List of Underground - including longwall Projects in NT


STRANGWAYS PROJECT - DIAMOND RESOURCE
Mining (Underground - including longwall) project for New development. Two short 60 metre HQ diamond drillholes are in progress to obtain samples for determination of mica flake size. Core from the first 31 metres is estimated to contain over 60 per cent vermiculite. Click for more details...

KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

ARUNTA PROJECT
Mining (Underground - including longwall) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

AUQUEST PROJECT- STEVES HILL - GOLD RESOURCE
Resource - Gold project at 15 km west of Toms Gully 100 km SSE of, Darwin, NT 0800 in the Mining (Underground - including longwall). A 12 hole 1200m RC drilling program is to be conducted at the Steve Hill deposit. Steves Hill is located 15 km from the Toms Gully CIP processing plant. Potential open cut. Click for more details...

TIMBER CREEK PROJECT
Timber Creek Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 10000000 it is In 2004 kimberlite had been put through an on-site rented Dense Media Separation plant and the heavy mineral concentrate produced shipped to the Company's diamond recovery facility in South Africa for final diamond recovery. Rehabilitation of the areas where previous bulk sampling had been undertaken is planned. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining (Underground - including longwall) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

ATLEE CREEK PROJECT
New project of Mining (Underground - including longwall) project at Approximately 580 km west of, Alice Springs, NT 0870. A Rab drilling programme has commenced at the Atlee project 200 km south-east of the Granites Mine. Click for more details...

BROWNS EMBAYMENT PROJECT - BROWNS/AREA 55/BROWNS EAST
Resource - Copper/Cobalt/Nickel project at 65 km south of, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The joint venture covers portions of the highly mineralised Embayment Structure that hosts Browns and Bro-wns East and the Area 55 copper cobalt deposit. It excludes the currently defined polymetallic resources at Browns to a vertical depth of 350 metres and at Browns East to a depth of 300 metres as well as the defined Area 55 deposit. The recent gravity survey recorded encouraging result. Additional surveying is required to help refine deep drill targets. Click for more details...

BROWNS OXIDE PROJECT - NICKEL/COBALT/COPPER/LEAD RESOURCE
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - Nickel/Cobalt/Copper/Lead Resource currently at Construction stage. The ore is to be mined, crushed, ground and slurried on site. Ore will be processed in a onsite process plant and tailing will be stored in a onsite tailings dam. The in-ground oxide resource estimate for the Batchelor region projects has an estimated value at over 1 billion dollars. Measured resource is 18 million tonnes, indicated is 27 million tonnes and inferred is 37 million tonnes. Metals in the ground are lead at 1,865,000 tonnes, copper 622,000 tonnes, cobalt at 98,000 tonnes and nickel at 90,000 tonnes. There are also significant exploration prospects at Mount Fitch and Mount Burton. Click for more details...

THE GRANITES GOLD OPERATIONS - BUNKERS HILL/TWIN HILLS
The Granites Gold Operations - Bunkers Hill/Twin Hills is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is Results from the December 2000 quarter drilling to test lithologies between Bunkers Hill and Twin Hills were disappointing, with best 60 at 0.5g/t. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...

BURNSIDE GOLD OPERATIONS - BROCKS CREEK UNDERGROUND MINE - RESOURCE
Currently at the Construction stage In Katherine Town is a project estimated to be $ 25000000. This project Resource estimate is a measured and indicated resource of 264,000 tonnes @ 17.6 g/t for 149,600 ounces of Au. Inferred resources are 138,200 tonnes @ 5.1 g/t for 22,800 ounces of Au. The previous developer had begun decline development. Click for more details...

EDNA BERYL GOLD PROJECT
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Includes sinking a shaft up to 150 m and associated drivage. Also includes moving 7,000 to 10,000 tonnes of ore. Click for more details...

TANAMI GOLD OPERATIONS - LEGS
Approximately 650 km northwest of, Alice Springs, NT 0870 Has Tanami Gold Operations - Legs currently at Early Planning stage. Drilling immediately south of the Legs Pit during February and March yielded pleasing results. On the basis of this programme, a southern extension of the current pit is presently being designed. Mineralisation at Legs remains open to the south. A resource has also been identified below the abandoned Battery and Bastille pits close to the treatment plant. Click for more details...

PINE CREEK GEOSYNCLINE/ MT TYMN
Resource - Gold New project In The Katherine Town Council Area. A recent comprehensive drilling programme demonstrated that the resource previously outlined was less continuous than the earlier drilling had indicated & cannot be readily traced from drill section to drill section. A new geological resource of 1.1 million tonnes @ 1.4 gpt has been calculated for the Central Hill area & the South Hill area has shown a calculated resource of 150 000 tonnes @ 2.0 gpt. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

RUSTLERS ROOST GOLD MINE
Addition project of Mining (Underground - including longwall) project at 100 km southeast of, Alice Springs, NT 0870. Likely to include widening and deepening of the existing pit. Click for more details...

TENNANT CREEK JOINT VENTURE - QUEEN OF SHEBA
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Interpretation & modelling of recently acquired detailed helicopter magnetic data has identified a high priority target at the Queen of Sheba Prospect. Previous work at this location although returning encouraging results failed to intersect economic mineralisation. With the aid of the new data & downhole magnetic probe surveys, a large magnetic body has been modelled at depth with two near surface extensions neither of which have been intersected by previous drilling. Click for more details...

PETERMANN RANGE BASE METALS PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Macdonnell Shire is a project estimated to be $ 5000000. This project Follow-up sampling could not replicate the results of first pass samplina nd further investigation is required. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS - MRM EXPANSION PROJECT
Mining (Underground - including longwall) project for New development. Looking at options from a feasability study. Click for more details...

CHARIOT GOLD PROJECT
Mining (Underground - including longwall) project at 9 km west of, Tennant Creek, NT 0860 for New. Underground mine plan includes establishment of a decline portal towards the base of the Chariot open pit. decline to be developed to a depth of 300 metres below the surface with the first ore development level at 120 metres below the surface. Flat back cut and fill stoping. production rates 10,000 to 12,000 tonnes per month. Click for more details...

HARTS RANGE PROJECT-MOUNT RIDDOCH/KONGO/COPPER KING/COPPER QUEEN
Harts Range Project-Mount Riddoch/Kongo/Copper King/Copper Queen is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is A helicopter supported stream sediment sampling programme was completed in mid April as follow-up to the anomalous results returned from the 2002 reconnaissance programme. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Underground - including longwall) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Underground - including longwall) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Underground - including longwall) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

VICTORIA RIVER JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Underground - including longwall) project In The Victoria Daly Shire Council Area of Resource - Uranium type. The eight tenements all contain radiometric anomalies and are variously prospective for a range of uranium mineralisations styles, including primary and secondary. Click for more details...

MOUNT TODD MINE
Consultancy For Materials Source Assessment project at ., Darwin, NT 0800 In The Council Area Of Darwin City of State. Consultancy for Materials Source Assessment Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining (Underground - including longwall) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...