms, administration & canteen facility & the construction of a 2 storey Middle School building to comprise learning areas, administration & staff facilities. The development includes the construction of a new library with gallery, a new art building with a canteen below, partial demolition & redevelopment of the existing library to allow for new multi-purpose learning areas, pipes room & sports store. Construction of landscaped recreation area will also be included, as well as the construction of a pedestrian underpass located beneath the existing at-grade pedestrian crossing on Shenton Rd. The existing 17 bay car park is proposed to be reduced to accommodate 11 car parking bays. The development also includes the removal of power poles & installation of underground services. Plans have been modified to include a lift and elevator shaft to provide access to the underpass for disabled and wheelchair users. Click for more details...

PORT OF ESPERANCE ACCESS CORRIDOR
Civil Engineering (Tunnels, Subways) project In The Esperance Council Area of Access Corridor - Consultancy Svcs type. Consultancy svcs required for Specialist Technical Support to comprise of reviewing all aspects of design & report on compliance with the Scope of Works & Technical Criteria (SWTC) for the Esperance Port Access Corridor from approximately Mungan St to the Esperance Port being a distance of about 1.8km. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Airport Rail/Tunnel Link - Consultancy Svcs New project In The Various Council Area. Tunnelling Engineers to provide Tunnel Logistics Advisor Consultancy Svcs for the Forrestfield - Perth Airport Rail/Tunnel Link project during the development, procurement & delivery phases of the project. Sufficient construction experience is required by the Advisor with cut & cover & bored tunnels in the ground & groundwater conditions of the Perth Coastal Plain. Under direction of the Project Director or delegated authority, advice & activities will be conducted under this contract. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Airport Rail/Tunnel Link - Structural Manager Consultancy Svcs project at Along Midland Line, Bayswater Station, Tonkin Hwy, Airport West Station to Forrestfield Rail Yards, High Wycombe area, ., WA 6999 In The Council Area Of Various of State. Structural engineer sought to fulfil the role of PTA Major Projects Unit - Structural Manager for the Forrestfield - Airport Link project during the development, procurement & delivery phases of the project. The Structural Manager is required to have significant planning, design & documentation experience with cut & cover bored tunnels structures in the ground & groundwater conditions. Under direction of the Major Projects Executive Director or delegated authority, advice & activities will be conducted under this contract. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 500000. This project Transaction Advisory Consultancy svcs sought to assist with the Forrestfield - Perth Link project's transaction phase & potentially for the provision of continued svcs during the project's delivery phase. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Civil Engineering (Tunnels, Subways) project In The Various Council Area of State ownership. Consultancy Services sought for a Station & Buildings Manager for the Forrestfield-Airport Link (FAL) project who will be responsible for managing the overall design development, delivery & commissioning into service of the 3 stations proposed being: Airport West Station, Consolidated Airport Station & Forrestfield Station. Consultancy svcs will also include a similar service for the design, delivery & commissioning of any ad-hoc buildings required on the project such as the tunnel evacuation shaft enclosures. This position is to be filled by an individual possessing relevant professional & technical background in project management, architecture and/or building construction & will be required to provide all of the following svcs: during the construction stage of the project, PTA may exercise an option to procure other personnel through this contract to provide superintendent's representative svcs to support the FAL stations delivery team. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Civil Engineering (Tunnels, Subways) project at Along Midland Line, Bayswater Station, Tonkin Hwy, Airport West Station, to Forrestfield Rail, ., WA 6999 for New. Stations Reference Design & Technical Specification consultancy svcs for the Forrestfield - Airport Rail/Tunnel Link project. The consultant is to be suitably skilled & experienced in Architectural, Structural & Building Svcs to continue with the conceptual work done so far & develop further to a reference Design for the 3 stations & above ground building infrastructure being the tunnel portals & emergency egress shafts, to a sufficient level. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Forrestfield - Perth Airport Rail/Tunnel Link Project is currently at the Early Planning stage, valued at about $ 733000 it is Commissioning Advisory Consultancy svcs to be provided during the development, procurement & delivery stages of the Forrestfield - Airport Link (FAL) project & is required to have significant experience in commissioning of major public transport system infrastructure in an operation electrified railway environment, to assist engineering discipline managers by providing them with detailed commissioning input into the SWTC & reference designs, highlighting design & specification improvements that will enhance the infrastructure commissioning, integration & handover to PTA. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Construction stage In Various is a project estimated to be $ 236000. This project Tunnel Boring Machine Advisor consultancy services sought for the development, procurement & delivery stages of the Forrestfield - Airport Link (FAL) project who is required to have strong experience with design, manufacture, operation & maintenance of Slurry, Earth Pressure Balance (EPB) & Dual mode tunnel boring machines (TBMs), with extensive experience in local & international bore tunnelling projects, mainly in soft ground conditions such as the ground & groundwater conditions similar to Perth Coastal Plain. Click for more details...

PERTH CITY LINK TUNNEL SCREED REPAIR WORKS
Perth City Link Tunnel Screed Repair Works is currently at the Construction stage, valued at about $ 50000 it is Works to include rectification works for the tunnels concrete protection screen associated with tunnels 5/6 of the Perth City Link Rail Alliance contract. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect